CN109064015A - Display methods, device and the computer readable storage medium of item nodes - Google Patents
Display methods, device and the computer readable storage medium of item nodes Download PDFInfo
- Publication number
- CN109064015A CN109064015A CN201810852536.4A CN201810852536A CN109064015A CN 109064015 A CN109064015 A CN 109064015A CN 201810852536 A CN201810852536 A CN 201810852536A CN 109064015 A CN109064015 A CN 109064015A
- Authority
- CN
- China
- Prior art keywords
- node
- grade
- item nodes
- display
- user
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 47
- 238000010276 construction Methods 0.000 claims description 10
- 238000012544 monitoring process Methods 0.000 abstract description 7
- 230000000875 corresponding effect Effects 0.000 description 37
- 238000010586 diagram Methods 0.000 description 6
- 238000004891 communication Methods 0.000 description 5
- 230000006870 function Effects 0.000 description 2
- 238000012913 prioritisation Methods 0.000 description 2
- 230000002860 competitive effect Effects 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/16—Real estate
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of display methods of item nodes, which is characterized in that the display methods of the item nodes identifies the first node grade currently chosen the following steps are included: when receiving item nodes idsplay order;There are when second node grade in default node level group, the second node grade is obtained, wherein the priority of the second node grade is higher than the first node grade;Show the first node grade and the corresponding nodal information of the second node grade.The invention also discloses a kind of display device of item nodes and computer readable storage mediums.The corresponding nodal information of item nodes of different significance levels is shown according to the node level difference that user selects, facilitate the completion status that user obtains different brackets node in understanding project, it obtains the item nodes performance under any fine degree of project at a glance convenient for user, is conducive to monitoring of the user in the project implementation process to each node.
Description
Technical field
The present invention relates to field of computer technology more particularly to the display methods of item nodes, device and computer-readable
Storage medium.
Background technique
Under the increasingly competitive environment of current real-estate market, the exploitation of real estate project is effectively supervised and supervised
It is imperative.Multiple nodes are set in a real estate project, and monitoring party is supervised construction party by the completion status of node, mentioned
The speed of application of high construction party.
In the prior art, item nodes state is checked for convenience of monitoring party, by the node of each node of the same project
Information is shown according to arrangements such as the completion status of node, deadline, the Projected completion times either sequence of construction of each node.
However, the node of real estate project is numerous, and the significance level of each node is also not quite similar, and checks project overall situation
When, it is difficult to obtain the substantially completion status of the project at a glance.
Summary of the invention
The main purpose of the present invention is to provide a kind of display methods of item nodes, device and computer-readable storage mediums
Matter, it is intended to which the node for solving real estate project is numerous, and the significance level of each node is also not quite similar, and checks project totality
When situation, it is difficult to obtain the substantially completion status of the project at a glance.
To achieve the above object, the present invention provides a kind of display methods of item nodes, the display side of the item nodes
Method the following steps are included:
When receiving item nodes idsplay order, the first node grade currently chosen is identified;
There are when second node grade in default node level group, the second node grade is obtained, wherein described
The priority of two node levels is higher than the first node grade;
Show the first node grade and the corresponding nodal information of the second node grade.
Preferably, before the step of acquisition second node grade, further includes:
Judge in default node level group with the presence or absence of the second node grade;
When the second node grade being not present in default node level group, show that the first node grade is corresponding
Nodal information;
There are when the second node grade, execute the acquisition first node grade in default node level group
The step of.
Preferably, the display first node grade and the step of the second node grade corresponding nodal information
Later, further includes:
When receiving predetermined registration operation instruction, the node details of the predetermined registration operation instruction corresponding node are shown;
The progress feedback operation entrance of node is provided in the display interface of the node details.
Preferably, the progress feedback operation entrance that node is provided in the display interface of the node details
The step of include:
Obtain the user right of currently logged on user;
When the user right of the currently logged on user is default access, in the display interface of the node details
In be provided with the progress feedback operation entrance of node.
Preferably, the progress feedback operation entrance that node is provided in the display interface of the node details
The step of after, further includes:
When receiving progress feedback operation, the nodal information of the progress feedback operation corresponding node is updated.
Preferably, the node details include nodename, node rank, affiliated project, node responsible person, plan
At least one of deadline, node state, the description of node performance and node picture.
Preferably, the step of nodal information of the display node includes:
Institute is shown according to the big minispread of the pre-set priority of the completion status of node, sequence of construction and Projected completion time
State nodal information.
Preferably, the nodal information includes nodename, node state, the affiliated building of node, node responsible person, plan
Complete at least one of day and the day of actually accomplishing.
In addition, to achieve the above object, the present invention also provides a kind of display devices of item nodes, which is characterized in that institute
The display device for stating item nodes includes: memory, processor and is stored on the memory and can be on the processor
The display program of the item nodes of operation is realized as described above when the display program of the item nodes is executed by the processor
Item nodes display methods the step of.
In addition, to achieve the above object, the present invention also provides a kind of computer readable storage mediums, which is characterized in that institute
The display program that item nodes are stored on computer readable storage medium is stated, the display program of the item nodes is by processor
The step of display methods of item nodes as described above is realized when execution.
Display methods, device and the computer readable storage medium for a kind of item nodes that the embodiment of the present invention proposes,
When receiving item nodes idsplay order, the node level that identification active user chooses, the node level that user is chosen is set as
First node grade, search priority is higher than the second node grade of first node grade in default node level group.When pre-
If obtaining second node grade there are when second node grade in node level group, first node grade and second node are shown
The nodal information of the corresponding all nodes of grade.The project of different significance levels is shown according to the node level difference that user selects
The corresponding nodal information of node facilitates the completion status that user obtains different brackets node in understanding project, is convenient for user one
Mesh obtains the item nodes performance under any fine degree of project with being clear, and is conducive to user in the project implementation process
Monitoring to each node.
Detailed description of the invention
Fig. 1 is the terminal structure schematic diagram for the hardware running environment that the embodiment of the present invention is related to;
Fig. 2 is the flow diagram of the display methods first embodiment of item nodes of the present invention;
Fig. 3 is the item nodes display interface schematic diagram of the display methods of item nodes of the present invention;
Fig. 4 is the flow diagram of the display methods second embodiment of item nodes of the present invention;
Fig. 5 is the flow diagram of the display methods 3rd embodiment of item nodes of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The primary solutions of the embodiment of the present invention are:
When receiving item nodes idsplay order, the first node grade currently chosen is identified;
There are when second node grade in default node level group, the second node grade is obtained, wherein described
The priority of two node levels is higher than the first node grade;
Show the first node grade and the corresponding nodal information of the second node grade.
Since the node of real estate project is numerous, and the significance level of each node is also not quite similar, total in the project of checking
When body situation, it is difficult to obtain the substantially completion status of the project at a glance.
The present invention provides a solution, and when receiving item nodes idsplay order, identification active user is chosen
Node level, the node level that user is chosen are set as first node grade, and search priority is high in default node level group
In the second node grade of first node grade.When there are when second node grade, obtaining the second section in default node level group
Point grade, shows the nodal information of first node grade and the corresponding all nodes of second node grade.According to user's selection
Node level difference shows the corresponding nodal information of the item nodes of different significance levels, facilitates user and obtains in understanding project
The completion status of different brackets node, the item nodes obtained at a glance under any fine degree of project convenient for user are complete
At situation, be conducive to monitoring of the user in the project implementation process to each node.
As shown in Figure 1, Fig. 1 is the terminal structure schematic diagram for the hardware running environment that the embodiment of the present invention is related to.
The terminal of that embodiment of the invention can be PC, be also possible to smart phone, tablet computer, portable computer etc. with aobvious
Show the packaged type terminal device of function.
As shown in Figure 1, the terminal may include: processor 1001, such as CPU, network interface 1004, user interface
1003, memory 1005, communication bus 1002.Wherein, communication bus 1002 is for realizing the connection communication between these components.
User interface 1003 may include display screen (Display), input unit such as keyboard (Keyboard), optional user interface
1003 can also include standard wireline interface and wireless interface.Network interface 1004 optionally may include that the wired of standard connects
Mouth, wireless interface (such as WI-FI interface).Memory 1005 can be high speed RAM memory, be also possible to stable memory
(non-volatile memory), such as magnetic disk storage.Memory 1005 optionally can also be independently of aforementioned processor
1001 storage device.
It will be understood by those skilled in the art that the restriction of the not structure paired terminal of terminal structure shown in Fig. 1, can wrap
It includes than illustrating more or fewer components, perhaps combines certain components or different component layouts.
As shown in Figure 1, as may include that operating system, network are logical in a kind of memory 1005 of computer storage medium
Believe module, the display program of Subscriber Interface Module SIM and item nodes.
In terminal shown in Fig. 1, network interface 1004 is mainly used for connecting background server, carries out with background server
Data communication;User interface 1003 is mainly used for connecting client (user terminal), carries out data communication with client;And processor
1001 can be used for calling the display program of the item nodes stored in memory 1005, and execute following operation:
When receiving item nodes idsplay order, the first node grade currently chosen is identified;
There are when second node grade in default node level group, the second node grade is obtained, wherein described
The priority of two node levels is higher than the first node grade;
Show the first node grade and the corresponding nodal information of the second node grade.
Further, processor 1001 can call the display program of the item nodes stored in memory 1005, also hold
The following operation of row:
Judge in default node level group with the presence or absence of the second node grade;
When the second node grade being not present in default node level group, show that the first node grade is corresponding
Nodal information;
There are when the second node grade, execute the acquisition first node grade in default node level group
The step of.
Further, processor 1001 can call the display program of the item nodes stored in memory 1005, also hold
The following operation of row:
When receiving predetermined registration operation instruction, the node details of the predetermined registration operation instruction corresponding node are shown;
The progress feedback operation entrance of node is provided in the display interface of the node details.
Further, processor 1001 can call the display program of the item nodes stored in memory 1005, also hold
The following operation of row:
Obtain the user right of currently logged on user;
When the user right of the currently logged on user is default access, in the display interface of the node details
In be provided with the progress feedback operation entrance of node.
Further, processor 1001 can call the display program of the item nodes stored in memory 1005, also hold
The following operation of row:
When receiving progress feedback operation, the nodal information of the progress feedback operation corresponding node is updated.
Further, processor 1001 can call the display program of the item nodes stored in memory 1005, also hold
The following operation of row:
When the node details include nodename, node rank, affiliated project, node responsible person, plan completion
Between, the description of node state, node performance and at least one of node picture.
Further, processor 1001 can call the display program of the item nodes stored in memory 1005, also hold
The following operation of row:
Institute is shown according to the big minispread of the pre-set priority of the completion status of node, sequence of construction and Projected completion time
State nodal information.
Further, processor 1001 can call the display program of the item nodes stored in memory 1005, also hold
The following operation of row:
The nodal information includes nodename, node state, the affiliated building of node, node responsible person, plan completion day
At least one of and actually accomplish day.
Referring to Fig. 2, the display methods first embodiment of item nodes of the present invention, the display methods packet of the item nodes
It includes:
Step S10 when receiving item nodes idsplay order, identifies the first node grade currently chosen.
Step S20 obtains the second node grade there are when second node grade in default node level group,
In, the priority of the second node grade is higher than the first node grade.
Step S30 shows the nodal information corresponding with the second node grade such as described first node.
In the creation of item destination node, using the plan of the item nodes drawing template establishment combination detailed programs pre-established
The projects concrete condition such as book, undertaking unit is created that the item nodes for meeting this project, wherein creates in the item nodes of offer
The title and the corresponding grade of node of each node are preset in template, founder chooses needs when creating item nodes
Node, and node responsible person, the nodal informations such as Projected completion time are added in the node chosen.Meanwhile in creation item
When mesh node, the corresponding grade of amended subject node drawing template establishment interior joint can be needed according to project.For example, in item nodes
There is A~I totally 10 node in drawing template establishment, interior joint A, B, E and G are first nodes, and node C, D and F are two-level node, node
F, H and I is three-level node.Founder has selected item according to the actual conditions of first project when creating the item nodes of first project
Node A, B, D, F, H and I in mesh node drawing template establishment, and specific node responsible person is added to the node of selection, by node H
Corresponding node level is changed to second level, retains the corresponding node level of remaining node, generates the item nodes of first project.
Generally, the significance level of the definition of item nodes grade and item nodes is positively correlated, i.e. the high item of significance level
The corresponding node level of mesh node is higher, i.e. the priority of node is higher.
During project implementation, the schedule of the corresponding node responsible person feedback node of item nodes, system root
According to the state of the corresponding modification node of the schedule of feedback.When the completion status for needing to check each item nodes in entire project
When, user triggers item nodes idsplay order, and system finds out the corresponding project of instruction and item according to item nodes idsplay order
Destination node information, and show the corresponding nodal information of the project.Nodal information includes but is not limited to nodename, node shape
Day and the day of actually accomplishing etc. are completed in the affiliated building of state, node, node responsible person, plan, and wherein node state usually has
It completes, does not complete, is overdue, being completed further includes completing and overdue completion on schedule.
Multiple selective node levels are shown in nodal information display interface as shown in Figure 3, wherein each node etc.
Grade is present in default node level group, and sets the priority of each node level, the high priority of usual node level
It is high.Click node level, the corresponding nodal informations for having node of display node level more.Node state is by corresponding node information
Font color is shown either before nodename with different color block identifications (color is not shown in the figure), for example, node shape
State is to complete on schedule, shows green, and overdue completion is displayed in blue, and does not complete and is displayed in red, overdue display grey.
When receiving node idsplay order, the node level that identification active user chooses, the node etc. that user is chosen
Grade is set as first node grade, and search priority is higher than the second node etc. of first node grade in default node level group
Grade.When there are when second node grade, obtaining second node grade in default node level group, first node grade and the are shown
The nodal information of the corresponding all nodes of two node levels.Wherein, second node grade may include one or more node levels.
For example, showing first nodes and the corresponding institute of two-level node when detecting the node level that user currently selects for two-level node
There is the nodal information of node.In addition, setting default node grade, when user does not trigger the selection instruction of node level, identification
The node level currently chosen is default node grade, for example, default node grade is first nodes, and the non-selected node of user
When grade, the nodal information for more there are first nodes is directly displayed.It is different important according to the node level difference display of user's selection
The corresponding nodal information of the item nodes of degree facilitates the completion status that user obtains different brackets node in understanding project,
It obtains the item nodes performance under any fine degree of project at a glance convenient for user, is conducive to user in project
To the monitoring of each node in implementation process.
In addition, excellent according to presetting for the completion status of node, sequence of construction, Projected completion time and actual finish time
The first big minispread of grade shows the nodal information.Specifically, being provided with the excellent of state, sequence of construction and Projected completion time
First grade, the high prioritization of priority, the node for grade that All factors being equal, preference will be give to, the high prioritization of lesser priority.Multiple sections if it exists
When the priority of the nodal information of point is all the same, random alignment shows the nodal information of multiple node.For example, priority is by height
To low are as follows: the deadline of completion status, sequence of construction, Projected completion time and actual finish time, the node that goes into operation is
2018.03.22, open the set node deadline be 2018.05.11, since the completion status of the two is to be completed, go into operation section
The sequence of construction of point is before opening quotation, then when showing nodal information, the nodal information for the node that goes into operation comes the section in opening quotation node
Before point information.
In the present embodiment, when receiving item nodes idsplay order, the node level that identification active user chooses will
The node level that user chooses is set as first node grade, and search priority is higher than first node etc. in default node level group
The second node grade of grade.When there are when second node grade, obtaining second node grade in default node level group, display the
The nodal information of one node level and the corresponding all nodes of second node grade.Node level difference according to user's selection is aobvious
Show the corresponding nodal information of the item nodes of different significance levels, facilitates user and obtain different brackets node in understanding project
Completion status obtains the item nodes performance under any fine degree of project at a glance convenient for user, is conducive to
Monitoring of the user in the project implementation process to each node.
Further, referring to Fig. 3, the display methods second embodiment of item nodes of the present invention is implemented based on above-mentioned first
, before the step S20, further includes:
Step S40 judges in default node level group with the presence or absence of the second node grade.
Step S50 shows described first node etc. when the second node grade being not present in default node level group
The corresponding nodal information of grade.
There are when the second node grade in default node level group, step S20 is executed, that is, obtains the first segment
Point grade.
When receiving item nodes idsplay order, if the priority for the first node grade that active user selects is default
Highest in node level, then there is no the node levels that priority is higher than first node grade in default node level group, i.e.,
There is no second node grades.For guarantee procedure execute validity, in the first node grade for identifying that active user chooses
Later, judge whether there is priority in default node level group with the presence or absence of second node grade in default node level
Higher than the node level of the first node grade.When in default node level group be not present second node grade, i.e., this first
The highest priority of node level then directly displays the corresponding nodal information of first node grade;When in default node level group
In there are second node grade, then follow the steps S20, obtain second node grade, and then shown in node level display interface
Show first node grade and the corresponding nodal information of second node grade.
In the present embodiment, after the first node grade that identification active user chooses, judge in default node level
The second node grade for being higher than the first node grade in group with the presence or absence of priority is said when second node grade is not present
The first node grade that bright active user chooses is the node level of highest priority, then is directly obtained first node grade pair
The nodal information answered, and show the nodal information got;When there are when second node grade, then being obtained in default node level group
Second node grade is taken, first node grade and second node grade are obtained according to first node grade and second node grade
Corresponding nodal information, and show the nodal information got.By high to whether there is node priority in node level group
In the judgement for the first node grade that active user chooses, avoiding the node level chosen as user is the node of highest priority
When grade, second node grade can not be got, program is caused to malfunction, can not normally show nodal information, perfect program
Node flow for displaying.
Further, referring to Fig. 4, the display methods 3rd embodiment of item nodes of the present invention, based on above-mentioned first or the
Two embodiments, after the step S30, further includes:
Step S60 when receiving predetermined registration operation instruction, shows that the node of the predetermined registration operation instruction corresponding node is believed in detail
Breath.
The predetermined registration operation instruction is the instruction that project details are checked to the triggering of detailed programs node, can be referred to touch
It enables, cursor selection instruction and phonetic order etc..When the user clicks when item nodes information, show that the node of the item nodes is detailed
Thin information, interior joint details include or part includes nodal information described in a upper embodiment, and specifically, node is detailed
Information has nodename, node rank, affiliated project, node responsible person, Projected completion time, node state, node to complete feelings
Condition description and picture etc..By item nodes display interface, the specific details of a certain item nodes can be directly viewable,
More thinner information of node are provided for user, increase the entrance of checking of Entry Details, it is user-friendly.
Step S70 is provided with the progress feedback operation entrance of node in the display interface of the node details.
Meanwhile be provided in the display interface of node details item nodes progress feedback entrance, by this into
Degree feedback entrance carries out the feedback of progress to the item nodes, so that user when checking nodal information, can quickly carry out node
The feedback of progress is back to progress feedback page without user and feeds back again to item nodes, simplifies user's operation.
Further, it is to be appreciated that there is the permission of feedback items node progress in the user for currently checking nodal information
When, just there is progress feedback operation entrance in the interface of node detail information, facilitate user to the feedback operation of node progress.
For the user of the progress feedback permission of not item nodes, does not then have progress feedback operation entrance, effectively manage project section
The feedback of point progress.
Further, when user carries out progress feedback operation to item nodes, feedback knot that program is inputted according to user
Fruit updates the corresponding nodal information of the item nodes, and the update of nodal information described herein is mainly to the state and reality of node
The update of border deadline.For example, the progress for the node that opens the set is fed back to complete by user, then the time of completion is identified, accordingly
State in the nodal information of opening quotation is changed to be completed, actual finish time is further may be used also the deadline identified
State to be set as completing or overdue completion according to actual finish time and Projected completion time on schedule.
In the present embodiment, the predetermined registration operation instruction is that the instruction of project details is checked to the triggering of detailed programs node,
By item nodes display interface, the specific details of a certain item nodes can be directly viewable, provide node for user
More thinner information, increase the entrance of checking of Entry Details, user-friendly.Meanwhile in node details
It is provided with the progress feedback entrance of item nodes in display interface, entrance is fed back by the progress, progress is carried out to the item nodes
Feedback so that user when checking nodal information, can quickly carry out the feedback of node progress, it is anti-to be back to progress without user
The feedback page again feeds back item nodes, simplifies user's operation.
In addition, the embodiment of the present invention also proposes a kind of display device of item nodes, the display device of the item nodes
It include: memory, processor and the display for being stored in the item nodes that can be run on the memory and on the processor
Program realizes item nodes described in as above each embodiment when the display program of the item nodes is executed by the processor
Display methods the step of.
In addition, the embodiment of the present invention also proposes a kind of computer readable storage medium, the computer readable storage medium
On be stored with the display programs of item nodes, as above each reality is realized when the display program of the item nodes is executed by processor
The step of applying the display methods of item nodes described in example.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that the process, method, article or the system that include a series of elements not only include those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or system institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do
There is also other identical elements in the process, method of element, article or system.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art
The part contributed out can be embodied in the form of software products, which is stored in one as described above
In storage medium (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that terminal device (it can be mobile phone,
Computer, server, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (10)
1. a kind of display methods of item nodes, which is characterized in that the display methods of the item nodes the following steps are included:
When receiving item nodes idsplay order, the first node grade currently chosen is identified;
There are when second node grade in default node level group, the second node grade is obtained, wherein second section
The priority of point grade is higher than the first node grade;
Show the first node grade and the corresponding nodal information of the second node grade.
2. the display methods of item nodes as described in claim 1, which is characterized in that described to obtain the second node grade
The step of before, further includes:
Judge in default node level group with the presence or absence of the second node grade;
When the second node grade being not present in default node level group, the corresponding node of the first node grade is shown
Information;
There are when the second node grade, execute the step for obtaining the first node grade in default node level group
Suddenly.
3. the display methods of item nodes as described in claim 1, which is characterized in that the display first node grade
After the step of nodal information corresponding with the second node grade, further includes:
When receiving predetermined registration operation instruction, the node details of the predetermined registration operation instruction corresponding node are shown;
The progress feedback operation entrance of node is provided in the display interface of the node details.
4. the display methods of item nodes as claimed in claim 3, which is characterized in that described in the node details
The step of progress feedback operation entrance of node is provided in display interface include:
Obtain the user right of currently logged on user;
When the user right of the currently logged on user is default access, set in the display interface of the node details
It is equipped with the progress feedback operation entrance of node.
5. the display methods of item nodes as claimed in claim 3, which is characterized in that described in the node details
After the step of being provided with the progress feedback operation entrance of node in display interface, further includes:
When receiving progress feedback operation, the nodal information of the progress feedback operation corresponding node is updated.
6. the display methods of item nodes as claimed in claim 3, which is characterized in that the node details include node
Title, node rank, affiliated project, node responsible person, Projected completion time, node state, node performance description and
At least one of node picture.
7. the display methods of item nodes as described in claim 1, which is characterized in that the node letter of the display node
The step of breath includes:
The section is shown according to the big minispread of the pre-set priority of the completion status of node, sequence of construction and Projected completion time
Point information.
8. the display methods of item nodes as described in claim 1, which is characterized in that the nodal information includes node name
At least one of day and the day of actually accomplishing are completed in the affiliated building of title, node state, node, node responsible person, plan.
9. a kind of display device of item nodes, which is characterized in that the display device of the item nodes includes: memory, place
Reason device and the display program for being stored in the item nodes that can be run on the memory and on the processor, the project section
The display such as item nodes described in any item of the claim 1 to 8 is realized when the display program of point is executed by the processor
The step of method.
10. a kind of computer readable storage medium, which is characterized in that be stored with project section on the computer readable storage medium
The display program of point is realized when the display program of the item nodes is executed by processor such as any one of claims 1 to 8 institute
The step of display methods for the item nodes stated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810852536.4A CN109064015A (en) | 2018-07-28 | 2018-07-28 | Display methods, device and the computer readable storage medium of item nodes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810852536.4A CN109064015A (en) | 2018-07-28 | 2018-07-28 | Display methods, device and the computer readable storage medium of item nodes |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109064015A true CN109064015A (en) | 2018-12-21 |
Family
ID=64831566
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810852536.4A Pending CN109064015A (en) | 2018-07-28 | 2018-07-28 | Display methods, device and the computer readable storage medium of item nodes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109064015A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105654243A (en) * | 2015-12-31 | 2016-06-08 | 上海筑想信息科技股份有限公司 | Orbital graph based project information automated processing system |
CN106096919A (en) * | 2016-08-09 | 2016-11-09 | 湖南宝信云建筑综合服务平台股份有限公司 | engineering project process online management system |
CN107103406A (en) * | 2017-03-28 | 2017-08-29 | 国网山东省电力公司信息通信公司 | A kind of supporting communication engineering entire process monitoring system of capital construction and its method |
CN107169673A (en) * | 2017-06-09 | 2017-09-15 | 上海嘉实(集团)有限公司 | Management system/method, computer-readable recording medium and the terminal of construction project |
-
2018
- 2018-07-28 CN CN201810852536.4A patent/CN109064015A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105654243A (en) * | 2015-12-31 | 2016-06-08 | 上海筑想信息科技股份有限公司 | Orbital graph based project information automated processing system |
CN106096919A (en) * | 2016-08-09 | 2016-11-09 | 湖南宝信云建筑综合服务平台股份有限公司 | engineering project process online management system |
CN107103406A (en) * | 2017-03-28 | 2017-08-29 | 国网山东省电力公司信息通信公司 | A kind of supporting communication engineering entire process monitoring system of capital construction and its method |
CN107169673A (en) * | 2017-06-09 | 2017-09-15 | 上海嘉实(集团)有限公司 | Management system/method, computer-readable recording medium and the terminal of construction project |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10284705B2 (en) | Method and apparatus for controlling smart device, and computer storage medium | |
US10805247B1 (en) | Method and apparatus for requesting private replies in messaging | |
CN109725901A (en) | Development approach, device, equipment and the computer storage medium of front-end code | |
US20130232411A1 (en) | Terminal and schedule displaying method | |
US20080178105A1 (en) | System and method for planning student assignments | |
CN108764669A (en) | Scheduling method, system and computer readable storage medium | |
CN108764810A (en) | Method, control device and the storage medium of task management | |
CN107943372A (en) | A kind of interface display method, device and computer-readable recording medium | |
CN108388988A (en) | Synergetic office work method, system and computer readable storage medium based on block chain | |
CN107909466A (en) | Customer relationship network display method, apparatus, equipment and readable storage medium storing program for executing | |
CN109710328A (en) | Page configuration method, apparatus, equipment and readable storage medium storing program for executing | |
CN106331178A (en) | Information sharing method and mobile terminal | |
CN106293763B (en) | The management method and device of application component version | |
CN104346024A (en) | Method and device for selecting shortcuts | |
CN110347494A (en) | Context information management method, apparatus, system and computer readable storage medium | |
CN109710665A (en) | Report downloading method, apparatus, equipment and readable storage medium storing program for executing | |
CN109902251A (en) | Scheme Choice method, apparatus, terminal and readable storage medium storing program for executing based on decision tree | |
CN109828906A (en) | UI automated testing method, device, electronic equipment and storage medium | |
CN109636566A (en) | Method for exhibiting data, device, equipment and computer readable storage medium | |
CN107977129A (en) | Icon display method, device and computer-readable recording medium | |
CN109615482A (en) | Methods of exhibiting, device and the storage medium of information of lease | |
CN112698895A (en) | Display method, device, equipment and medium of electronic equipment | |
CN109615471A (en) | Source of houses temperature display methods, device and computer readable storage medium | |
CN109088914A (en) | Generation method, the block chain ecosystem and the computer readable storage medium of block | |
CN109753612B (en) | Questionnaire display control method and device, storage medium and electronic equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181221 |
|
RJ01 | Rejection of invention patent application after publication |