CN109056067A - A kind of quickly cooling device of silica crystals production - Google Patents
A kind of quickly cooling device of silica crystals production Download PDFInfo
- Publication number
- CN109056067A CN109056067A CN201810947136.1A CN201810947136A CN109056067A CN 109056067 A CN109056067 A CN 109056067A CN 201810947136 A CN201810947136 A CN 201810947136A CN 109056067 A CN109056067 A CN 109056067A
- Authority
- CN
- China
- Prior art keywords
- water
- compartment
- air
- conveyer belt
- tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C30—CRYSTAL GROWTH
- C30B—SINGLE-CRYSTAL GROWTH; UNIDIRECTIONAL SOLIDIFICATION OF EUTECTIC MATERIAL OR UNIDIRECTIONAL DEMIXING OF EUTECTOID MATERIAL; REFINING BY ZONE-MELTING OF MATERIAL; PRODUCTION OF A HOMOGENEOUS POLYCRYSTALLINE MATERIAL WITH DEFINED STRUCTURE; SINGLE CRYSTALS OR HOMOGENEOUS POLYCRYSTALLINE MATERIAL WITH DEFINED STRUCTURE; AFTER-TREATMENT OF SINGLE CRYSTALS OR A HOMOGENEOUS POLYCRYSTALLINE MATERIAL WITH DEFINED STRUCTURE; APPARATUS THEREFOR
- C30B29/00—Single crystals or homogeneous polycrystalline material with defined structure characterised by the material or by their shape
- C30B29/10—Inorganic compounds or compositions
- C30B29/16—Oxides
- C30B29/18—Quartz
-
- C—CHEMISTRY; METALLURGY
- C30—CRYSTAL GROWTH
- C30B—SINGLE-CRYSTAL GROWTH; UNIDIRECTIONAL SOLIDIFICATION OF EUTECTIC MATERIAL OR UNIDIRECTIONAL DEMIXING OF EUTECTOID MATERIAL; REFINING BY ZONE-MELTING OF MATERIAL; PRODUCTION OF A HOMOGENEOUS POLYCRYSTALLINE MATERIAL WITH DEFINED STRUCTURE; SINGLE CRYSTALS OR HOMOGENEOUS POLYCRYSTALLINE MATERIAL WITH DEFINED STRUCTURE; AFTER-TREATMENT OF SINGLE CRYSTALS OR A HOMOGENEOUS POLYCRYSTALLINE MATERIAL WITH DEFINED STRUCTURE; APPARATUS THEREFOR
- C30B35/00—Apparatus not otherwise provided for, specially adapted for the growth, production or after-treatment of single crystals or of a homogeneous polycrystalline material with defined structure
- C30B35/005—Transport systems
Abstract
The invention discloses a kind of quickly cooling devices of silica crystals production, including conveyer belt, cooling compartment and air-dried compartment, the cooling compartment and air-dried compartment are respectively mounted on the conveyor belt, the conveyer belt is arranged in the inner cavity in cooling compartment and air-dried compartment, the cooling compartment includes air cooling chamber and waterway, the waterway is located at the lower section of conveyer belt, water supply tank and feed-tank are provided in the waterway, the left and right ends of the water supply tank are separately installed with water inlet pipe and drainpipe, the right end of the water supply tank is equipped with water-delivery pump, the water delivery end of the water-delivery pump is equipped with water-supply-pipe, the feed-tank is mounted on the inner cavity of conveyer belt mechanism, the feed-tank is between upper conveyor belt and lower conveyer belt, the feed-tank is divided into water chamber and backwater cavity, backwater cavity is connected with return pipe, the end of the return pipe is connected with water supply tank.Waterway is in the present invention for reducing conveyor belt temperature, while further coolant, prevents material bonding on the conveyor belt.
Description
Technical field
The present invention relates to chemical production field, the quickly cooling device of specifically a kind of silica crystals production.
Background technique
Silica is for manufacturing plate glass, glassware, casting model powder, glass fibre, ceramic glaze, antirust spray
Sand, filtering sand, flux, refractory material and manufacture light weight cellular concrete.Silica has many uses.In nature
Than the important component, optical instrument and craftwork that sparser crystal can be used to manufacture electronics industry.Silica is manufacture light
Lead the important source material of fiber.General purer quartz, may be utilized in fabricating quartz glass.Quartz glass coefficient of expansion very little, phase
When being amenable to the drastic change of temperature, acid resistance is good (in addition to HF), and therefore, quartz glass is commonly used in the 1/18 of simple glass
Manufacture chemical apparatuses resistant to high temperature.Quartz sand is commonly used for glass raw material and construction material.Silica is manufacture glass, quartzy glass
Glass, waterglass, optical fiber, the important component of electronics industry, optical instrument, craftwork and refractory material raw material, be science
The important materials of research.
The production of silica crystals material at present includes the reaction process such as condensation, neutralization, distillation and sedimentation, and generates height
The product of warm liquid.For that need to be cooled to and solidify convenient for packing and transporting.As can making final product become graininess, then
Not only convenient for packaging, but also it is conducive to production management.Therefore, it is simple to design a kind of structure, easy to operate, the fireballing granulation dress in cold-zone
It sets, active influence will be brought to the production of rubber silica crystals material.
Summary of the invention
The purpose of the present invention is to provide a kind of quickly cooling devices of silica crystals production, to solve above-mentioned background
The problem of being proposed in technology.
To achieve the above object, the invention provides the following technical scheme:
A kind of quickly cooling device of silica crystals production, including conveyer belt, cooling compartment and air-dried compartment, the cooling compartment and
Air-dried compartment is respectively mounted on the conveyor belt, and the conveyer belt is arranged in the inner cavity in cooling compartment and air-dried compartment, and the cooling compartment includes gas
Cold chamber and waterway, the air cooling chamber are mounted on the top in cooling compartment, and the inner cavity of the air cooling chamber is horizontally installed with fixed plate, institute
If stating and being fixedly installed with arterial highway refrigerator in fixed plate, the inner cavity top of the air cooling chamber is equipped with fixed frame, the fixed frame
On driving motor is installed, the bottom end of the driving motor is equipped with transmission shaft, and the transmission shaft passes through fixed plate and bottom end
Fan is installed, the fan is located at the underface of refrigerator, and the bottom end of the air cooling chamber is equipped with bottom plate, sets on the bottom plate
Several road ventholes are equipped with, air cooling chamber is for being rapidly cooled material.
As a further solution of the present invention: the waterway is located at the lower section of conveyer belt, is provided in the waterway
Water supply tank and feed-tank, the left and right ends of the water supply tank are separately installed with water inlet pipe and drainpipe, the right end of the water supply tank
Water-delivery pump is installed, the water delivery end of the water-delivery pump is equipped with water-supply-pipe, and the feed-tank is mounted on the inner cavity of conveyer belt mechanism,
For the feed-tank between upper conveyor belt and lower conveyer belt, the feed-tank is divided into water chamber and backwater cavity, the water-supply-pipe
It is connected with water chamber, is mutually divided between the water chamber and backwater cavity by partition, if is equipped with arterial highway spray on the partition
Water pipe, the sparge pipe passes through backwater cavity and top is equipped with spray head, and the spray head is located at the underface of upper conveyor belt.Return water
Chamber is connected with return pipe, and the end of the return pipe is connected with water supply tank, and waterway is for reducing conveyor belt temperature, further
While coolant, material bonding is prevented on the conveyor belt.
As a further solution of the present invention: the moisturizing box cavity is equipped with quickly cooling unit, to quickly reduce water flow
Temperature, and then re-use, it fills into water chamber.
As a further solution of the present invention: the left and right ends of the backwater cavity are equipped with water receiving baffle, prevent in water receiving
Sealing stream spluttering.
As a further solution of the present invention: Plane Installation has water strainer on the backwater cavity, synchronizes in water receiving to water
Stream is filtered.
As a further solution of the present invention: the middle position of the bottom plate is equipped with bearing, the transmission the tip of the axis
It is installed in bearing, improves stability when operation.
As a further solution of the present invention: the refrigerator uses inert gas as heat sink, will not be with high temperature
Under material react.
As further scheme of the invention: the air-dried compartment is located at the rear end of conveyer belt, the top in the air-dried compartment
Organic frame is installed, if being equidistantly equipped with arterial highway hair dryer in the rack, the outer wall in the air-dried compartment uses permeability type material simultaneously
And if arterial highway air hole is installed on outer wall, thus Quick-air-drying material.
Compared with prior art, the beneficial effects of the present invention are:
One, air-flow is quickly pushed to move downward to carry out heat absorption cooling to the material of molten, so that its rapid crystallization;
It using inert gas as heat sink, avoids reacting with material, causes material quality to occur abnormal.
Two, by way of water cooling, cool down to conveyer belt, while further coolant, prevent material from bonding
On the conveyor belt;Cooling water source recycles, and saves water resource, environmentally protective.
Three, the steam of Quick-air-drying material surface after being quickly cooled down, so that the finished product of dry cooling is obtained, convenient for subsequent
Splicing transport.
Four, cooling process and transport of materials integrated process carry out, and the used time for conveying material is cooled down, and merge working hour,
The time difference in working hour is avoided, maximizes and improves working efficiency.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the structural schematic diagram of air cooling chamber in the present invention.
Fig. 3 is the structural schematic diagram of waterway in the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
In the embodiment of the present invention, a kind of quickly cooling device of silica crystals production, including conveyer belt 1, cooling compartment 2
With air-dried compartment 7, referring to Fig. 1, the cooling compartment 2 and air-dried compartment 7 are installed on conveyer belt 1, the conveyer belt 1 is arranged in cold
But the inner cavity in compartment 2 and air-dried compartment 7, the cooling compartment 2 include air cooling chamber 3 and waterway 4, and air cooling chamber 3 is used to carry out material fast
But, waterway 4 is for reducing conveyor belt temperature for quickly cooling, while further coolant, prevents material bonding on the conveyor belt.
Fig. 1 and Fig. 2 are please referred to, the air cooling chamber 3 is mounted on the top in cooling compartment 2, and the inner cavity of the air cooling chamber 3 is laterally pacified
Equipped with fixed plate 32, if being fixedly installed with arterial highway refrigerator 34 in the fixed plate 32, the inner cavity top installation of the air cooling chamber 3
There is fixed frame 30, driving motor 31 is installed on the fixed frame 30, the bottom end of the driving motor 31 is equipped with transmission shaft 33,
The transmission shaft 33 passes through fixed plate 32 and bottom end is equipped with fan 35, and the fan 35 is located at the underface of refrigerator 34,
The bottom end of the air cooling chamber 3 is equipped with bottom plate 36, several road ventholes 38 is provided on the bottom plate 36, in the bottom plate 36
Between position bearing 37 is installed, the end of the transmission shaft 33 is installed in bearing 37.When operation, start driving motor
31, the refrigerator 34 uses inert gas as heat sink, avoids reacting with material, causes material quality to occur different
Often, driving motor 31 drives 35 operation of fan, quickly pushes air-flow to move downward to absorb heat to the material of molten cold
But, so that its rapid crystallization.
Fig. 1 and Fig. 3 are please referred to, the waterway 4 is located at the lower section of conveyer belt 1, is provided with water supply tank in the waterway 4
5 and feed-tank 6, the left and right ends of the water supply tank 5 be separately installed with water inlet pipe 51 and drainpipe 52, the right side of the water supply tank 5
End is equipped with water-delivery pump, and the water delivery end of the water-delivery pump is equipped with water-supply-pipe 53, and the feed-tank 6 is mounted on 1 mechanism of conveyer belt
Inner cavity, between upper conveyor belt and lower conveyer belt, the feed-tank 6 divides for water chamber 62 and backwater cavity the feed-tank 6
61, the water-supply-pipe 53 is connected with water chamber 62, is mutually divided between the water chamber 62 and backwater cavity 61 by partition, described
If being equipped with arterial highway sparge pipe 62 on partition, the sparge pipe 62 passes through backwater cavity 61 and top is equipped with spray head, the spray
Head is located at the underface of upper conveyor belt.Water flow is conveyed to water chamber 62 by water supply tank 5, so that sparge pipe 62 is sprayed to upper conveyor belt
Bottom end while further coolant, prevent material bonding on the conveyor belt, return to reduce the temperature of upper conveyor belt
Water cavity 61 is connected with return pipe 64, and the end of the return pipe 64 is connected with water supply tank 5.Water flow after spray is from backwater cavity 61
It is back to water supply tank 5 again through return pipe 64 again, 5 inner cavity of water supply tank is equipped with quickly cooling unit 54, to quickly reduce water flow
Temperature, and then re-use fill into water chamber 62, the effect of water circulation use.It installs the left and right ends of the backwater cavity 61
There is water receiving baffle 63, water flow spluttering is prevented in water receiving, causes the adverse effect of equipment;There is Plane Installation on the backwater cavity 61
Water strainer is synchronized in water receiving and is filtered to water flow, and sundries is discharged, and when anti-backflow causes the situation of reflux blockage.
The air-dried compartment 7 is located at the rear end of conveyer belt 1, and organic frame is installed at the top in the air-dried compartment 7, in the rack etc.
Away from if arterial highway hair dryer 71 is equipped with, if the outer wall in the air-dried compartment 7, which uses, is equipped with arterial highway on permeability type material and outer wall
Air hole 72.Plane of crystal after rapid cooling there will necessarily be part steam, air-dry the velocity of liquid assets that air is accelerated in compartment 7, thus
The steam of Quick-air-drying material surface transports to obtain the finished product of dry cooling convenient for subsequent splicing.
The present invention pushes air-flow to move downward quickly to carry out heat absorption cooling to the material of molten, so that it is fast
Speed crystallization;It using inert gas as heat sink, avoids reacting with material, causes material quality to occur abnormal.Pass through water
Cold mode, cools down to conveyer belt, while further coolant, prevents material bonding on the conveyor belt;Cooling water
Source recycles, and saves water resource, environmentally protective.The steam of Quick-air-drying material surface after rapid cooling, to be done
The finished product of dry cooling transports convenient for subsequent splicing.Cooling process and transport of materials integrated process carry out, and convey the use of material
Shi Jinhang is cooling, merges working hour, avoids the time difference in working hour, maximizes and improves working efficiency.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (8)
1. a kind of quickly cooling device of silica crystals production, including conveyer belt (1), cooling compartment (2) and air-dried compartment (7),
The cooling compartment (2) and air-dried compartment (7) are installed on conveyer belt (1), and the conveyer belt (1) is arranged in cooling compartment (2) and wind
The inner cavity of dry compartment (7), the cooling compartment (2) include air cooling chamber (3) and waterway (4), which is characterized in that the waterway (4)
Positioned at the lower section of conveyer belt (1), it is provided with water supply tank (5) and feed-tank (6) in the waterway (4), the water supply tank (5)
Left and right ends are separately installed with water inlet pipe (51) and drainpipe (52), and the right end of the water supply tank (5) is equipped with water-delivery pump, described
The water delivery end of water-delivery pump is equipped with water-supply-pipe (53), and the feed-tank (6) is mounted on the inner cavity of conveyer belt (1) mechanism, described to give
For water tank (6) between upper conveyor belt and lower conveyer belt, the feed-tank (6) is divided into water chamber (62) and backwater cavity (61), institute
It states water-supply-pipe (53) to be connected with water chamber (62), mutually be divided between the water chamber (62) and backwater cavity (61) by partition,
If being equipped with arterial highway sparge pipe (62) on the partition, the sparge pipe (62) passes through backwater cavity (61) and top is equipped with spray
Head, the spray head are located at the underface of upper conveyor belt, and backwater cavity (61) is connected with return pipe (64), the end of the return pipe (64)
End is connected with water supply tank (5).
2. the quickly cooling device of silica crystals production according to claim 1, which is characterized in that the water supply tank
(5) inner cavity is equipped with quickly cooling unit (54).
3. the quickly cooling device of silica crystals production according to claim 1, which is characterized in that the backwater cavity
(61) left and right ends are equipped with water receiving baffle (63).
4. the quickly cooling device of silica crystals production according to claim 3, which is characterized in that the backwater cavity
(61) Plane Installation has water strainer on.
5. the quickly cooling device of silica crystals production according to claim 1, which is characterized in that the air cooling chamber
(3) it is mounted on the top of cooling compartment (2), the inner cavity of air cooling chamber (3) is horizontally installed with fixed plate (32), the fixed plate
(32) if on be fixedly installed with arterial highway refrigerator (34), it is described air cooling chamber (3) inner cavity top be equipped with fixed frame (30), it is described
It is equipped on fixed frame (30) driving motor (31), the bottom end of the driving motor (31) is equipped with transmission shaft (33), the biography
Moving axis (33) passes through fixed plate (32) and bottom end and is equipped with fan (35), the fan (35) be located at refrigerator (34) just under
The bottom end of side, air cooling chamber (3) is equipped with bottom plate (36), and several road ventholes (38) are provided on the bottom plate (36).
6. the quickly cooling device of silica crystals production according to claim 5, which is characterized in that the bottom plate
(36) middle position is equipped with bearing (37), and the end of the transmission shaft (33) is installed in bearing (37).
7. the quickly cooling device of silica crystals production according to claim 5, which is characterized in that the refrigerator
(34) use inert gas is as heat sink.
8. the quickly cooling device of -7 any silica crystals productions according to claim 1, which is characterized in that described
The rear end that compartment (7) are located at conveyer belt (1) is air-dried, the top of the air-dried compartment (7) is installed organic frame, is mounted equidistant in the rack
If there is arterial highway hair dryer (71), the air-dried compartment (7) if outer wall using permeability type material and on outer wall to be equipped with arterial highway saturating
Stomata (72).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810947136.1A CN109056067A (en) | 2018-08-20 | 2018-08-20 | A kind of quickly cooling device of silica crystals production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810947136.1A CN109056067A (en) | 2018-08-20 | 2018-08-20 | A kind of quickly cooling device of silica crystals production |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109056067A true CN109056067A (en) | 2018-12-21 |
Family
ID=64686466
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810947136.1A Pending CN109056067A (en) | 2018-08-20 | 2018-08-20 | A kind of quickly cooling device of silica crystals production |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109056067A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021082026A1 (en) * | 2019-10-29 | 2021-05-06 | 许继平 | Heat dissipation water spraying device for bearing machining |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1808086B1 (en) * | 2006-01-11 | 2010-07-28 | Messer France S.A.S. | Device for cooling products |
CN103962055A (en) * | 2014-03-11 | 2014-08-06 | 贵州宏业矿产资源开发有限公司 | Semi-automatic rapid cooling granulator for rubber aging inhibitor |
CN207379161U (en) * | 2017-11-07 | 2018-05-18 | 上海鑫水机械有限公司 | A kind of Fast Cooling device of chemical reaction product |
CN207594169U (en) * | 2017-11-23 | 2018-07-10 | 浙江荣远科技有限公司 | A kind of pvc sheet materials pipe combined cooling temperature control |
-
2018
- 2018-08-20 CN CN201810947136.1A patent/CN109056067A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1808086B1 (en) * | 2006-01-11 | 2010-07-28 | Messer France S.A.S. | Device for cooling products |
CN103962055A (en) * | 2014-03-11 | 2014-08-06 | 贵州宏业矿产资源开发有限公司 | Semi-automatic rapid cooling granulator for rubber aging inhibitor |
CN207379161U (en) * | 2017-11-07 | 2018-05-18 | 上海鑫水机械有限公司 | A kind of Fast Cooling device of chemical reaction product |
CN207594169U (en) * | 2017-11-23 | 2018-07-10 | 浙江荣远科技有限公司 | A kind of pvc sheet materials pipe combined cooling temperature control |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021082026A1 (en) * | 2019-10-29 | 2021-05-06 | 许继平 | Heat dissipation water spraying device for bearing machining |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206529521U (en) | A kind of device of microwave plasma CVD diamond film | |
CN109056067A (en) | A kind of quickly cooling device of silica crystals production | |
CN106830638B (en) | A kind of processing method of glassware | |
JP2010533640A5 (en) | ||
CN106191997B (en) | casting device and casting method | |
KR101670295B1 (en) | Apparatus for fabrication quartz-crucible | |
CN1531509A (en) | Process and apparatus for producing spherical glass | |
CN205324701U (en) | Device and have its system of infiltrating infiltrates | |
CN102476177B (en) | Upward drawing method for copper alloy wire blank | |
CN105710303A (en) | Vacuum vibration precise casting device and method of high-temperature alloy | |
CN203741048U (en) | Continuous forming and cooling device for liquid calcium carbide | |
CN106082603A (en) | A kind of manufacture method of opaque silica glass ingot | |
CN102270587B (en) | A kind of expoxy transistor flash bating liquor and preparation method thereof | |
JPWO2008069150A1 (en) | Glass melting equipment | |
CN202214287U (en) | One-time thermal forming device for optical glass | |
CN206045962U (en) | High tower grit blast crystal system | |
JP5598424B2 (en) | Method of forming quartz glass | |
CN102432189B (en) | The spraying equipment of barium coating on quartz crucible | |
CN205066433U (en) | Mobilizable continuous tunnel furnace | |
CN202192220U (en) | Improved drying device | |
JP2002087829A (en) | Method for manufacturing glass microdroplet and method for manufacturing microglass product using this method | |
CN205074522U (en) | Negative pressure updraft type pouring device | |
CN217434847U (en) | Novel efficient rapid prototyping injection molding machine | |
CN111792820B (en) | Process for producing large-size quartz glass plate by continuous melting method, quartz glass plate and application thereof | |
CN209555051U (en) | A kind of quartz crucible mold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181221 |