CN109048194A - A kind of method that pipeline looks for mouth to dock using bquster - Google Patents

A kind of method that pipeline looks for mouth to dock using bquster Download PDF

Info

Publication number
CN109048194A
CN109048194A CN201811143386.6A CN201811143386A CN109048194A CN 109048194 A CN109048194 A CN 109048194A CN 201811143386 A CN201811143386 A CN 201811143386A CN 109048194 A CN109048194 A CN 109048194A
Authority
CN
China
Prior art keywords
bquster
section
flue tube
angle steel
concordant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811143386.6A
Other languages
Chinese (zh)
Inventor
姜兆双
郭建平
张辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN201811143386.6A priority Critical patent/CN109048194A/en
Publication of CN109048194A publication Critical patent/CN109048194A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/053Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor
    • B23K37/0533Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor external pipe alignment clamps

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Arc Welding In General (AREA)

Abstract

A kind of method that pipeline looks for mouth to dock using bquster, belongs to large and medium-sized Tube formation docking technique field.Step: one section of flue tube (1) is docked with another section of flue tube (2) assembling, guarantees that flue tube is concordant to interface (3) part, (4) are welded and fixed in the concordant position in part;Mismatch position (7) two sides welding angle steel section (5) is docked with another section of flue tube (2) in one section of flue tube (1), so that bquster 6 (6) is passed through two sides angle steel section (5), and hold out against;Bquster (6) tail end, bquster (6) jacking are struck using external force, while driving mismatch position gradually concordant;After bquster (6) centering, (8) are welded and fixed after docking mismatch position (7) centering is concordant, remove bquster (6) and angle steel section (5) later, docking mismatch position (7) centering finishes.The advantage is that it is easy to operate, the group of flue tube has not only been demonstrate,proved to interface quality, and the bquster and angle steel section after dismounting are reusable, and manpower and material resources are greatly saved, reduce construction cost.

Description

A kind of method that pipeline looks for mouth to dock using bquster
Technical field
The invention belongs to large and medium-sized Tube formation docking technique field, in particular, provides a kind of pipeline and looked for using bquster The method of mouth docking.
Background technique
When large and medium-sized Tube formation docks on industrial project, jack dragging and jack is often taken to assist pipeline mismatch The mode helped, and temporary support rod piece is added inside pipeline, it takes a lot of work, is time-consuming, expense material, increasing construction cost.
Summary of the invention
The purpose of the present invention is to provide a kind of methods that pipeline looks for mouth to dock using bquster, burn to steel mill 360m2 It ties in the construction of main building flue, docking mismatch is assembled in such a way that bquster looks for mouth to flue tube, and achieve success, it should Method not only ensure that the group of flue tube to interface quality, and greatly reduce people, machine come into operation, save people Power material resources, reduce construction cost, have gained most valuable experience for similar construction later.
The present invention docks mismatch spot size in processing factory, according to flue tube, processes bquster (steel plate thickness 30mm) And mating angle steel section, angle steel section is weldingly fixed on flue tube docking mismatch position end position later, bquster is mating to be passed through Two angle steel sections, and hold out against, bquster tail end, bquster jacking are struck using external force later, while driving docking mismatch position It is gradually concordant, docking mismatch position is welded and fixed after concordant, bquster and angle steel section is removed later, docks mismatch position centering It finishes.Triangle bquster and angle steel section are reusable.Specific step is as follows:
The first step, one section of flue tube 1 are docked with another section of assembling of flue tube 2, first guarantee that flue tube is flat to 3 part of interface Together, 4 (Fig. 1) are welded and fixed in the concordant position in part;
Second step docks welding angle steel section 5 in 7 two sides of mismatch position with another section of flue tube 2 in one section of flue tube 1, makes steel Chock 6 passes through two sides angle steel section 5, and holds out against (Fig. 2, Fig. 3, Fig. 4);
Third step strikes 6 tail end of bquster, 6 jacking of bquster using external force, while driving mismatch position gradually concordant (Fig. 5);
4th step after 6 centering of bquster, is welded and fixed 8 after docking 7 centering of mismatch position is concordant, removes bquster 6 later And angle steel section 5, docking 7 centering of mismatch position finish (Fig. 6).
This method is easy to operate, not only ensure that the group of flue tube to interface quality, and greatly reduces people, machine Come into operation, and remove after bquster and angle steel section it is reusable, manpower and material resources are greatly saved, reduce construction Cost achieves good economic benefit for company.
Detailed description of the invention
Fig. 1 is one section of flue tube and another section of flue tube docking scheme.
Fig. 2 is bquster machining sketch chart.
Fig. 3 is angle steel section machining sketch chart.
Fig. 4 is that flue tube docks mismatch position end installation bquster and angle steel section figure.
Fig. 5 schemes flue tube docking mismatch position concordantly by external force for bquster.
Fig. 6 is that spot welding is fixed after flue tube docks mismatch position concordantly, removes bquster and angle steel section figure later.
In figure, 4, angle is welded and fixed to interface 3, the concordant position in part in one section of flue tube 1, another section of flue tube 2, flue tube 8 are welded and fixed after steel section 5, bquster 6, docking mismatch position 7, centering are concordant.
Specific embodiment
Fig. 1-Fig. 5 is a kind of specific embodiment of the invention.Specific embodiment is as follows:
The first step, one section of flue tube 1 are docked with another section of assembling of flue tube 2, first guarantee that flue tube is flat to 3 part of interface Together, the concordant position in part is welded and fixed 4;
Second step docks welding angle steel section 5 in 7 two sides of mismatch position with another section of flue tube 2 in one section of flue tube 1, makes steel Chock 6 passes through two sides angle steel section 5, and holds out against;
Third step strikes 6 tail end of bquster, 6 jacking of bquster using external force, while driving mismatch position gradually concordant;
4th step after 6 centering of bquster, is welded and fixed 8 after docking 7 centering of mismatch position is concordant, removes bquster 6 later And angle steel section 5, docking 7 centering of mismatch position finish.

Claims (1)

1. a kind of method that pipeline looks for mouth to dock using bquster, which is characterized in that specific step is as follows:
The first step, one section of flue tube (1) are docked with another section of flue tube (2) assembling, guarantee that flue tube is locally flat to interface (3) Together, (4) are welded and fixed in the concordant position in part;
Second step docks mismatch position (7) two sides welding angle steel section (5) with another section of flue tube (2) in one section of flue tube (1), So that bquster 6 (6) is passed through two sides angle steel section (5), and holds out against;
Third step strikes bquster (6) tail end, bquster (6) jacking using external force, while driving mismatch position gradually concordant;
4th step after bquster (6) centering, is welded and fixed (8) after docking mismatch position (7) centering is concordant, removes gad later Sub (6) and angle steel section (5), docking mismatch position (7) centering finish.
CN201811143386.6A 2018-09-28 2018-09-28 A kind of method that pipeline looks for mouth to dock using bquster Pending CN109048194A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811143386.6A CN109048194A (en) 2018-09-28 2018-09-28 A kind of method that pipeline looks for mouth to dock using bquster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811143386.6A CN109048194A (en) 2018-09-28 2018-09-28 A kind of method that pipeline looks for mouth to dock using bquster

Publications (1)

Publication Number Publication Date
CN109048194A true CN109048194A (en) 2018-12-21

Family

ID=64766556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811143386.6A Pending CN109048194A (en) 2018-09-28 2018-09-28 A kind of method that pipeline looks for mouth to dock using bquster

Country Status (1)

Country Link
CN (1) CN109048194A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111496447A (en) * 2020-05-15 2020-08-07 中冶天工集团天津有限公司 Fastening device for steel plate lap joint paving and operation method
CN111805151A (en) * 2020-07-31 2020-10-23 中国十七冶集团有限公司 Device and method for aligning longitudinal seams between shells of hot blast stove
CN111805150A (en) * 2020-07-31 2020-10-23 中国十七冶集团有限公司 Staggered joint prevention device and method for blast furnace shell assembly transverse joint
CN111842537A (en) * 2020-07-31 2020-10-30 中国十七冶集团有限公司 Seam aligning device and method for large and medium-diameter conical pipelines

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3928919A (en) * 1975-04-25 1975-12-30 Russell S Thatcher Welding track positioning gauge
CN201208680Y (en) * 2008-05-16 2009-03-18 中冶天工建设有限公司 Wedge tool for tube group butt welding
CN201552381U (en) * 2009-10-30 2010-08-18 天津振汉机械装备有限公司 Tool component used for assembly spot welding of circular seam of container tank body
CN202667995U (en) * 2012-08-10 2013-01-16 唐山三友化工股份有限公司 Device for eliminating misalignment of butt joint of metal container or pipeline
CN107931944A (en) * 2017-11-30 2018-04-20 中国冶集团有限公司 A kind of steel construction large-diameter pipeline butt welding erecting device and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3928919A (en) * 1975-04-25 1975-12-30 Russell S Thatcher Welding track positioning gauge
CN201208680Y (en) * 2008-05-16 2009-03-18 中冶天工建设有限公司 Wedge tool for tube group butt welding
CN201552381U (en) * 2009-10-30 2010-08-18 天津振汉机械装备有限公司 Tool component used for assembly spot welding of circular seam of container tank body
CN202667995U (en) * 2012-08-10 2013-01-16 唐山三友化工股份有限公司 Device for eliminating misalignment of butt joint of metal container or pipeline
CN107931944A (en) * 2017-11-30 2018-04-20 中国冶集团有限公司 A kind of steel construction large-diameter pipeline butt welding erecting device and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111496447A (en) * 2020-05-15 2020-08-07 中冶天工集团天津有限公司 Fastening device for steel plate lap joint paving and operation method
CN111805151A (en) * 2020-07-31 2020-10-23 中国十七冶集团有限公司 Device and method for aligning longitudinal seams between shells of hot blast stove
CN111805150A (en) * 2020-07-31 2020-10-23 中国十七冶集团有限公司 Staggered joint prevention device and method for blast furnace shell assembly transverse joint
CN111842537A (en) * 2020-07-31 2020-10-30 中国十七冶集团有限公司 Seam aligning device and method for large and medium-diameter conical pipelines

Similar Documents

Publication Publication Date Title
CN109048194A (en) A kind of method that pipeline looks for mouth to dock using bquster
CN104759824A (en) T-shaped structure ship assembly tool without clamping plate
CN104741858A (en) Codeless welding fixture of welding with backing of CO2 butt joint
CN103862302B (en) Spool retaining wall on slope positioner
CN209551017U (en) A kind of steel pipe docking bar straightening mechanism
CN107175456A (en) Large diameter steel pipe self-control line-up clamp docking construction
CN205577400U (en) Tool type template
CN204024088U (en) The fast-positioning device of workshop steel column sectional lifting docking
CN110497356B (en) Large-scale electric motor rotor installs and removes retaining ring tool equipment
CN110480253A (en) Chain sprocket restorative procedure
CN215509866U (en) Hydraulic dismounting system for rear matched wheel set of shield tunneling machine
CN111001976A (en) Opening aligning device for large-diameter thin-wall pipeline and using method thereof
CN204081536U (en) For the detachable safety device of Steel Structure Installation in a kind of building operations
CN105370028B (en) A kind of junction button installed for scaffold
CN102720353A (en) Post-construction one-side shear wall formwork for settlement joint of tower and construction method
CN201455842U (en) Centering device for H-shape steel
CN103252590B (en) Butt welding method of column of steelmaking workshop
CN201969903U (en) Two-jaw chuck
CN213703249U (en) Auxiliary tool for removing coupler through electro-hydraulic
CN209206798U (en) A kind of new and old furnace skin rapid abutting joint alignment tool
CN205660331U (en) Seamless steel pipe ring flange welding die set
CN205153801U (en) Detachable connector is used with protection frame to outdoor elevator guard gate
CN202137535U (en) A-shaped fixture for welding operation for excavator grabs
CN203784558U (en) Telescoping device for socket-and-spigot pipe replacement
CN204545795U (en) A kind of assembly tooling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221

RJ01 Rejection of invention patent application after publication