CN106948762A - The stake of CFG reducing back tapers stepped ramp type and preparation method and drilling tool - Google Patents

The stake of CFG reducing back tapers stepped ramp type and preparation method and drilling tool Download PDF

Info

Publication number
CN106948762A
CN106948762A CN201710333352.2A CN201710333352A CN106948762A CN 106948762 A CN106948762 A CN 106948762A CN 201710333352 A CN201710333352 A CN 201710333352A CN 106948762 A CN106948762 A CN 106948762A
Authority
CN
China
Prior art keywords
drilling tool
linkage
sleeve drilling
stepped ramp
ramp type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710333352.2A
Other languages
Chinese (zh)
Other versions
CN106948762B (en
Inventor
李广信
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710333352.2A priority Critical patent/CN106948762B/en
Publication of CN106948762A publication Critical patent/CN106948762A/en
Application granted granted Critical
Publication of CN106948762B publication Critical patent/CN106948762B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/28Enlarging drilled holes, e.g. by counterboring
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/48Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/22Rods or pipes with helical structure
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00Rotary drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00Rotary drilling
    • E21B3/02Surface drives for rotary drilling

Abstract

The present invention relates to technical field of buildings, more particularly, to a kind of stake of CFG reducings back taper stepped ramp type and preparation method and drilling tool.The drilling tool includes:Outer sleeve drilling tool, intermediate sleeve drilling tool and the center drilling tool being sequentially coaxially arranged;The center drilling tool is provided with the first linkage;The intermediate sleeve drilling tool is provided with the second linkage;The outer sleeve drilling tool is provided with the 3rd linkage;Each linkage on the drilling tool is superposition phase shell type, by being engaged with auxiliary equipment hoist engine, can finally form a kind of CFG reducings back taper stepped ramp type stake.The CFG reducing back taper stepped ramp type pile bearing capacitys not only have the pile side friction and stake end bottom bearing of traditional pile body, and the back taper disk inclined-plane of back taper stepped ramp type body, the vertical power vertically downwards in part can be decomposed into the tangential force and normal force of the conical surface, soil around pile forms passive compression chord state and squeezed state, pile peripheral friction force increases, the bearing capacity of single pile is comprehensively improved, settling amount is reduced.

Description

The stake of CFG reducing back tapers stepped ramp type and preparation method and drilling tool
Technical field
The present invention relates to technical field of buildings, more particularly, to a kind of stake of CFG reducings back taper stepped ramp type and preparation method And drilling tool.
Background technology
In the tide of reform and opening-up, construction industry, which has, to be developed rapidly, and architectural engineering is got over to the design of ground, construction requirement Come higher, concrete stake and reinforced concrete pile are used widely in the engineerings such as skyscraper, bridge, harbour, in order that concrete stake and steel The stake of muscle concrete meets bending resistance, anti-shearing, improves the design requirement such as bearing capacity and shockproof requirements, the shape to concrete stake and reinforced concrete pile is entered Row changes.Design requirement can be not only met, save material consumption, moreover it is possible to improve construction quality and shorten construction speed.
The traditional pile-type built with existing equipment, its vertical and horizontal section be typically not with stake it is long and change it is circular or square Stake, its bearing capacity is mainly made up of the frictional resistance of stake side and the bottom bearing at stake end.
The content of the invention
It is an object of the invention to provide a kind of stake of CFG reducings back taper stepped ramp type and preparation method and drilling tool, to solve Traditional pile-type structure type that existing equipment is built is single, the not high technical problem of bearing capacity.
In order to solve the above technical problems, in a first aspect, the present invention provides a kind of drilling tool, it includes:Sequentially coaxially it is arranged Outer sleeve drilling tool, intermediate sleeve drilling tool and center drilling tool;The center drilling tool is provided with the first linkage;The intermediate sleeve Drilling tool is provided with the second linkage;The outer sleeve drilling tool is provided with the 3rd linkage;The outer sleeve drilling tool by During upper lifting, the 3rd linkage can be arranged and be locked on second linkage, second linkage It can be arranged and be locked on first linkage.
Further, the center drilling tool includes:Hollow drill, retractable drill bit and the first helical blade;Described One helical blade is axially set on the outer wall of the hollow drill along the hollow drill, and the drill bit is connected to the sky The lower end of heart drilling rod, first linkage is coaxially disposed in the upper end of the hollow drill, in first linkage On be provided with first flange disk.
Further, the intermediate sleeve drilling tool includes:First sleeve drilling tool and the second helical blade, second spiral Blade is axially set on the outer wall of the first sleeve drilling tool along the first sleeve drilling tool, on the first sleeve drilling tool Multiple earth discharging holes are provided with, second linkage is coaxially disposed in the upper end of the first sleeve drilling tool, described second The upper end of linkage is provided with second flange disk.
Further, the outer sleeve drilling tool includes:Second sleeve drilling tool, the 3rd helical blade and casing, the described 3rd Helical blade is axially set on the outer wall of the second sleeve drilling tool along the second sleeve drilling tool, and the second sleeve is bored Multiple earth discharging holes are provided with tool, the 3rd linkage is arranged at the upper end of the second sleeve drilling tool, and the casing is set The outer sleeve drilling tool upper end is placed in, and is provided with the casing spring assembly for being connected with steel wire rope of windlass, Stopping means is set on the spring assembly, the upper end of the 3rd linkage is provided with the 3rd ring flange.
Further, first linkage includes the first cubic cylinder, and the described first cubic cylinder is coaxially arranged with Section is circular first set hole, and the first set hole is used for the upper end for being fixed on the center drilling tool;
Second linkage includes the second cubic cylinder, and it is square that the described second cubic cylinder, which is coaxially arranged with section, Second set of hole, second set of hole be used for be inserted in first linkage;
3rd linkage includes cylinder, and the cylinder is coaxially arranged with section for the 3rd set of square hole, The 3rd set of hole is used to be inserted in second linkage.
In order to solve the above technical problems, second aspect, the present invention also provides a kind of CFG reducings prepared according to the drilling tool The stake of back taper stepped ramp type, it includes being provided with least two back taper stepped ramp type bodies on main body pile body, the main body pile body.
Further, the cross section of the back taper stepped ramp type body is circle, and vertical section is inverted ladder type.
Further, the angle of the inverted cone disk inclined-plane extended line of the back taper stepped ramp type body and main body pile body central axis Angular range is preferably:30 °~45 °.
In order to solve the above technical problems, the third aspect, the present invention also provides the drilling tool described in a kind of basis to prepare CFG changes The method of footpath back taper stepped ramp type stake, it comprises the following steps:
Center drilling tool clockwise/counterclockwise is rotated by power set, is moved down simultaneously;
First linkage of center drilling tool close to intermediate sleeve drilling tool the second linkage when, by auxiliary equipment elevator Machine lifts outer sleeve drilling tool, and the 3rd linkage of outer sleeve drilling tool is arranged and is locked in the second linkage dress of intermediate sleeve drilling tool Put, then drive intermediate sleeve drilling tool Synchronous lifting, the second linkage of intermediate sleeve drilling tool is finally arranged and is locked in On first linkage of center drilling tool, now each linkage is locked mutually;
Making each drilling tool by power set, clockwise/counterclockwise is rotated simultaneously, and is moved down;
When each drilling tool is drilled into respective projected depth, stop operating, rig master winch lifting center drilling tool, center drilling tool Lower end drill bit is opened, concrete pump startup, starts pressure concrete injecting, lifting center drilling tool, lifts intermediate sleeve successively afterwards in pressure concrete injecting Drilling tool, outer sleeve drilling tool, until outer sleeve drilling tool proposes aperture absolute altitude, while concrete also presses filling to designed elevation.
Further, comprise the following steps during the auxiliary equipment hoist engine lifting outer sleeve drilling tool:
One casing is installed on outer sleeve drilling tool, spring assembly is provided with casing, auxiliary equipment hoist engine passes through Steel wire rope, spring assembly and casing are connected, and enable the 3rd linkage of outer sleeve drilling tool certainly using the elasticity of spring assembly It is dynamic to be set on the second linkage of intermediate sleeve drilling tool;Similarly make the of intermediate sleeve drilling tool using the elasticity of spring assembly Two linkages can automatic insertion on the first linkage of center drilling tool, and on spring assembly set limited location fill Put, when the deformation quantity of spring assembly reaches preset length, stopping means control auxiliary equipment hoist engine is stopped.
Using above-mentioned technical proposal, the present invention has the advantages that:
The invention provides a kind of drilling tool, each linkage on the drilling tool is superposition phase shell type, is rolled up with auxiliary equipment The machine of raising is engaged, and so as to form multiple back taper stepped ramp type drillings, drilling tool is lifted successively, and pressure concrete injecting is achieved one kind simultaneously The stake of CFG reducing back tapers stepped ramp type.
The invention provides a kind of stake of CFG reducings back taper stepped ramp type, its bearing capacity not only has the shaft resistance of traditional pile body Power and stake end bottom bearing, and the back taper disk inclined-plane of back taper stepped ramp type body, can be decomposed into the vertical power vertically downwards in part The tangential force and normal force of the conical surface, soil around pile form passive compression chord state and squeezed state, and pile peripheral friction force increase is comprehensive The bearing capacity of single pile is improved, settling amount is reduced.Structural change function, the bearing capacity Ke Yong Tai Shaji (Terzagh of this I) bearing capacity formulas is calculated.
The invention provides a kind of preparation method, this method by the way that drilling tool is combined with auxiliary equipment hoist engine so that Form the CFG reducing back tapers stepped ramp type stake with said structure and function.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art The accompanying drawing to be used needed for embodiment or description of the prior art is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation that drilling tool of the present invention is in original state;
Fig. 2 is the structural representation that drilling tool of the present invention is in lifting state;
Fig. 3 is the structural representation of center drilling tool of the present invention;
Fig. 4 is the structural representation of the first linkage of the invention;
Fig. 5 is the structural representation of intermediate sleeve drilling tool of the present invention;
Fig. 6 is the structural representation of the second linkage of the invention;
Fig. 7 is the structural representation of outer sleeve drilling tool of the present invention;
Fig. 8 is the structural representation of the 3rd linkage of the invention;
Fig. 9 is the structural representation of CFG reducings back taper stepped ramp type of the present invention stake;
Figure 10 to Figure 16 is the construction procedure schematic diagram of drilling tool of the present invention.
In figure, 1 is hoist engine, and 2 be drilling tool centered on steel wire rope, 3, and 31 be first flange disk, and 32 be the first linkage, 33 be hollow drill, and 34 be the first helical blade, and 35 be drill bit, and 4 be intermediate sleeve drilling tool, and 41 be second flange disk, and 42 be the Two linkages, 43 be the first sleeve drilling tool, and 44 be the second helical blade, and 45 is bore earth discharging hole, and 5 be outer sleeve drilling tool, and 51 are 3rd ring flange, 52 be the 3rd linkage, and 53 be second sleeve drilling tool, and 54 be the 3rd helical blade, and 55 be brill earth discharging hole, 56 It is main body pile body for casing, 71,72 be back taper stepped ramp type body;8 be concrete pump.
Embodiment
Technical scheme is clearly and completely described below in conjunction with accompanying drawing, it is clear that described implementation Example is a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill The every other embodiment that personnel are obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
The embodiment of the present invention is described in detail below in conjunction with accompanying drawing.It should be appreciated that this place is retouched The embodiment stated is merely to illustrate and explain the present invention, and is not intended to limit the invention.
Embodiment one
With reference to shown in Fig. 1 to Fig. 2, the present embodiment provides a kind of drilling tool, and it includes:The outer sleeve drilling tool being sequentially coaxially arranged 5th, intermediate sleeve drilling tool 4 and center drilling tool 3;The center drilling tool 3 is provided with the first linkage 32;The intermediate sleeve drilling tool 4 are provided with the second linkage 42;The outer sleeve drilling tool 5 is provided with the 3rd linkage 52;In the quilt of outer sleeve drilling tool 5 When being lifted up, the 3rd linkage 52 can be arranged and be locked on second linkage 42, and described second Dynamic device 42 can be arranged and be locked on first linkage 32.
It can be seen that, each linkage of drilling tool is each linkage on superposition phase shell type, the drilling tool in the present embodiment It can be engaged with auxiliary equipment hoist engine 1, so as to form multiple back taper stepped ramp type drillings, drilling tool be lifted successively and is pressed simultaneously Fill concrete and be achieved a kind of CFG reducings back taper stepped ramp type stake.
With reference to shown in Fig. 3 to Fig. 4, center drilling tool described in the present embodiment 3 includes:Hollow drill 33, retractable drill bit 35 and first helical blade 34;First helical blade 34 is axially set in the hollow drill along the hollow drill 33 On 33 outer wall, the drill bit 35 is connected to the lower end of the hollow drill 33, first linkage 32 be coaxially disposed in The upper end of the hollow drill 33, first flange disk 31 is provided with first linkage 32.
With reference to shown in Fig. 5 to Fig. 6, intermediate sleeve drilling tool described in the present embodiment 4 includes:First sleeve drilling tool 43 and second Helical blade 44, second helical blade 44 is axially set in the first sleeve drilling tool along the first sleeve drilling tool 43 On 43 outer wall, multiple earth discharging holes 45 are provided with the first sleeve drilling tool 43, second linkage 42 is coaxially disposed In the upper end of the first sleeve drilling tool 43, the upper end of second linkage 42 is provided with second flange disk 41.
What deserves to be explained is, intermediate sleeve drilling tool 4 can be nested by multiple superpositions according to design requirement and be constituted.Intermediate sleeve is bored When tool 4 is nested by multiple superpositions, in addition to sleeve diameter and length are different, structure all same.
With reference to shown in Fig. 7 to Fig. 8, outer sleeve drilling tool described in the present embodiment 5 includes:Second sleeve drilling tool 53, the 3rd spiral shell Vane piece 54 and casing 56, the 3rd helical blade 54 are axially set in described second set along the second sleeve drilling tool 53 On the outer wall of cylinder drilling tool 53, multiple earth discharging holes 55 are provided with the second sleeve drilling tool 53, the 3rd linkage 52 is set On the inside of the upper end for being placed in the second sleeve drilling tool 53, the casing 56 is arranged at outside the upper end of the second sleeve drilling tool 53 Side, and be provided with the casing 56 on the spring assembly for being connected with the steel wire rope 2 of hoist engine 1, the spring assembly and set Stopping means is put, bullet Huang device, which stretches or contracts to stopping means to a certain degree, makes its auxiliary equipment hoist engine 1 be stopped, and limits Wei Installed put realization and are automatically stopped action.The upper end of 3rd linkage 52 is provided with the 3rd ring flange 51.
What deserves to be explained is, the first helical blade 34, the second helical blade 44 and the 3rd helical blade 54 both can be for just Spirally, or backpitch formula, no longer limit to herein.
The geometry of linkage in the present embodiment can also flexibly be set according to actual needs, with following a kind of excellent Mode is selected to illustrate:
First linkage 32 includes the first cubic cylinder, and it is circle that the described first cubic cylinder, which is coaxially arranged with section, The first set hole of shape, the first set hole is used for the upper end for being fixed on the hollow drill 33;Second linkage 42 is wrapped The second cubic cylinder is included, the described second cubic cylinder is coaxially arranged with section for second set of square hole, and second set of hole is used In being inserted in first linkage 32;3rd linkage 52 includes cylinder, and the cylinder, which is coaxially arranged with, to be cut Face is the 3rd set of square hole, and the 3rd set of hole is used to be inserted in second linkage 42.
Wherein, the linkage upper end of each drilling tool is provided with the flange with diameter greater than square column type cross section diagonal Its function of disk:Promote corresponding linkage interlocking in place;The vertical pressure of center drilling tool 3 is passed into other sleeve drilling tools.
To sum up, the drilling tool in the present embodiment can coordinate auxiliary equipment to use, auxiliary equipment by hoist engine 1, steel wire rope 2, Casing 56 is constituted.This kind of drilling tool connection is mainly realized with combining by the linkage that can be unlocked on drilling tool.Specifically, in rig Unit head lower end sets hoist engine 1, and hoist engine 1 connects the casing 56 slided up and down by steel wire rope 2.The auxiliary equipment is linkage Device interactive provides service.Auxiliary equipment, linkage cause many sleeve drilling tool pore-formings for the drilling of multiple back taper stepped ramp types, successively Pressure concrete injecting is achieved a kind of CFG reducings back taper stepped ramp type stake to lifting drilling tool simultaneously.
Embodiment two
With reference to shown in Fig. 9, the present embodiment two also provides one kind on the basis of embodiment one and bored according to embodiment one Has the CFG reducing back tapers stepped ramp types stake prepared, it, which includes being provided with least two on main body pile body 71, the main body pile body 71, falls Bore stepped ramp type body 72.Preferably, each section of cross section on main body pile body 71 is continually changing from top to bottom.
Further, the cross section of the back taper stepped ramp type body 72 is circle, and vertical section is inverted ladder type.Back taper stepped ramp type body 72 inverted cone disk inclined-plane, can be decomposed into the vertical power vertically downwards in part the tangential force and normal force of the conical surface.
Wherein, the side of main body pile body 71 is slightly less than with the angle angle of horizontal plane or equal to 90 °.
Preferably, the angle of the inverted cone disk inclined-plane extended line of the back taper stepped ramp type body 72 and main body pile body central axis Angular range is preferably:30 °~45 °.
Preferably, the main body pile body 71 can be inserted with steel reinforcement cage according in design requirement pile body.
To sum up, the CFG reducing back tapers stepped ramp type stake that the present embodiment is provided is included on main body pile body 71, the main body pile body 71 At least two back taper stepped ramp type bodies 72 are provided with, its bearing capacity not only has the pile side friction and stake end bottom bearing of traditional pile body, And the back taper disk inclined-plane of back taper stepped ramp type body 72, the vertical power vertically downwards in part can be decomposed into the conical surface tangential force and Normal force, soil around pile forms passive compression chord state and squeezed state, and pile peripheral friction force increase comprehensively improves holding for single pile Power is carried, settling amount is reduced.
Embodiment three
With reference to shown in Figure 10 to Figure 16, the present embodiment three also provides a kind of drilling tool according to embodiment one to prepare The method of CFG reducing back tapers stepped ramp type stake, it comprises the following steps:
By power set (for example:Power motor) clockwise/counterclockwise of center drilling tool 3 is rotated, move down simultaneously;
First linkage 32 of center drilling tool 3 close to intermediate sleeve drilling tool 4 the second linkage 42 when, set by auxiliary (specifically, hoist engine 1 lifts casing 56 to the standby lifting outer sleeve of hoist engine 1 drilling tool 5 by steel wire rope 2, and casing 56 drives lifting outer Sleeve drilling tool 5), the 3rd linkage 52 of outer sleeve drilling tool 5 is arranged and is locked in the second linkage of intermediate sleeve drilling tool 4 On 42, the Synchronous lifting of intermediate sleeve drilling tool 4 is then driven, the second linkage 42 of intermediate sleeve drilling tool 4 is finally arranged and locked Due on the first linkage 32 of center drilling tool 3, now each linkage locks mutually that (interlocking here at least can be with It is interpreted as radially spacing, also there is corresponding position-limiting action in the presence of hoist engine 1 on axial direction certainly);
By power set (for example:Power motor) making each drilling tool, clockwise/counterclockwise is rotated simultaneously, and to moving down It is dynamic;
When each drilling tool is drilled into respective projected depth, stop operating, rig master winch lifting center drilling tool 3, center drilling tool 3 Lower end drill bit 35 open and (expose discharging opening), concrete pump 8 starts, start pressure concrete injecting, the lifting center drilling tool 3 in pressure concrete injecting, it Lifting intermediate sleeve drilling tool 4, outer sleeve drilling tool 5 successively afterwards, (wherein, the horizontal interface dimensions of drill bit 35 are slightly larger than intermediate sleeve drilling tool 4 Bottom size, last helical layer blade of the isometrical helical blade lower end of intermediate sleeve drilling tool 4, gradual change helical blade is free of, transversal Face size is slightly larger than the sleeve-port internal diameter of outer sleeve drilling tool 5), until outer sleeve drilling tool 5 proposes aperture absolute altitude, while concrete also presses filling extremely Designed elevation.
Further, comprise the following steps during the lifting of the auxiliary equipment hoist engine 1 outer sleeve drilling tool 5:Bored in outer sleeve One casing 56 is installed on tool 5, spring assembly is provided with casing 56, auxiliary equipment hoist engine 1 passes through steel wire rope 2, spring Device is connected with casing 56, and the automatic insertion of the 3rd linkage 52 of outer sleeve drilling tool 5 is enable using the elasticity of spring assembly On the second linkage 42 of intermediate sleeve drilling tool 4;Similarly make the second of intermediate sleeve drilling tool using the elasticity of spring assembly Linkage can automatic insertion on the first linkage of center drilling tool.And set limited location to fill on spring assembly Put, when the deformation quantity of spring assembly reaches preset length, stopping means control auxiliary equipment hoist engine 1 is stopped.
The principle of back taper stepped ramp type body 72 is set:Pile foundation or basement process scope internal upper part are with existing (more than level of ground water) Two or more back taper stepped ramp type bodies can be set when Rotating fields stabilization, the stratum that compressibility is smaller, bearing capacity is higher, thickness is larger 72。
Note:During rig master winch lifting drilling tool, auxiliary equipment hoist engine 1 accordingly coordinates.Intermediate sleeve drilling tool 4 is many During number, such a linkage is stackable to be nested interlocking in place, forms the stake of inverted ladder type multi-step back taper stepped ramp type.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to The technical scheme described in foregoing embodiments can so be modified, or which part or all technical characteristic are entered Row equivalent;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. a kind of drilling tool, it is characterised in that including:Outer sleeve drilling tool, intermediate sleeve drilling tool and the centre drill being sequentially coaxially arranged Tool;The center drilling tool is provided with the first linkage;The intermediate sleeve drilling tool is provided with the second linkage;The overcoat Cylinder drilling tool is provided with the 3rd linkage;When the outer sleeve drilling tool is moving upward, the 3rd linkage can cover And if be locked on second linkage, second linkage can be arranged and be locked in first linkage On.
2. drilling tool according to claim 1, it is characterised in that the center drilling tool includes:Hollow drill, retractable brill Head and the first helical blade;The outer wall that is axially set in the hollow drill of first helical blade along the hollow drill On, the drill bit is connected to the lower end of the hollow drill, and first linkage is coaxially disposed in the hollow drill Upper end, first flange disk is provided with first linkage.
3. drilling tool according to claim 2, it is characterised in that the intermediate sleeve drilling tool includes:First sleeve drilling tool and Second helical blade, the be axially set in first sleeve drilling tool of second helical blade along the first sleeve drilling tool On outer wall, multiple earth discharging holes are provided with the first sleeve drilling tool, second linkage is coaxially disposed in described first The upper end of sleeve drilling tool, second flange disk is provided with the upper end of second linkage.
4. drilling tool according to claim 3, it is characterised in that the outer sleeve drilling tool includes:Second sleeve drilling tool, the 3rd Helical blade and casing, the 3rd helical blade are axially set in the second sleeve drilling tool along the second sleeve drilling tool Outer wall on, multiple earth discharging holes are provided with the second sleeve drilling tool, the 3rd linkage is arranged at described second set The upper end of cylinder drilling tool, the casing is arranged at the outer sleeve drilling tool upper end, and is provided with and is used for and elevator on the casing Stopping means is set on the connected spring assembly of machine steel wire rope, the spring assembly, set in the upper end of the 3rd linkage It is equipped with the 3rd ring flange.
5. drilling tool according to claim 2, it is characterised in that
First linkage includes the first cubic cylinder, and it is circular that the described first cubic cylinder, which is coaxially arranged with section, A set of hole, the first set hole is used for the upper end for being fixed on the center drilling tool;
Second linkage includes the second cubic cylinder, and it is square that the described second cubic cylinder, which is coaxially arranged with section, Two sets of holes, second set of hole is used to be inserted in first linkage;
3rd linkage includes cylinder, and the cylinder is coaxially arranged with section for the 3rd set of square hole, described 3rd set of hole is used to be inserted in second linkage.
6. a kind of CFG reducing back tapers stepped ramp type stake that in 1-5 according to claim prepared by drilling tool described in any one, its feature exists In being provided with least two back taper stepped ramp type bodies on, including main body pile body, the main body pile body.
7. CFG reducings back taper stepped ramp type stake according to claim 6, it is characterised in that the horizontal stroke of the back taper stepped ramp type body Section is circle, and vertical section is inverted ladder type.
8. CFG reducings back taper stepped ramp type according to claim 6 stake, it is characterised in that the back taper stepped ramp type body falls The angle angular range of Cone Disc inclined-plane extended line and main body pile body central axis is:30 °~45 °.
9. method of the drilling tool to prepare the stake of CFG reducing back tapers stepped ramp type in a kind of 1-5 according to claim described in any one, It is characterised in that it includes following steps:
Center drilling tool clockwise/counterclockwise is rotated by power set, is moved down simultaneously;
First linkage of center drilling tool close to intermediate sleeve drilling tool the second linkage when, carried by auxiliary equipment hoist engine Outer sleeve drilling tool is risen, the 3rd linkage of outer sleeve drilling tool is arranged and is locked in the second linkage of intermediate sleeve drilling tool On, intermediate sleeve drilling tool Synchronous lifting is then driven, during the second linkage of intermediate sleeve drilling tool is finally arranged and is locked in On first linkage of heart drilling tool, now each linkage is locked mutually;
Making each drilling tool by power set, clockwise/counterclockwise is rotated simultaneously, and is moved down;
When each drilling tool is drilled into respective projected depth, stop operating, rig master winch lifting center drilling tool, the lower end of center drilling tool Drill bit is opened, concrete pump startup, starts pressure concrete injecting, the lifting center drilling tool in pressure concrete injecting, afterwards successively lifting intermediate sleeve drilling tool, Outer sleeve drilling tool, until outer sleeve drilling tool proposes aperture absolute altitude, while concrete also presses filling to designed elevation.
10. the method for preparing the stake of CFG reducing back tapers stepped ramp type according to claim 9, it is characterised in that the auxiliary Equipment hoist engine comprises the following steps when lifting outer sleeve drilling tool:
One casing is installed on outer sleeve drilling tool, spring assembly is provided with casing, auxiliary equipment hoist engine passes through steel wire Rope, spring assembly and casing are connected, and the 3rd linkage for enabling outer sleeve drilling tool using the elasticity of spring assembly is worn automatically It is enclosed within the second linkage of intermediate sleeve drilling tool;Similarly make the second of intermediate sleeve drilling tool using the elasticity of spring assembly Dynamic device can automatic insertion on the first linkage of center drilling tool, and be provided with spring assembly stopping means, When the deformation quantity of spring assembly reaches preset length, stopping means control auxiliary equipment hoist engine is stopped.
CN201710333352.2A 2017-05-12 2017-05-12 CFG reducing back taper stepped pile, preparation method and drilling tool Active CN106948762B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710333352.2A CN106948762B (en) 2017-05-12 2017-05-12 CFG reducing back taper stepped pile, preparation method and drilling tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710333352.2A CN106948762B (en) 2017-05-12 2017-05-12 CFG reducing back taper stepped pile, preparation method and drilling tool

Publications (2)

Publication Number Publication Date
CN106948762A true CN106948762A (en) 2017-07-14
CN106948762B CN106948762B (en) 2023-12-08

Family

ID=59478646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710333352.2A Active CN106948762B (en) 2017-05-12 2017-05-12 CFG reducing back taper stepped pile, preparation method and drilling tool

Country Status (1)

Country Link
CN (1) CN106948762B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035341A (en) * 2018-01-24 2018-05-15 李广信 Extruding and removing soil complex superposition is nested drilling tool, the back taper stepped ramp type stake of CFG reducings and method
CN109025809A (en) * 2018-10-11 2018-12-18 李广信 More power guide position linkage combination drill tools, preparation method and pile-type
CN109098655A (en) * 2018-10-11 2018-12-28 李广信 More Power compound drilling tools, preparation method and type stake

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2230777Y (en) * 1995-05-26 1996-07-10 张德永 Drill for screw extruding filling pills
US20040173383A1 (en) * 2001-06-04 2004-09-09 Hollingsworth John R. Apparatus and method for rotary bored drilling
JP2005220594A (en) * 2004-02-05 2005-08-18 Nippon Beesu Kk Pile construction method and equipment therefor
CN202117556U (en) * 2011-03-01 2012-01-18 何庆林 Auger driller for moulding concrete piles with different depth and shapes
CN203939424U (en) * 2014-04-23 2014-11-12 贾前卫 A kind of for pressing the spiral drilling machine of filling with the stake of back taper stepped ramp type concrete
CN104533292A (en) * 2014-12-31 2015-04-22 贾前卫 Back taper step-shaped pile, preparation method thereof and drilling tool
CN105507312A (en) * 2015-11-11 2016-04-20 李金良 Variable-section bidirectional soil displacement screw pile and manufacturing method thereof
CN206753495U (en) * 2017-05-12 2017-12-15 李广信 The back taper stepped ramp type stake of CFG reducings and drilling tool

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2230777Y (en) * 1995-05-26 1996-07-10 张德永 Drill for screw extruding filling pills
US20040173383A1 (en) * 2001-06-04 2004-09-09 Hollingsworth John R. Apparatus and method for rotary bored drilling
JP2005220594A (en) * 2004-02-05 2005-08-18 Nippon Beesu Kk Pile construction method and equipment therefor
CN202117556U (en) * 2011-03-01 2012-01-18 何庆林 Auger driller for moulding concrete piles with different depth and shapes
CN203939424U (en) * 2014-04-23 2014-11-12 贾前卫 A kind of for pressing the spiral drilling machine of filling with the stake of back taper stepped ramp type concrete
CN104533292A (en) * 2014-12-31 2015-04-22 贾前卫 Back taper step-shaped pile, preparation method thereof and drilling tool
CN105507312A (en) * 2015-11-11 2016-04-20 李金良 Variable-section bidirectional soil displacement screw pile and manufacturing method thereof
CN206753495U (en) * 2017-05-12 2017-12-15 李广信 The back taper stepped ramp type stake of CFG reducings and drilling tool

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035341A (en) * 2018-01-24 2018-05-15 李广信 Extruding and removing soil complex superposition is nested drilling tool, the back taper stepped ramp type stake of CFG reducings and method
CN109025809A (en) * 2018-10-11 2018-12-18 李广信 More power guide position linkage combination drill tools, preparation method and pile-type
CN109098655A (en) * 2018-10-11 2018-12-28 李广信 More Power compound drilling tools, preparation method and type stake
CN109025809B (en) * 2018-10-11 2024-02-06 李广信 Multi-power guide linkage composite drilling tool, preparation method and pile type
CN109098655B (en) * 2018-10-11 2024-02-06 李广信 Multi-power composite drilling tool, preparation method and pile

Also Published As

Publication number Publication date
CN106948762B (en) 2023-12-08

Similar Documents

Publication Publication Date Title
JP6335319B2 (en) Pile formation method for composite expanded pile and pile forming equipment for combined expanded pile
CN101495701A (en) Torque down pile substructure support system
CN106948762A (en) The stake of CFG reducing back tapers stepped ramp type and preparation method and drilling tool
CN104453717A (en) Long auger drilling and bottom expanding device and expanded anchor rod construction method
CN108035341A (en) Extruding and removing soil complex superposition is nested drilling tool, the back taper stepped ramp type stake of CFG reducings and method
CN208293568U (en) Extruding and removing soil complex superposition is nested drilling tool
CN203846486U (en) Integrated long spiral squeezing expanding cast-in-place pile forming device
CN102808407B (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN211646449U (en) Combined single-pile foundation of offshore wind turbine
EP2700750A1 (en) Foundation pile for offshore structures and method for constructing a foundation pile for offshore structures
CN110984212A (en) Offshore wind turbine combined single-pile foundation and construction method
CN206753495U (en) The back taper stepped ramp type stake of CFG reducings and drilling tool
CN102877466A (en) Rotary expansion cast-in-place pile and construction method thereof
CN106978974A (en) The stake of CFG reducing back tapers stepped ramp type and preparation method and drilling tool
CN101457522B (en) Long spiral support disk pile construction method
CN101196115B (en) Construction method for high pressure underground gas storing well
CN206753486U (en) The back taper stepped ramp type stake of CFG reducings and drilling tool
CN206753494U (en) The back taper stepped ramp type stake of CFG reducings and drilling tool
CN201334661Y (en) Integrated long-spiral drilling tool for squeezed branch pile
CN103821137B (en) The construction method of guncreting pile at the bottom of the embedding rock of a kind of long auger, expansion
CN109098655A (en) More Power compound drilling tools, preparation method and type stake
CN204532082U (en) A kind of forward becomes spiral shell extruding and expanding drilling tool structure
CN209244499U (en) Link combination drill tool for more power guide positions
CN210343236U (en) Thread matching type multi-power composite drilling tool and profile pile
CN209244498U (en) More Power compound drilling tools

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170714

Assignee: Hebei cone base civil engineering Co.,Ltd.

Assignor: Li Guangxin

Contract record no.: 2018990000103

Denomination of invention: CFG variable diameter inverted cone step type pile, preparation method and drilling tool

License type: Exclusive License

Record date: 20180419

GR01 Patent grant
GR01 Patent grant