CN109057247A CN201810856732.9A CN201810856732A CN109057247A CN 109057247 A CN109057247 A CN 109057247A CN 201810856732 A CN201810856732 A CN 201810856732A CN 109057247 A CN109057247 A CN 109057247A
Authority
CN
China
Prior art keywords
edge list
internal lining
pipe
lining pipe
girder construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810856732.9A
Other languages
Chinese (zh)
Other versions
CN109057247B (en
Inventor
时康
方杰
张卫纲
刘健
柯昌吉
左义
范垚垚
王鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201810856732.9A priority Critical patent/CN109057247B/en
Publication of CN109057247A publication Critical patent/CN109057247A/en
Application granted granted Critical
Publication of CN109057247B publication Critical patent/CN109057247B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings

Abstract

The present invention relates to the connection structures and its construction method of a kind of edge list and girder construction, wherein connection structure includes: vertically to be fixed on the internal lining pipe of girder construction bottom, internal lining pipe and edge list to be installed be located at same vertical direction and between be installed with a vertical expansion joint;And one end is sheathed on the casing at the top of edge list, the bottom that the other end of casing is sheathed on internal lining pipe is fixedly connected with internal lining pipe, the inner wall of casing is mutually bonded with the outer wall of the outer wall of internal lining pipe, edge list respectively, so that edge list is installed on the bottom of girder construction and can move in expansion joint to prevent edge list deformation.Expansion joint provides the space accommodated after expansion to edge list, is deformed after preventing edge list from expanding under the action of expanding with heat and contract with cold by the both ends Node compression of edge list.

Description

The connection structure and its construction method of edge list and girder construction
Technical field
The present invention relates to the realm of building construction, the connection structure and its construction party of espespecially a kind of edge list and girder construction Method.
Background technique
Edge list is made of the part such as column cap, cylinder, base for post.Edge list, which removes to have, bears weight, and there are also beautifying and decorating works With.Usually by edge list and metope, roof and indoor and outdoor one entirety of other structures in construction.For example, one Under kind operating condition, edge list is shored and is installed between the lower margin stub of girder construction and ground.The cross section of elongated edge list Product is small and has biggish height, after edge list is installed on girder construction, since the opposite end of edge list is all connected with Closely, edge list easily deforms under the action of expanding with heat and contract with cold, to influence the aesthetics of edge list.
Summary of the invention
It is an object of the invention to overcome the deficiencies of existing technologies, the connection structure of a kind of edge list and girder construction is provided And its construction method, solve the problems, such as that edge list is easily deformed under the action of expanding with heat and contract with cold in the prior art.
Realizing the technical solution of above-mentioned purpose is:
The present invention provides the connection structure of a kind of edge list and girder construction, comprising:
It is vertically fixed on the internal lining pipe of girder construction bottom, the internal lining pipe and edge list to be installed are located at same vertical Direction and between be installed with a vertical expansion joint;And
One end is sheathed on the casing at the top of the edge list, and the other end of described sleeve pipe is sheathed on the bottom of the internal lining pipe It portion and is fixedly connected with the internal lining pipe, the inner wall of described sleeve pipe and outer wall, the outer wall of the edge list of the internal lining pipe are equal It is bonded to each other, so that the edge list is installed on the bottom of the girder construction and can move in the expansion joint to prevent The edge list deformation.
The connection structure of edge list and girder construction of the present invention and its construction method the utility model has the advantages that
The present invention fixes an internal lining pipe by the bottom in girder construction, and is sheathed on internal lining pipe and decoration using casing Column realizes the bottom that edge list is installed on to girder construction so that internal lining pipe and edge list are vertically connected with.Vertically standing If being stayed between edge list and internal lining pipe during installation edge list and setting an expansion joint, thus when edge list is expanding with heat and contract with cold It, can be by the relative movement between casing and edge list, after expansion joint provides expansion to edge list when being expanded under effect The space of accommodating is become after preventing edge list from expanding under the action of expanding with heat and contract with cold by the both ends Node compression of edge list Shape solves the problems, such as edge list influence of crust deformation beauty and stability after mounting in the prior art.
The connection structure of edge list and girder construction of the present invention further improvement lies in that, the edge list and described sleeve pipe Between be folded with lubricant layer.
The connection structure of edge list and girder construction of the present invention further improvement lies in that, the lubricant layer is is pasted on State the polytetrafluoroethylene ethylene layer of the inner wall of casing.
The connection structure of edge list and girder construction of the present invention further improvement lies in that, the inner sidewall interval of internal lining pipe is solid Surely there is nut, correspond on the side wall of the internal lining pipe and be equipped with through-hole at the nut;
Corresponding through-hole in described sleeve pipe and the internal lining pipe is arranged in by bolt and is screwed together in the corresponding spiral shell Mother, so that described sleeve pipe is fixedly connected with the internal lining pipe.
The connection structure of edge list and girder construction of the present invention further improvement lies in that, the internal lining pipe and the connection It is fixedly connected between column by securing plate.
The connection structure of edge list and girder construction of the present invention further improvement lies in that, the top of the edge list is vertical Be fixed with the sliding pipe that bore is less than the edge list, described sleeve pipe be sheathed on the sliding manage and the bottom of described sleeve pipe and It is stayed between the bottom of the sliding pipe and sets a distance.
The present invention also provides a kind of construction methods of the connection structure of edge list and girder construction, comprising:
There is provided internal lining pipe, by the internal lining pipe be vertically fixed on girder construction bottom and with edge list position to be installed In same vertical direction;
Casing is provided, one end of described sleeve pipe is sheathed on to the top of the edge list;
The edge list is lifted to position to be installed and vertically erect installation, stayed between the edge list and the internal lining pipe Equipped with a vertical expansion joint;And
The other end of the casing at the top of edge list is sheathed on to the bottom of the internal lining pipe, by described sleeve pipe and described interior Bushing pipe is fixedly connected, so that the edge list is installed on the bottom of the girder construction and can be moved in the expansion joint To prevent the edge list deformation.
The construction method of the connection structure of edge list and girder construction of the present invention further improvement lies in that,
Before described sleeve pipe to be sheathed on to the top of the edge list, further includes:
Lubricant layer is provided, the lubricant layer is pasted on to the inner wall of described sleeve pipe.
The construction method of the connection structure of edge list and girder construction of the present invention further improvement lies in that,
Before the internal lining pipe is vertically fixed on the bottom of girder construction, further includes:
Nuts and bolt is provided, by the inner sidewall of the fixed internal lining pipe in the nut interval;
Correspond at the nut on the internal lining pipe side wall and opens up through-hole;
Described sleeve pipe is fixedly connected with the internal lining pipe, comprising:
The bolt is arranged in corresponding through-hole in described sleeve pipe and the internal lining pipe and is screwed together in the corresponding spiral shell Mother, so that described sleeve pipe is fixedly connected with the internal lining pipe.
The construction method of the connection structure of edge list and girder construction of the present invention further improvement lies in that,
There is provided internal lining pipe, by the internal lining pipe be vertically fixed on girder construction bottom and with edge list position to be installed In same vertical direction;
Casing is provided, one end of described sleeve pipe is sheathed on to the top of the edge list;
The edge list is lifted to position to be installed and vertically erect installation, stayed between the edge list and the internal lining pipe Equipped with a vertical expansion joint;And
The other end of the casing at the top of edge list is sheathed on to the bottom of the internal lining pipe, by described sleeve pipe and described interior Bushing pipe is fixedly connected, so that the edge list is installed on the bottom of the girder construction and can be moved in the expansion joint To prevent the edge list deformation.
Detailed description of the invention
Fig. 1 is the cross-sectional view of the installation condition of the connection structure of edge list of the present invention and girder construction.
Fig. 2 is the schematic diagram of the decomposition of the connection structure of edge list of the present invention and girder construction.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples.
Refering to fig. 1, it is shown that the cross-sectional view of the installation condition of the connection structure of edge list and girder construction of the present invention.Fig. 2 For the schematic diagram of the decomposition of the connection structure of edge list of the present invention and girder construction.Referring to figs. 1 and 2, it is decorated in installation Lower margin stub and pre embedded bolt in the work progress of column 30, first in construction ground.Then the girder construction 10 on construction top, Edge list 30 can be lifted after the intensity of girder construction 10 and lower margin stub can satisfy requirement and vertically be pacified Loaded between lower margin stub and girder construction 10.In the prior art, 10 He of girder construction is fixed on when shoring edge list 30 After between lower margin stub, edge list 30 is easy to be influenced by expanding with heat and contract with cold, such as due to not buffering after the expansion of edge list 30 Space, edge list 30 is easily bent deformation, to influence appearance and support performance.
Girder construction 10 is steel construction, and it is before Construction of Steel Structure just first in processing factory that the component of steel construction is general It makes, component length, anchor bolt position, component specification is all the determination according to design requirement, so in face of decoration When problem that column 30 is easy that deformation occurs in the case where expanding with heat and contract with cold, do not consider generally to adjust girder construction 10.
Therefore the adjustable region only top node link position of the node at remaining lower margin stub and edge list 30.It is inciting somebody to action After node at lower margin stub fixes, the top node position of edge list 30 can be reached to adjustment model to the greatest extent It encloses.
The connection structure of edge list and girder construction of the present invention includes: the internal lining pipe for being vertically fixed on 10 bottom of girder construction 20, internal lining pipe 20 and edge list 30 to be installed be located at same vertical direction and between be installed with a vertical expansion joint;And One end is sheathed on the casing 40 at the top of edge list 30, and the other end of casing 40 is sheathed on the bottom of internal lining pipe 20 and and internal lining pipe 20 are fixedly connected, and the inner wall of casing 40 is mutually bonded with the outer wall of the outer wall of internal lining pipe 20, edge list 30 respectively, to decorate Column 30 is installed on the bottom of girder construction 10 and can move in expansion joint to prevent 30 deformation of edge list.
One better embodiment of the connection structure as edge list of the present invention and girder construction, edge list 30 and casing 40 Between be folded with lubricant layer 50.Lubricant layer 50 is fixed on the inner wall of casing 40, and lubricant layer 50 is capable of forming low-friction coefficient sliding Face, thus it is subsequent casing 40 is sheathed on edge list 30 when, the frictional resistance between edge list 30 and casing 40 can be reduced, Facilitate and relatively moves edge list 30 and casing 40.In the present embodiment, lubricant layer 50 be pasted on casing 40 inner wall it is poly- Tetrafluoroethene layer.Lubricant layer 50 can also be replaced using the small material of other frictional resistance.
One better embodiment of the connection structure as edge list of the present invention and girder construction, the inner sidewall of internal lining pipe 20 It is fixed at intervals with nut 60, corresponds on the inner sidewall of internal lining pipe 20 and is equipped with through-hole at nut 60.One end welding of nut 60 is solid Due to the inner sidewall of internal lining pipe 20, so that the threaded hole of nut 60 corresponds to the inner sidewall of internal lining pipe 20, for can it is subsequent can Screw bolt and nut 60 is screwed together, the position on the side wall of internal lining pipe 20 corresponding to nut 60 opens up through-hole.Pass through bolt 61 are arranged in corresponding through-hole on casing 40 and internal lining pipe 20 and are screwed together in corresponding nut 60, thus by casing 40 and liner Pipe 20 is fixedly connected.It is screwed together, is easy for installation and removal using screw bolt and nut.
One better embodiment of the connection structure as edge list of the present invention and girder construction, multiple nuts 60 are in liner Circumferentially it is arranged on the inner sidewall of pipe 20, so as to which circumferentially casing 40 and internal lining pipe 20 are fixed from multiple directions, It ensure that the fastness and stability of the connection of casing 40 and internal lining pipe 20.
One better embodiment of the connection structure as edge list of the present invention and girder construction, girder construction 10 include extremely Few two crossbeams 11 and the connecting column 12 being connected between crossbeam 11, internal lining pipe 20 are fixed on the bottom of connecting column 12.Multiple cross Beam 11 is arranged in divergent shape, and end is resisted against connecting column 12, is fixedly connected multiple crossbeams 11 using connecting column 12, To which shape is integral, the stability that connects between multiple crossbeams 11 and securely qualitative is strengthened.In the present embodiment, connecting column 12 be steel pipe, and crossbeam 11 is girder steel, and the end of girder steel is welded in the side wall of steel pipe to be fixedly connected.
One better embodiment of the connection structure as edge list of the present invention and girder construction, internal lining pipe 20 and connecting column It is fixedly connected between 12 by securing plate 13.Securing plate 13 strengthens the fastness connected between internal lining pipe 20 and connecting column 12. In the present embodiment, securing plate 13 is steel plate, and steel plate is welded in the bottom of connecting column 12.The area of steel plate is slightly larger than connecting column 12 Sectional area.
When making edge list, the top of edge list 30 is vertically fixed with the sliding pipe that bore is less than edge list 30, casing 40 are sheathed on sliding pipe and stay between the bottom of casing 40 and the bottom for sliding pipe and set a distance, thus to casing 40 and decoration Relative movement between column 30 provides mobile space, the top of edge list 30 when edge list 30 is affected by thermal expansion and contraction and expands Mobile adjusting can be carried out relative to casing 40, and edge list 30 is prevented to be deformed.
One better embodiment of the connection structure as edge list of the present invention and girder construction, the present invention also provides one The construction method of the connection structure of kind edge list and girder construction, comprising:
There is provided internal lining pipe 20, by internal lining pipe 20 be vertically fixed on girder construction 10 bottom and with edge list to be installed 30 are located at same vertical direction;
Casing 40 is provided, one end of casing 40 is sheathed on to the top of edge list 30;
It lifts edge list 30 and to position to be installed and vertically erects installation, be installed with one between edge list 30 and internal lining pipe 20 Vertical expansion joint;And
The other end of the casing 40 at the top of edge list 30 is sheathed on to the bottom of internal lining pipe 20, by casing 40 and internal lining pipe 20 are fixedly connected, so that edge list 30 is installed on the bottom of girder construction 10 and can be moved in expansion joint to prevent from decorating 30 deformation of column.
One better embodiment of the construction method of the connection structure as edge list of the present invention and girder construction will cover Pipe 40 is sheathed on before the top of edge list 30, further includes: provides lubricant layer 50, lubricant layer 50 is pasted in casing 40 Wall.
One better embodiment of the construction method of the connection structure as edge list of the present invention and girder construction, will in Bushing pipe 20 is vertically fixed on before the bottom of girder construction 10, further includes: is provided nut 60 and bolt 61, nut 60 is spaced solid Determine the inner sidewall of internal lining pipe 20;
Correspond at nut 60 on the side wall of internal lining pipe 20 and opens up through-hole.
Casing 40 is fixedly connected with internal lining pipe 20, comprising: bolt 61 is arranged on casing 40 and internal lining pipe 20 corresponding Through-hole and be screwed together in corresponding nut 60, so that casing 40 is fixedly connected with internal lining pipe 20.
One better embodiment of the construction method of the connection structure as edge list of the present invention and girder construction, nut 60 Due to being located at the inner sidewall of internal lining pipe 20, to can not directly be tightened outside internal lining pipe 20 when installing nuts and bolt, therefore need First to be about to the inner sidewall that nut 60 is fixed on internal lining pipe 20 before internal lining pipe 20 and girder construction 10 are welded and fixed.It is inciting somebody to action Internal lining pipe 20 and the girder construction 10 on top are welded and fixed again after fixing for nut 60, in case installation edge list 30.
One better embodiment of the construction method of the connection structure as edge list of the present invention and girder construction, beam body knot Structure 10 includes at least two crossbeams 11 and the connecting column 12 being connected between crossbeam 11, and internal lining pipe 20 is vertically being fixed on beam body When the bottom of structure 10, further includes: securing plate 13 is provided, securing plate 13 is fastened transversely to the bottom of internal lining pipe 20, and will be interior Bushing pipe 20 is fixed on the bottom of securing plate 13, so that internal lining pipe 13 to be fixed on to the bottom of connecting column 12.
The top of edge list 30 is vertically fixed with the sliding pipe that bore is less than edge list 30;
During one end of casing 40 to be sheathed on to the top of edge list 30, by casing 40 be sheathed on sliding pipe and It is stayed between the bottom of casing 40 and the bottom for sliding pipe and sets a distance.
Specifically, casing 40 is sheathed on edge list 30 and simply done down and be fixed temporarily, with steady when guaranteeing subsequent lifting It is qualitative.After casing 40 is sheathed on edge list 30, then casing 40 and edge list 30 are lifted together to position to be installed, The bottom of edge list 30 and lower margin stub are fixedly connected.After the bottom of edge list 30 fixes, 40 He of decannulation is solved Being fixed temporarily between edge list 30 is located at same by the top and internal lining pipe 20 of the fine tuning control edge list 30 of screw bolt and nut One vertical direction.After internal lining pipe 20 is had good positioning, then casing 40 is moved up, and is sheathed on internal lining pipe 20, and lead to Screw bolt and nut is crossed by 20 fixation of casing 40 and internal lining pipe, to guarantee whole stability and fastness.
The connection structure of edge list and girder construction of the present invention and its having the beneficial effect that for construction method
The present invention fixes an internal lining pipe by the bottom in girder construction, and is arranged using casing and is connected to internal lining pipe and dress Column is adornd, so that internal lining pipe and edge list are vertically connected with, realizes the bottom that edge list is installed on to girder construction.Vertical It during erecting installation edge list, is stayed between edge list and internal lining pipe and sets an expansion joint, thus when edge list is expanding with heat and contract with cold Under the action of when expanding, expansion can be provided to edge list by the relative movement between casing and edge list, expansion joint The space accommodated afterwards is become after preventing edge list from expanding under the action of expanding with heat and contract with cold by the both ends Node compression of edge list Shape solves the problems, such as edge list influence of crust deformation beauty and stability after mounting in the prior art.
The present invention has been described in detail with reference to the accompanying drawings, those skilled in the art can be according to upper It states and bright many variations example is made to the present invention.Thus, certain details in embodiment should not constitute limitation of the invention, this Invention will be using the range that the appended claims define as protection scope of the present invention.

Claims (10)

1. the connection structure of a kind of edge list and girder construction characterized by comprising
It is vertically fixed on the internal lining pipe of girder construction bottom, the internal lining pipe and edge list to be installed are located at same vertical side To and between be installed with a vertical expansion joint;And
One end is sheathed on the casing at the top of the edge list, the other end of described sleeve pipe be sheathed on the bottom of the internal lining pipe and Be fixedly connected with the internal lining pipe, the outer wall of the inner wall of described sleeve pipe and the internal lining pipe, the edge list outer wall mutually Fitting, so that the edge list is installed on the bottom of the girder construction and can move in the expansion joint described to prevent Edge list deformation.
2. the connection structure of edge list as described in claim 1 and girder construction, which is characterized in that the edge list and described Lubricant layer is folded between casing.
3. the connection structure of edge list as claimed in claim 2 and girder construction, which is characterized in that the lubricant layer is to paste In the polytetrafluoroethylene ethylene layer of the inner wall of described sleeve pipe.
4. the connection structure of edge list as described in claim 1 and girder construction, which is characterized in that the inside of the internal lining pipe Wall is fixed at intervals with nut, corresponds on the internal lining pipe side wall and is equipped with through-hole at the nut;
Corresponding through-hole in described sleeve pipe and the internal lining pipe is arranged in by bolt and is screwed together in the corresponding nut, from And described sleeve pipe is fixedly connected with the internal lining pipe.
5. the connection structure of edge list as claimed in claim 5 and girder construction, which is characterized in that the internal lining pipe and described It is fixedly connected between connecting column by securing plate.
6. the connection structure of edge list as described in claim 1 and girder construction, which is characterized in that the top of the edge list It is vertically fixed with the sliding pipe that bore is less than the edge list, described sleeve pipe is sheathed on the bottom of the sliding pipe and described sleeve pipe It is stayed between portion and the bottom of the sliding pipe and sets a distance.
7. a kind of construction method of the connection structure of edge list and girder construction characterized by comprising
Internal lining pipe is provided, the internal lining pipe is vertically fixed on the bottom of girder construction and is located at edge list to be installed same One vertical direction;
Casing is provided, one end of described sleeve pipe is sheathed on to the top of the edge list;
The edge list is lifted to position to be installed and vertically erect installation, is installed between the edge list and the internal lining pipe One vertical expansion joint;And
The other end of the casing at the top of edge list is sheathed on to the bottom of the internal lining pipe, by described sleeve pipe and the internal lining pipe Be fixedly connected, thus by the edge list be installed on the bottom of the girder construction and can be moved in the expansion joint to prevent The only edge list deformation.
8. the construction method of the connection structure of edge list as claimed in claim 7 and girder construction, which is characterized in that
Before described sleeve pipe to be sheathed on to the top of the edge list, further includes:
Lubricant layer is provided, the lubricant layer is pasted on to the inner wall of described sleeve pipe.
9. the construction method of the connection structure of edge list as claimed in claim 7 and girder construction, which is characterized in that
Before the internal lining pipe is vertically fixed on the bottom of girder construction, further includes:
Nuts and bolt is provided, by the inner sidewall of the fixed internal lining pipe in the nut interval;
Correspond at the nut on the internal lining pipe side wall and opens up through-hole;
Described sleeve pipe is fixedly connected with the internal lining pipe, comprising:
The bolt is arranged in corresponding through-hole in described sleeve pipe and the internal lining pipe and is screwed together in the corresponding nut, To which described sleeve pipe is fixedly connected with the internal lining pipe.
10. the construction method of the connection structure of edge list as claimed in claim 7 and girder construction, which is characterized in that
The sliding pipe that bore is less than the edge list is vertically fixed at the top of the edge list;
During one end of described sleeve pipe to be sheathed on to the top of the edge list, described sleeve pipe is sheathed on the sliding It is stayed between pipe and the bottom of described sleeve pipe and the bottom of the sliding pipe and sets a distance.
CN201810856732.9A 2018-07-31 2018-07-31 Connecting structure of decorative column and beam body structure and construction method thereof Active CN109057247B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810856732.9A CN109057247B (en) 2018-07-31 2018-07-31 Connecting structure of decorative column and beam body structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810856732.9A CN109057247B (en) 2018-07-31 2018-07-31 Connecting structure of decorative column and beam body structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN109057247A true CN109057247A (en) 2018-12-21
CN109057247B CN109057247B (en) 2021-04-06

Family

ID=64831784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810856732.9A Active CN109057247B (en) 2018-07-31 2018-07-31 Connecting structure of decorative column and beam body structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN109057247B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112412117A (en) * 2020-11-11 2021-02-26 杭州阿房仿古建筑工程有限公司 Archaized building and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19546917A1 (en) * 1994-12-22 1996-06-27 Valeo Climatisation Car air-conditioning heat exchanger
CN202530608U (en) * 2012-04-24 2012-11-14 无锡金城幕墙装饰工程有限公司 Connecting structure at top of glass curtain wall in hole
US20120298248A1 (en) * 2011-05-26 2012-11-29 Guido Schwager Tendon duct, duct connector and duct termination therefor
CN103938735A (en) * 2014-04-26 2014-07-23 中国能源建设集团山西省电力勘测设计院 Single-tube beam capable of releasing temperature stress and suitable for transformer substation continuous rigid frame
CN206635950U (en) * 2017-04-01 2017-11-14 温州远协电子科技有限公司 A kind of square beam column steel construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19546917A1 (en) * 1994-12-22 1996-06-27 Valeo Climatisation Car air-conditioning heat exchanger
US20120298248A1 (en) * 2011-05-26 2012-11-29 Guido Schwager Tendon duct, duct connector and duct termination therefor
CN202530608U (en) * 2012-04-24 2012-11-14 无锡金城幕墙装饰工程有限公司 Connecting structure at top of glass curtain wall in hole
CN103938735A (en) * 2014-04-26 2014-07-23 中国能源建设集团山西省电力勘测设计院 Single-tube beam capable of releasing temperature stress and suitable for transformer substation continuous rigid frame
CN206635950U (en) * 2017-04-01 2017-11-14 温州远协电子科技有限公司 A kind of square beam column steel construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112412117A (en) * 2020-11-11 2021-02-26 杭州阿房仿古建筑工程有限公司 Archaized building and construction method thereof

Also Published As

Publication number Publication date
CN109057247B (en) 2021-04-06

Similar Documents

Publication Publication Date Title
CN205604464U (en) Exterior wall cladding antidetonation is connecting piece down
GB2496035A (en) A yield support prop for a mine
CN109057247A (en) The connection structure and its construction method of edge list and girder construction
CN207999047U (en) Ground levelling device and leveling component
CN204216536U (en) A kind of high pressure suspension circuit sagging prevention device
KR102228837B1 (en) The curtain wall sleeve absorbing relative storey disolacement apllying die-casting construction method
CN206174136U (en) Externally -hanging wallboard coupling assembling
CN207620148U (en) Steel-structure factory building brick wall receives side structure with color steel wall junction waterproof
CN102359185A (en) Connecting structure of large steel structural member and concrete member and construction method
CN110528821A (en) A kind of anti-act formula raised floor foot rest structure
CN207244440U (en) A kind of laminated rubber bases component with adaptively adjustment initial deformation
CN107035035B (en) Light external vertical curtain wall
CN207048052U (en) Steelframe attachment structure
CN207228535U (en) Cladding leveling structure part
CN206681233U (en) A kind of double heat-insulation waterproof roofs
JPS6011223Y2 (en) Handrail top surface waterproof structure
JPH0335781Y2 (en)
CN206987272U (en) Cladding leveling structure part
CN106245843A (en) A kind of open-type building base plate being suitable for lifting suspension member
KR200187233Y1 (en) Buiding roof panel setting constraction
CN207003743U (en) Vertical curtain wall outside a kind of lightweight
JP6971761B2 (en) How to build a tank
CN207376963U (en) A kind of high-strength structure support column
CN106193903A (en) A kind of door and window installation structure
CN205676773U (en) A kind of bridge expanssion joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant