CN109079361A - Stainless steel pipes exempt from argon gas welding procedure - Google Patents

Stainless steel pipes exempt from argon gas welding procedure Download PDF

Info

Publication number
CN109079361A
CN109079361A CN201811057288.0A CN201811057288A CN109079361A CN 109079361 A CN109079361 A CN 109079361A CN 201811057288 A CN201811057288 A CN 201811057288A CN 109079361 A CN109079361 A CN 109079361A
Authority
CN
China
Prior art keywords
welding
welded
stainless steel
steel pipes
pipes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811057288.0A
Other languages
Chinese (zh)
Inventor
高波
王宁
于志远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering Sixth Construction Co Ltd
Original Assignee
China National Chemical Engineering Sixth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering Sixth Construction Co Ltd filed Critical China National Chemical Engineering Sixth Construction Co Ltd
Priority to CN201811057288.0A priority Critical patent/CN109079361A/en
Publication of CN109079361A publication Critical patent/CN109079361A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • B23K31/027Making tubes with soldering or welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups

Abstract

The invention discloses a kind of stainless steel pipes to exempt from argon gas welding procedure, polishing A, is respectively cut in two sections of stainless steel pipes both ends to be welded and connected, until both ends are fitted to each other;B, the interface to be welded of pipeline, then hot-air seasoning are successively cleaned repeatedly with degreasing liquor, alkyl carboxylic acid sodium solution;C, it is welded using auxiliary welding equipment;E, the auxiliary welding equipment is removed in end to be welded;F, manual inspection, which whether there is, does not weld position, and if it exists, position is not then welded in air shooter alignment, sets supplying nitrogen to non-welding position, welding gun is recycled to carry out repair welding.Welding procedure of the invention does not use expensive argon gas, and construction cost is low;And welding process in ultrasonic environment by the way of welding, and adjust supersonic frequency, the ultrasonic wave of various frequencies can be made full use of, which to adjust the ion flow that quickening weld part split-phase is melted between part, reduces its welding stress to effectively improve the uniformity of welding.

Description

Stainless steel pipes exempt from argon gas welding procedure
Technical field
The present invention relates to welding procedure fields.It is more particularly related to which a kind of stainless steel pipes exempt from argon gas welding Technique.
Background technique
For special medias such as petroleum gases, pipeline transportation is a kind of the most economic, simple means of transportation, and pipeline Connection relies primarily on welding to complete, in pipeline welding process, usually in pipeline back side argon-filled protection, but argon gas price ten Divide valuableness, a large amount of argon fillings are very unfavorable to engineering cost.
Summary of the invention
The present invention provides a kind of stainless steel pipes and exempts from argon gas welding procedure, employs nitrogen as to protect gas, engineering cost is big Amplitude reduction.
In order to achieve the goal above, the present invention, which provides a kind of stainless steel pipes, exempts from argon gas welding procedure, comprising the following steps:
A, polishing is respectively cut in two sections of stainless steel pipes both ends to be welded and connected, until both ends are fitted to each other;
B, prepare obtain mass fraction 8% degreasing agent solution and mass fraction 6% alkyl carboxylic acid sodium solution, respectively according to The secondary interface to be welded for cleaning pipeline repeatedly with degreasing liquor, alkyl carboxylic acid sodium solution, then hot-air seasoning;
C, two sections of stainless steel pipes are respectively placed on two stations, station is stretched out at end to be welded respectively and exposed Come, and two segment pipes are spliced to both ends Relative vertical to be welded;Auxiliary welding equipment is set in two segment pipes to be welded two The outside at end, wherein the auxiliary welding equipment includes:
Straight line casing 1, one end are opened wide completely, and the other end opens up the limited mouth 124 that stainless steel pipes are set for card, the limit A circle attaches sealing rubber ring on the inside of the mouth of position, so that realizing sealing after stainless steel pipes are inserted in;
L-type casing, both ends are arranged substantially perpendicular to each other, and one end completes to open wide, and the other end, which is opened up, sets stainless steel tube for blocking The limited mouth in road, one circle of limited mouth inside attaches sealing rubber ring, so that realizing sealing after stainless steel pipes are inserted in;
And the completely open both ends spiral connection of straight line casing, L-type casing, the two is linked into an integrated entity, it is to be welded to accommodate The two sections of pipelines to be welded connect;
The straight line casing 1, L-type casing 2 include outer tube body 121, in interval installation inner split ring 122, it is described in every Ring 122 will be divided into interior space, the external space inside outer tube body 121,121 surface of outer tube body opens up the air inlet for nitrogen circulation Mouthful, interval opens up multiple ventholes, and the attached one layer of high temperature resistant sponge of medial surface face paste of inner split ring 122 on the inner split ring 122 123, so that nitrogen sequentially enters the external space of outer tube body 121, the venthole on inner split ring 122 and high temperature resistant sea through air inlet Silk floss 123 finally reaches the interior space of outer tube body 121, to provide protective gas for welding;
D, the corner of the L-type casing opens up soldering opening, for welding gun entrance;
And the corner of L-type casing is transparent, and corresponding inside has no high temperature resistant sponge herein, checks to facilitate operation person; Weld the place to be welded of two sections of stainless steel pipes using welding gun;
E, the auxiliary welding equipment is removed in end to be welded;
F, manual inspection, which whether there is, does not weld position, and if it exists, position is not then welded in air shooter alignment, to non-welding position Supplying nitrogen is set, welding gun is recycled to carry out repair welding.
Preferably, the stainless steel pipes exempt from argon gas welding procedure, are welded as secondary welding in step D, and Welding process carries out in ultrasonic environment twice, specifically:
Two ultrasonic generators are placed near two pipeline position to be welded;
Primary welding: the frequency of preceding 1/2 Control Welding Process, two ultrasonic generators is respectively 25KHz and 38KHz, Two ultrasonic generators are kept to work at the same time;1/2 Control Welding Process keep frequency is constant afterwards, but controls two ultrasonic waves Generator works alternatively, every task 1min;
Secondary welding: the frequency of preceding 1/2 Control Welding Process, two ultrasonic generators is respectively 30KHz and 40KHz, Two ultrasonic generators are kept to work at the same time;1/2 Control Welding Process keep frequency is constant afterwards, but controls two ultrasonic waves Generator works alternatively, every task 1min.
Preferably, the stainless steel pipes exempt from argon gas welding procedure, the air shooter by multiple sub-pipes that This is arranged to be formed, sub-pipes structure in a circular table shape, two neighboring sub-pipes, and two sides that the two is bonded each other are recessed respectively inwards It falls into, protrude outward to form limiting slot and positive stop strip that multiple cards that are fitted to each other are set, set by card between the two, to realize Card between two neighboring sub-pipes sets fixation;
And gas-guide tube is installed in the front end for being located at the smallest size of sub-pipes in front end.
Preferably, the stainless steel pipes exempt from argon gas welding procedure, the step A, wait for two sections of stainless steel pipes Polishing is respectively cut in the both ends of welded connecting, until both ends are fitted to each other, specifically: using cutting machine by the end of one of pipeline Mouth is cut to form protrusion, and the port of another pipeline is cut to form groove, then is polished with sand paper, so that two segment pipes It is realized and is cooperatively connected using the clamping of protrusion and groove.
Preferably, the stainless steel pipes exempt from argon gas welding procedure, and the station surface is equipped with for fixing The fixture of pipeline.
Preferably, the stainless steel pipes exempt from argon gas welding procedure, the flat adhesive of the fixture and tube contacts Rubber antiskid pad.
Preferably, the stainless steel pipes exempt from argon gas welding procedure, and L-type is formed after two sections of steel-pipe weldings.
The present invention is include at least the following beneficial effects:
1, welding procedure of the invention does not use expensive argon gas, and construction cost is low;
2, step B of the invention recycles degreaser to remove remaining grease first with the grease of degreasing agent removal pipeline, And the utilization remaining degreaser of sodium carboxylate solution removal previous step, secondary cleaning, cleaning effect are good;
3, using auxiliary welding equipment of the invention, it can be convenient the vertical welding for efficiently realizing two root canal roads, and In auxiliary welding equipment, high speed protection gas nitrogen is buffered using high temperature sponge, and disperses, avoids protective gas local The excessive Stress non-homogeneity problem caused by welding of flow velocity;
4, after welding terminates, manual inspection, which whether there is, does not weld position, and if it exists, then carries out repair welding, not only ensure that Welding quality, and using air shooter can accurately to do not weld part carry out accurate repair welding, avoid protection unsaturated vapor, or Person excessively causes to waste;
5, welding process in ultrasonic environment by the way of welding, and adjusts supersonic frequency, can make full use of each The ultrasonic wave of kind frequency adjusts quickening weld part split-phase and melts the ion flow between part, to effectively improve the uniform of welding Property, reduce its welding stress.
Further advantage, target and feature of the invention will be partially reflected by the following instructions, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of welding auxiliary equipment of the invention;
Fig. 2 is the cross-sectional view of straight line casing of the invention;
Fig. 3 is the structural schematic diagram of gas transport pipeline of the present invention.
Specific embodiment
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art referring to specification text Word can be implemented accordingly.
It should be noted that experimental method described in following embodiments is unless otherwise specified conventional method, institute Reagent and material are stated, unless otherwise specified, is commercially obtained;In the description of the present invention, term " transverse direction ", " vertical To ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", the instructions such as "outside" side Position or positional relationship are to be based on the orientation or positional relationship shown in the drawings, and are merely for convenience of description of the present invention and simplification of the description, It is not that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, because This is not considered as limiting the invention.
As shown in Figure 1, the present invention, which provides a kind of stainless steel pipes, exempts from argon gas welding procedure, comprising the following steps:
A, polishing is respectively cut in two sections of stainless steel pipes both ends to be welded and connected, until both ends are fitted to each other;
B, prepare obtain mass fraction 8% degreasing agent solution and mass fraction 6% alkyl carboxylic acid sodium solution, respectively according to The secondary interface to be welded for cleaning pipeline repeatedly with degreasing liquor, alkyl carboxylic acid sodium solution, then hot-air seasoning;It is gone first with degreasing agent Except the grease of pipeline, degreaser is recycled to remove remaining grease, and is remained using sodium carboxylate solution removal previous step Degreaser, secondary cleaning, cleaning effect is good;
C, two sections of stainless steel pipes are respectively placed on two stations, station is stretched out at end to be welded respectively and exposed Come, and two segment pipes are spliced to both ends Relative vertical to be welded;Auxiliary welding equipment is set in two segment pipes to be welded two The outside at end,
D, the corner of the L-type casing opens up soldering opening, for welding gun entrance;
E, the auxiliary welding equipment is removed in end to be welded;
F, manual inspection, which whether there is, does not weld position, and if it exists, position is not then welded in air shooter alignment, to non-welding position Supplying nitrogen is set, welding gun is recycled to carry out repair welding.
Wherein, as shown in Figure 1, the auxiliary welding equipment includes: straight line casing 1, one end is opened wide completely, and the other end is opened If a circle attaches sealing rubber ring on the inside of the limited mouth, so that stainless steel pipes for blocking the limited mouth for setting stainless steel pipes After being inserted in, sealing is realized;L-type casing 2, both ends are arranged substantially perpendicular to each other, and one end completes to open wide, and the other end is opened up for card If the limited mouth of stainless steel pipes, a circle attaches sealing rubber ring on the inside of the limited mouth, so that after stainless steel pipes are inserted in, Realize sealing;And the completely open both ends spiral connection of straight line casing 1, L-type casing 2, the two is linked into an integrated entity, to accommodate Two sections of pipelines to be welded to be welded;As shown in Fig. 2, the straight line casing 1, L-type casing 2 include outer tube body, interior interval Inner split ring is installed, outer tube internal body portion is divided into interior space, the external space by the inner split ring, and the outer tube body surface is opened up for nitrogen The air inlet of circulation, interval opens up multiple ventholes, and the attached one layer of high temperature resistant of medial surface face paste of inner split ring on the inner split ring Sponge, so that nitrogen sequentially enters the external space of outer tube body, the venthole on inner split ring and high temperature resistant sponge through air inlet, most The interior space of outer tube body is reached, afterwards to provide protective gas for welding;And the corner of L-type casing is transparent, and herein correspond in Portion has no high temperature resistant sponge, checks to facilitate operation person;Carry out the place to be welded of two sections of stainless steel pipes using welding gun Welding;Using auxiliary welding equipment of the invention, the vertical welding for efficiently realizing two root canal roads can be convenient, and assist weldering It connects in equipment, high speed protection gas nitrogen is buffered using high temperature sponge, and disperses, avoids protective gas local velocity mistake The Stress non-homogeneity problem caused by welding greatly;
In another embodiment, the stainless steel pipes exempt from argon gas welding procedure, are welded as secondary weldering in step D It connects, and welding process carries out in ultrasonic environment twice, specifically: two ultrasonic generators are placed in two pipes Near road position to be welded;Primary welding: the frequency of preceding 1/2 Control Welding Process, two ultrasonic generators is respectively 25KHz And 38KHz, keep two ultrasonic generators to work at the same time;1/2 Control Welding Process keep frequency is constant afterwards, but controls Two ultrasonic generators work alternatively, every task 1min;Secondary welding: two ultrasonic waves of preceding 1/2 Control Welding Process produce The frequency of raw device is respectively 30KHz and 40KHz, and two ultrasonic generators is kept to work at the same time;1/2 Control Welding Process afterwards Keep frequency is constant, but controls two ultrasonic generators and work alternatively, every task 1min.Welding process uses ultrasonic wave The mode welded in environment, and supersonic frequency is adjusted, the ultrasonic wave of various frequencies can be made full use of to adjust and accelerate weld part Split-phase melts the ion flow between part, to effectively improve the uniformity of welding, reduces its welding stress.
In another embodiment, the stainless steel pipes exempt from argon gas welding procedure, as shown in figure 3, the gas is defeated It send pipe to be arranged each other by multiple sub-pipes 3 to be formed, the structure in a circular table shape of sub-pipes 3, two neighboring sub-pipes, the two is bonded each other Two sides be recessed respectively inwards, protrude outward to form limiting slot and positive stop strip that multiple cards that are fitted to each other are set, pass through two Card between person is set, to realize that the card between two neighboring sub-pipes sets fixation;And it is located at the smallest size of sub- pipe in front end The front end in road is installed by gas-guide tube.Using air shooter can accurately to do not weld part carry out accurate repair welding, avoid protection gas Deficiency, or excessively cause to waste;
In another embodiment, the stainless steel pipes exempt from argon gas welding procedure, the step A, stainless by two sections Polishing is respectively cut in steel conduit both ends to be welded and connected, until both ends are fitted to each other, specifically: using cutting machine by one of them The port of pipeline is cut to form protrusion, and the port of another pipeline is cut to form groove, then is polished with sand paper, so that Two segment pipes are realized using the clamping of protrusion and groove and are cooperatively connected.Make to be welded to connect more closely in this way, it is not easy to occur Fracture.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and legend shown and described herein.

Claims (7)

1. a kind of stainless steel pipes exempt from argon gas welding procedure, which comprises the following steps:
A, polishing is respectively cut in two sections of stainless steel pipes both ends to be welded and connected, until both ends are fitted to each other;
B, the alkyl carboxylic acid sodium solution for preparing the degreasing agent solution and mass fraction 6% that obtain mass fraction 8%, is successively used respectively Degreasing liquor, alkyl carboxylic acid sodium solution clean the interface to be welded of pipeline, then hot-air seasoning repeatedly;
C, two sections of stainless steel pipes are respectively placed on two stations, station is stretched out at end to be welded respectively and exposed, And two segment pipes are spliced to both ends Relative vertical to be welded;Auxiliary welding equipment is set in two segment pipes both ends to be welded It is external, wherein the auxiliary welding equipment includes:
Straight line casing, one end are opened wide completely, and the other end opens up the limited mouth that stainless steel pipes are set for card, on the inside of the limited mouth One circle attaches sealing rubber ring, so that realizing sealing after stainless steel pipes are inserted in;
L-type casing, both ends are arranged substantially perpendicular to each other, and one end completes to open wide, and the other end, which is opened up, sets stainless steel pipes for card Limited mouth, one circle of limited mouth inside attaches sealing rubber ring, so that realizing sealing after stainless steel pipes are inserted in;
And the completely open both ends spiral connection of straight line casing, L-type casing, the two is linked into an integrated entity, it is to be welded to accommodate Two sections of pipelines to be welded;
The straight line casing, L-type casing include outer tube body, and interior interval installation inner split ring, the inner split ring will be in outer tube body Part is divided into interior space, the external space, and the outer tube body surface opens up the air inlet for nitrogen circulation, is spaced apart on the inner split ring If multiple ventholes, and the attached one layer of high temperature resistant sponge of medial surface face paste of inner split ring, so that nitrogen sequentially enters outside through air inlet The external space, the venthole on inner split ring and the high temperature resistant sponge of tube body finally reach the interior space of outer tube body, to mention for welding For protective gas;
D, the corner of the L-type casing opens up soldering opening, for welding gun entrance;
And the corner of L-type casing is transparent, and corresponding inside has no high temperature resistant sponge herein, checks to facilitate operation person;It utilizes Welding gun weld to the place to be welded of two sections of stainless steel pipes;
E, the auxiliary welding equipment is removed in end to be welded;
F, manual inspection, which whether there is, does not weld position, and if it exists, position is not then welded in air shooter alignment, is set to non-welding position defeated Nitrogen is sent, welding gun is recycled to carry out repair welding.
2. stainless steel pipes as described in claim 1 exempt from argon gas welding procedure, which is characterized in that be welded as two in step D Secondary welding, and welding process carries out in ultrasonic environment twice, specifically:
Two ultrasonic generators are placed near two pipeline position to be welded;
Primary welding: the frequency of preceding 1/2 Control Welding Process, two ultrasonic generators is respectively 25KHz and 38KHz, is kept Two ultrasonic generators work at the same time;1/2 Control Welding Process keep frequency is constant afterwards, but controls two ultrasonic waves and generate Device works alternatively, every task 1min;
Secondary welding: the frequency of preceding 1/2 Control Welding Process, two ultrasonic generators is respectively 30KHz and 40KHz, is kept Two ultrasonic generators work at the same time;1/2 Control Welding Process keep frequency is constant afterwards, but controls two ultrasonic waves and generate Device works alternatively, every task 1min.
3. stainless steel pipes as described in claim 1 exempt from argon gas welding procedure, which is characterized in that the air shooter is by more A sub-pipes are arranged to be formed each other, sub-pipes structure in a circular table shape, two neighboring sub-pipes, two sides that the two is bonded each other It is recessed respectively inwards, protrudes outward to form limiting slot and positive stop strip that multiple cards that are fitted to each other are set, passes through card between the two If to realize that the card between two neighboring sub-pipes sets fixation;
And gas-guide tube is installed in the front end for being located at the smallest size of sub-pipes in front end.
4. stainless steel pipes as described in claim 1 exempt from argon gas welding procedure, which is characterized in that the step A, by two sections not Polishing is respectively cut in rust steel conduit both ends to be welded and connected, until both ends are fitted to each other, specifically: utilize cutting machine will wherein one The port of a pipeline is cut to form protrusion, and the port of another pipeline is cut to form groove, then is polished with sand paper, to make It obtains two segment pipes and realizes mating connection using the clamping of protrusion and groove.
5. stainless steel pipes as described in claim 1 exempt from argon gas welding procedure, which is characterized in that the station surface installation There is the fixture for fixed -piping.
6. stainless steel pipes as claimed in claim 5 exempt from argon gas welding procedure, which is characterized in that the fixture and tube contacts Flat adhesive rubber antiskid pad.
7. stainless steel pipes as described in claim 1 exempt from argon gas welding procedure, which is characterized in that shape after two sections of steel-pipe weldings L-shaped.
CN201811057288.0A 2018-09-11 2018-09-11 Stainless steel pipes exempt from argon gas welding procedure Pending CN109079361A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811057288.0A CN109079361A (en) 2018-09-11 2018-09-11 Stainless steel pipes exempt from argon gas welding procedure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811057288.0A CN109079361A (en) 2018-09-11 2018-09-11 Stainless steel pipes exempt from argon gas welding procedure

Publications (1)

Publication Number Publication Date
CN109079361A true CN109079361A (en) 2018-12-25

Family

ID=64841198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811057288.0A Pending CN109079361A (en) 2018-09-11 2018-09-11 Stainless steel pipes exempt from argon gas welding procedure

Country Status (1)

Country Link
CN (1) CN109079361A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110170803A (en) * 2019-06-14 2019-08-27 泰州市长征冷机管件有限公司 A kind of welding procedure for interior exhaust coil pack
CN111097998A (en) * 2019-12-23 2020-05-05 保定安保能冶金设备有限公司 Rectangular steel pipe connecting method for aluminum alloy smelting furnace

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4810703B1 (en) * 1969-05-13 1973-04-06
US3735472A (en) * 1971-03-26 1973-05-29 I Silverman Pipe fitting weld alignment apparatus
JPS52126646A (en) * 1976-04-16 1977-10-24 Mitsubishi Electric Corp Tig welding for tubes
JPS57127590A (en) * 1981-01-30 1982-08-07 Mitsubishi Heavy Ind Ltd Method for connecting end part of pipe of steel pipe technique by curling
DE3127200A1 (en) * 1981-07-07 1983-02-03 Mannesmann AG, 4000 Düsseldorf Process for the circumferential seam welding of pipes as well as device for carrying out the process
JPH09168876A (en) * 1995-10-20 1997-06-30 Harness Sogo Gijutsu Kenkyusho:Kk Supersonic wave welding equipment
JP2753734B2 (en) * 1989-06-28 1998-05-20 昭和アルミニウム株式会社 How to connect tubing in a refrigeration cycle
CN104308382A (en) * 2014-09-19 2015-01-28 合肥通用机械研究院 Connection method and connection structure of austenitic stainless steel pressure pipeline
WO2015110347A1 (en) * 2014-01-24 2015-07-30 Herrmann Ultraschalltechnik Gmbh & Co. Kg Converter unit
CN104874902A (en) * 2015-05-15 2015-09-02 哈尔滨飞机工业集团有限责任公司 Method for welding fork-shaped aluminum pipe fitting
CN204658934U (en) * 2015-05-24 2015-09-23 河北聚华保温防腐工程有限公司 A kind of heat-shrinkable T bush soldering and sealing device
CN107096987A (en) * 2017-03-22 2017-08-29 华南理工大学 A kind of quick diffusion welding method of metal bar based on pulsed current annealing

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4810703B1 (en) * 1969-05-13 1973-04-06
US3735472A (en) * 1971-03-26 1973-05-29 I Silverman Pipe fitting weld alignment apparatus
JPS52126646A (en) * 1976-04-16 1977-10-24 Mitsubishi Electric Corp Tig welding for tubes
JPS57127590A (en) * 1981-01-30 1982-08-07 Mitsubishi Heavy Ind Ltd Method for connecting end part of pipe of steel pipe technique by curling
DE3127200A1 (en) * 1981-07-07 1983-02-03 Mannesmann AG, 4000 Düsseldorf Process for the circumferential seam welding of pipes as well as device for carrying out the process
JP2753734B2 (en) * 1989-06-28 1998-05-20 昭和アルミニウム株式会社 How to connect tubing in a refrigeration cycle
JPH09168876A (en) * 1995-10-20 1997-06-30 Harness Sogo Gijutsu Kenkyusho:Kk Supersonic wave welding equipment
WO2015110347A1 (en) * 2014-01-24 2015-07-30 Herrmann Ultraschalltechnik Gmbh & Co. Kg Converter unit
CN104308382A (en) * 2014-09-19 2015-01-28 合肥通用机械研究院 Connection method and connection structure of austenitic stainless steel pressure pipeline
CN104874902A (en) * 2015-05-15 2015-09-02 哈尔滨飞机工业集团有限责任公司 Method for welding fork-shaped aluminum pipe fitting
CN204658934U (en) * 2015-05-24 2015-09-23 河北聚华保温防腐工程有限公司 A kind of heat-shrinkable T bush soldering and sealing device
CN107096987A (en) * 2017-03-22 2017-08-29 华南理工大学 A kind of quick diffusion welding method of metal bar based on pulsed current annealing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110170803A (en) * 2019-06-14 2019-08-27 泰州市长征冷机管件有限公司 A kind of welding procedure for interior exhaust coil pack
CN111097998A (en) * 2019-12-23 2020-05-05 保定安保能冶金设备有限公司 Rectangular steel pipe connecting method for aluminum alloy smelting furnace

Similar Documents

Publication Publication Date Title
CN109079361A (en) Stainless steel pipes exempt from argon gas welding procedure
GB2053474B (en) System for inspecting welded joints in pipe lines by means of ultrasonic waves
CN105750743A (en) Laser welding device and method based on laser cleaning pretreatment
CN207608663U (en) A kind of single crystal growing furnace water-cooled jacket
CN104832746B (en) Flange form heavy caliber PE is pipe pressurized to repair structure and its restorative procedure
CN106402572A (en) Method for carrying out rush repair on steel-skeleton polyethylene plastic composite pipe with water and under pressure
CN205342165U (en) Anti -corrosion overlay of tube sheet large tracts of land and have its tube sheet
CN210623841U (en) Novel natural gas pipeline
CN211331892U (en) Welding back gas protection device
CN206924003U (en) A kind of built at lower part of drinking machine connection component and its water dispenser
CN109530884A (en) One kind stays gap to wave welding method for stainless steel tube
CN208772059U (en) A kind of cleaning equipment of oil-gas pipeline erosion resistant coating
CN104227251A (en) Pipeline skylight forming welding method
CN211729276U (en) Pipe cutting equipment
CN212041750U (en) Ultrasonic cleaning equipment with gas as heat source
CN106181094A (en) A kind of welding procedure of high pressure pipe material
CN213507074U (en) Clear glass pipeline annealing protection device
CN206913696U (en) Edge banding apparatus for plastic honeycomb core plate
CN2132060Y (en) Leakage-stopping unit for pipeline with water or steam running in it
CN208297126U (en) A kind of supersonic nozzle for plane cascade test device
CN201064785Y (en) Liquid crystal screen cleaning equipment
CN205938308U (en) Quick joint for pipe
CN220498004U (en) Liquid separation head surface scaling powder cleaning device
CN207076713U (en) Cleaning equipment after LCD edging angle laps
CN218544869U (en) Cavitation heating device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181225