CN109057766A - Liquid nitrogen fracturing process and device - Google Patents

Liquid nitrogen fracturing process and device Download PDF

Info

Publication number
CN109057766A
CN109057766A CN201811213632.0A CN201811213632A CN109057766A CN 109057766 A CN109057766 A CN 109057766A CN 201811213632 A CN201811213632 A CN 201811213632A CN 109057766 A CN109057766 A CN 109057766A
Authority
CN
China
Prior art keywords
liquid nitrogen
stratum
pressure
fracturing
rupture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811213632.0A
Other languages
Chinese (zh)
Inventor
张广清
李兆星
赵波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum Beijing
Original Assignee
China University of Petroleum Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing filed Critical China University of Petroleum Beijing
Priority to CN201811213632.0A priority Critical patent/CN109057766A/en
Publication of CN109057766A publication Critical patent/CN109057766A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/255Methods for stimulating production including the injection of a gaseous medium as treatment fluid into the formation
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Measuring Fluid Pressure (AREA)

Abstract

A kind of liquid nitrogen fracturing process and device provided by the invention, method includes: liquid nitrogen to be injected into fracturing string, and apply first pressure to liquid nitrogen, so that liquid nitrogen can make stratum occur to rupture for the first time under the action of first pressure;Wherein, fracturing string is arranged in pit shaft;It after stratum occurs to rupture for the first time, closes pit shaft and carries out stewing well, ruptured so that the liquid nitrogen in stratum can gasify and stratum is made to occur second;It is provided with pressure sensor on fracturing string, is injecting liquid nitrogen into fracturing string, and during applying first pressure to liquid nitrogen, passes through the first current pressure that pressure sensor obtains liquid nitrogen;When bust occurs for the first current pressure, show that stratum occurs to rupture for the first time.The application embodiment provides a kind of liquid nitrogen fracturing process and device that can improve effect of increasing production.

Description

Liquid nitrogen fracturing process and device
Technical field
The present invention relates to unconventional petroleum resources fracturing technique field more particularly to a kind of liquid nitrogen fracturing process and device.
Background technique
During pressure break refers to oil recovery or gas production, using the effect of fracturing fluid, so that stratum ruptures, to generate The method in crack.
Usually used is hydraulic fracturing technology in the prior art.But fracturing fluid used in hydraulic fracturing technology is Water, so the hydraulic fracturing technology needs a large amount of water resource, and a large amount of chemicals contained in the fracturing fluid of hydraulic fracturing Matter meeting polluted underground water resource, it is also possible to which reservoir is polluted.And liquid nitrogen, i.e. liquid nitrogen are due to its colorless and odorless and temperature Spend extremely low, chemical property is stablized, and face AIR Proportional 78% is taken up an area, and preparation is convenient, very environmentally friendly, so can be with using liquid nitrogen pressure break The waste for reducing water resource, is effectively reduced hydration swelling and leak-off problem, protects reservoir not contaminated.But it is in the prior art Liquid nitrogen fracturing technique is only merely to have not been used and construct on site in laboratory test.
Summary of the invention
In view of this, the application embodiment provides a kind of liquid nitrogen fracturing process and device that can improve effect of increasing production.
Following technical proposal can be used to realize in above-mentioned purpose of the invention: a kind of liquid nitrogen fracturing process, comprising: to pressure break Liquid nitrogen is injected in tubing string, and first pressure is applied to the liquid nitrogen, so that the liquid nitrogen can be under the action of the first pressure Stratum is set to occur to rupture for the first time;Wherein, the fracturing string is arranged in pit shaft;When the stratum occurs to rupture for the first time Afterwards, it closes the pit shaft and carries out stewing well, so that the liquid nitrogen in the stratum can gasify and occur that the stratum second Rupture.
As a preferred embodiment, inject liquid nitrogen into fracturing string in step, and the is applied to the liquid nitrogen One pressure, so that the liquid nitrogen can make stratum occur to rupture for the first time under the action of the first pressure;Wherein, the pressure break Before tubing string is arranged in pit shaft, further includes: pressure testing is carried out to wellhead equipment, with test the wellhead equipment whether gas leakage;When When the wellhead equipment is air tight, the wellhead equipment is attached with fracturing unit truck, wherein the fracturing unit truck is used for described The liquid nitrogen is injected in fracturing string and applies first pressure to the liquid nitrogen, so that the liquid nitrogen can be in the first pressure Under the action of make the stratum occur to rupture for the first time.
As a preferred embodiment, carrying out pressure testing to the wellhead equipment by cryogenic high pressure nitrogen.
As a preferred embodiment, passing through the annular described in packer sealing between pit shaft and the fracturing string Space, to close the pit shaft.
As a preferred embodiment, the first pressure is not less than the first scheduled value.
As a preferred embodiment, be provided with pressure sensor on the fracturing string, to the pressure break pipe The injection liquid nitrogen in column, and during applying the first pressure to the liquid nitrogen, it is obtained by the pressure sensor First current pressure of the liquid nitrogen;When bust occurs for first current pressure, it is broken for the first time to show that the stratum occurs It splits.
As a preferred embodiment, the pit shaft is closed after the stratum occurs to rupture for the first time, so that In the step of liquid nitrogen in the stratum can gasify and the stratum is made to occur to rupture for second, pass through the pressure sensing Device monitors the second current pressure of gas in the stratum, when second current pressure is less than the second scheduled value, to institute It states and injects liquid nitrogen in fracturing string.
As a preferred embodiment, closing the pit shaft after stratum occurs to rupture for the first time in step Stewing well is carried out, so that the liquid nitrogen in the stratum can gasify and occur that the stratum second after rupturing, further includes: Load fluid is injected into the stratum by the fracturing string;Collect the nitrogen in the stratum.
A kind of liquid nitrogen fracturing device comprising: the first pressure break module, the first pressure break module are used for into fracturing string Liquid nitrogen is injected, and first pressure is applied to the liquid nitrogen, so that the liquid nitrogen can make stratum under the action of the first pressure Occur to rupture for the first time;Wherein, the fracturing string is arranged in pit shaft;Second pressure break module, the second pressure break module are used Stewing well is carried out in after the stratum occurs to rupture for the first time, closing the pit shaft, so that the liquid nitrogen in the stratum can occur Gasify and the stratum is made to occur second and ruptures.
As a preferred embodiment, further include: pressure testing module, the pressure testing module are used to carry out wellhead equipment Pressure testing, with test the wellhead equipment whether gas leakage;Link block, the link block are used for when the wellhead equipment is air tight When, the wellhead equipment is attached with fracturing unit truck, wherein the fracturing unit truck is used for into the fracturing string described in injection Liquid nitrogen and to the liquid nitrogen apply first pressure so that the liquid nitrogen can make the stratum under the action of first pressure Occur to rupture for the first time.
As a preferred embodiment, further include: injection module, the injection module is for passing through the pressure break pipe Column injects load fluid into the stratum;Collection module, the collection module are used to collect the nitrogen in the stratum.
Liquid nitrogen fracturing process provided by the present application and device beneficial effect are: the liquid nitrogen fracturing process of the application embodiment After stratum occurs to rupture for the first time, closes pit shaft and carry out stewing well, so that the liquid nitrogen in stratum can gasify and send out stratum Raw second of rupture.Stewing well is carried out after stratum 17 occurs to rupture for the first time.So as to extend rupture institute's shape for the first time At micro-crack and hole, effective communication for the first time rupture is formed by crack split so that the formation in stratum is more complicated Network is stitched, therefore effect of increasing production can be improved.Therefore, the application embodiment provides a kind of liquid nitrogen pressure that can improve effect of increasing production Cracking method and device.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is the schematic diagram for the liquid nitrogen pressure break that one embodiment of the present invention provides;
Fig. 2 is the schematic diagram of the second man-made fracture in Fig. 1;
Fig. 3 is the flow chart for the liquid nitrogen fracturing process that one embodiment of the present invention provides;
Fig. 4 is the module map for the liquid nitrogen fracturing device that one embodiment of the present invention provides.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1, Fig. 3.The liquid nitrogen fracturing process that a kind of embodiment of the application provides, may include: step S11: liquid nitrogen is injected into fracturing string 11, and first pressure is applied to liquid nitrogen, so that liquid nitrogen can be under the action of first pressure Stratum 17 is set to occur to rupture for the first time;Wherein, fracturing string 11 is arranged in pit shaft 15;Step S13: when stratum 17 occurs first It after secondary rupture, closes pit shaft 15 and carries out stewing well, so that the liquid nitrogen in stratum 17 can gasify and occur that stratum 17 second Rupture.
As can be seen from the above technical solutions: the liquid nitrogen fracturing process of the application embodiment is first by applying liquid nitrogen First pressure, so that liquid nitrogen makes stratum 17 occur to rupture for the first time under the action of first pressure.Then occur the on stratum 17 It after primary rupture, closes pit shaft 15 and carries out stewing well, so that the liquid nitrogen in stratum 17 can gasify and stratum 17 is made to occur second Secondary rupture carries out stewing well after stratum 17 occurs to rupture for the first time.Second of rupture that stratum 17 occurs can extend Rupture for the first time is formed by micro-crack and hole, and rupture is formed by crack for the first time for effective communication, so that in stratum 17 More complicated fracture network is formed, therefore effect of increasing production can be improved.
As shown in Figure 1, in the present embodiment, step S11: injecting liquid nitrogen into fracturing string 11, and applying to liquid nitrogen First pressure, so that liquid nitrogen can make stratum 17 occur to rupture for the first time under the action of first pressure;Wherein, fracturing string 11 is worn In pit shaft 15.Specifically, perforation is carried out to the fracturing string 11 of corresponding fracturing section first.Then start more fracturing unit trucks 13, with by each fracturing unit truck 13 into fracturing string 11 fluid injection nitrogen.And through each fracturing unit truck 13 into fracturing string 11 Liquid nitrogen applies first pressure, so as to suppress high pressure in shaft bottom under the action of the liquid nitrogen energy first pressure in fracturing string 11, works as liquid When the pressure of nitrogen is higher than the fracture pressure on stratum 17, interior liquid nitrogen is flowed into stratum 17 by perforation on fracturing string 11, makes ground Layer 17 occurs to rupture for the first time, to form the first man-made fracture 19.Preferably, first pressure is not less than the first scheduled value, Gasify in fracturing string 11 to avoid liquid nitrogen.The first scheduled value can refer to liquid nitrogen keep liquid when it is required most Small pressure.On the other hand, since the temperature of liquid nitrogen is -196 DEG C, and the pressure temperature in stratum 17 is generally 80 DEG C, so needing Cooling device is set outside the corresponding fracturing section of fracturing string 11, so as to the environment of low temperature is kept in fracturing string 11, thus Avoid the gasification of liquid nitrogen.The cooling device can use existing construction, not provide to this application.
Further, in step S11: injecting liquid nitrogen into fracturing string 11, and apply first pressure to liquid nitrogen, so that liquid Nitrogen can make stratum 17 occur to rupture for the first time under the action of first pressure;Wherein, fracturing string 11 is arranged in pit shaft 15 it Before, further includes:
Step S101: to wellhead equipment carry out pressure testing, with shaft mouth test equipment whether gas leakage.The wellhead equipment includes but not It is limited to ground high pressure line, well head, thread and oily nonyl.Preferably, wellhead equipment is carried out by cryogenic high pressure nitrogen Pressure testing.After avoiding passing through other media progress pressure testings, to wellhead equipment progress, fluid injection nitrogen can there is a situation where reveal.
Step S103: when wellhead equipment is air tight, wellhead equipment and fracturing unit truck 13 are attached.The connection type can To be that threaded connection, screw are connected, are bolted, weld, are integrally formed.To pass through well head when the liquid nitrogen in fracturing unit truck 13 When equipment is flowed into fracturing string 11, the liquid nitrogen in the wellhead equipment will not be revealed.Wherein, fracturing unit truck 13 is used for pressure break Liquid nitrogen is injected in tubing string 11 and applies pressure to liquid nitrogen, so that liquid nitrogen can make stratum 17 occur to rupture for the first time.That is, working as well head After equipment is connect with fracturing unit truck 13, fracturing unit truck 13 can be started and inject liquid nitrogen into fracturing string 11.And by fracturing unit truck 13 to Liquid nitrogen applies pressure.
Further, it is provided with pressure sensor on fracturing string 11, liquid nitrogen is being injected into fracturing string 11, and to liquid During nitrogen applies first pressure, the first current pressure of liquid nitrogen is obtained by pressure sensor;When the first current pressure is sent out When raw bust, show that stratum 17 occurs to rupture for the first time.When the moment that stratum 17 ruptures, liquid nitrogen is flowed into stratum 17, from And make the first current pressure of liquid nitrogen that bust occur.Therefore stratum can be known by the variation of the first current pressure of liquid nitrogen Whether 17 occur to rupture for the first time.
In the present embodiment, step S13: after stratum 17 occurs to rupture for the first time, closing pit shaft 15 and carry out stewing well, with So that the liquid nitrogen in stratum 17 is gasified and makes stratum 17 that second of rupture occur.Wherein, pit shaft 15 is closed, that is, is carried out bored Well.Since the temperature of liquid nitrogen is -196 DEG C, and the temperature in stratum 17 is generally 80 DEG C, so after closing pit shaft 15, stratum Liquid nitrogen heat absorption in 17 is gasified, and is expanded, and the nitrogen that this is expanded forms high pressure in stratum 17, to make stratum 17 second of the rupture occurred, and then the second man-made fracture 21 is formed, as shown in Figure 2.That is, the second of the generation of stratum 17 Secondary rupture is realized under the action of the pressure of nitrogen.Therefore increase after stratum 17 occurs to rupture for the first time in the application One stewing well stage, so that the liquid nitrogen in stratum 17 can gasify, so that the nitrogen after gasifying can be on stratum High pressure is formed in 17, is ruptured so that stratum 17 be made to occur second.And should rupture for second can extend rupture institute's shape for the first time At micro-crack and hole, effective communication for the first time rupture is formed by crack so that the formation in stratum 17 is more complicated Fracture network.To improve effect of increasing production.
In one embodiment, by the annular space between packer sealing pit shaft 15 and fracturing string 11, to close Close pit shaft 15.Since after stratum 17 occurs to rupture for the first time, fracturing string 11 is connected with fracturing unit truck 13, so only needing close The annular space sealed between fracturing string 11 and pit shaft 15 closes pit shaft 15.Further, the time for closing pit shaft 15 can be with It is determined according to specific production practices, such as can be 1 week or so.The time of certain closing pit shaft 15 is without being limited thereto, This application is not provided.
Preferably, after stratum 17 occurs to rupture for the first time, pit shaft 15 is closed, so that the liquid nitrogen in stratum 17 can occur It is current by second of gas in pressure sensor monitoring stratum 17 in the step of gasifying and stratum 17 is made to occur to rupture for second Pressure injects liquid nitrogen into fracturing string 11 when the second current pressure is less than the second scheduled value.The second scheduled value can To be the pressure for enabling stratum 17 that the gas that second ruptures occurs.Since after closing pit shaft 15, nitrogen has been extruded more Behind bigger crack, nitrogen can be flowed into crack, so that air pressure reduces.So in order to improve the effect of second of rupture Fruit injects liquid nitrogen into fracturing string 11 when the second current pressure is less than the second scheduled value, so that liquid nitrogen gasification is over the ground It is pressurized inside layer 17.
In one embodiment, it in step after stratum 17 occurs to rupture for the first time, closes pit shaft 15 and carries out stewing well, with So that the liquid nitrogen in stratum 17 is gasified and occur that stratum 17 second after rupturing, further includes: passes through fracturing string 11 Load fluid is injected into stratum 17;Collect the nitrogen in stratum 17.The load fluid prevents crack for carrying the proppant into crack Closure.Nitrogen collection can carry out secondary use, so that the utilization rate of nitrogen is improved, with save the cost.
As shown in figure 4, a kind of embodiment of the application also provides a kind of liquid nitrogen fracturing device comprising: the first pressure break mould Block 20, the first pressure break module 20 applies first pressure for injecting liquid nitrogen into fracturing string 11, and to liquid nitrogen, so that liquid nitrogen energy Stratum 17 is set to occur to rupture for the first time at the first pressure;Wherein, fracturing string 11 is arranged in pit shaft 15;Second pressure break module 30, the second pressure break module 30 is used to pit shaft 15 is closed, so that the liquid nitrogen energy in stratum 17 after stratum 17 occurs to rupture for the first time Occur to gasify and stratum 17 is made to occur second to rupture.
As can be seen from the above technical solutions: the liquid nitrogen fracturing process of the application embodiment is first by applying liquid nitrogen First pressure, so that liquid nitrogen makes stratum 17 occur to rupture for the first time under the action of first pressure.Then occur the on stratum 17 After primary rupture, pit shaft 15 is closed, is ruptured so that the liquid nitrogen in stratum 17 can gasify and stratum 17 is made to occur second.Ground Second of rupture that layer 17 occurs can extend rupture for the first time and be formed by micro-crack and hole, and effective communication is broken for the first time It splits and is formed by crack, so that the more complicated fracture network of the formation in stratum 17.Therefore effect of increasing production can be improved.
As shown in Fig. 2, in the present embodiment, the first pressure break module 20 is used to inject liquid nitrogen into fracturing string 11, and First pressure is applied to liquid nitrogen, so that liquid nitrogen can make stratum 17 occur to rupture for the first time under the action of first pressure;Wherein, it presses Tubing string 11 is split to be arranged in pit shaft 15.Specifically, perforation is carried out to the fracturing string 11 of corresponding fracturing section first.Then start more Platform fracturing unit truck 13, with by each fracturing unit truck 13 into fracturing string 11 fluid injection nitrogen.And by each fracturing unit truck 13 to pressure break pipe Liquid nitrogen in column 11 applies first pressure, so as to suppress height in shaft bottom under the action of the liquid nitrogen energy first pressure in fracturing string 11 Pressure, when the pressure of liquid nitrogen is higher than the fracture pressure on stratum 17, interior liquid nitrogen passes through perforation inflow stratum 17 on fracturing string 11 It is interior, make stratum 17 occur to rupture for the first time, to form the first man-made fracture 19.Preferably, first pressure is pre- not less than first Fixed value gasifies in fracturing string 11 to avoid liquid nitrogen.When the first scheduled value can refer to that liquid nitrogen keeps liquid Required minimum pressure.On the other hand, since the temperature of liquid nitrogen is -196 DEG C, and the pressure temperature in stratum 17 is generally 80 DEG C, So needing that cooling device is arranged outside the corresponding fracturing section of fracturing string 11, so as to keep the ring of low temperature in fracturing string 11 Border, to avoid the gasification of liquid nitrogen.The cooling device can use existing construction, not provide to this application.
Further, in the first pressure break module 20, liquid nitrogen is injected into fracturing string 11, and the first pressure is applied to liquid nitrogen Power, so that liquid nitrogen can make stratum 17 occur to rupture for the first time under the action of first pressure;Wherein, fracturing string 11 is arranged in well Before in cylinder 15, further includes:
Pressure testing module, the pressure testing module be used for wellhead equipment carry out pressure testing, with shaft mouth test equipment whether gas leakage.The well Jaws equipment includes but is not limited to ground high pressure line, well head, thread and oily nonyl.Preferably, pass through cryogenic high pressure nitrogen Pressure testing is carried out to wellhead equipment.After avoiding passing through other media progress pressure testings, the meeting of fluid injection nitrogen is carried out to the wellhead equipment There is a situation where reveal.
Link block, the link block are used for when wellhead equipment is air tight, wellhead equipment and fracturing unit truck 13 are connected It connects.The connection type can be threaded connection, screw is connected, is bolted, welds, is integrally formed.To work as fracturing unit truck 13 When interior liquid nitrogen is flowed into fracturing string 11 by wellhead equipment, the liquid nitrogen in the wellhead equipment will not be revealed.Wherein, it presses Vehicle 13 is split for injecting liquid nitrogen into fracturing string 11 and applying pressure to liquid nitrogen, so that liquid nitrogen can make stratum 17 occur first Secondary rupture.That is, can start fracturing unit truck 13 after wellhead equipment is connect with fracturing unit truck 13 and inject liquid nitrogen into fracturing string 11. And pressure is applied to liquid nitrogen by fracturing unit truck 13.
Further, it is provided with pressure sensor on fracturing string 11, liquid nitrogen is being injected into fracturing string 11, and to liquid During nitrogen applies first pressure, the first current pressure of liquid nitrogen is obtained by pressure sensor;When the first current pressure is sent out When raw bust, show that stratum 17 occurs to rupture for the first time.When the moment that stratum 17 ruptures, liquid nitrogen is flowed into stratum 17, from And make the first current pressure of liquid nitrogen that bust occur.Therefore stratum can be known by the variation of the first current pressure of liquid nitrogen Whether 17 occur to rupture for the first time.
In the present embodiment, the second pressure break module 30 is used to close pit shaft 15 after stratum 17 occurs to rupture for the first time, It is ruptured so that the liquid nitrogen in stratum 17 can gasify and stratum 17 is made to occur second.Wherein, pit shaft 15 is closed, that is, is carried out bored Well.Since the temperature of liquid nitrogen is -196 DEG C, and the pressure temperature in stratum 17 is generally 80 DEG C, so after closing pit shaft 15, ground Liquid nitrogen heat absorption in layer 17 is gasified, and is expanded, and the nitrogen that this is expanded forms high pressure in stratum 17, to make ground Second of rupture that layer 17 occurs, and then form the second man-made fracture 21.That is, second of rupture that stratum 17 occurs is It is realized under the action of the pressure of nitrogen.Therefore in the application after stratum 17 occurs to rupture for the first time, increase one it is bored The well stage, so that the liquid nitrogen in stratum 17 can gasify, so that the nitrogen after gasifying can be formed in stratum 17 High pressure ruptures so that stratum 17 be made to occur second.And it should rupture for second extend to rupture for the first time and be formed by fine fisssure Line and hole, rupture is formed by crack for the first time for effective communication, so that the more complicated fracture network of the formation in stratum 17. To improve effect of increasing production.
In one embodiment, by the annular space between packer sealing pit shaft 15 and fracturing string 11, to close Close pit shaft 15.Since after stratum 17 occurs to rupture for the first time, fracturing string 11 is connected with fracturing unit truck 13, so only needing close The annular space sealed between fracturing string 11 and pit shaft 15 closes pit shaft 15.Further, the time for closing pit shaft 15 can be with It is determined according to specific production practices, such as can be 1 week or so.The time of certain closing pit shaft 15 is without being limited thereto, This application is not provided.
Preferably, after stratum 17 occurs to rupture for the first time, pit shaft 15 is closed, so that the liquid nitrogen in stratum 17 can occur Gasify and occurs that stratum 17 in the module of second of rupture, it is current by second of gas in pressure sensor monitoring stratum 17 Pressure injects liquid nitrogen into fracturing string 11 when the second current pressure is less than the second scheduled value.The second scheduled value can To be the pressure for enabling stratum 17 that the gas that second ruptures occurs.Since after closing pit shaft 15, nitrogen has been extruded more Behind bigger crack, nitrogen can be flowed into crack, so that air pressure reduces.So in order to improve the effect of second of rupture Fruit injects liquid nitrogen into fracturing string 11 when the second current pressure is less than the second scheduled value, so that liquid nitrogen gasification is over the ground It is pressurized inside layer 17.
In one embodiment, after stratum 17 occurs to rupture for the first time, pit shaft 15 is closed, so that in stratum 17 After liquid nitrogen can gasify and make stratum 17 that the module that second ruptures occur, further includes: injection module, the injection module are used Load fluid is injected into stratum 17 in passing through fracturing string 11.Collection module, the collection module are used to collect the nitrogen in stratum 17 Gas.The load fluid prevents crack closure for carrying the proppant into crack.Nitrogen collection can carry out secondary use, to mention The utilization rate of high nitrogen, with save the cost.
The above is only several embodiments of the present invention, those skilled in the art can be right according to application documents disclosure The embodiment of the present invention carries out various changes or modifications without departing from the spirit and scope of the present invention.

Claims (11)

1. a kind of liquid nitrogen fracturing process characterized by comprising
Liquid nitrogen is injected into fracturing string, and first pressure is applied to the liquid nitrogen, so that the liquid nitrogen can be in first pressure Stratum is set to occur to rupture for the first time under the action of power;Wherein, the fracturing string is arranged in pit shaft;
After the stratum occurs to rupture for the first time, closes the pit shaft and carry out stewing well, so that the liquid nitrogen in the stratum can be sent out Angerization simultaneously makes the stratum that second of rupture occur.
2. liquid nitrogen fracturing process according to claim 1, which is characterized in that liquid nitrogen is injected into fracturing string in step, And first pressure is applied to the liquid nitrogen, so that the liquid nitrogen can be such that stratum occurs for the first time under the action of the first pressure Rupture;Wherein, before the fracturing string is arranged in pit shaft, further includes:
To wellhead equipment carry out pressure testing, with test the wellhead equipment whether gas leakage;
When the wellhead equipment is air tight, the wellhead equipment is attached with fracturing unit truck, wherein the fracturing unit truck is used for The liquid nitrogen is injected into the fracturing string and applies first pressure to the liquid nitrogen, so that the liquid nitrogen can be described the The stratum is set to occur to rupture for the first time under the action of one pressure.
3. liquid nitrogen fracturing process according to claim 2, it is characterised in that: set by cryogenic high pressure nitrogen to the well head It is standby to carry out pressure testing.
4. liquid nitrogen fracturing process according to claim 1, it is characterised in that: by pit shaft described in packer sealing with it is described Annular space between fracturing string, to close the pit shaft.
5. liquid nitrogen fracturing process according to claim 1, it is characterised in that: the first pressure is scheduled not less than first Value.
6. liquid nitrogen fracturing process according to claim 1, which is characterized in that be provided with pressure sensing on the fracturing string Device is injecting the liquid nitrogen into the fracturing string, and during applying the first pressure to the liquid nitrogen, passes through institute State the first current pressure that pressure sensor obtains the liquid nitrogen;When bust occurs for first current pressure, show described Stratum occurs to rupture for the first time.
7. liquid nitrogen fracturing process according to claim 6, it is characterised in that: occur to rupture for the first time when the stratum Afterwards, the pit shaft is closed, so that the step that the liquid nitrogen in the stratum can gasify and make the stratum that second of rupture occur In rapid, by the second current pressure of gas in stratum described in the pressure sensor monitoring, when second current pressure is small When the second scheduled value, liquid nitrogen is injected into the fracturing string.
8. liquid nitrogen fracturing process according to claim 1, it is characterised in that: in step when the stratum occurs to break for the first time It after splitting, closes the pit shaft and carries out stewing well, so that the liquid nitrogen in the stratum can gasify and the stratum is made to occur second After secondary rupture, further includes:
Load fluid is injected into the stratum by the fracturing string;
Collect the nitrogen in the stratum.
9. a kind of liquid nitrogen fracturing device, characterized in that it comprises:
First pressure break module, the first pressure break module apply for injecting liquid nitrogen into fracturing string, and to the liquid nitrogen One pressure, so that the liquid nitrogen can make stratum occur to rupture for the first time under the action of the first pressure;Wherein, the pressure break Tubing string is arranged in pit shaft;
Second pressure break module, the second pressure break module are used to close the pit shaft after stratum occurs to rupture for the first time Stewing well is carried out, is ruptured so that the liquid nitrogen in the stratum can gasify and the stratum is made to occur second.
10. liquid nitrogen fracturing device according to claim 9, which is characterized in that further include:
Pressure testing module, the pressure testing module be used for wellhead equipment carry out pressure testing, with test the wellhead equipment whether gas leakage;
Link block, the link block are used for when the wellhead equipment is air tight, by the wellhead equipment and fracturing unit truck into Row connection, wherein the fracturing unit truck is for injecting the liquid nitrogen into the fracturing string and applying first to the liquid nitrogen Pressure, so that the liquid nitrogen can make the stratum occur to rupture for the first time under the action of the first pressure.
11. liquid nitrogen fracturing device according to claim 9, which is characterized in that further include:
Injection module, the injection module are used to inject load fluid into the stratum by the fracturing string;
Collection module, the collection module are used to collect the nitrogen in the stratum.
CN201811213632.0A 2018-10-18 2018-10-18 Liquid nitrogen fracturing process and device Pending CN109057766A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811213632.0A CN109057766A (en) 2018-10-18 2018-10-18 Liquid nitrogen fracturing process and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811213632.0A CN109057766A (en) 2018-10-18 2018-10-18 Liquid nitrogen fracturing process and device

Publications (1)

Publication Number Publication Date
CN109057766A true CN109057766A (en) 2018-12-21

Family

ID=64764132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811213632.0A Pending CN109057766A (en) 2018-10-18 2018-10-18 Liquid nitrogen fracturing process and device

Country Status (1)

Country Link
CN (1) CN109057766A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173246A (en) * 2019-04-16 2019-08-27 中国矿业大学 A kind of water-liquid nitrogen method that alternately heating rate is adopted in tired pressure break hot dry rock raising
CN114278263A (en) * 2021-12-23 2022-04-05 中国石油大学(北京) Method for efficiently developing deep geothermal reservoir through liquid nitrogen circulating fracturing
CN114607337A (en) * 2022-03-09 2022-06-10 中国石油大学(北京) Liquid nitrogen-water composite fracturing method for coal-bed gas well
CN118030005A (en) * 2024-04-11 2024-05-14 四川泓腾能源集团有限公司 Liquid nitrogen fracturing device and use method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493795A (en) * 2011-11-15 2012-06-13 燕山大学 Method for gasification fracturing of liquid nitrogen in hydrocarbon reservoirs
CA2777449A1 (en) * 2012-05-17 2013-11-17 L'air Liquide - Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Liquefied industrial gas based solution in hydraulic fracturing
CN104612645A (en) * 2014-11-26 2015-05-13 山西潞安环保能源开发股份有限公司 Method for nitrogen fracturing and yield increasing of low-pressure coal-bed gas well
CN108302324A (en) * 2018-04-02 2018-07-20 中国石油集团川庆钻探工程有限公司工程技术研究院 Liquid carbon dioxide energization frac system and technological process

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493795A (en) * 2011-11-15 2012-06-13 燕山大学 Method for gasification fracturing of liquid nitrogen in hydrocarbon reservoirs
CA2777449A1 (en) * 2012-05-17 2013-11-17 L'air Liquide - Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Liquefied industrial gas based solution in hydraulic fracturing
CN104612645A (en) * 2014-11-26 2015-05-13 山西潞安环保能源开发股份有限公司 Method for nitrogen fracturing and yield increasing of low-pressure coal-bed gas well
CN108302324A (en) * 2018-04-02 2018-07-20 中国石油集团川庆钻探工程有限公司工程技术研究院 Liquid carbon dioxide energization frac system and technological process

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐红芳: "适用于页岩气开发的液化氮气汽化压裂技术", 《中国优秀硕士学位论文全文数据库 工程科技I辑》 *
高荫桐: "《采油工程》", 31 August 1989 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173246A (en) * 2019-04-16 2019-08-27 中国矿业大学 A kind of water-liquid nitrogen method that alternately heating rate is adopted in tired pressure break hot dry rock raising
CN114278263A (en) * 2021-12-23 2022-04-05 中国石油大学(北京) Method for efficiently developing deep geothermal reservoir through liquid nitrogen circulating fracturing
CN114278263B (en) * 2021-12-23 2022-11-29 中国石油大学(北京) Method for efficiently developing deep geothermal reservoir through liquid nitrogen circulating fracturing
CN114607337A (en) * 2022-03-09 2022-06-10 中国石油大学(北京) Liquid nitrogen-water composite fracturing method for coal-bed gas well
CN114607337B (en) * 2022-03-09 2023-08-25 中国石油大学(北京) Liquid nitrogen-water composite fracturing method for coal-bed gas well
CN118030005A (en) * 2024-04-11 2024-05-14 四川泓腾能源集团有限公司 Liquid nitrogen fracturing device and use method

Similar Documents

Publication Publication Date Title
CN109057766A (en) Liquid nitrogen fracturing process and device
CN102778554B (en) Experimental device for improving permeability of shale gas storage layer in supercritical CO2 fracturing process
WO2019205577A1 (en) Simulation test system for gas extraction from tectonically-deformed coal seam in-situ by depressurizing horizontal well cavity
CN204679347U (en) A kind of drilling fluid pressurization sealing crushing test device
CN106639971B (en) A kind of high pressure-bearing method for blocking of perforation holes
CN102720473A (en) Method for exploiting coal bed gas
CN208380562U (en) A kind of Multifunctional casing looks for leakage process pipe string
CN106761650A (en) Oil, many microcrack pressure break block releasing techniques of well
Huang New progresses in safe, clean and efficient development technologies for high-sulfur gas reservoirs
CN205743857U (en) Hydraulic feedback formula casing gas recovering device
CN205135508U (en) Sealing device of oil pumping unit
CN117449788A (en) Method for replacing wellhead and wellhead fittings under pressure
CN201738861U (en) Freezing Temporary Blocking Device
CN204457614U (en) A kind of two disc type circulating valve that breaks
CN105672934B (en) The closed Anticreep packer of hydraulic cylinder-type
CN104213848B (en) Arc-shaped sealing device for opening hole of pipeline or drill rod with pressure and using method
CN101586455B (en) Anchoring expansion type packer
CN104612625A (en) Hole sealing device for low-permeability coal bed gas-phase fracturing drilling
CN106368645B (en) SAGD well temperature measuring cable is with pressure to be mentioned, under construction method
CN203614073U (en) Thermal insulation annular blowout preventer for oil well
CN203626689U (en) Well head protection sealing connection device
CN103105270A (en) Pressure test method applied to downhole tool
CN202000957U (en) Steam injection packer
CN204266982U (en) A kind of heating power is bored into formula packer
CN203412526U (en) Device for converting medium sealed in under-pressure operating well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221