CN109026025B - 用于施工隧道联络通道的顶管支撑与顶进系统 - Google Patents
用于施工隧道联络通道的顶管支撑与顶进系统 Download PDFInfo
- Publication number
- CN109026025B CN109026025B CN201811005028.9A CN201811005028A CN109026025B CN 109026025 B CN109026025 B CN 109026025B CN 201811005028 A CN201811005028 A CN 201811005028A CN 109026025 B CN109026025 B CN 109026025B
- Authority
- CN
- China
- Prior art keywords
- supporting
- jacking
- frame
- originating
- oil cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 62
- 238000004891 communication Methods 0.000 claims abstract description 35
- 238000013461 design Methods 0.000 claims abstract description 9
- 230000000670 limiting effect Effects 0.000 claims description 46
- 230000007246 mechanism Effects 0.000 claims description 16
- 238000000034 method Methods 0.000 description 11
- 238000009434 installation Methods 0.000 description 7
- 229910000831 Steel Inorganic materials 0.000 description 6
- 239000002689 soil Substances 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- 230000006872 improvement Effects 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 238000009412 basement excavation Methods 0.000 description 3
- 230000008014 freezing Effects 0.000 description 3
- 238000007710 freezing Methods 0.000 description 3
- 210000001503 joint Anatomy 0.000 description 3
- 229920001296 polysiloxane Polymers 0.000 description 3
- 230000002829 reductive effect Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000005489 elastic deformation Effects 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 238000010297 mechanical methods and process Methods 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000036961 partial effect Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000002441 reversible effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000010257 thawing Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811005028.9A CN109026025B (zh) | 2018-08-30 | 2018-08-30 | 用于施工隧道联络通道的顶管支撑与顶进系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811005028.9A CN109026025B (zh) | 2018-08-30 | 2018-08-30 | 用于施工隧道联络通道的顶管支撑与顶进系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109026025A CN109026025A (zh) | 2018-12-18 |
CN109026025B true CN109026025B (zh) | 2020-04-10 |
Family
ID=64626446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811005028.9A Active CN109026025B (zh) | 2018-08-30 | 2018-08-30 | 用于施工隧道联络通道的顶管支撑与顶进系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109026025B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112212069B (zh) * | 2020-09-01 | 2022-05-13 | 中国十七冶集团有限公司 | 一种可调节顶管受力的辅助装置 |
CN112253191B (zh) * | 2020-10-16 | 2022-08-23 | 河南城建学院 | 一种地铁施工的顶部支撑结构 |
CN114060037B (zh) * | 2021-10-18 | 2023-08-29 | 宁波用躬科技有限公司 | 一种隧道施工用台车支撑系统 |
AU2023285921A1 (en) * | 2022-06-24 | 2024-01-18 | Ningbo Yonggong Technology Co., Ltd. | Jacking system for contact channel tunneling construction and construction method using same |
CN115110973B (zh) * | 2022-07-26 | 2022-12-20 | 北京建工土木工程有限公司 | 一种联络通道顶管施工靠背系统及其使用方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2767103B2 (ja) * | 1996-06-06 | 1998-06-18 | 南野建設株式会社 | 管体の推進工法と推進装置 |
CN100501124C (zh) * | 2006-09-04 | 2009-06-17 | 上海隧道工程股份有限公司 | 地铁盾构区间隧道联络通道的施工方法 |
CN107060788A (zh) * | 2016-09-19 | 2017-08-18 | 中铁隧道集团有限公司 | 一种隧道联络通道开挖装置 |
CN206174961U (zh) * | 2016-11-07 | 2017-05-17 | 中铁工程装备集团有限公司 | 隧道联络通道用盾构机 |
CN206723175U (zh) * | 2017-03-21 | 2017-12-08 | 武汉善福重型机床有限公司 | 一种盾构机推进油缸偏角调节装置 |
CN106948833B (zh) * | 2017-04-05 | 2019-08-27 | 宁波大学 | 拼装式联络通道结构及其施工方法 |
CN107130972B (zh) * | 2017-07-07 | 2023-05-26 | 中铁工程装备集团有限公司 | 适应转弯的tbm步进装置 |
-
2018
- 2018-08-30 CN CN201811005028.9A patent/CN109026025B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN109026025A (zh) | 2018-12-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109026025B (zh) | 用于施工隧道联络通道的顶管支撑与顶进系统 | |
LU101102B1 (en) | Machine Non-Excavation Advancing Apparatus | |
CN213233477U (zh) | 一种基坑支护结构以及基坑边坡支护系统 | |
CN106837362B (zh) | 盾构机始发的施工装置及施工方法 | |
CN103590833B (zh) | 螺旋出土顶管管幕施工方法 | |
CN110924961B (zh) | 一种盾构机下穿既有车站始发的施工方法 | |
CN204267093U (zh) | 一种移动式矿山充填挡墙 | |
WO2018133743A1 (zh) | 一种用于顶管法的掘进装置及其施工法 | |
CN110552709A (zh) | 适用于大直径盾构机的自进式整体过站方法及装置 | |
CN109026052B (zh) | 用于施工隧道联络通道的顶管始发架角度调节装置 | |
CN111365022B (zh) | 隧道深孔注浆装置 | |
CN102817617B (zh) | 新型拉索式盾构始发后靠基座体系 | |
CN109630175B (zh) | 一种可移动式预应力支撑系统及其使用方法 | |
CN115030527B (zh) | 一种门式钢架厂房钢结构安装设备 | |
CN114810110B (zh) | 一种适用于复杂地层内的盾构接收施工体系及施工方法 | |
CN115110973B (zh) | 一种联络通道顶管施工靠背系统及其使用方法 | |
CN115749896A (zh) | 一种巷道掘进中围岩顶部临时支护设备及其使用方法 | |
CN111424708B (zh) | 装配式管廊、装配式管廊拼装台架及拼装方法 | |
CN111502702B (zh) | 一种巷道钢支撑用混凝土填充装置 | |
CN204163762U (zh) | 一种矿山充填挡墙 | |
CN110030003B (zh) | 一种隧洞施工的防塌方开挖装置及其工艺 | |
CN110410105A (zh) | 一种隧道的二次衬砌设备及其使用方法 | |
CN218989910U (zh) | 一种拼装式高墩连续梁施工托架 | |
CN218204475U (zh) | 一种道路施工路基铺设用边坡防护板 | |
CN212716634U (zh) | 盾构反力装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211105 Address after: No. 1099, No. 5, Wan Ping Nan Road, Xuhui District, Shanghai Patentee after: SHANGHAI TUNNEL ENGINEERING Co.,Ltd. Patentee after: SHANGHAI DUNGOU DESIGN EXPERIMENTAL RESEARCH CENTER Co.,Ltd. Patentee after: SHANGHAI TUNNEL SHIELD ENGINEERING Co.,Ltd. Patentee after: Shanghai Waigaoqiao tunnel machinery Co.,Ltd. Address before: No. 1099, No. 5, Wan Ping Nan Road, Xuhui District, Shanghai Patentee before: SHANGHAI TUNNEL ENGINEERING Co.,Ltd. Patentee before: SHANGHAI DUNGOU DESIGN EXPERIMENTAL RESEARCH CENTER Co.,Ltd. Patentee before: SHANGHAI TUNNEL SHIELD ENGINEERING Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 1099, No. 5, Wan Ping Nan Road, Xuhui District, Shanghai Patentee after: SHANGHAI TUNNEL ENGINEERING Co.,Ltd. Patentee after: SHANGHAI DUNGOU DESIGN EXPERIMENTAL RESEARCH CENTER Co.,Ltd. Patentee after: SHANGHAI TUNNEL SHIELD ENGINEERING Co.,Ltd. Patentee after: Shanghai urban construction tunnel equipment Co.,Ltd. Address before: No. 1099, No. 5, Wan Ping Nan Road, Xuhui District, Shanghai Patentee before: SHANGHAI TUNNEL ENGINEERING Co.,Ltd. Patentee before: SHANGHAI DUNGOU DESIGN EXPERIMENTAL RESEARCH CENTER Co.,Ltd. Patentee before: SHANGHAI TUNNEL SHIELD ENGINEERING Co.,Ltd. Patentee before: Shanghai Waigaoqiao tunnel machinery Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |