CN109034531A - 一种考虑多时间窗口约束的卫星成像多源任务动态规划方法 - Google Patents
一种考虑多时间窗口约束的卫星成像多源任务动态规划方法 Download PDFInfo
- Publication number
- CN109034531A CN109034531A CN201810631113.XA CN201810631113A CN109034531A CN 109034531 A CN109034531 A CN 109034531A CN 201810631113 A CN201810631113 A CN 201810631113A CN 109034531 A CN109034531 A CN 109034531A
- Authority
- CN
- China
- Prior art keywords
- task
- dynamic
- constraint
- windows
- satellite
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Control Of Position, Course, Altitude, Or Attitude Of Moving Bodies (AREA)
Abstract
本发明公开了一种考虑多时间窗口约束的卫星成像多源任务动态规划方法,包括如下步骤:步骤1、将多源任务看作是新任务插入到初始规划方案中,构建动态任务集;步骤2、考虑多时间窗口的约束,建立基于多时间窗口的动态约束满足问题模型;步骤3、根据总收益最大原则和扰动测度最小原则,采用最优路径搜索的方法为每个观测任务确定成像时间窗口和成像姿态角。本发明解决了卫星成像任务动态规划的技术难题,相比于现有的动态任务规划方法具有明显的自主性优势和工程适用性。
Description
技术领域
本发明涉及卫星成像任务规划方法,具体地,涉及一种考虑多时间窗口约束的卫星成像多源任务动态规划方法。
背景技术
动态任务规划问题由于其不确定性、多变性,一直以来都是卫星成像任务规划技术研究中的难点。卫星成像任务动态规划问题主要有卫星资源状态变化、新任务的插入等几种扰动形式。且目前任务规划问题考虑的任务来源单一,对多任务源情况下的任务规划问题研究甚少。
在多任务源情况下,卫星可接收成像任务的通道多,任务类型多,卫星与成像任务之间的时间窗口约束复杂,传统的任务规划已经无法满足这种情况下的成像需求。
本发明在卫星成像任务自主规划的基础上提出了一种考虑多时间窗口约束的卫星成像多源任务动态规划方法,对于实现卫星在轨成像任务动态规划具有重要意义。
发明内容
针对卫星成像任务动态规划的技术难题,本发明提供了一种考虑多时间窗口约束的卫星成像多源任务动态规划方法,对于实现卫星在轨成像任务动态规划具有重要意义。
本发明具体通过以下技术方案实现:
一种考虑多时间窗口约束的卫星成像多源任务动态规划方法,包括如下步骤:
步骤1、设初始规划方案中未完成的任务集为Mrest,在Tinsert时刻有来自其他任务源的新任务集Mnew,构建动态任务集Mdynamic为:
Mdynamic=Mrest∪Mnew
步骤2、考虑多时间窗口的约束,建立基于多时间窗口的动态约束满足问题模型;具体的:
S21、优化目标,使动态调整后的方案总收益最大。
设动态任务集Mdynamic中任务mdi的优先级为pi,决策变量为xi,且
则目标函数为
S22、多时间窗口约束,包括卫星与任务源之间的可见时间窗口约束、卫星与新任务之间的可见时间窗口约束;
设任务源集合为GS={GS1,GS2,……,GSn},n为任务源的数量;新任务集合为 表示由第i个任务源插入的第j个新任务。
卫星与任务源之间的可见时间窗口集合为
卫星对新任务的可见时间窗口集合为
卫星对新任务的成像时间窗口集合为
则应满足
S23、新任务的优先观测性约束,即插入的新任务是要求卫星优先观测或必须观测的;
设动态任务集为Mdynamic,插入的新任务集为则应满足
步骤3、设扰动测度为Δ,n1、n2分别为相对初始方案,动态调整后的方案中开始观测时间发生变化的任务数量和被删除的任务数量,n为初始方案中观测任务的总数,pi、pj、pk为任务的优先级;根据总收益最大原则和扰动测度最小原则,即:
并采用最优路径搜索的方法为每个观测任务确定成像时间窗口和成像姿态角。
本发明的一种考虑多时间窗口约束的卫星成像多源任务动态规划方法,由于采取上述的技术方案,使得本发明的卫星成像任务动态规划方法相比于现有的任务动态规划方法具有明显的自主性优势和工程适用性。
附图说明
图1为本发明涉及的一种考虑多时间窗口约束的卫星成像多源任务动态规划方法流程图。
具体实施方式
以下实施例将有助于本领域的技术人员进一步理解本发明,但不以任何形式限制本发明。应当指出的是,对本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进。这些都属于发明的保护范围。
下面结合具体实施例对本发明进行详细说明。
图1为本发明涉及的一种考虑多时间窗口约束的卫星成像多源任务动态规划方法,本发明包括如下步骤:
步骤1、设初始规划方案中未完成的任务集为Mrest,在Tinsert时刻有来自其他任务源的新任务集Mnew,构建动态任务集Mdynamic为:
Mdynamic=Mrest∪Mnew
步骤2、考虑多时间窗口的约束,建立基于多时间窗口的动态约束满足问题模型,即:
S21、优化目标:使动态调整后的方案总收益最大。
设动态任务集Mdynamic中任务mdi的优先级为pi,决策变量为xi,且
则目标函数为
S22、多时间窗口约束:包括卫星与任务源之间的可见时间窗口约束、卫星与新任务之间的可见时间窗口约束。
设任务源集合为GS={GS1,GS2,……,GSn},n为任务源的数量;新任务集合为 表示由第i个任务源插入的第j个新任务。
卫星与任务源之间的可见时间窗口集合为
卫星对新任务的可见时间窗口集合为
卫星对新任务的成像时间窗口集合为
则应满足
S23、新任务的优先观测性约束:即插入的新任务是要求卫星优先观测或必须观测的。
设动态任务集为Mdynamic,插入的新任务集为则应满足
步骤3、设扰动测度为Δ,n1、n2分别为相对初始方案,动态调整后的方案中开始观测时间发生变化的任务数量和被删除的任务数量,n为初始方案中观测任务的总数,pi、pj、pk为任务的优先级。根据总收益最大原则和扰动测度最小原则,即:
并采用最优路径搜索的方法为每个观测任务确定成像时间窗口和成像姿态角。
经过仿真验证,本发明取得了卫星成像任务动态规划时满足最大收益和最小扰动测度时的规划方案。
本发明优选实施例只是用于帮助阐述本发明。优选实施例并没有详尽叙述所有的细节,也不限制该发明仅为所述的具体实施方式。根据本说明书的内容,可作很多的修改和变化。本说明书选取并具体描述这些实施例,是为了更好地解释本发明的原理和实际应用,从而使所属技术领域技术人员能很好地利用本发明。本发明仅受权利要求书及其全部范围和等效物的限制。
Claims (2)
1.一种考虑多时间窗口约束的卫星成像多源任务动态规划方法,其特征在于,包括如下步骤:
步骤1、设初始规划方案中未完成的任务集为Mrest,在Tinsert时刻有来自其他任务源的新任务集Mnew,构建动态任务集Mdynamic为:
Mdynamic=Mrest∪Mnew
步骤2、考虑多时间窗口的约束,建立基于多时间窗口的动态约束满足问题模型;
步骤3、设扰动测度为Δ,n1、n2分别为相对初始方案,动态调整后的方案中开始观测时间发生变化的任务数量和被删除的任务数量,n为初始方案中观测任务的总数,pi、pj、pk为任务的优先级;根据总收益最大原则和扰动测度最小原则,即:
并采用最优路径搜索的方法为每个观测任务确定成像时间窗口和成像姿态角。
2.如权利要求1所述的一种考虑多时间窗口约束的卫星成像多源任务动态规划方法,其特征在于,所述轴S2具体包括如下步骤:
S21、优化目标,使动态调整后的方案总收益最大;
设动态任务集Mdynamic中任务mdi的优先级为pi,决策变量为xi,且则目标函数为:
S22、多时间窗口约束,包括卫星与任务源之间的可见时间窗口约束、卫星与新任务之间的可见时间窗口约束;具体的:
设任务源集合为GS={GS1,GS2,……,GSn},n为任务源的数量;新任务集合为 表示由第i个任务源插入的第j个新任务;
卫星与任务源之间的可见时间窗口集合为:
卫星对新任务的可见时间窗口集合为:
卫星对新任务的成像时间窗口集合为:
则应满足:
S23、新任务的优先观测性约束,即插入的新任务是要求卫星优先观测或必须观测的;
设动态任务集为Mdynamic,插入的新任务集为则应满足:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810631113.XA CN109034531B (zh) | 2018-06-19 | 2018-06-19 | 一种考虑多时间窗口约束的卫星成像多源任务动态规划方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810631113.XA CN109034531B (zh) | 2018-06-19 | 2018-06-19 | 一种考虑多时间窗口约束的卫星成像多源任务动态规划方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109034531A true CN109034531A (zh) | 2018-12-18 |
CN109034531B CN109034531B (zh) | 2021-08-17 |
Family
ID=64609677
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810631113.XA Active CN109034531B (zh) | 2018-06-19 | 2018-06-19 | 一种考虑多时间窗口约束的卫星成像多源任务动态规划方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109034531B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111612384A (zh) * | 2020-06-23 | 2020-09-01 | 中国人民解放军国防科技大学 | 一种具有时间分辨率约束的多星接力任务规划方法 |
CN111861230A (zh) * | 2020-07-24 | 2020-10-30 | 二十一世纪空间技术应用股份有限公司 | 一种面向灾害应急的多星协同观测任务规划方法及装置 |
CN115099581A (zh) * | 2022-05-25 | 2022-09-23 | 北京航天飞行控制中心 | 一种卫星的动态任务规划方法、装置、电子设备及介质 |
CN117557068A (zh) * | 2024-01-10 | 2024-02-13 | 南京融星智联信息技术有限公司 | 一种低轨卫星星上半自主任务规划方法及系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102867107A (zh) * | 2012-08-16 | 2013-01-09 | 中国人民解放军国防科学技术大学 | 一种多成像卫星应急任务动态调度方法 |
CN104063748A (zh) * | 2014-06-28 | 2014-09-24 | 中国人民解放军国防科学技术大学 | 一种用于解决面向成像卫星的时间依赖型调度问题的算法 |
US20150377596A1 (en) * | 2013-02-08 | 2015-12-31 | Mbda France | Method and device for optimising a resource allocation plan |
CN107290961A (zh) * | 2017-06-29 | 2017-10-24 | 中国人民解放军国防科学技术大学 | 一种针对敏捷卫星的在线调度方法 |
CN107608793A (zh) * | 2017-09-13 | 2018-01-19 | 航天恒星科技有限公司 | 快速搜索的敏捷卫星任务规划方法 |
-
2018
- 2018-06-19 CN CN201810631113.XA patent/CN109034531B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102867107A (zh) * | 2012-08-16 | 2013-01-09 | 中国人民解放军国防科学技术大学 | 一种多成像卫星应急任务动态调度方法 |
US20150377596A1 (en) * | 2013-02-08 | 2015-12-31 | Mbda France | Method and device for optimising a resource allocation plan |
CN104063748A (zh) * | 2014-06-28 | 2014-09-24 | 中国人民解放军国防科学技术大学 | 一种用于解决面向成像卫星的时间依赖型调度问题的算法 |
CN107290961A (zh) * | 2017-06-29 | 2017-10-24 | 中国人民解放军国防科学技术大学 | 一种针对敏捷卫星的在线调度方法 |
CN107608793A (zh) * | 2017-09-13 | 2018-01-19 | 航天恒星科技有限公司 | 快速搜索的敏捷卫星任务规划方法 |
Non-Patent Citations (2)
Title |
---|
邱涤珊等: ""多类扰动下电子侦察卫星动态调度问题研究"", 《计算机工程与应用》 * |
陈英武等: ""卫星任务调度问题的约束规划模型"", 《国防科技大学学报》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111612384A (zh) * | 2020-06-23 | 2020-09-01 | 中国人民解放军国防科技大学 | 一种具有时间分辨率约束的多星接力任务规划方法 |
CN111612384B (zh) * | 2020-06-23 | 2023-04-25 | 中国人民解放军国防科技大学 | 一种具有时间分辨率约束的多星接力任务规划方法 |
CN111861230A (zh) * | 2020-07-24 | 2020-10-30 | 二十一世纪空间技术应用股份有限公司 | 一种面向灾害应急的多星协同观测任务规划方法及装置 |
CN111861230B (zh) * | 2020-07-24 | 2023-11-28 | 二十一世纪空间技术应用股份有限公司 | 一种面向灾害应急的多星协同观测任务规划方法及装置 |
CN115099581A (zh) * | 2022-05-25 | 2022-09-23 | 北京航天飞行控制中心 | 一种卫星的动态任务规划方法、装置、电子设备及介质 |
CN117557068A (zh) * | 2024-01-10 | 2024-02-13 | 南京融星智联信息技术有限公司 | 一种低轨卫星星上半自主任务规划方法及系统 |
CN117557068B (zh) * | 2024-01-10 | 2024-04-05 | 南京融星智联信息技术有限公司 | 一种低轨卫星星上半自主任务规划方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN109034531B (zh) | 2021-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109034531A (zh) | 一种考虑多时间窗口约束的卫星成像多源任务动态规划方法 | |
CN107608793B (zh) | 快速搜索的敏捷卫星任务规划方法 | |
Lemaître et al. | How to manage the new generation of agile earth observation satellites | |
Tveteras et al. | Non-stop flights and tourist arrivals | |
WO2008152614A3 (en) | Local news seαrch engine | |
Paglia | A higher level of civilisation? The transformation of Ny-Ålesund from Arctic coalmining settlement in Svalbard to global environmental knowledge center at 79 North | |
Le BUI | A journey of digital transformation of small and medium-sized enterprises in Vietnam: Insights from multiple cases | |
Sun et al. | Agile earth observation satellite scheduling algorithm for emergency tasks based on multiple strategies | |
JP2015141550A (ja) | 工事スケジュール作成システム及び工事スケジュール作成方法 | |
CN103400197B (zh) | 基于动态规划的前瞻启发式卫星任务规划算法 | |
Wang et al. | Fixed interval scheduling of multiple earth observation satellites with multiple observations | |
Sato et al. | Crew and vehicle rescheduling based on a network flow model and its application to a railway train operation | |
JPWO2017157635A5 (zh) | ||
KR101764026B1 (ko) | 국내외 이벤트의 수송 최적화를 위한 시뮬레이션 기반 사전 플래닝 방법 및 시스템 | |
Szwed et al. | Application of new ATAM tools to evaluation of the dynamic map architecture | |
Mclaren et al. | Scheduling results for the THEMis observation scheduling tool | |
CN102135998A (zh) | 基于前后置条件的Web服务交互式组合方法 | |
Mission | Week 35 (8/24/20-8/30/20), Sample Collection | |
Borromeo | Process-Based Quality Control Techniques in Crowdsourcing | |
WO2022158090A1 (ja) | 情報処理方法、情報処理装置及び情報処理プログラム | |
CN115345418A (zh) | 基于星下点地表属性预报结果的星上全自主任务规划方法 | |
Ernst et al. | Direction instructions for communicating linear locations in TPEG2-ULR | |
Hasuike et al. | A flexible tour route planning problem with time-dependent parameters considering rescheduling based on current conditions | |
Bosi et al. | Social Paradigms in Contemporary Airport Design | |
Gombosi et al. | Machine Learning and the" Holy Grail" of Space Weather Forecasting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |