CN109060259A - A kind of project supervision external wall and window side water test device - Google Patents

A kind of project supervision external wall and window side water test device Download PDF

Info

Publication number
CN109060259A
CN109060259A CN201810975948.7A CN201810975948A CN109060259A CN 109060259 A CN109060259 A CN 109060259A CN 201810975948 A CN201810975948 A CN 201810975948A CN 109060259 A CN109060259 A CN 109060259A
Authority
CN
China
Prior art keywords
clamp plate
spray pipe
external wall
window side
test device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810975948.7A
Other languages
Chinese (zh)
Other versions
CN109060259B (en
Inventor
杜轶云
伊鹏辉
李聪秀
沈健博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang tuoan Engineering Project Management Co.,Ltd.
Original Assignee
Wenzhou Hongye Construction Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Hongye Construction Management Co Ltd filed Critical Wenzhou Hongye Construction Management Co Ltd
Priority to CN201810975948.7A priority Critical patent/CN109060259B/en
Publication of CN109060259A publication Critical patent/CN109060259A/en
Application granted granted Critical
Publication of CN109060259B publication Critical patent/CN109060259B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum
    • G01M3/04Investigating fluid-tightness of structures by using fluid or vacuum by detecting the presence of fluid at the leakage point

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The invention discloses a kind of project supervision external wall and window side water test devices, belong to building engineering field, its drip irrigation device includes water tank, water pump and spray pipe, the water pump is arranged in the water tank, the water pump is connect by outlet pipe with the spray pipe, it further include telescoping shoring column, the side of the telescoping shoring column is extended with the support frame for being used to support the spray pipe, side on support frame as described above far from the telescoping shoring column is provided with upper clamp plate, lower clamp plate and spring for connecting the upper clamp plate and lower clamp plate, the spray pipe is clamped between the upper clamp plate and lower clamp plate, it is evenly distributed on the spray pipe several towards exterior wall or the water spout on window side, the present invention can be improved fastness of the spray pipe when carrying out water drenching test, ensure that spray pipe can not take off in prolonged water drenching duration It falls.

Description

A kind of project supervision external wall and window side water test device
Technical field
The invention belongs to building engineering fields, and more specifically it is related to a kind of project supervision external wall and window side is seeped Water test device.
Background technique
With the rapid development of China's building trade, requirement of the people to construction safety and construction quality is also higher and higher, Management system, production method and the institutional framework of building trade have all obtained continuous in-depth, build house, office building etc. are some The phenomenon that often can be appreciated that leak in object is built, this has seriously affected people's lives work.
Therefore, have to carry out infiltration detection in building construction process, check buildings leakage point to repair in time, Traditional waterproof testing method is water drenching and air blast, after a period of time, there is ne-leakage in side within the walls for observation, standard GB/T/ There are corresponding regulation, watertightness in T7106-2008 " building external doors and windows are airtight, watertight, resisting wind press capacity is classified and detection method " Test, which takes around, carries out several hours, to determine the watertightness of the side seam of exterior window and wall.
But above method time-consuming is long, a test needs several hours, and existing spray pipe is not easy to be fixed on wall On, and since the gravity of water is easy to fall off spray pipe, it is difficult to reach water drenching duration, thus the sky that could be improved Between.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of project supervision external wall and window Side water test device, the advantage is that can ensure that spray pipe is not fallen off in prolonged water drenching duration.
To achieve the above object, the present invention provides the following technical scheme that a kind of project supervision external wall and window side Water test device, including water tank, water pump and spray pipe, the water pump are arranged in the water tank, and the water pump passes through water outlet Pipe is connect with the spray pipe, it is characterised in that: further includes telescoping shoring column, the side of the telescoping shoring column, which is extended with, to be used for The support frame of the spray pipe is supported, the side far from the telescoping shoring column is provided with upper clamp plate, lower folder on support frame as described above Plate and spring for connecting the upper clamp plate and lower clamp plate, the spray pipe be clamped in the upper clamp plate and lower clamp plate it Between, it is evenly distributed on the spray pipe several towards exterior wall or the water spout on window side.
First spray pipe is clamped between upper clamp plate and lower clamp plate in construction by using above-mentioned technical proposal, then will Telescoping shoring column is placed in the position for needing to detect, such as roof of building, so that support is placed on above external wall, water spout Towards external wall, i.e., the switch of openable water pump, so that the water in water tank is flowed into spray pipe by outlet pipe, and by spray pipe On water spout be sprayed on external wall, formed rain making find out seepage point after water drenching certain time length and carry out leak repairing, Complete leak repairing.
To sum up, by the cooperation of upper clamp plate and lower clamp plate, spray pipe is firmly secured on support frame, avoids Spray pipe falls off because of the gravity of water, improves fastness of the spray pipe when carrying out water drenching test, it is ensured that spray pipe can be with It is not fallen off in prolonged water drenching duration.
The present invention is further arranged to: the side of the upper clamp plate and lower clamp plate towards the spray pipe is arcwall face.
By using above-mentioned technical proposal, since the tube wall of spray pipe is generally curved surface, to can be made by arcwall face Upper clamp plate and lower clamp plate are preferably bonded with the tube wall of spray pipe, are improved spray pipe and are clamped in the jail between upper clamp plate and lower clamp plate Solidity.
The present invention is further arranged to: being provided with non-slip texture on the arcwall face.
By using above-mentioned technical proposal, the design of non-slip texture increases the friction between arcwall face and spray pipe, keeps away Exempt from the case where changing water spout direction due to spray pipe is generated and rotated in construction, improves stability when water drenching.
The present invention is further arranged to: being provided with mounting groove on the arcwall face, is provided with rubber pad in the mounting groove Block.
By using above-mentioned technical proposal, rubber cushion blocks can generate biggish deformation under lesser external force, when When the outer wall and rubber cushion blocks of spray pipe offset, spray pipe can generate the effect close to mounting groove direction to rubber cushion blocks Power, and rubber cushion blocks can also give active force of the spray pipe far from mounting groove direction simultaneously, so as to make spray pipe firmly It is clamped between upper clamp plate and lower clamp plate.
The present invention is further arranged to: sliding is connected with mounting base on support frame as described above, is arranged on the telescoping shoring column There is the adjusting screw rod being threadedly coupled with the mounting base, the upper clamp plate and lower clamp plate are arranged in the mounting base.
By using above-mentioned technical proposal, when spray pipe is clamped between upper clamp plate and lower clamp plate, adjusted by rotation Screw rod can be such that mounting base moves back and forth along the length direction of adjusting screw rod, i.e., between changeable spray pipe and external wall away from From adapting to different operating conditions.
The present invention is further arranged to: T-shaped slide rail is provided on support frame as described above along its length, in the mounting base It is formed with the T-type sliding block being placed in the T-shaped slide rail.
By using above-mentioned technical proposal, under the mating reaction of T-type sliding block and T-shaped slide rail, mounting base can be steadily Length direction along support frame moves.
The present invention is further arranged to: being provided with the idler wheel for being connected to the T-shaped slide rail inner wall on the T-type sliding block.
By using above-mentioned technical proposal, the design of idler wheel reduces the friction between T-type sliding block and T-shaped slide rail, so that The movement of mounting base is more smooth.
The present invention is further arranged to: the adjusting screw rod is connected with handle close to one end of the telescoping shoring column.
By using above-mentioned technical proposal, the setting of handle can rotate adjusting screw rod convenient for tester, so that operation Process is more convenient.
The present invention is further arranged to: the telescoping shoring column includes fixed beam and walking beam, and the walking beam activity is inserted It is connected in the fixed beam, the upper end of the walking beam is connect with support frame as described above, is provided with and is used on the outside of the fixed beam By the fastener that walking beam and fixed beam are fixed.
By using above-mentioned technical proposal, walking beam can be moved along the short transverse of fixed beam, and certain being moved to Behind position, walking beam and fixed beam can be fixed by fastener, realize the height adjustment of telescoping shoring column, improve whole reality The property used.
The present invention is further arranged to: the fastener is fastening screw, is provided in the fixed beam for fastening screw The mounting hole of threaded connection is provided with the connecting hole of several correspondences mounting hole on the walking beam along its length.
Fastening screw is first rotated when needing to adjust walking beam and ground distance by using above-mentioned technical proposal, is made tight Gu screw rod is disconnected hole, then pulls up walking beam, until walking beam reaches designated position, then fastening bolt screw thread is connected It connects in mounting hole and offsets with connecting hole inner wall, the height adjustment of walking beam can be completed.
In conclusion the invention has the following advantages that
1, by the way that spray pipe to be clamped between upper clamp plate and lower clamp plate, it can be avoided spray pipe and fall off because of the gravity of water, really Water drenching test can be carried out for a long time and not fall off by protecting spray pipe;
2, when spray pipe is clamped between upper clamp plate and lower clamp plate, by rotating adjusting screw rod, mounting base can be made along adjusting spiral shell The length direction of bar moves back and forth, i.e., changeable the distance between spray pipe and external wall adapt to different operating conditions.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the present embodiment one;
Fig. 2 is the partial structural diagram of the present embodiment one;
Fig. 3 is the enlarged diagram of A in Fig. 2;
Fig. 4 is confined explosion's schematic diagram that the present embodiment one highlights non-slip texture;
Fig. 5 is the schematic cross-sectional view that the present embodiment one highlights idler wheel;
Fig. 6 is confined explosion's schematic diagram that the present embodiment one highlights telescoping shoring column structure;
Fig. 7 is confined explosion's schematic diagram that the present embodiment two highlights rubber cushion blocks.
Description of symbols: 1, water tank;2, water pump;3, spray pipe;4, outlet pipe;5, water spout;6, telescoping shoring column;7, Support frame;8, upper clamp plate;9, lower clamp plate;89, arcwall face;10, spring;11, non-slip texture;12, mounting base;13, adjusting screw rod; 14, handle;15, T-shaped slide rail;16, T-type sliding block;17, idler wheel;18, fixed beam;19, walking beam;20, fastener;21, it installs Hole;22, connecting hole;23, mounting groove;24, rubber cushion blocks.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment one, a kind of project supervision external wall and window side water test device, as shown in Figure 1, including water tank 1, water pump 2 and spray pipe 3, water pump 2 are mounted in water tank 1, and water pump 2 is connect by outlet pipe 4 with spray pipe 3, the length of spray pipe 3 Degree is uniformly distributed several water spouts 5 on direction.
As shown in Figure 2,3, telescoping shoring column 6 is placed on the roof of building, telescoping shoring column 6 can pass through screw and building The ground on top is fixed, and the side of telescoping shoring column 6 is extended with the support frame for being placed in above external wall and being used to support spray pipe 3 7, the side on support frame 7 far from telescoping shoring column 6 be provided with upper clamp plate 8, lower clamp plate 9 and for connect upper clamp plate 8 and under The spring 10 of clamping plate 9, spray pipe 3 are clamped between upper clamp plate 8 and lower clamp plate 9, and water spout 5 is towards the surface of external wall.
As shown in Figure 3,4, the side of upper clamp plate 8 and lower clamp plate 9 towards spray pipe 3 is arcwall face 89, due to spray pipe 3 Tube wall be generally curved surface, thus the tube wall of upper clamp plate 8 and lower clamp plate 9 preferably with spray pipe 3 can be made by arcwall face 89 Fitting improves spray pipe 3 and is clamped in the fastness between upper clamp plate 8 and lower clamp plate 9.
Further, it in order to increase the friction between arcwall face 89 and spray pipe 3, avoids the occurrence of in construction because of spray pipe 3 generate the case where rotating and changing 5 direction of water spout, are provided with non-slip texture 11 on arcwall face 89 in the present embodiment.
It is connected with mounting base 12 as shown in figure 4, sliding on support frame 7, the adjusting screw rod 13 of 12 internal screw thread of mounting base connection, Adjusting screw rod 13 is connected with close to one end of telescoping shoring column 6 convenient for the handle 14 of rotation adjusting screw rod 13, and upper clamp plate 8 is fixed on The lower end surface of mounting base 12.Therefore, when spray pipe 3 (see Fig. 2) is clamped between upper clamp plate 8 and lower clamp plate 9, turned by rotation 14, mounting base 12 can be made to move back and forth along the length direction of adjusting screw rod 13, i.e., between changeable spray pipe 3 and external wall Distance, adapt to different operating conditions.Specifically, T-shaped slide rail 15 is provided on support frame 7 along its length, in mounting base 12 It is formed with the T-type sliding block 16 being placed in T-shaped slide rail 15, by the cooperation of T-type sliding block 16 and T-shaped slide rail 15, mounting base can be made 12 length direction steadily along support frame 7 moves.
As shown in connection with fig. 5, in order to reduce the friction between T-type sliding block 16 and T-shaped slide rail 15, so that the movement of mounting base 12 It is more smooth, the idler wheel 17 for being connected to 15 inner wall of T-shaped slide rail is installed in T-type sliding block 16 towards the side of T-shaped slide rail 15.
As shown in fig. 6, telescoping shoring column 6 includes fixed beam 18 and walking beam 19, walking beam 19 is plugged in fixed beam 18, The upper end of walking beam 19 is vertical with support frame 7 to be connect, and the outside of fixed beam 18 is provided with for by walking beam 19 and fixed beam 18 Fixed fastener 20.Therefore, walking beam 19 can be moved along the short transverse of fixed beam 18, and be moved to certain position Afterwards, can be fixed by walking beam 19 and fixed beam 18 by fastener 20, it realizes the height adjustment of telescoping shoring column 6, improves whole Practicability.
Specifically, it as shown in fig. 6, fastener 20 is fastening screw, is provided in fixed beam 18 and connects for fastening screw screw thread The mounting hole 21 connect is provided with the connecting hole 22 of several corresponding mounting holes 21 on the length direction of walking beam 19.When needing to adjust When walking beam 19 and ground distance, fastening screw need to be first only rotated, so that fastening screw is disconnected hole 22, then pull up activity Beam 19, until walking beam 19 reach designated position, then by fastening bolt be threaded in mounting hole 21 and with connecting hole 22 Inner wall offsets, and the height adjustment of walking beam 19 can be completed.
It is noted that when in order to improve construction spray pipe 3 stability, the number of telescoping shoring column 6 in the present embodiment Amount setting two, the both ends of spray pipe 3 are clamped in respectively between the upper clamp plate 8 on two support frames 7 and lower clamp plate 9.
Specific construction process: before starting to carry out water drenching test, spray pipe 3 is first clamped in upper clamp plate 8 and lower clamp plate 9 Between, then pass through screw and telescoping shoring column 6 is fixed on the roof of building, and support frame 7 is placed in above external wall, Water spout 5 is towards external wall.At this point, the switch of openable water pump 2, so that the water in water tank 1 flows into spray pipe by outlet pipe 4 It in 3, and is sprayed on external wall by the water spout 5 on spray pipe 3, forms rain making and find out infiltration after water drenching certain time length Water spot simultaneously carries out leak repairing, i.e. completion leak repairing.
To sum up, by the cooperation of upper clamp plate 8 and lower clamp plate 9, spray pipe 3 can be firmly secured on support frame 7, avoid Spray pipe 3 falls off because of the gravity of water, it is ensured that spray pipe 3 can not fallen off in prolonged water drenching duration.
Embodiment two, a kind of project supervision external wall and window side water test device, as shown in fig. 7, and embodiment It is provided with mounting groove 23 on arcwall face 89 unlike one, rubber cushion blocks 24 are provided in mounting groove 23, rubber cushion blocks 24 pass through Glue is fixed in mounting groove 23.Since rubber cushion blocks 24 are under lesser external force, biggish deformation can be generated, that is, is existed Spray pipe 3(is shown in Fig. 1) outer wall and rubber cushion blocks 24 when offseting, spray pipe 3 can generate rubber cushion blocks 24 to mounting groove 23 The close active force in direction, and rubber cushion blocks 24 can also give active force of the spray pipe 3 far from 23 direction of mounting groove simultaneously, thus Spray pipe 3 can be made firmly to be clamped between upper clamp plate 8 and lower clamp plate 9, it is ensured that spray pipe 3 is in prolonged water drenching duration It does not fall off.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to restrict the invention, all in design structure of the invention Within think of, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of project supervision external wall and window side water test device, including water tank (1), water pump (2) and spray pipe (3), in the water tank (1), the water pump (2) is connected by outlet pipe (4) and the spray pipe (3) for water pump (2) setting It connects, it is characterised in that: further include telescoping shoring column (6), the side of the telescoping shoring column (6), which is extended with, is used to support the leaching The support frame (7) of water pipe (3), the side on support frame as described above (7) far from the telescoping shoring column (6) be provided with upper clamp plate (8), Lower clamp plate (9) and spring (10) for connecting the upper clamp plate (8) and lower clamp plate (9), the spray pipe (3) are clamped in institute It states between upper clamp plate (8) and lower clamp plate (9), is evenly distributed on the spray pipe (3) several towards exterior wall or the water spray on window side Mouth (5).
2. a kind of project supervision external wall according to claim 1 and window side water test device, it is characterised in that: The side of the upper clamp plate (8) and lower clamp plate (9) towards the spray pipe (3) is arcwall face (89).
3. a kind of project supervision external wall according to claim 2 and window side water test device, it is characterised in that: Non-slip texture (11) are provided on the arcwall face (89).
4. a kind of project supervision external wall according to claim 2 and window side water test device, it is characterised in that: It is provided with mounting groove (23) on the arcwall face (89), is provided with rubber cushion blocks (24) in the mounting groove (23).
5. a kind of project supervision external wall according to claim 1 and window side water test device, it is characterised in that: Sliding is connected with mounting base (12) on support frame as described above (7), is provided on the telescoping shoring column (6) and the mounting base (12) The adjusting screw rod (13) of threaded connection, the upper clamp plate (8) and lower clamp plate (9) are arranged on the mounting base (12).
6. a kind of project supervision external wall according to claim 5 and window side water test device, it is characterised in that: It is provided with along its length on support frame as described above (7) T-shaped slide rail (15), is formed on the mounting base (12) and is placed in the T T-type sliding block (16) in type sliding rail (15).
7. a kind of project supervision external wall according to claim 6 and window side water test device, it is characterised in that: The idler wheel (17) for being connected to the T-shaped slide rail (15) inner wall is provided on the T-type sliding block (16).
8. a kind of project supervision external wall according to claim 5 and window side water test device, it is characterised in that: The adjusting screw rod (13) is connected with handle (14) close to the one end of the telescoping shoring column (6).
9. a kind of project supervision external wall according to claim 1 and window side water test device, it is characterised in that: The telescoping shoring column (6) includes fixed beam (18) and walking beam (19), and the walking beam (19) is actively plugged in the fixation In beam (18), the upper end of the walking beam (19) is connect with support frame as described above (7), and the outside setting of the fixed beam (18) is useful In the fastener (20) that walking beam (19) and fixed beam (18) are fixed.
10. a kind of project supervision external wall according to claim 1 and window side water test device, feature exist In: the fastener (20) is fastening screw, and the mounting hole being threadedly coupled for fastening screw is provided on the fixed beam (18) (21), the connecting hole (22) of several correspondences mounting hole (21) is provided on the walking beam (19) along its length.
CN201810975948.7A 2018-08-24 2018-08-24 Building outer wall and window limit infiltration testing arrangement for engineering supervision Active CN109060259B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810975948.7A CN109060259B (en) 2018-08-24 2018-08-24 Building outer wall and window limit infiltration testing arrangement for engineering supervision

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810975948.7A CN109060259B (en) 2018-08-24 2018-08-24 Building outer wall and window limit infiltration testing arrangement for engineering supervision

Publications (2)

Publication Number Publication Date
CN109060259A true CN109060259A (en) 2018-12-21
CN109060259B CN109060259B (en) 2020-08-04

Family

ID=64756994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810975948.7A Active CN109060259B (en) 2018-08-24 2018-08-24 Building outer wall and window limit infiltration testing arrangement for engineering supervision

Country Status (1)

Country Link
CN (1) CN109060259B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110567643A (en) * 2019-09-24 2019-12-13 杭州同正建设工程检测有限公司 Device for detecting rain of field window
CN111879675A (en) * 2020-07-24 2020-11-03 惠州建安工程项目管理有限公司 Window infiltration testing arrangement is used in engineering supervision
CN113758637A (en) * 2021-09-17 2021-12-07 浙江天元项目管理有限公司 City assembled residential engineering manages with building outer wall infiltration testing arrangement
CN113834607A (en) * 2021-11-29 2021-12-24 广东省有色工业建筑质量检测站有限公司 Method and device for processing outer wall water spraying data
CN114486090A (en) * 2021-12-22 2022-05-13 采埃孚合力传动技术(合肥)有限公司 Device and method for testing waterproof performance of reduction gearbox

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2798092Y (en) * 2005-01-10 2006-07-19 李嘉奇 On-vehicle timing display for testing automobile tail gas
CN201050640Y (en) * 2007-06-19 2008-04-23 中国海洋石油总公司 Non-corrosive steel elastic pipe clamp and its system
CN203774701U (en) * 2014-01-24 2014-08-13 国家电网公司 Portable cable head fixing and making platform
CN105382684A (en) * 2015-12-11 2016-03-09 重庆市鑫勇灯饰厂 Plastic pipe surface super-finishing and polishing equipment
CN205300852U (en) * 2015-11-19 2016-06-08 孔艳丽 Wall seepage testing arrangement
CN206383991U (en) * 2017-01-09 2017-08-08 天津舞台科学技术研究所 A kind of stage equipment transport carriage
CN107389273A (en) * 2017-08-25 2017-11-24 苏州中正工程检测有限公司 One kind is used for building enclosure water pouring test device in assembled architecture
CN107687920A (en) * 2017-09-04 2018-02-13 吴步晨 A kind of construction supervision construction wall water test device
CN207472508U (en) * 2017-11-29 2018-06-08 四川建科工程建设管理有限公司 Project supervision external wall and window side water test device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2798092Y (en) * 2005-01-10 2006-07-19 李嘉奇 On-vehicle timing display for testing automobile tail gas
CN201050640Y (en) * 2007-06-19 2008-04-23 中国海洋石油总公司 Non-corrosive steel elastic pipe clamp and its system
CN203774701U (en) * 2014-01-24 2014-08-13 国家电网公司 Portable cable head fixing and making platform
CN205300852U (en) * 2015-11-19 2016-06-08 孔艳丽 Wall seepage testing arrangement
CN105382684A (en) * 2015-12-11 2016-03-09 重庆市鑫勇灯饰厂 Plastic pipe surface super-finishing and polishing equipment
CN206383991U (en) * 2017-01-09 2017-08-08 天津舞台科学技术研究所 A kind of stage equipment transport carriage
CN107389273A (en) * 2017-08-25 2017-11-24 苏州中正工程检测有限公司 One kind is used for building enclosure water pouring test device in assembled architecture
CN107687920A (en) * 2017-09-04 2018-02-13 吴步晨 A kind of construction supervision construction wall water test device
CN207472508U (en) * 2017-11-29 2018-06-08 四川建科工程建设管理有限公司 Project supervision external wall and window side water test device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110567643A (en) * 2019-09-24 2019-12-13 杭州同正建设工程检测有限公司 Device for detecting rain of field window
CN111879675A (en) * 2020-07-24 2020-11-03 惠州建安工程项目管理有限公司 Window infiltration testing arrangement is used in engineering supervision
CN111879675B (en) * 2020-07-24 2023-08-29 惠州建安工程项目管理有限公司 Engineering is managed with window infiltration testing arrangement
CN113758637A (en) * 2021-09-17 2021-12-07 浙江天元项目管理有限公司 City assembled residential engineering manages with building outer wall infiltration testing arrangement
CN113758637B (en) * 2021-09-17 2024-03-26 浙江天元项目管理有限公司 Building outer wall seepage testing device for city assembly type residential engineering supervision
CN113834607A (en) * 2021-11-29 2021-12-24 广东省有色工业建筑质量检测站有限公司 Method and device for processing outer wall water spraying data
CN114486090A (en) * 2021-12-22 2022-05-13 采埃孚合力传动技术(合肥)有限公司 Device and method for testing waterproof performance of reduction gearbox
CN114486090B (en) * 2021-12-22 2022-12-09 采埃孚合力传动技术(合肥)有限公司 Waterproof performance testing device and method for reduction gearbox

Also Published As

Publication number Publication date
CN109060259B (en) 2020-08-04

Similar Documents

Publication Publication Date Title
CN109060259A (en) A kind of project supervision external wall and window side water test device
CN203684468U (en) Curtain wall system with combination of exposed frame and hidden frame
CN109406057A (en) A kind of project supervision external wall and window side water test device
CN206205548U (en) A kind of mobile communication base station
CN103352549B (en) A kind of steel-structure backflow-type double-layer colorful-plate rain tent
CN206002254U (en) Collapsible external window of building water pouring test device
CN205356240U (en) Solar cell support with adjustable
CN203643097U (en) Building external window water-pouring test device for engineering supervision
CN206233500U (en) Heat-preserving wall balustrade exterior panelling mounting structure
CN102589814A (en) Water pouring test equipment for door and window of outer eave of building
CN109140795A (en) A kind of balcony hanging solar water heater
CN110749534A (en) Window limit infiltration testing arrangement is used in engineering supervision
CN204876519U (en) Building interior decoration frame of ascending a height
CN206683821U (en) A kind of adjustable exterior window water pouring test device of nozzle angle
CN209145066U (en) Removable heavy type log cabin metope splicing structure
CN209596468U (en) A kind of fixed bracket of fire-fighting lance
CN202442846U (en) Sprinkling test device for building external eave doors and windows
CN202973634U (en) Mounting rack for wall-mounted solar water heater heat collection device
CN218956317U (en) Aqueduct engineering inspection device
CN106677219B (en) A kind of Combined type power communication well
CN219094483U (en) Drilling device convenient to cool
CN219528594U (en) Single side sliding door type side wall awning
CN205373968U (en) Outer wall water pouring test system
CN219119066U (en) Metal window capable of preventing window sash from leaking rain
CN214091194U (en) Movable house with risk avoiding function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 325000 rooms 1601, 1602, 1603, 1610, 1611 and 1612, Oushang building, Louqiao street, Ouhai District, Wenzhou City, Zhejiang Province

Patentee after: Zhejiang tuoan Engineering Project Management Co.,Ltd.

Address before: 325000 room 30-b, Dongyou building, Wenzhou City, Zhejiang Province

Patentee before: WENZHOU HONGYE CONSTRUCTION SUPERVISION Co.,Ltd.