CN109025808A - More power guide position linkage combination drill tools, preparation method and pile-type - Google Patents

More power guide position linkage combination drill tools, preparation method and pile-type Download PDF

Info

Publication number
CN109025808A
CN109025808A CN201811185498.8A CN201811185498A CN109025808A CN 109025808 A CN109025808 A CN 109025808A CN 201811185498 A CN201811185498 A CN 201811185498A CN 109025808 A CN109025808 A CN 109025808A
Authority
CN
China
Prior art keywords
drilling tool
power
linkage
tool
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811185498.8A
Other languages
Chinese (zh)
Other versions
CN109025808B (en
Inventor
李广信
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811185498.8A priority Critical patent/CN109025808B/en
Publication of CN109025808A publication Critical patent/CN109025808A/en
Application granted granted Critical
Publication of CN109025808B publication Critical patent/CN109025808B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/22Rods or pipes with helical structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to technical field of civil engineering, more particularly, to a kind of more power guide position linkage combination drill tools, preparation method and pile-type.More power guide positions linkage combination drill tools include: sequentially coaxially be arranged lead position linkage drilling tool, middle power drilling tool and upper power drilling tool;The upper power drilling tool and middle power drilling tool are respectively equipped with a power device, and the power device can be operated alone its correspondence drilling tool and be rotated;For the position linkage drilling tool of leading equipped with guide device, the guide device can make described lead realize that leading position links between position linkage drilling tool and the middle power drilling tool.When the combination drill tool is constructed, each drilling tool is converted into the mode that active drive adds linkage to assist by traditional linked manner, and can disposably complete pore-forming and concrete pressure filling pile, and high degree of automation realizes the raising of work efficiency;The variable diameter of pile body, reasonable engineering method, so that bearing capacity of single pile is further to be improved, to reduce costs;The above composite factor shortens the duration.

Description

More power guide position linkage combination drill tools, preparation method and pile-type
Technical field
The present invention relates to technical field of civil engineering, more particularly, to a kind of more power guide position linkage combination drill tools, preparation Method and pile-type.
Background technique
In the tide of reform and opening-up, construction industry has rapid development, and design, the construction of foundation are wanted in architectural engineering Ask higher and higher, concrete stake and reinforced concrete pile basis and composite foundation are in skyscraper, bridge, harbour, railway, highway, airport, water It is used widely in the engineerings such as sharp hydroelectric facility, in order to make concrete stake and reinforced concrete pile meet bending resistance, anti-shearing, raising bearing capacity Constantly the shape of concrete stake and reinforced concrete pile is improved with design requirements, people such as antidetonations, is wanted to further satisfaction design It asks, save material dosage, improves construction quality and shortens construction speed.With traditional pile-type that existing equipment and technique are built, Its in length and breadth section be usually it is not long with stake and change cylinder or square column type stake, bearing capacity mainly by stake side frictional resistance and The end resistance composition at stake end.Existing equipment function is more single, and automation degree of equipment is low, is unable to adaptation to local conditions Ground Treatment Soil causes certain cost waste, affects bearing capacity of single pile and play effect.
A linkage technology reference that this patent was related to lead: utility model patent: 201820159509.4, invention name Claim: a kind of guide device and drilling tool.(patent of invention is in the substantive examination stage)
The extruding and removing soil combination drill tool technology reference that this patent is related to: utility model patent: 201820124401.1, invention name Claim: a kind of extruding and removing soil combination drill tool and CFG extruding and removing soil stake.(patent of invention is in the substantive examination stage)
The information disclosed in the background technology section is intended only to deepen understanding of the general background technology to the present invention, and It is not construed as recognizing or implying in any form that the information constitutes the prior art known to those skilled in the art.
Summary of the invention
The purpose of the present invention is to provide a kind of more power guide position linkage combination drill tools, preparation method and pile-type, to solve The automatic degree of equipment existing in the prior art is low, and engineering method is single, and pile-type is single, and bad adaptability and bearing capacity of single pile be not high The technical issues of.
To achieve the goals above, the invention adopts the following technical scheme:
In a first aspect, the present invention provides a kind of more power guide position linkage combination drill tools comprising: what is be sequentially coaxially arranged leads Position linkage drilling tool, middle power drilling tool and upper power drilling tool;
The upper power drilling tool and middle power drilling tool are respectively equipped with a power device, and the power device can individually drive Its correspondence drilling tool is moved to be rotated;For the position linkage drilling tool of leading equipped with guide device, the guide device can make described lead It is realized between position linkage drilling tool and the middle power drilling tool and leads position linkage.
As a kind of further technical solution, the position linkage drilling tool of leading includes: that outer sleeve drilling tool and first lead position connection Dynamic device-leads an interlocking bar;Described first, which leads a linkage-, leads an interlocking bar outer peripheral surface and is provided with guide post.
As a kind of further technical solution, it is provided with casing on the outer sleeve drilling tool, passes through the slips on casing It fixed with boring tower, keep outer sleeve drilling tool verticality;When taking casting engineering method, several castings are opened up on the outer sleeve drilling tool Hole;It takes and is not necessarily to open up earth discharging hole on the outer sleeve drilling tool when soil compaction engineering method.
As a kind of further technical solution, the middle power drilling tool include: middle power head, intermediate sleeve drilling tool and in Lifting device;The middle power head is set to the upper end of the intermediate sleeve drilling tool, for drive the intermediate sleeve drilling tool into Row spinning movement;The middle lifting device is set to the lower end of the middle power head, for drive it is described lead position link drilling tool into Row lifting action;The guide device includes that the second linkage-being set on the intermediate sleeve drilling tool leads position linkage slot, The top that second linkage-leads position linkage slot is provided with position guiding groove and leads a bank face;It is described to lead a bank face and lead position connection When guide post contacts in lever, guide post can rotate into position guiding groove entrance along a bank face of leading, it is passive on move to it is described At position guiding groove horn mouth, promote to lead an interlocking bar accurately into leading in position linkage slot, completion linkage, which is nested, locks work.
As a kind of further technical solution, the middle power drilling tool further include: middle casting slot, the middle casting slot are set It is placed in the upper end of the middle power head.
As a kind of further technical solution, the upper power drilling tool includes: upper power head, center drilling tool and upper promotion Device;The upper power head is set to the upper end of the center drilling tool, for driving the center drilling tool to carry out spinning movement;Institute The lower end that lifting device is set to the upper power head is stated, for driving the middle power drilling tool to carry out lifting action.
As a kind of further technical solution, the upper power drilling tool further include: position limit device;The upper limit dress Install the lower end for being placed in the upper power head.
As a kind of further technical solution, more power guide position linkage combination drill tools include: pressurizing device, described Pressurizing device is set to any one among the upper power drilling tool and the middle power drilling tool.
Second aspect, the present invention provide a kind of type stake according to more power guide position linkage combination drill tool preparations, packet It includes: main body pile body;
At least two back taper stepped ramp type bodies are provided on the main body pile body;
The inverted cone disk inclined-plane extended line of the back taper stepped ramp type body and the included angle of the main body pile body central axis Range are as follows: 5 °~90 °.
The third aspect, the present invention also provides a kind of according to more power guide position linkage combination drill tools with the side of preparative stake Method comprising:
Demand according to stratum to engineering method, the upper power drilling tool, middle power drilling tool and leads position linkage drilling tool successively successively It is drilled into respective projected depth, so as to form multiple back taper stepped ramp type drillings;Start concrete pump, starts pressure concrete injecting, side pressure concrete injecting Side successively promotes power drilling tool, middle power drilling tool and leads position linkage drilling tool, Synchronous lifting after each drilling tool bottom end is successively concordant, Until mentioning aperture absolute altitude, while concrete also presses and fills pile to designed elevation, realizes that disposable completion pore-forming and concrete pressure fill pile.
By adopting the above technical scheme, the invention has the following beneficial effects:
The present invention provides a kind of more power guide positions linkage combination drill tools, which includes leading position linkage drilling tool, middle power Drilling tool and upper power drilling tool, the middle power drilling tool and upper power drilling tool of the drilling tool are respectively equipped with a power mechanism, this leads position connection Drilling tool is moved equipped with guide device, guide device, which can make to lead, realizes that leading position links between position linkage drilling tool and middle power drilling tool. It is constructed by the combination drill tool, adds linkage to assist so that each drilling tool is converted into active drive by traditional linked manner Mode, and pore-forming and concrete pressure filling pile can be disposably completed, high degree of automation realizes the raising of work efficiency, bearing capacity of single pile Raising, reduce costs simultaneously, shorten the duration;It is adaptable, it is conducive to promote and applies.
The present invention provides a kind of type stake according to more power guide positions linkage combination drill tool preparation, bearing capacity not only includes The pile side friction and stake end bottom bearing of traditional pile body, and the back taper disk inclined-plane of back taper stepped ramp type body, can be vertical part Power vertically downwards is decomposed into the tangential force and normal force of the conical surface, and soil around pile forms passive compression chord state and squeezed state, Pile perimeter resistance is increased, the bearing capacity of single pile is improved, settling amount can be reduced.This superficial part inversed taper platform part bearing capacity is available The shallow water oil field formula of Tai Shaji (Terzaghi) calculates.It is superimposed the combination construction that is nested by the combination drill tool, it can be primary Property complete pore-forming and concrete pressure fill pile, realize the raising of work efficiency, bearing capacity of single pile further improves, while reducing into This, shortens the duration.
The present invention provides a kind of preparation methods according to more Power compound drilling tools, and this method is according to stratum to the need of engineering method Ask, upper power drilling tool, middle power drilling tool and lead position linkage drilling tool be successively drilled into respective projected depth successively, it is more so as to be formed A back taper stepped ramp type drilling;Start concrete pump, start pressure concrete injecting, successively promotes upper power drilling tool, middle power successively in pressure concrete injecting Drilling tool and position linkage drilling tool is led, Synchronous lifting after each drilling tool bottom end is successively concordant, until mentioning aperture absolute altitude, while concrete also presses filling Pile realizes that disposable completion pore-forming and concrete pressure fill pile, to form the type with above structure and function to designed elevation Stake.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is more power guide position linkage combination drill tool original state structural schematic diagrams provided in an embodiment of the present invention;
Fig. 2 is that more power guide position linkage combination drill tools provided in an embodiment of the present invention creep into status architecture schematic diagram;
Fig. 3 is the structural schematic diagram of upper power drilling tool provided in an embodiment of the present invention;
Fig. 4 is the positive structure schematic of upper power head provided in an embodiment of the present invention;
Fig. 5 is the structural schematic diagram of middle power drilling tool provided in an embodiment of the present invention;
Fig. 6 is the positive structure schematic of middle power head provided in an embodiment of the present invention;
Fig. 7 is the structural schematic diagram of middle casting slot provided in an embodiment of the present invention;
Fig. 8 is the structural schematic diagram provided in an embodiment of the present invention for leading position linkage drilling tool;
Fig. 9 is the original state schematic diagram of guide device provided in an embodiment of the present invention;
Figure 10 is the working state schematic representation of guide device provided in an embodiment of the present invention;
Figure 11 to Figure 19 is the construction procedure schematic diagram of drilling tool provided in an embodiment of the present invention;
Figure 20 to Figure 23 is different types of pile-type schematic diagram provided in an embodiment of the present invention.
Icon: the upper power drilling tool of 1-;Power drilling tool in 2-;3- leads position linkage drilling tool;4- type stake;5- concrete pump;The upper power of 11- Head;The center 12- drilling tool;The upper lifting device of 13-;14- position limit device;15- pressurizing device;Power head in 21-;22- intermediate sleeve Cylinder drilling tool;Lifting device in 23-;Casting slot in 26-;27- leads position linkage slot;32- outer sleeve drilling tool;37- leads an interlocking bar; 38- casing;41- main body pile body;42- back taper stepped ramp type body.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Below in conjunction with attached drawing, detailed description of the preferred embodiments.It should be understood that this place is retouched The specific embodiment stated is merely to illustrate and explain the present invention, and is not intended to restrict the invention.
Embodiment one
In conjunction with shown in Fig. 1 to Figure 10, the present embodiment one provides a kind of more power guide position linkage combination drill tools comprising: according to It is secondary be coaxially arranged lead position linkage drilling tool 3, middle power drilling tool 2 and upper power drilling tool 1 (ecto-entad, which is sequentially overlapped, to be nested);It is described Upper power drilling tool and middle power drilling tool 2 are respectively equipped with a power device, and the power device can be operated alone it and correspond to brill Tool is rotated;Equipped with guide device, the guide device can make described to lead position linkage drilling tool the position linkage drilling tool 3 of leading It is realized between 3 and the middle power drilling tool 2 and leads position linkage.It is actively driven as it can be seen that each drilling tool is converted by passively linked manner Dynamic plus the auxiliary that links mode, high degree of automation is adaptable, is conducive to promote and apply.
Preferably, it is described lead position linkage drilling tool 3 include: outer sleeve drilling tool 32 and first lead a linkage-lead position linkage Bar 37;Described first, which leads a linkage-, leads 37 outer peripheral surface of an interlocking bar and is provided with guide post.
It is provided with casing 38 on the outer sleeve drilling tool 32, fixed by the slips on casing 38 with boring tower, keep housing Cylinder 32 verticality of drilling tool;When taking casting engineering method, several earth discharging holes are opened up on the outer sleeve drilling tool;Take soil compaction engineering method when institute It states on outer sleeve drilling tool without opening up earth discharging hole.
For outer sleeve drilling tool 32, third helical blade, the third helical-blade are provided on outer sleeve drilling tool 32 Piece is axially set on the outer wall of the outer sleeve drilling tool 32 along the outer sleeve drilling tool 32.The size of outer sleeve drilling tool 32 and Concrete shape can flexible setting according to actual needs.
Preferably, the middle power drilling tool 2 includes: middle power head 21, intermediate sleeve drilling tool 22 and middle lifting device 23;Institute The upper end that middle power head 21 is set to the intermediate sleeve drilling tool 22 is stated, for driving the intermediate sleeve drilling tool 22 to be rotated Movement;The middle lifting device 23 is set to the lower end of the middle power head 21, for driving the position linkage drilling tool 3 of leading to carry out Lifting action;The guide device includes that the second linkage-being set on the intermediate sleeve drilling tool 22 leads position linkage slot 27, the top that second linkage-leads position linkage slot 27 is provided with position guiding groove and leads a bank face;It is described to lead a bank face and lead In the interlocking bar 37 of position when guide post contact, guide post can rotate into position guiding groove entrance along a bank face of leading, and passively move up At to the position guiding groove horn mouth, promote to lead an interlocking bar 37 accurately into leading in position linkage slot 27, completion linkage is nested Lock work.
In the present embodiment, as a kind of further technical solution, the position guiding groove leads the axis of position linkage slot 27 described in To being opened on the outer wall for leading position linkage slot 27, the position guiding groove has the bottom in expansion shape, such as: bell mouth shape, When linkage works, protection guide post avoids collision damage, and guide post and position guiding groove, which reduce, when linkage disengages rubs.
In the present embodiment, as a kind of further technical solution, a top edge in bank face of leading is with inclined arc The ramp of shape, for being contacted with the guide post.
In the present embodiment, as a kind of further technical solution, the quantity of the position guiding groove is two, is led described in two Position slot is respectively arranged at the described the point of bisection position for leading position linkage slot circumferential direction.
It, can be there are many mode for middle lifting device 23.
Such as: lifting device 23 includes: hoist engine in this, which is set to the lower end of the middle power head 21, should The traction rope of hoist engine is connected with position linkage drilling tool (preferably casing 38) is led.
Another example is: lifting device 23 includes: telescoping cylinder (oil cylinder) in this, telescoping cylinder is set under the middle power head 21 End, the telescopic rod of the telescoping cylinder are connected with position linkage drilling tool (preferably casing 38) is led.
For intermediate sleeve drilling tool 22, which is provided with the second helical blade, second spiral shell Vane piece is axially set on the outer wall of the first sleeve drilling tool along the first sleeve drilling tool.
Preferably, the middle power drilling tool 2 further include: middle casting slot 26, the middle casting slot 26 are set in described and move The upper end of power head 21.For middle casting slot 26, casting slot 26 including a casting case and is set to casting case side in this And what is be inclined to set leads soil box.The bottom of the casting case can be connected by the shell of middle power head 21 with intermediate sleeve drilling tool 22 Logical, i.e. the part rotation casting of center drilling tool 12 is exported through 22 inside of intermediate sleeve drilling tool, middle casting slot 26.For middle power head 21 For, shell of power head 21 can be hollow cylindrical in this, internal to have the casting space communicated with middle casting slot 26.
It is formed it is worth noting that middle power drilling tool 2 can be nested according to design requirement by multiple superpositions.Middle power drilling tool 2 When being nested by multiple superpositions, except in addition to leading the position middle power drilling tool 2 that is in contact of linkage drilling tool 3 and being equipped with and lead position linkage slot, in other Power drilling tool, which is not set, leads position linkage slot, in addition adds middle limiting device;In structure in addition to sleeve drilling tool diameter and length are different, Other are all the same.
It further illustrates, on more power guide position linkage combination drill tool overall constructions, the position linkage of leading sequentially coaxially being arranged is bored Tool 3, middle power drilling tool 2 and upper power drilling tool 1, middle power drilling tool 2 and upper power can also be set to coaxial sleeve by leading position linkage drilling tool 3 Between drilling tool 1, also can normal use, but consider manufacture, assembling, operation etc. factors, preferably overall construction from top to bottom are as follows: according to It is secondary to be coaxially arranged power drilling tool 1, middle power drilling tool 2 and lead position linkage drilling tool 3.
Preferably, the upper power drilling tool 1 includes: upper power head 11, center drilling tool 12 and upper lifting device 13;On described Power head 11 is set to the upper end of the center drilling tool 12, for driving the center drilling tool 12 to carry out spinning movement;On described Lifting device 13 is set to the lower end of the upper power head 11, for driving the middle power drilling tool 2 to carry out lifting action.It is preferred that , the upper power drilling tool 1 further include: position limit device 14;The position limit device 14 is set to the upper power head 11 Lower end.
For upper power head 11, structure, form and its power head 21 are substantially similar outer, and it is (mixed in addition to add slip casting Solidifying soil) union elbow (bend pipe one end is communicated with center drilling tool core pipe, and the other end connects with concrete conveyance high-pressure hose), is moved Power top head is additionally provided with suspension centre, is connect with drilling machine master winch by wirerope, no casting slot setting.
It, can be there are many mode for upper lifting device 13.
Such as: lifting device 13 includes: hoist engine on this, which is set to the lower end of the upper power head 11, should The traction rope of hoist engine is connected with middle power drilling tool 2 (power head 21 in preferably).
Another example is: lifting device 13 includes: telescoping cylinder (oil cylinder) on this, telescoping cylinder is set under the upper power head 11 End, the telescopic rod of the telescoping cylinder are connected with middle power drilling tool 2 (power head 21 in preferably).
It, can be there are many mode for position limit device 14.Such as: the position limit device 14 can be rigid connection Bar, the length of the rigid connecting rod is according to practical flexible setting.It may be telescopic connection rod, length is any according to requiring It adjusts.
In addition, the present embodiment further include: pressurizing device 15, the pressurizing device 15 are set to 1 He of upper power drilling tool Any one among the middle power drilling tool 2.
Certainly, for pressurizing device 15, can be self-possessed according to power device, geological conditions and design requirement are flexibly set It sets, it is preferred that the pressurizing device 15 can be hoist engine, and hoist engine is set on drilling machine platform, and the traction rope of hoist engine is logical Cross times among a directive wheel and the upper power drilling tool 1 (upper power head 11) and the middle power drilling tool 2 (middle power head 21) One of anticipating connection.Pressurizing device 15 or hydraulic cylinder, cylinder tube are fixedly installed on boring tower suitable position, oil cylinder piston Bar top with it is any one among the upper power drilling tool 1 (upper power head 11) and the middle power drilling tool 2 (middle power head 21) Person's connection.
Embodiment two
Shown in Figure 11 to Figure 19, the present embodiment three provides a kind of Power compound drilling tools more according to embodiment one again to make The method of standby type stake 4 comprising: the demand according to stratum to engineering method and leads position connection at the upper power drilling tool 1, middle power drilling tool 2 Dynamic drilling tool 3 is successively drilled into respective projected depth successively;Start concrete pump 5, start pressure concrete injecting, upper power is successively promoted in pressure concrete injecting Drilling tool 1, middle power drilling tool 2 and position linkage drilling tool 3 is led, until Synchronous lifting goes out aperture absolute altitude after each drilling tool bottom end is successively concordant, Concrete, which is also pressed, simultaneously fills pile to designed elevation.
In the treatments of soft foundation such as building structure or railway, highway, need to carry out the foundation soil of disposal field soil from shallow to deep According to mean shear wave velocity value changing rule can generally be divided into Soft site soil (soil layer average clearance method≤140m/s), in Soft Site Soil (140m/s < soil layer average clearance method≤250m/s), native (the 250m/s < soil layer average shear wave of Moderate stiff soil sites Speed≤500m/s), hard ground it is native (500m/s < soil layer shear wave velocity).
For diameter-variable pile:
Such as: it is Moderate stiff soil sites soil (or the overwhelming majority is Moderate stiff soil sites soil) for stratum in the processing long range of stake, adopts With casting engineering method, casting pore-forming is successively crept by center drilling tool 12- intermediate sleeve drilling tool 22- outer sleeve drilling tool 32 respectively.Into one Step, this kind of 15 pressure point of process flow pressurizing device is set on power head 11 most preferably.
Such as: for stratum in the processing long range of stake be it is weak, in soft Site Soil (or the overwhelming majority it is weak, in soft field Ground soil), using soil compaction engineering method, soil compaction is successively crept by center drilling tool 12-intermediate sleeve, 22-outer sleeve of drilling tool drilling tool 32 respectively Pore-forming.Further, this kind of 15 pressure point of process flow pressurizing device is set on power head 11 most preferably.The first variable diameter of stake top Casting mode (mainly seeing intermediate sleeve drilling tool 22 to the compacted degree of hole wall soil) also can be used in pile body pore-forming engineering method.
Such as: handling stratum top in the long range of stake is soft Site Soil in weakness-, and lower part is Moderate stiff soil sites soil, using crowded Engineering method is had both in casting, and by intermediate sleeve drilling tool 22, (drilling tool 12 drill bit in center stretches out 22 bottom end of intermediate sleeve drilling tool at this time, when drilling For reversion, spin-ended casting is prevented, only play as the positioning of intermediate sleeve drilling tool 22, break ground and creep into function)-outer sleeve drilling tool 32 is successively Soft Site Soil creeps into soil compaction pore-forming in weakness-respectively, and (or 22 bottom end of intermediate sleeve drilling tool slightly penetrates soil compaction area) stops boring, so It is rotated forward afterwards by center drilling tool 12, continues drilling rotation casting into stake holes, reach projected depth in Moderate stiff soil sites soil.Further, Stake top the first variable diameter pile body pore-forming engineering method also can be used casting mode and (mainly see intermediate sleeve drilling tool 22 to the compacted journey of hole wall soil Degree).This kind of 15 pressure point of process flow pressurizing device is set on middle power head 21.
For screw thread diameter-variable pile:
Such as: in the processing long range of stake stratum be it is weak, in soft Site Soil (or the overwhelming majority it is weak, in soft place Soil), using partial threads soil compaction engineering method, by center drilling tool 12 using simultaneous techniques drilling soil compaction at screw thread stake holes;Intermediate sleeve The extruding and removing soil drilling tool drilling and forming hole based on soil compaction is successively respectively adopted in 22-outer sleeve of drilling tool drilling tool 32.Intermediate sleeve drilling tool 22, outer sleeve drilling tool 32 it is weak, in soft Site Soil drilling reach projected depth after stop boring, (intermediate sleeve drilling tool 22, outer sleeve For drilling tool 32 when soil compaction area pore-forming is crept into, drilling tool 12 drill bit in center stretches out 22 bottom end of intermediate sleeve drilling tool, is reversion when drilling, prevents Only soil is drained into outside aperture by the rotation of center drilling tool 12, only plays as intermediate sleeve drilling tool 22, the positioning of outer sleeve drilling tool 32, drilling of breaking ground Function), it is then rotated forward by center drilling tool 12, using simultaneous techniques drilling soil compaction at screw thread stake holes.Further, this kind of technique stream 15 pressure point of journey pressurizing device is set on middle power head 21.Further, the first variable diameter of stake top pile body pore-forming engineering method can also adopt With casting mode (mainly seeing intermediate sleeve drilling tool 22 to the compacted degree of hole wall soil).
Embodiment three
Shown in Figure 20 to Figure 23, the present embodiment also provides a kind of type stake 4 according to more Power compound drilling tool preparations, It include: main body pile body 41;At least two back taper stepped ramp type bodies 42 are provided on the main body pile body 41;The back taper stepped ramp type body The included angle range of place inclined-plane extended line and 41 central axis of main body pile body at 42 variable diameter are as follows: 5 °~90 °.Example Such as: being located at pile body superficial part at the variable diameter of the back taper stepped ramp type body 42, the place at the variable diameter of the back taper stepped ramp type body 42 is oblique The included angle value range of face extended line and 41 central axis of main body pile body is preferably 30 °~45 °.Another example is: the back taper It is located at pile body deep, place inclined-plane extended line and institute at the variable diameter of the back taper stepped ramp type body 42 at the variable diameter of stepped ramp type body 42 The included angle range for stating 41 central axis of main body pile body is 5 °~90 °, (such as: 30 °, 45 °, 60 °, 75 °).
In addition, for main body pile body 41, it can also be there are many form.
For example, non-threaded type diameter-variable pile: there are two back taper stepped ramp type body 42, the back tapers for setting on the main body pile body 41 The angle 5 °~900 of place inclined-plane extended line and 41 central axis of main body pile body at the variable diameter of stepped ramp type body 42.
In another example screw-type diameter-variable pile: there are two back taper stepped ramp type bodies 42 for setting on the main body pile body 41, from top to bottom It is divided into the first pile body, the second pile body and third pile body, wherein third pile body has helicitic texture.The back taper stepped ramp type body 42 The angle 5 °~900 of place inclined-plane extended line and 41 central axis of main body pile body at variable diameter.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (9)

  1. The combination drill tool 1. a kind of more power guide positions are linked characterized by comprising be sequentially coaxially arranged lead position linkage drilling tool, Middle power drilling tool and upper power drilling tool;
    The upper power drilling tool and middle power drilling tool are respectively equipped with a power device, it can be operated alone in the power device Corresponding drilling tool is rotated;For the position linkage drilling tool of leading equipped with guide device, the guide device can be such that the position of leading joins It is realized between dynamic drilling tool and the middle power drilling tool and leads position linkage.
  2. 2. link combination drill tool for more power guide positions according to claim 1, which is characterized in that described to lead position linkage drilling tool packet Include: outer sleeve drilling tool and first leads a linkage-and leads an interlocking bar;
    Described first, which leads a linkage-, leads an interlocking bar outer peripheral surface and is provided with guide post.
    It is provided with casing on the outer sleeve drilling tool, fixed by the slips on casing with boring tower, keep outer sleeve drilling tool vertical Degree;When taking casting engineering method, several earth discharging holes are opened up on the outer sleeve drilling tool;Outer sleeve drilling tool when taking soil compaction engineering method It is upper to be not necessarily to open up earth discharging hole.
  3. 3. link combination drill tool for more power guide positions according to claim 1, which is characterized in that the middle power drilling tool packet It includes: middle power head, intermediate sleeve drilling tool and middle lifting device;
    The middle power head is set to the upper end of the intermediate sleeve drilling tool, for driving the intermediate sleeve drilling tool to be rotated Movement;The middle lifting device is set to the lower end of the middle power head, for driving the position linkage drilling tool of leading to be gone up and down Movement;A linkage of leading includes that the second linkage-being set on the intermediate sleeve drilling tool leads position linkage slot, institute It states the second linkage-and leads the top of position linkage slot and be provided with and position guiding groove and lead a bank face;It is described to lead a bank face and lead position linkage When guide post contacts on bar, guide post can rotate into position guiding groove entrance along a bank face of leading, it is passive on move to described lead At the slot horn mouth of position, promote to lead an interlocking bar accurately into leading in position linkage slot, completion linkage, which is nested, locks work.
  4. 4. link combination drill tool for more power guide positions according to claim 3, which is characterized in that the middle power drilling tool also wraps Include: middle casting slot, the middle casting slot are set to the upper end of the middle power head.
  5. 5. link combination drill tool for more power guide positions according to claim 1, which is characterized in that the upper power drilling tool packet It includes: upper power head, center drilling tool and upper lifting device;The upper power head is set to the upper end of the center drilling tool, for driving It moves the center drilling tool and carries out spinning movement;The upper lifting device is set to the lower end of the upper power head, for driving It states middle power drilling tool and carries out lifting action.
  6. 6. link combination drill tool for more power guide positions according to claim 5, which is characterized in that the upper power drilling tool also wraps It includes: position limit device;The position limit device is set to the lower end of the upper power head.
  7. 7. link combination drill tool for more power guide positions according to claim 1 to 6, which is characterized in that further include: Pressurizing device, the pressurizing device are set to any one among the upper power drilling tool and the middle power drilling tool.
  8. 8. a kind of type stake of more power guide position linkage combination drill tool preparations described in any one of -7 according to claim 1, special Sign is, comprising: main body pile body;
    At least two back taper stepped ramp type bodies are provided on the main body pile body;
    The inverted cone disk inclined-plane extended line of the back taper stepped ramp type body and the included angle range of the main body pile body central axis Are as follows: 5 °~90 °.
  9. 9. a kind of more power guide position linkage combination drill tools described in any one of -8 according to claim 1 are with the side of preparative stake Method characterized by comprising
    Demand according to stratum to engineering method, the upper power drilling tool, middle power drilling tool and lead position linkage drilling tool be successively drilled into successively Respective projected depth, so as to form multiple back taper stepped ramp type drillings;Start concrete pump, start pressure concrete injecting, in pressure concrete injecting according to Power drilling tool, middle power drilling tool and position linkage drilling tool is led in secondary promotion, Synchronous lifting after each drilling tool bottom end is successively concordant, until Aperture absolute altitude is mentioned, while concrete also presses and fills pile to designed elevation, realizes that disposable completion pore-forming and concrete pressure fill pile.
CN201811185498.8A 2018-10-11 2018-10-11 Multi-power guide linkage composite drilling tool, preparation method and pile type Active CN109025808B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811185498.8A CN109025808B (en) 2018-10-11 2018-10-11 Multi-power guide linkage composite drilling tool, preparation method and pile type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811185498.8A CN109025808B (en) 2018-10-11 2018-10-11 Multi-power guide linkage composite drilling tool, preparation method and pile type

Publications (2)

Publication Number Publication Date
CN109025808A true CN109025808A (en) 2018-12-18
CN109025808B CN109025808B (en) 2024-02-06

Family

ID=64616296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811185498.8A Active CN109025808B (en) 2018-10-11 2018-10-11 Multi-power guide linkage composite drilling tool, preparation method and pile type

Country Status (1)

Country Link
CN (1) CN109025808B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008297752A (en) * 2007-05-30 2008-12-11 Taisei Corp Pile burying method
CN201334661Y (en) * 2009-01-05 2009-10-28 广州市地平线岩土工程有限公司 Integrated long-spiral drilling tool for squeezed branch pile
CN102162248A (en) * 2011-04-26 2011-08-24 武汉高铁桩工科技有限公司 Method for forming variable-cross-section compaction thread pile and compaction drilling tool
WO2015058555A1 (en) * 2013-10-27 2015-04-30 海南卓典高科技开发有限公司 Pile-forming method for compound extruded and expanded pile and pile-forming equipment for compound extruded and expanded pile
CN108035341A (en) * 2018-01-24 2018-05-15 李广信 Extruding and removing soil complex superposition is nested drilling tool, the back taper stepped ramp type stake of CFG reducings and method
CN108086928A (en) * 2018-01-30 2018-05-29 李广信 A kind of guide device and drilling tool
CN209244499U (en) * 2018-10-11 2019-08-13 李广信 Link combination drill tool for more power guide positions

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008297752A (en) * 2007-05-30 2008-12-11 Taisei Corp Pile burying method
CN201334661Y (en) * 2009-01-05 2009-10-28 广州市地平线岩土工程有限公司 Integrated long-spiral drilling tool for squeezed branch pile
CN102162248A (en) * 2011-04-26 2011-08-24 武汉高铁桩工科技有限公司 Method for forming variable-cross-section compaction thread pile and compaction drilling tool
WO2015058555A1 (en) * 2013-10-27 2015-04-30 海南卓典高科技开发有限公司 Pile-forming method for compound extruded and expanded pile and pile-forming equipment for compound extruded and expanded pile
CN108035341A (en) * 2018-01-24 2018-05-15 李广信 Extruding and removing soil complex superposition is nested drilling tool, the back taper stepped ramp type stake of CFG reducings and method
CN108086928A (en) * 2018-01-30 2018-05-29 李广信 A kind of guide device and drilling tool
CN209244499U (en) * 2018-10-11 2019-08-13 李广信 Link combination drill tool for more power guide positions

Also Published As

Publication number Publication date
CN109025808B (en) 2024-02-06

Similar Documents

Publication Publication Date Title
CN104763328A (en) Hydraulic reaming circulation drilling machine and reaming pile construction technology thereof
CN105649083B (en) The clear stake device of the disposable rotary-cutting type of full-sleeve and its clear piling method
CN102226342B (en) Multi-functional piling machine for jet grouting pile-sinking
CN208293568U (en) Extruding and removing soil complex superposition is nested drilling tool
CN108035341A (en) Extruding and removing soil complex superposition is nested drilling tool, the back taper stepped ramp type stake of CFG reducings and method
CN102182180A (en) Rotary extrusion sleeve anchor rod and construction method thereof
CN102312427A (en) Half soil squeezing screw expansion pile forming method
CN106192996A (en) The construction method of a kind of T-shaped stake and the T-shaped drilling tool of T-shaped cast pile driving construction
CN209244499U (en) Link combination drill tool for more power guide positions
CN109098655B (en) Multi-power composite drilling tool, preparation method and pile
CN109025809B (en) Multi-power guide linkage composite drilling tool, preparation method and pile type
CN209244498U (en) More Power compound drilling tools
CN204627406U (en) A kind of hydraulic pressure reaming circulation drilling machine
CN202039369U (en) Multifunctional pilling machine for jet grouting pile sinking
CN106948762A (en) The stake of CFG reducing back tapers stepped ramp type and preparation method and drilling tool
CN109025808A (en) More power guide position linkage combination drill tools, preparation method and pile-type
CN209228300U (en) Link combination drill tool for more power guide positions
CN209244509U (en) More Power compound drilling tools
CN206562910U (en) A kind of auger machine
CN210343236U (en) Thread matching type multi-power composite drilling tool and profile pile
CN113338273B (en) Stirring pile construction method based on water-rich organic matter soft soil layer river channel
CN210105746U (en) Thread fit type composite drilling tool and profile pile
CN201851001U (en) Drilling machine for constructing piles with high bearing capacity
CN210858571U (en) Thread matching type multi-power guide composite drilling tool and profile pile
CN106978974A (en) The stake of CFG reducing back tapers stepped ramp type and preparation method and drilling tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20181218

Assignee: Hebei cone base civil engineering Co.,Ltd.

Assignor: Li Guangxin

Contract record no.: 2019990000261

Denomination of invention: Multi-power guide linkage compound drilling tool, preparation method and pile type

License type: Exclusive License

Record date: 20190801

EE01 Entry into force of recordation of patent licensing contract
GR01 Patent grant