CN109028437A - A kind of coke oven basement cooling ventilation equipment - Google Patents

A kind of coke oven basement cooling ventilation equipment Download PDF

Info

Publication number
CN109028437A
CN109028437A CN201810598993.5A CN201810598993A CN109028437A CN 109028437 A CN109028437 A CN 109028437A CN 201810598993 A CN201810598993 A CN 201810598993A CN 109028437 A CN109028437 A CN 109028437A
Authority
CN
China
Prior art keywords
coke oven
level
bolted
air inlet
ventilation duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810598993.5A
Other languages
Chinese (zh)
Other versions
CN109028437B (en
Inventor
张永强
姬广伟
王丰岩
孙国庆
孟凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenglong Chemical Co Ltd
Original Assignee
Shenglong Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenglong Chemical Co Ltd filed Critical Shenglong Chemical Co Ltd
Priority to CN201810598993.5A priority Critical patent/CN109028437B/en
Publication of CN109028437A publication Critical patent/CN109028437A/en
Application granted granted Critical
Publication of CN109028437B publication Critical patent/CN109028437B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F7/04Ventilation with ducting systems, e.g. by double walls; with natural circulation
    • F24F7/06Ventilation with ducting systems, e.g. by double walls; with natural circulation with forced air circulation, e.g. by fan positioning of a ventilator in or against a conduit
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • F24F11/84Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers using valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/0254Ducting arrangements characterised by their mounting means, e.g. supports
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/28Arrangement or mounting of filters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/50Air quality properties

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Coke Industry (AREA)

Abstract

The present invention provides a kind of coke oven basement cooling ventilation equipment, including air compressor, air inlet pipe, isocon, second level coke oven, level-one coke oven, smoke evacuation hush pipe structure, seals ventilation duct structure, enters the wind screen pipe structure, connecting tube, temperature sensor, air quality sensor, control cabinet, display, PLC, power supply indicator and switch, the air inlet pipe are welded on the lower end middle position of air compressor.The setting of filtering frame of the present invention, stainless steel filter screen and activated charcoal strainer is conducive to filtering into the air inside connecting tube, prevents from entering dust and impurities;Smoke exhaust pipe, attachment base, the setting of noise elimination felt and hush tube are conducive to carry out coke oven noise reduction and noise abatement work;L-type ventilation duct, fixed frame, mounting plate enter the wind motor, and the setting of connector sleeve and flabellum is conducive in basement internal leakage toxic gas, carry out toxic gas and dilute work.

Description

A kind of coke oven basement cooling ventilation equipment
Technical field
The invention belongs to ventilation equipment technical field more particularly to a kind of coke oven basement cooling ventilation equipment of cooling down.
Background technique
Lithium carbonate can be used for potting porcelain, drug, catalyst etc., and common lithium ion battery raw material.Its production process In need to use electrodialysis, electrodialysis carries out the separation of ion under the action of DC electric field.And the energy is provided for electrodialysis Rectifier transformer, rectifier cabinet need to discharge in use a large amount of heat, and heat gathers indoors, can not give out in time It goes, causes indoor environment temperature excessively high, rectifier and rectification is easy to cause to become overheat protector tripping under this environment, workshop is unexpected Have a power failure, workshop yield is caused to reduce the waste with a large amount of material electric power energies.So needing during producing lithium carbonate to room Interior temperature carries out real-time monitoring, and when temperature is higher than certain value, staff needs to open blower, but staff does not allow The quantity that blower is opened easily is grasped, the quantity that blower is opened is excessive, will cause the waste of the energy;Blower is opened very few, then is reached Less than expected cooling effect.
China Patent Publication No. is CN206861808U, and invention and created name is a kind of ventilation equipment, including temperature detection Device, control unit and n blower, for the blower for indoor air to be discharged, n is the integer more than or equal to 2.But it is existing There is also the air that cannot filter sucking for some ventilation equipment, not can be carried out noise reduction processing and can not dilute the toxic of basement The problem of gas.
Therefore, a kind of coke oven basement cooling ventilation equipment are invented to be very necessary.
Summary of the invention
It is existing to solve in order to solve the above technical problem, the present invention provides a kind of coke oven basement cooling ventilation equipment Ventilation equipment there is the air that cannot filter sucking, not can be carried out noise reduction processing and the toxic gas of basement can not be diluted The problem of.A kind of coke oven basement cooling ventilation equipment, including air compressor, air inlet pipe, isocon, second level coke oven, level-one Coke oven, hush pipe structure of discharging fume, seals ventilation duct structure, enters the wind screen pipe structure, connecting tube, temperature sensor, air quality Sensor, control cabinet, display, PLC, power supply indicator and switch, the air inlet pipe are welded on the lower end of air compressor Middle position;The isocon is respectively welded at the left and right sides lower position of air inlet pipe;The second level coke oven setting exists The right positions of air inlet pipe;The leftward position of air inlet pipe is arranged in the level-one coke oven;The smoke evacuation hush pipe structure point It is not mounted on the right side of the upper end of second level coke oven;The smoke evacuation hush pipe structure is also mounted on the upper end left lateral position of level-one coke oven It sets;The sealing ventilation duct structure is separately mounted to the right upper portion position of second level coke oven;The sealing ventilation duct structure Also it is mounted on the left upper portion position of level-one coke oven;The connecting tube is bolted to the upper end interposition of air compressor It sets;The air inlet screen pipe structure is mounted on the upper end position of connecting tube;Screw is connected to the temperature sensor respectively The inner tip middle position of second level coke oven and level-one coke oven;Screw connects in second level coke oven the air quality sensor respectively With the inner tip middle position of level-one coke oven;The control cabinet is bolted to the left side middle position of air compressor; The display screw is connected to the front surface middle upper portion position of control cabinet;The PLC screw is connected to control cabinet Front surface middle position;The power supply indicator screw is connected to the front surface lower part right positions of control cabinet;Described opens Close the front surface lower left side position that screw is connected to control cabinet;The smoke evacuation hush pipe structure includes smoke exhaust pipe, attachment base, Noise elimination felt, hush tube, mounting base and flue tube, the attachment base are respectively welded at the left and right sides upper position of smoke exhaust pipe; The hush tube is bolted to the external wall of upper portion position of smoke exhaust pipe;The noise elimination felt screw is connected to the left and right of hush tube Two sides upper inside wall position;The mounting base is respectively welded at the left and right sides outer wall lower position of hush tube;The cigarette Deferent is bolted to the outer wall position of hush tube.
Preferably, the lower end of the smoke exhaust pipe is bolted to respectively on the right side of the upper end of second level coke oven;The smoke evacuation The lower end of pipe is also bolted to the upper end leftward position of level-one coke oven.
Preferably, the junction of the right upper portion position and lower position of the isocon and second level coke oven is respectively set There is rubber seal;The left upper portion position of isocon and level-one coke oven and the junction of lower position is respectively arranged with Rubber seal;Junction on the right side of the upper end of the smoke exhaust pipe and second level coke oven is provided with rubber seal;The row The junction of the upper end leftward position of smoke pipe and level-one coke oven is provided with rubber seal.
Preferably, the attachment base use left and right sides offers the stainless steel seat of threaded hole respectively;The installation The seat use left and right sides offers the stainless steel seat of threaded hole respectively;The left and right sides top of the hush tube is correspondingly connected with seat Offer through-hole;The left and right sides lower part of the flue tube corresponds to mounting base and offers through-hole.
Preferably, the sealing ventilation duct structure includes L-type ventilation duct, solenoid valve, fixed frame, mounting plate, air inlet electricity Machine, connector sleeve and flabellum, the solenoid valve are bolted to the upper end inner wall position of L-type ventilation duct;The fixed frame spiral shell Bolt is connected to L-type ventilation inside pipe wall middle position;The mounting plate is respectively welded at the left and right sides upper inside wall of fixed frame Position;The air inlet motor is bolted to the position between mounting plate and mounting plate;The described connector sleeve key connection into On the output shaft of wind turbine;The flabellum is respectively welded at the left and right sides middle position of connector sleeve.
Preferably, the L-type ventilation duct is bolted to the right upper portion position of second level coke oven respectively;The L-type Ventilation duct is also bolted to the left upper portion position of level-one coke oven respectively.
Preferably, the junction of the right upper portion position of the L-type ventilation duct and second level coke oven is provided with seal rubber Pad;The junction of the left upper portion position of the L-type ventilation duct and level-one coke oven is provided with sealing rubber pad;The fixation Frame offers the stainless steel frame of through-hole using top and bottom.
Preferably, the air inlet screen pipe structure includes filtering frame, stainless steel filter screen, activated charcoal strainer and air draught Pipe, the stainless steel filter screen screw are connected to the upper inside wall position of filtering frame;The activated charcoal strainer screw connects It connects in the inner wall lower position of filtering frame;The aspiration channel is welded on the upper end middle position of filtering frame.
Preferably, the filtering frame is bolted to the upper end position of connecting tube;The filtering frame and connecting tube Junction is provided with rubber ring.
Preferably, the temperature sensing implement body uses the temperature sensor of model WZP-PT100;The air Mass sensitivity implement body uses the air quality sensor of model MQ-135;The PLC specifically uses model FX2N-48 PLC;The solenoid valve specifically uses the solenoid valve of model 2W160-15.
Preferably, the air quality sensor is electrically connected the input terminal of PLC.
Preferably, the temperature sensor is electrically connected the input terminal of PLC.
Preferably, the output end of the air inlet electrical connection of motor PLC.
Preferably, the display is electrically connected the output end of PLC.
Preferably, the power supply indicator is electrically connected the output end of PLC.
Preferably, the switch is electrically connected the input terminal of PLC.
Preferably, the air compressor electrically connects the output end for being electrically connected PLC.
Preferably, the solenoid valve is electrically connected the output end of PLC.
Compared with prior art, the invention has the benefit that
1. in the present invention, the filtering frame, the setting of stainless steel filter screen and activated charcoal strainer, be conducive to filter into Enter the air inside connecting tube, prevents from entering dust and impurities.
2. in the present invention, the smoke exhaust pipe, attachment base, the setting of noise elimination felt and hush tube is conducive to carry out coke oven Noise reduction and noise abatement work.
3. in the present invention, the L-type ventilation duct, fixed frame, mounting plate, air inlet motor, the setting of connector sleeve and flabellum, Be conducive in basement internal leakage toxic gas, carry out toxic gas and dilute work.
4. in the present invention, it is close that the junction of the isocon and second level coke oven and level-one coke oven is respectively arranged with rubber The setting of seal is conducive to be sealed, and prevents to reveal.
5. in the present invention, the hush tube, the setting of mounting base and flue tube is beneficial to prevent rainwater and passes through smoke exhaust pipe Respectively enter the internal influence work of second level coke oven and level-one coke oven.
6. in the present invention, the filtering frame, the setting of stainless steel filter screen and activated charcoal strainer is conducive to conveniently more Change stainless steel filter screen and activated charcoal strainer.
7. in the present invention, the setting of the L-type ventilation duct and solenoid valve is conducive to conveniently be sealed work when not used Make, prevents from revealing by L-type ventilation duct.
8. in the present invention, the junction of the L-type ventilation duct and second level coke oven and level-one coke oven is provided with sealing rubber The setting of rubber mat, is beneficial to prevent and leaks.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the structural schematic diagram of smoke evacuation hush pipe structure of the invention.
Fig. 3 is the structural schematic diagram of sealing ventilation duct structure of the invention.
Fig. 4 is the structural schematic diagram of air inlet screen pipe structure of the invention.
Fig. 5 is electrical wiring schematic diagram of the invention.
In figure:
1, air compressor;2, air inlet pipe;3, isocon;4, second level coke oven;5, level-one coke oven;6, smoke evacuation hush pipe knot Structure;61, smoke exhaust pipe;62, attachment base;63, noise elimination felt;64, hush tube;65, mounting base;66, flue tube;7, ventilation duct knot is sealed Structure;71, L-type ventilation duct;72, solenoid valve;73, fixed frame;74, mounting plate;75, motor is entered the wind;76, connector sleeve;77, flabellum; 8, screen pipe structure is entered the wind;81, filtering frame;82, stainless steel filter screen;83, activated charcoal strainer;84, aspiration channel;9, it connects Pipe;10, temperature sensor;11, air quality sensor;12, control cabinet;13, display;14,PLC;15, power supply indicator; 16, it switchs.
Specific embodiment
The present invention is described further below in conjunction with attached drawing:
Embodiment:
As shown in attached drawing 1 to attached drawing 5
The present invention provides a kind of coke oven basement cooling ventilation equipment, including air compressor 1, air inlet pipe 2, isocon 3, Second level coke oven 4, level-one coke oven 5, hush pipe structure 6 of discharging fume, sealing ventilation duct structure 7, air inlet screen pipe structure 8, connecting tube 9, Temperature sensor 10, air quality sensor 11, control cabinet 12, display 13, PLC14, power supply indicator 15 and switch 16, institute The air inlet pipe 2 stated is welded on the lower end middle position of air compressor 1;The isocon 3 is respectively welded at a left side for air inlet pipe 2 Right two sides lower position;The right positions of air inlet pipe 2 are arranged in the second level coke oven 4;The described setting of level-one coke oven 5 into The leftward position of tracheae 2;The smoke evacuation hush pipe structure 6 is separately mounted on the right side of the upper end of second level coke oven 4;The smoke evacuation Hush pipe structure 6 is also mounted on the upper end leftward position of level-one coke oven 5;The sealing ventilation duct structure 7 is separately mounted to two The right upper portion position of grade coke oven 4;The sealing ventilation duct structure 7 is also mounted on the left upper portion position of level-one coke oven 5;Institute The connecting tube 9 stated is bolted to the upper end middle position of air compressor 1;8 company of being mounted on of air inlet screen pipe structure The upper end position of adapter tube 9;Screw is connected to second level coke oven 4 to the temperature sensor 10 respectively and the inside of level-one coke oven 5 is pushed up Hold middle position;Screw connects in the inner tip of second level coke oven 4 and level-one coke oven 5 air quality sensor 11 respectively Between position;The control cabinet 12 is bolted to the left side middle position of air compressor 1;13 screw of display connects It connects in the front surface middle upper portion position of control cabinet 12;The PLC14 screw is connected to the front surface interposition of control cabinet 12 It sets;15 screw of power supply indicator is connected to the front surface lower part right positions of control cabinet 12;16 screw of switch It is connected to the front surface lower left side position of control cabinet 12;The smoke evacuation hush pipe structure 6 includes smoke exhaust pipe 61, attachment base 62, noise elimination felt 63, hush tube 64, mounting base 65 and flue tube 66, the attachment base 62 are respectively welded at a left side for smoke exhaust pipe 61 Right two sides upper position;The hush tube 64 is bolted to the external wall of upper portion position of smoke exhaust pipe 61;The noise elimination felt 63 Screw is connected to the left and right sides upper inside wall position of hush tube 64;The mounting base 65 is respectively welded at a left side for hush tube 64 Right two sides outer wall lower position;The flue tube 66 is bolted to the outer wall position of hush tube 64.
In above-described embodiment, specifically, the lower end of the smoke exhaust pipe 61 is bolted to the upper end of second level coke oven 4 respectively Right side;The lower end of the smoke exhaust pipe 61 is also bolted to the upper end leftward position of level-one coke oven 5.
In above-described embodiment, specifically, the right upper portion position of the isocon 3 and second level coke oven 4 and lower position Junction be respectively arranged with rubber seal;The left upper portion position of the isocon 3 and level-one coke oven 5 and lower position Junction be respectively arranged with rubber seal;Junction setting on the right side of the upper end of the smoke exhaust pipe 61 and second level coke oven 4 There is rubber seal;The junction of the upper end leftward position of the smoke exhaust pipe 61 and level-one coke oven 5 is provided with rubber seal.
In above-described embodiment, specifically, the attachment base 62 uses the left and right sides to offer the stainless of threaded hole respectively Steel seat;The use of mounting base 65 left and right sides offers the stainless steel seat of threaded hole respectively;A left side for the hush tube 64 Right two upper lateral parts are correspondingly connected with seat 62 and offer through-hole;The left and right sides lower part of the flue tube 66 corresponds to mounting base 65 and opens up There is through-hole.
In above-described embodiment, specifically, the sealing ventilation duct structure 7 include L-type ventilation duct 71, solenoid valve 72, Gu Determine frame 73, mounting plate 74 enters the wind motor 75, and connector sleeve 76 and flabellum 77, the solenoid valve 72 are bolted to L-type ventilation duct 71 upper end inner wall position;The fixed frame 73 is bolted to 71 inner wall middle position of L-type ventilation duct;The mounting plate 74 are respectively welded at the left and right sides upper inside wall position of fixed frame 73;The air inlet motor 75 is bolted to mounting plate 74 Position between mounting plate 74;The key connection of connector sleeve 76 is on the output shaft of air inlet motor 75;The flabellum 77 It is respectively welded at the left and right sides middle position of connector sleeve 76.
In above-described embodiment, specifically, the L-type ventilation duct 71 is bolted to respectively on the right side of second level coke oven 4 Portion position;The L-type ventilation duct 71 is also bolted to the left upper portion position of level-one coke oven 5 respectively.
In above-described embodiment, specifically, the connection of the right upper portion position of the L-type ventilation duct 71 and second level coke oven 4 Place is provided with sealing rubber pad;The junction of the left upper portion position of the L-type ventilation duct 71 and level-one coke oven 5 is provided with close Seal rubber pad;The fixed frame 73 offers the stainless steel frame of through-hole using top and bottom.
In above-described embodiment, specifically, the air inlet screen pipe structure 8 include filtering frame 81, stainless steel filter screen 82, Activated charcoal strainer 83 and aspiration channel 84,82 screw of stainless steel filter screen are connected to the upper inside wall position of filtering frame 81 It sets;83 screw of activated charcoal strainer is connected to the inner wall lower position of filtering frame 81;The aspiration channel 84 is welded on The upper end middle position of filtering frame 81.
In above-described embodiment, specifically, the filtering frame 81 is bolted to the upper end position of connecting tube 9;Described The junction of filtering frame 81 and connecting tube 9 is provided with rubber ring.
In above-described embodiment, specifically, the temperature sensor 10 is specifically passed using the temperature of model WZP-PT100 Sensor;The air quality sensor 11 specifically uses the air quality sensor of model MQ-135;The PLC14 tool Body uses the PLC of model FX2N-48;The solenoid valve 72 specifically uses the solenoid valve of model 2W160-15.
In above-described embodiment, specifically, the air quality sensor 11 is electrically connected the input terminal of PLC14.
In above-described embodiment, specifically, the temperature sensor 10 is electrically connected the input terminal of PLC14.
In above-described embodiment, specifically, the air inlet motor 75 is electrically connected the output end of PLC14.
In above-described embodiment, specifically, the display 13 is electrically connected the output end of PLC14.
In above-described embodiment, specifically, the power supply indicator 15 is electrically connected the output end of PLC14.
In above-described embodiment, specifically, the switch 16 is electrically connected the input terminal of PLC14.
In above-described embodiment, specifically, the air compressor 1 is electrically connected the output end of PLC14.
In above-described embodiment, specifically, the solenoid valve 72 is electrically connected the output end of PLC14.
Working principle
In the present invention, in use, burning gases to be each led into the inside of second level coke oven 4 and level-one coke oven 5, fired It burns, turns on the switch 16, make temperature sensor 10 start to detect the temperature inside second level coke oven 4 and level-one coke oven 5, pass through PLC14 The temperature inside the display second level coke oven 4 of display 13 and level-one coke oven 5 is controlled, passes through air quality sensor 11 and detects second level coke Air inside furnace 4 and level-one coke oven 5 is started to work for a long time in use, controlling air compressor 1 by PLC14, by not The air of rust steel filter screen 82 and the filtering sucking of activated charcoal strainer 83, is sent into second level coke oven 4 after air is compressed and level-one is burnt The inside of furnace 5 carries out cooling and ventilation operation, and the flue gas after making burning is discharged by smoke exhaust pipe 61, and when discharge passes through noise elimination felt 63 and hush tube 64 carry out noise reduction processing, complete noise reduction and noise reduction, when air quality sensor 11 detect air it is exceeded when, control It enters the wind motor 75 to start to work, is controlled by PLC14 and open solenoid valve 72, air inlet motor 75 is made to drive connector sleeve 76 and flabellum 77 Work is started turning, toxic gas dilution is carried out, air circulation is increased, to complete work.
Using technical solutions according to the invention or those skilled in the art under the inspiration of technical solution of the present invention, Similar technical solution is designed, and reaches above-mentioned technical effect, is to fall into protection scope of the present invention.

Claims (9)

  1. The ventilation equipment 1. a kind of coke oven basement cools down, which is characterized in that coke oven basement cooling ventilation equipment include air Compressor (1), air inlet pipe (2), isocon (3), second level coke oven (4), level-one coke oven (5) are discharged fume hush pipe structure (6), sealing Ventilation duct structure (7) is entered the wind screen pipe structure (8), connecting tube (9), temperature sensor (10), air quality sensor (11), Control cabinet (12), display (13), PLC (14), power supply indicator (15) and switch (16), the air inlet pipe (2) are welded on The lower end middle position of air compressor (1);The isocon (3) is respectively welded at the left and right sides lower part of air inlet pipe (2) Position;Right positions of second level coke oven (4) setting in air inlet pipe (2);The level-one coke oven (5) is arranged in air inlet pipe (2) leftward position;The smoke evacuation hush pipe structure (6) is separately mounted on the right side of the upper end of second level coke oven (4);The row Cigarette hush pipe structure (6) is also mounted on the upper end leftward position of level-one coke oven (5);The sealing ventilation duct structure (7) is respectively It is mounted on the right upper portion position of second level coke oven (4);The sealing ventilation duct structure (7) is also mounted on level-one coke oven (5) Left upper portion position;The connecting tube (9) is bolted to the upper end middle position of air compressor (1);The air inlet Screen pipe structure (8) is mounted on the upper end position of connecting tube (9);Screw is connected to second level to the temperature sensor (10) respectively The inner tip middle position of coke oven (4) and level-one coke oven (5);Screw connects two the air quality sensor (11) respectively The inner tip middle position of grade coke oven (4) and level-one coke oven (5);The control cabinet (12) is bolted to air compressor (1) left side middle position;Described display (13) screw is connected to the front surface middle upper portion position of control cabinet (12);Institute PLC (14) screw stated is connected to the front surface middle position of control cabinet (12);Power supply indicator (15) the screw connection In the front surface lower part right positions of control cabinet (12);Described switch (16) screw is connected under the front surface of control cabinet (12) Portion's leftward position;The smoke evacuation hush pipe structure (6) includes smoke exhaust pipe (61), attachment base (62), noise elimination felt (63), hush tube (64), mounting base (65) and flue tube (66), the attachment base (62) are respectively welded on the left and right sides of smoke exhaust pipe (61) Portion position;The hush tube (64) is bolted to the external wall of upper portion position of smoke exhaust pipe (61);Described noise elimination felt (63) spiral shell Nail is connected to the left and right sides upper inside wall position of hush tube (64);The mounting base (65) is respectively welded at hush tube (64) Left and right sides outer wall lower position;The flue tube (66) is bolted to the outer wall position of hush tube (64).
  2. The ventilation equipment 2. coke oven basement as described in claim 1 cools down, which is characterized in that under the smoke exhaust pipe (61) End is bolted to respectively on the right side of the upper end of second level coke oven (4);The lower end of the smoke exhaust pipe (61) is also bolted to level-one The upper end leftward position of coke oven (5).
  3. The ventilation equipment 3. coke oven basement as claimed in claim 2 cools down, which is characterized in that the isocon (3) and two The right upper portion position of grade coke oven (4) and the junction of lower position are respectively arranged with rubber seal;The isocon (3) Rubber seal is respectively arranged with the left upper portion position of level-one coke oven (5) and the junction of lower position;The smoke evacuation Junction on the right side of the upper end of pipe (61) and second level coke oven (4) is provided with rubber seal;The smoke exhaust pipe (61) and level-one The junction of the upper end leftward position of coke oven (5) is provided with rubber seal.
  4. The ventilation equipment 4. coke oven basement as described in claim 1 cools down, which is characterized in that the attachment base (62) uses The left and right sides offers the stainless steel seat of threaded hole respectively;The mounting base (65) uses the left and right sides to offer screw thread respectively The stainless steel seat in hole;The left and right sides top of the hush tube (64) is correspondingly connected with seat (62) and offers through-hole;The cigarette The left and right sides lower part of deferent (66) corresponds to mounting base (65) and offers through-hole.
  5. The ventilation equipment 5. coke oven basement as described in claim 1 cools down, which is characterized in that the sealing ventilation duct structure It (7) include L-type ventilation duct (71), solenoid valve (72), fixed frame (73), mounting plate (74), air inlet motor (75), connector sleeve (76) With flabellum (77), the solenoid valve (72) is bolted to the upper end inner wall position of L-type ventilation duct (71);The fixed frame (73) it is bolted to L-type ventilation duct (71) inner wall middle position;The mounting plate (74) is respectively welded at fixed frame (73) Left and right sides upper inside wall position;The air inlet motor (75) is bolted between mounting plate (74) and mounting plate (74) Position;Connector sleeve (76) key connection is on the output shaft of air inlet motor (75);The flabellum (77) is respectively welded In the left and right sides middle position of connector sleeve (76).
  6. The ventilation equipment 6. coke oven basement as claimed in claim 5 cools down, which is characterized in that the L-type ventilation duct (71) It is bolted to the right upper portion position of second level coke oven (4) respectively;The L-type ventilation duct (71) is also bolted to one respectively The left upper portion position of grade coke oven (5).
  7. The ventilation equipment 7. coke oven basement as claimed in claim 5 cools down, which is characterized in that the L-type ventilation duct (71) The junction of the right upper portion position of second level coke oven (4) is provided with sealing rubber pad;The L-type ventilation duct (71) and level-one The junction of the left upper portion position of coke oven (5) is provided with sealing rubber pad;The fixed frame (73) uses top and bottom Offer the stainless steel frame of through-hole.
  8. The ventilation equipment 8. coke oven basement as described in claim 1 cools down, which is characterized in that the air inlet screen pipe structure It (8) include filtering frame (81), stainless steel filter screen (82), activated charcoal strainer (83) and aspiration channel (84), the stainless steel Filter screen (82) screw is connected to the upper inside wall position of filtering frame (81);Described activated charcoal strainer (83) screw is connected to The inner wall lower position of filtering frame (81);The aspiration channel (84) is welded on the upper end middle position of filtering frame (81).
  9. The ventilation equipment 9. coke oven basement as claimed in claim 8 cools down, which is characterized in that described filtering frame (81) bolt It is connected to the upper end position of connecting tube (9);The junction of the filtering frame (81) and connecting tube (9) is provided with rubber ring.
CN201810598993.5A 2018-06-12 2018-06-12 Cooling and ventilating device for basement of coke oven Active CN109028437B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810598993.5A CN109028437B (en) 2018-06-12 2018-06-12 Cooling and ventilating device for basement of coke oven

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810598993.5A CN109028437B (en) 2018-06-12 2018-06-12 Cooling and ventilating device for basement of coke oven

Publications (2)

Publication Number Publication Date
CN109028437A true CN109028437A (en) 2018-12-18
CN109028437B CN109028437B (en) 2020-08-21

Family

ID=64612632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810598993.5A Active CN109028437B (en) 2018-06-12 2018-06-12 Cooling and ventilating device for basement of coke oven

Country Status (1)

Country Link
CN (1) CN109028437B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109506308A (en) * 2018-12-20 2019-03-22 北京懿风科技有限公司 A kind of air purifier
CN111982358A (en) * 2020-09-03 2020-11-24 山东伯乐智能科技有限公司 Mobilizable temperature-sensitive detector finished product check out test set

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008232492A (en) * 2007-03-19 2008-10-02 Matsushita Electric Ind Co Ltd Bathroom ventilation air-conditioning device
CN104141998A (en) * 2013-05-09 2014-11-12 江苏盈通建设科技发展有限公司 Future combined operating room and air supply system thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008232492A (en) * 2007-03-19 2008-10-02 Matsushita Electric Ind Co Ltd Bathroom ventilation air-conditioning device
CN104141998A (en) * 2013-05-09 2014-11-12 江苏盈通建设科技发展有限公司 Future combined operating room and air supply system thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109506308A (en) * 2018-12-20 2019-03-22 北京懿风科技有限公司 A kind of air purifier
CN109506308B (en) * 2018-12-20 2023-11-10 北京懿风科技有限公司 Air purifier
CN111982358A (en) * 2020-09-03 2020-11-24 山东伯乐智能科技有限公司 Mobilizable temperature-sensitive detector finished product check out test set

Also Published As

Publication number Publication date
CN109028437B (en) 2020-08-21

Similar Documents

Publication Publication Date Title
CN206273331U (en) A kind of medium frequency induction melting furnace smoke-discharging dust-eliminating device
CN206216152U (en) A kind of robot welding house
CN109028437A (en) A kind of coke oven basement cooling ventilation equipment
CN207654833U (en) A kind of fixed flame proof closed exhaust dust pelletizing system
CN108240692A (en) A kind of kitchen fresh air system
CN107062345A (en) A kind of elevating cooker hood, lifting fume extracting machine arranged side by side and central smoke exhaust ventilator
CN205840604U (en) A kind of automatic window device
CN104676661A (en) Integrated cooker for kitchen
CN201945895U (en) Air supplying device of positive pressure control cabinet
CN206814691U (en) A kind of dedusting device arranged beside coke pushing machine
CN207279731U (en) A kind of range hood
CN205760234U (en) A kind of efficient low-resistance impulse bag type dust collector
CN207569884U (en) A kind of purification flue dust incinerator
CN104353291A (en) Portable high-negative pressure welding fume purifier
CN105536377A (en) Metal dust filtering apparatus
CN204388173U (en) A kind of smoke exhaust ventilator
CN209065850U (en) A kind of biomass gas purifying processing unit
CN105737225A (en) Range hood with CO monitoring and alarming function
CN206304486U (en) A kind of filter cartridge type dust arrester
CN209622822U (en) One kind being used for the harmless processing equipment of clinical waste
CN201313877Y (en) Smoke and dust removing device used in stampcharging coke oven
CN107806735A (en) A kind of refrigerator negative ion air-cleaner
CN214263173U (en) Welding fume collecting and disposing system
CN211384223U (en) Automatic control device for leakage detection of fluorescent powder of dust removing equipment
CN211084035U (en) Dustproof effectual steam generator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant