CN109026813A - Electric locomotive breeze fan test tool equipment - Google Patents

Electric locomotive breeze fan test tool equipment Download PDF

Info

Publication number
CN109026813A
CN109026813A CN201811231410.1A CN201811231410A CN109026813A CN 109026813 A CN109026813 A CN 109026813A CN 201811231410 A CN201811231410 A CN 201811231410A CN 109026813 A CN109026813 A CN 109026813A
Authority
CN
China
Prior art keywords
test tool
breeze fan
terminal
module
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811231410.1A
Other languages
Chinese (zh)
Other versions
CN109026813B (en
Inventor
韩松波
杨晓梅
刘阳
朱琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Luoyang Locomotive Co Ltd
Original Assignee
CRRC Luoyang Locomotive Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Luoyang Locomotive Co Ltd filed Critical CRRC Luoyang Locomotive Co Ltd
Priority to CN201811231410.1A priority Critical patent/CN109026813B/en
Priority claimed from CN201811231410.1A external-priority patent/CN109026813B/en
Publication of CN109026813A publication Critical patent/CN109026813A/en
Application granted granted Critical
Publication of CN109026813B publication Critical patent/CN109026813B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D27/00Control, e.g. regulation, of pumps, pumping installations or pumping systems specially adapted for elastic fluids
    • F04D27/001Testing thereof; Determination or simulation of flow characteristics; Stall or surge detection, e.g. condition monitoring

Abstract

The present invention relates to locomotive repair technical field, in particular to a kind of electric locomotive breeze fan test tool equipment includes: test tool module and power module, and power module includes power-switching circuit;Test tool module includes shell and speed regulation route;Conversion controling switch, terminal-type power module, terminal-type adjustable resistance, control switch and status indicator lamp are equipped in speed regulation route, the constant voltage dc source connecting with test tool module is converted into double loop power supply output by terminal-type power module, terminal-type adjustable resistance is disposed on double loop power supply outlet line, terminal-type adjustable resistance is electrically connected with the conversion controling switch of regulation breeze fan revolving speed.The configuration of the present invention is simple, it is novel in design, reasonable, it can be realized the performance test after component disintegrates, it was found that after quality problems, it is practical convenient for carrying out the judgement processing of failure in time and repairing, it is easy to carry, overhaul efficiency is effectively improved, there is stronger application value.

Description

Electric locomotive breeze fan test tool equipment
Technical field
The present invention relates to locomotive repair technical field, in particular to a kind of electric locomotive breeze fan test tool equipment.
Background technique
As China is in the continuous accumulation of railway territory technology, syntonic type AC transmission electric power locomotive obtains quickly in China Development, gradually replacing existing DC Transmission electric locomotive.The introduction and autonomous innovation of railway territory advanced technology, make Obtaining a large amount of function admirable, reliably external imported components are used by syntonic type AC transmission electric power locomotive.With syntonic type AC transmission electric power locomotive uses the increase of mileage and the time limit, and the locomotive operation mileage of early stage investment has been over 1,800,000 public affairs In, the use of the time is more than 10 years, has just stepped into harmonious locomotive C6 grades at present and repair the journey stage and (be equivalent to the big of existing locomotive Repair), and the imported equipments and parts that use is introduced in this part on locomotive are also required to remove maintenance, are overhauled and are tested accordingly, with Just the state for finding performance deficiency and unit failure, to be repaired accordingly.In view of the particularity in railway locomotive field, greatly Partial external imported equipments and parts at home do not equip by mature coordinative experiments.
Ebmpapst brand G1G160-BH29-14 type blower originates from Germany, is mostly installed in HXD1 type electric locomotive, It is matched on locomotive with air conditioner in cab, main function is that the fresh air being sent into makes drivers' cab keep certain micro-positive pressure, is prevented Only outside air is from the not severely punished infiltration of drivers' cab, and destroys the cleanliness of drivers' cab, while positive pressure arranges exhaust gas from exhaust outlet Out, drivers' cab and extraneous air exchange are completed.It is repaired in journey in previous locomotive, due to locomotive smaller, the G1G160- that repairs journey BH29-14 type blower does not descend vehicle overhauling substantially, and the inspection and maintenance of system were not also carried out to blower.And HXD1 type electric power Whether locomotive needs to remove the type blower into carry out checking experiment when entering C6 grades and repairing journey, working condition to blower and deposit Inspection judgement is carried out in abnormal sound, to guarantee the performance after entrucking.Since the type blower belongs to imported equipments and parts, at home without corresponding Testing equipment, if purchased from foreign countries, not only the equipment purchase period customized is long, and external import cost price is high.
Summary of the invention
Aiming at the shortcomings in the prior art, the present invention provides a kind of electric locomotive breeze fan test tool equipment, design It is scientific, reasonable, it is safe and reliable, easy to operate.
According to design scheme provided by the present invention, a kind of electric locomotive breeze fan test tool equipment includes test Frock module, and respectively test tool module and breeze fan provide the power module of electric energy, the power module includes The power-switching circuit of constant voltage dc source is converted alternating current to, constant voltage dc source is exported as power-switching circuit, point Electric energy is not provided for test tool module and breeze fan;Test tool module includes shell and the speed regulation being set in the housing Route;Conversion controling switch, terminal-type power module, terminal-type adjustable resistance, control are equipped in the speed regulation route Switch and status indicator lamp, the constant voltage dc source connecting with test tool module are converted into double by terminal-type power module The output of road power supply, is disposed with terminal-type adjustable resistance on double loop power supply outlet line, terminal-type adjustable resistance with regulation The conversion controling switch of breeze fan revolving speed is electrically connected;Status indicator lamp is sequentially arranged at conversion controling switch and connect with breeze fan Route on and double loop power supply output and the route that is connect with breeze fan of constant voltage dc source on;Control switch is sequentially arranged at On the route that constant voltage dc source is connect with double loop power supply and on route that constant voltage dc source is connect with breeze fan.
It is above-mentioned, power-switching circuit by AC220V power supply be converted to respectively with test tool module and breeze fan module The DC24V power supply of electric energy is provided.
Preferably, the DC24V power supply of input is converted to the output of two-way DC10V power supply by terminal-type power module.
Above-mentioned, shell uses insulation box structure.
Preferably, it is provided with case lid in the insulation box structure, status indicator lamp and conversion controling switch are fixed on On case lid.
Above-mentioned, terminal block structure and connector structure are provided on shell;Power-switching circuit passes through terminal block structure With the speed regulation connection for being set to insulation box inside configuration;Speed regulation route passes through connector structure and breeze fan Connection.
Preferably, the connector structure uses rectangular connector.
Above-mentioned, enclosure interior is provided with for fixed conversion control switch, terminal-type power module, terminal-type adjustable electric The installation guide rail of resistance and control switch.
Above-mentioned, the control switch is double-pole cut-out.
Above-mentioned, the conversion controling switch is that there are three the change-over switches of control gear for tool.
Beneficial effects of the present invention:
The configuration of the present invention is simple, it is novel in design, reasonable, it can be realized the performance test after component disintegrates, after finding quality problems, It is practical convenient for carrying out the judgement processing of failure in time and repairing, it is easy to carry, overhaul efficiency is effectively improved, is had relatively strong Application value.
Detailed description of the invention:
Fig. 1 is that tooling device electrical schematic is tested in embodiment;
Fig. 2 is that tooling device structural schematic diagram is tested in embodiment;
Fig. 3 is that tooling device internal element scheme of installation is tested in embodiment.
Specific embodiment:
Figure label, label 1 represent D.C. regulated power supply, and label 2 represents test tool module, and label 3 represents control switch, mark Numbers 4 represent terminal-type power module, and label 5,6 represents terminal-type adjustable resistance, and label 7 represents Input terminal block structure, label 8 Connecting terminal block structure is represented, label 9 represents connector structure, and label 10 represents installation guide rail, and label 11 represents conversion and control Switch, label 12 represent status indicator lamp.
The present invention is described in further detail with technical solution with reference to the accompanying drawing, and detailed by preferred embodiment Describe bright embodiments of the present invention in detail, but embodiments of the present invention are not limited to this.
For there are at high cost, the period is long, the situations such as inconvenient, the present invention is implemented in existing locomotive fan maintenance process Example includes test tool module, and respectively referring to a kind of electric locomotive breeze fan test tool equipment shown in Fig. 1 ~ 3, is provided The power module of electric energy is provided for test tool module and breeze fan, the power module includes to convert alternating current to surely The power-switching circuit of DC power supply is pressed, constant voltage dc source is exported as power-switching circuit, respectively test tool module Electric energy is provided with breeze fan;Test tool module includes shell and the speed regulation route being set in the housing;The speed Conversion controling switch, terminal-type power module, terminal-type adjustable resistance, control switch and state instruction are equipped in keying line Lamp, the constant voltage dc source connecting with test tool module is converted into double loop power supply by terminal-type power module and exports, double Power supply output line road in road is disposed with terminal-type adjustable resistance, terminal-type adjustable resistance with regulation breeze fan revolving speed Conversion controling switch electrical connection;Status indicator lamp is sequentially arranged on the route that conversion controling switch is connect with breeze fan and double On the route that the output of road power supply and constant voltage dc source are connect with breeze fan;Control switch be sequentially arranged at constant voltage dc source with On the route of double loop power supply connection and on the route that is connect with breeze fan of constant voltage dc source.According to blower working principle and Locomotive control principle passes through the power supply mould of test tool module and respectively test tool module and breeze fan offer electric energy Block, and the speed regulation route in test tool module, can test blower, carry out speed regulating control to blower.
It is above-mentioned, power-switching circuit by AC220V power supply be converted to respectively with test tool module and breeze fan module The DC24V power supply of electric energy is provided.Preferably, the DC24V power supply of input is converted to two-way DC10V power supply by terminal-type power module Output.External AC 220V power conversion is DC24V power supply by D.C. regulated power supply, by test tool module control switch to sending Wind blower provides DC24V working power, and provides power supply to speed adjustment circuit.Terminal-type power module (DC24V/ DC10V DC24V) is converted into two-way DC10V output.Two-way DC10V is adjusted to the different letter of two-way by terminal-type adjustable resistance Number, the adjustment signal of the different DC0~10V of two-way is provided to subject blower by conversion controling switch.To reach control not With desired rotation speed of fan, to realize the Adjustment Tests of blower, and then judge whether blower work meets the requirements.By artificial Required speed adjustment signal can be set by adjusting terminal-type adjustable resistance.
Above-mentioned, shell uses insulation box structure, easy to carry, assembling and maintenance, more convenient to use.
Preferably, it is provided with case lid in the insulation box structure, status indicator lamp and conversion controling switch are fixed on On case lid, convenient for checking trouble hunting state in time during the test, facilitate operation.
Above-mentioned, terminal block structure and connector structure are provided on shell;Power-switching circuit passes through terminal block structure With the speed regulation connection for being set to insulation box inside configuration;Speed regulation route passes through connector structure and breeze fan Connection.Assemble, safeguard it is more convenient.
Preferably, the connector structure uses rectangular connector, can be convenient, quickly carries out wiring.
Above-mentioned, enclosure interior is provided with for fixed conversion control switch, terminal-type power module, terminal-type adjustable electric The installation guide rail of resistance and control switch.
Above-mentioned, the control switch is double-pole cut-out.
Above-mentioned, the conversion controling switch is that there are three the change-over switches of control gear for tool.
It is shown in Figure 1 in the present invention, first part be D.C. regulated power supply (AC220/DC24), have one it is external AC220V power input and the output of DC24V power supply.Second part is the test tool module of case structure, there is a DC24V electricity Source input terminal and power output end, an output regulation signal end (DC0~10V) are interior to be equipped with terminal-type power module, terminal-type Adjustable resistance, control switch, conversion controling switch, status indicator lamp, terminal block.The DC24V power supply of input passes through control switch After be divided into two-way, all the way directly output by external connector with subject blower be connected, as be tested blower working power.One Input of the road as terminal-type power module, exports two-way DC10V power supply after conversion, and two-way DC10V power supply passes through respectively Two-way circuit is connected with two terminal-type adjustable resistances, constitutes adjustable signal (two terminal-type adjustable resistances of two-way DC0 ~ 10V Can be adjusted to required setting range in advance as needed), passing through manipulation transforms control switch, external connector and subject Blower is connected, the different Fan Regulation signal of output two-way.When it is implemented, D.C. regulated power supply (AC220/DC24) is connected, It is closed control switch, so that DC24V is directly output to subject blower, while conversion controling switch is placed in 1 gear, to subject blower The given speed adjustment signal of output, subject blower is according to 1 grade of velocity mode work operating.It, will after being tested blower smooth working Conversion controling switch is transformed into 2 gears by 1 grade, and subject blower is according to 2 grades of velocity mode work operatings.Through the embodiment of the present invention Middle technical solution is able to solve existing great work intensity, working efficiency during locomotive fan repair and maintenance in the prior art The situations such as low, at high cost, inconvenient, greatly save locomotive fan experimentation cost.
The present invention is not limited to above-mentioned specific embodiment, and those skilled in the art can also make a variety of variations accordingly, but It is any all to cover within the scope of the claims with equivalent or similar variation of the invention.

Claims (10)

1. a kind of electric locomotive breeze fan test tool equipment includes test tool module, and respectively test tool module The power module of electric energy is provided with breeze fan, which is characterized in that the power module includes to convert alternating current to pressure stabilizing The power-switching circuit of DC power supply, constant voltage dc source as power-switching circuit export, respectively test tool module and Breeze fan provides electric energy;Test tool module includes shell and the speed regulation route being set in the housing;The speed tune It controls and is equipped with conversion controling switch, terminal-type power module, terminal-type adjustable resistance, control switch and status indicator lamp in route, The constant voltage dc source connecting with test tool module is converted into double loop power supply output, two-way electricity by terminal-type power module Terminal-type adjustable resistance, conversion of the terminal-type adjustable resistance with regulation breeze fan revolving speed are disposed on the outlet line of source Control switch electrical connection;Status indicator lamp is sequentially arranged on the route that conversion controling switch is connect with breeze fan and two-way electricity On the route that source output and constant voltage dc source are connect with breeze fan;Control switch is sequentially arranged at constant voltage dc source and two-way On the route of power supply connection and on the route that is connect with breeze fan of constant voltage dc source.
2. electric locomotive breeze fan test tool equipment according to claim 1, which is characterized in that power-switching circuit AC220V power supply is converted to and provides the DC24V power supply of electric energy with test tool module and breeze fan module respectively.
3. electric locomotive breeze fan test tool equipment according to claim 2, which is characterized in that terminal-type power supply mould The DC24V power supply of input is converted to the output of two-way DC10V power supply by block.
4. electric locomotive breeze fan test tool equipment according to claim 1, which is characterized in that shell is using insulation Body structure.
5. electric locomotive breeze fan test tool equipment according to claim 4, which is characterized in that the insulated case Case lid is provided in body structure, status indicator lamp and conversion controling switch are fixed on case lid.
6. electric locomotive breeze fan test tool equipment according to claim 1, which is characterized in that be provided on shell Terminal block structure and connector structure;Power-switching circuit passes through terminal block structure and the speed for being set to insulation box inside configuration Keying line connection;Speed regulation route is connect by connector structure with breeze fan.
7. electric locomotive breeze fan test tool equipment according to claim 6, which is characterized in that the plug connector Structure uses rectangular connector.
8. electric locomotive breeze fan test tool equipment according to claim 1, which is characterized in that enclosure interior setting There is the installation guide rail for fixed conversion control switch, terminal-type power module, terminal-type adjustable resistance and control switch.
9. electric locomotive breeze fan test tool equipment according to claim 1, which is characterized in that the control is opened Closing is double-pole cut-out.
10. electric locomotive breeze fan test tool equipment according to claim 1, which is characterized in that the conversion Control switch is that there are three the change-over switches of control gear for tool.
CN201811231410.1A 2018-10-22 Electric locomotive air supply fan test tool equipment Active CN109026813B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811231410.1A CN109026813B (en) 2018-10-22 Electric locomotive air supply fan test tool equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811231410.1A CN109026813B (en) 2018-10-22 Electric locomotive air supply fan test tool equipment

Publications (2)

Publication Number Publication Date
CN109026813A true CN109026813A (en) 2018-12-18
CN109026813B CN109026813B (en) 2024-05-17

Family

ID=

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113883081A (en) * 2021-11-24 2022-01-04 大连鼎力交通轨道设备有限公司 A experimental frock that is convenient for it is fixed that is used for locomotive ventilation blower vibration to detect

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3545307A (en) * 1967-04-27 1970-12-08 Bosch Gmbh Robert Means for the synchronized shifting of transmissions in motor vehicles
JPH09203551A (en) * 1996-01-25 1997-08-05 Yamatake Honeywell Co Ltd Fan coil unit control apparatus
KR19990023386U (en) * 1997-12-05 1999-07-05 정몽규 Heater Blower Motor Control
CN1348254A (en) * 2001-10-18 2002-05-08 上海复旦微电子股份有限公司 Product-to-pulse conversion method and circuit
CN2733739Y (en) * 2004-03-24 2005-10-12 张世武 Controller of dual closed-loop AC voltage-regulating speed-regulating device for blower fan water pump
CN202971259U (en) * 2012-11-27 2013-06-05 洛阳源创电气有限公司 Mine fan control system capable of automatically adjusting air volume
CN103994089A (en) * 2014-05-22 2014-08-20 湖南工业大学 Random variable wind fan and random variable wind generation method
CN204003555U (en) * 2014-08-22 2014-12-10 唐山开诚电控设备集团有限公司 The two fan frequency conversion arrangements for speed regulation of mine flameproof and intrinsic safety type
CN204481770U (en) * 2015-04-07 2015-07-15 北京北广科技股份有限公司 Sampling protective device in power amplifier module debugging
CN204761796U (en) * 2015-07-06 2015-11-11 湖南工业大学 Ceiling fan lamp control circuit
CN205190297U (en) * 2015-12-01 2016-04-27 林桦 Special power suitable for on -vehicle electric air conditioner direct current has brush fan
CN205283106U (en) * 2015-12-25 2016-06-01 深圳市安健科技股份有限公司 High frequency and high voltage generator and power modular dirve ware thereof
CN106707063A (en) * 2016-12-29 2017-05-24 株洲中车时代电气股份有限公司 Automatic test bench for rail transit electronic product
CN106839281A (en) * 2017-01-04 2017-06-13 深圳市菲莱克电子有限公司 A kind of control system of split-type air conditioner
US20170370626A1 (en) * 2015-01-30 2017-12-28 Denso Corporation Air conditioning apparatus
CN206892132U (en) * 2017-07-19 2018-01-16 中车洛阳机车有限公司 Diesel locomotive motor positive and inverse is to auxiliary detection device
CN108591109A (en) * 2018-07-13 2018-09-28 广东爱美信电器有限公司 Frequency conversion fan intelligent controlling device and control switch
CN208831306U (en) * 2018-10-22 2019-05-07 中车洛阳机车有限公司 Electric locomotive breeze fan test tool equipment

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3545307A (en) * 1967-04-27 1970-12-08 Bosch Gmbh Robert Means for the synchronized shifting of transmissions in motor vehicles
JPH09203551A (en) * 1996-01-25 1997-08-05 Yamatake Honeywell Co Ltd Fan coil unit control apparatus
KR19990023386U (en) * 1997-12-05 1999-07-05 정몽규 Heater Blower Motor Control
CN1348254A (en) * 2001-10-18 2002-05-08 上海复旦微电子股份有限公司 Product-to-pulse conversion method and circuit
CN2733739Y (en) * 2004-03-24 2005-10-12 张世武 Controller of dual closed-loop AC voltage-regulating speed-regulating device for blower fan water pump
CN202971259U (en) * 2012-11-27 2013-06-05 洛阳源创电气有限公司 Mine fan control system capable of automatically adjusting air volume
CN103994089A (en) * 2014-05-22 2014-08-20 湖南工业大学 Random variable wind fan and random variable wind generation method
CN204003555U (en) * 2014-08-22 2014-12-10 唐山开诚电控设备集团有限公司 The two fan frequency conversion arrangements for speed regulation of mine flameproof and intrinsic safety type
US20170370626A1 (en) * 2015-01-30 2017-12-28 Denso Corporation Air conditioning apparatus
CN204481770U (en) * 2015-04-07 2015-07-15 北京北广科技股份有限公司 Sampling protective device in power amplifier module debugging
CN204761796U (en) * 2015-07-06 2015-11-11 湖南工业大学 Ceiling fan lamp control circuit
CN205190297U (en) * 2015-12-01 2016-04-27 林桦 Special power suitable for on -vehicle electric air conditioner direct current has brush fan
CN205283106U (en) * 2015-12-25 2016-06-01 深圳市安健科技股份有限公司 High frequency and high voltage generator and power modular dirve ware thereof
CN106707063A (en) * 2016-12-29 2017-05-24 株洲中车时代电气股份有限公司 Automatic test bench for rail transit electronic product
CN106839281A (en) * 2017-01-04 2017-06-13 深圳市菲莱克电子有限公司 A kind of control system of split-type air conditioner
CN206892132U (en) * 2017-07-19 2018-01-16 中车洛阳机车有限公司 Diesel locomotive motor positive and inverse is to auxiliary detection device
CN108591109A (en) * 2018-07-13 2018-09-28 广东爱美信电器有限公司 Frequency conversion fan intelligent controlling device and control switch
CN208831306U (en) * 2018-10-22 2019-05-07 中车洛阳机车有限公司 Electric locomotive breeze fan test tool equipment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
陈燎;蒋侃;吴志敏;: "车辆电磁制动器电磁体试验台基于LabVIEW和数字电位器的调速电机控制系统设计", 拖拉机与农用运输车, no. 01 *
陈立明;潘利科;杨才智;邢彤;许波;: "第三轨/集电靴试验台电源系统设计", 铁道技术监督, no. 07 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113883081A (en) * 2021-11-24 2022-01-04 大连鼎力交通轨道设备有限公司 A experimental frock that is convenient for it is fixed that is used for locomotive ventilation blower vibration to detect
CN113883081B (en) * 2021-11-24 2024-02-20 大连鼎力交通轨道设备有限公司 A test fixture that is used for locomotive ventilation blower vibration detection's being convenient for fixed

Similar Documents

Publication Publication Date Title
CN208831306U (en) Electric locomotive breeze fan test tool equipment
CN105513488A (en) Experiment teaching equipment for excavator electrical system
CN109026813A (en) Electric locomotive breeze fan test tool equipment
CN207937583U (en) A kind of test ageing system of power supply adaptor
CN209214943U (en) A kind of experimental rig for locomotive air conditioner unit
CN109026813B (en) Electric locomotive air supply fan test tool equipment
CN205487091U (en) Engine attaches automatic gearbox and synthesizes real standard platform
CN208273306U (en) A kind of lighting device used suitable for transformer and distribution power station
CN109506971A (en) A kind of experimental rig for locomotive air conditioner unit
CN209036492U (en) A kind of Multifunctional debugging tool box
CN202393880U (en) Split-type marine onsite detecting device of air breaker
CN205910235U (en) Modified multiepitope meter case
CN208590142U (en) A kind of NB-IoT intelligent road-lamp control equipment
CN206506161U (en) The new-energy automobile high voltage distribution box that a kind of band fusing is indicated
CN206421191U (en) Gas station's intelligent power saving statistical system
CN111123899A (en) Test system of fuel cell commercial vehicle electric drive system
CN111146710A (en) Alternating-current high-voltage armored drawer type intelligent vacuum switch cabinet
CN205092442U (en) A high -low voltage switch cabinet
CN205901130U (en) Middle -arranged switch cabinet
CN220751570U (en) Testing device of wind pressure regulator
CN220822680U (en) Lamp overhaul test power supply
CN217787267U (en) Testing device for testing braking resistor of subway vehicle
CN210416469U (en) Intelligent control box for automobile central electric appliance
CN203250994U (en) Optimizing energy-saving cabinet of power plant fuel pump system
CN205657361U (en) Container formula becomes distribution unit for data center

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant