CN109025246A - Scaffold frame for building engineering convenient to installation - Google Patents

Scaffold frame for building engineering convenient to installation Download PDF

Info

Publication number
CN109025246A
CN109025246A CN201810833330.7A CN201810833330A CN109025246A CN 109025246 A CN109025246 A CN 109025246A CN 201810833330 A CN201810833330 A CN 201810833330A CN 109025246 A CN109025246 A CN 109025246A
Authority
CN
China
Prior art keywords
fixed
screw
fixedly connected
fixed link
easily installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810833330.7A
Other languages
Chinese (zh)
Other versions
CN109025246B (en
Inventor
周青松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Huahang Construction Group Co ltd
Original Assignee
Hefei Zhenxun Low Temperature Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Zhenxun Low Temperature Technology Co ltd filed Critical Hefei Zhenxun Low Temperature Technology Co ltd
Priority to CN201810833330.7A priority Critical patent/CN109025246B/en
Publication of CN109025246A publication Critical patent/CN109025246A/en
Application granted granted Critical
Publication of CN109025246B publication Critical patent/CN109025246B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/28Clips or connections for securing boards

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The invention discloses a scaffold for construction engineering, which is convenient to install, wherein a second fixed rod is fixedly connected to the inner bottom wall of a fixed box, the upper end of the second fixed rod extends into a first fixed groove formed in the fixed block, the fixed block is in abutting connection with one end, close to the fixed box, of the fixed box, and the moving plate is pushed to move by the movement of a second screw through a push plate, so that a third fixed rod enters the second fixed groove to achieve the fixing effect; the rotation of the second screw can enable the steel rope to be wound on the winding shaft, so that the rotating pipe rotates, and the rotation of the rotating pipe enables the screw to move because the inner side wall of the rotating pipe is in threaded connection with the screw, so that the third fixing rod is pushed by the stress plate to enter the third fixing groove, and the fixing effect is achieved; therefore, the device can achieve the effect of high-efficiency fixation through multi-step measures.

Description

A kind of architectural engineering scaffold being easily installed
Technical field
The present invention relates to construction engineering technical field, specially a kind of architectural engineering scaffold being easily installed.
Background technique
Scaffold (scaffold) refers to that construction site is worker operation and solves vertically and horizontally to transport and set up various Bracket.The generic term of architecture field refers to and is used in exterior wall, interior decoration or the higher ground that can not directly construct of layer height on construction site Side.It is plainly exactly to build a framework mainly for construction personnel works or perimeter security net is gone along with sb. to guard him and high-altitude installation component etc. up and down, Scaffold making material usually has: bamboo and wood, steel pipe or synthetic material etc..Some engineerings are also with scaffold when template use, furthermore It is also used extensively in departments such as advertising, municipal administration, traffic road bridge, mines.
At present there are many kinds of the scaffolds of the architectural engineering in construction site, the wherein scaffold of portal architecture engineering It is more commonly used with the scaffold of bowl fastening type architectural engineering.The scaffold of portal architecture engineering there are multiple door frames to erect with Framed bent is formed, not only complicated but also brace easily fractures the structure, and bearing strength is poor, and shape is big, inconvenience transport.Bowl buckle The scaffold of formula architectural engineering to form framed bent mainly by being clasped for the bowl buckle and cross bar being welded on column, and structure is multiple Miscellaneous, part is more, and installs complicated and be easy to cause operator injured.And after a cross bar and column continuous damage, the column Tie point with other cross bars also can be and then slack and undisciplined, causes security risk.
The patent of Publication No. CN203905455U discloses the scaffold of architectural engineering, and the scaffold is by with lower part It is grouped as: column;Cross bar;Wedge-shaped fixed block;Connector;Fixation hole;Wedge-shaped fixing groove;Fixation hole;Clamping screw;Branch pipe;Branch End face is held, the scaffold in this patent can solve problem complicated for operation, but since fixture structure is simple, still can Often there is clamping shakiness, the case where scaffold loosens.
Summary of the invention
The purpose of the present invention is to provide a kind of architectural engineering scaffolds being easily installed, to solve above-mentioned background technique The problem of middle proposition.
To achieve the above object, the invention provides the following technical scheme:
A kind of architectural engineering scaffold being easily installed, including vertical bar, the side wall of the vertical bar are fixedly connected with fixation Case;
The inner bottom wall of the fixed case is fixedly connected with the second fixed link, and the upper end of the second fixed link extends to fixed block On in the first fixing groove for opening up, the fixed block and fixed case one end close to each other contradict and connect, and open on the fixed case If the first screw hole internal screw thread be connected with the second screw, and one end fixing sleeve that the second screw is located in fixed case is connected to push plate, The side wall conflict of the push plate is connected with movable plate, and movable plate is actively socketed on the second screw, the side wall of the movable plate Multiple telescopic rods are fixedly connected with, and the other end of telescopic rod is fixedly connected on the inner sidewall of fixed case, the movable plate is remote Multiple third fixed links are fixedly connected with from one end of telescopic rod, and the other end of third fixed link extends in third fixed link In the second fixing groove opened up.
Preferably, fixing sleeve is connected to roll on second screw, and is intertwined and connected on roll and has steel cable, the steel The other end of rope successively bypasses the first fixed pulley and the second fixed pulley and is intertwined and connected on the lateral wall of rotation pipe, and first is fixed Pulley rotation is connected on the inner sidewall of fixed case, and second fixed pulley is rotatably connected on the inner sidewall of fixed case, described One end of rotation pipe is rotatably connected on the inner sidewall of fixed case, and the inner sidewall of rotation pipe is threaded with screw rod, the spiral shell Gag lever post is slidably connected in the groove opened up on bar, and one end that gag lever post is located in groove is fixedly connected with the first spring The other end of one end, the first spring is fixedly connected on the side wall of groove, and the gag lever post is located at the fixed company in one end outside groove It connects on the inner sidewall of fixed case, one end that the screw rod is located at outside rotation pipe is fixedly connected with stressed plate, and stressed plate is another One end is fixedly connected with multiple third fixed links, and it is solid that the other end of the third fixed link extends to the third opened up on fixed block Determine in slot.
Preferably, one end that second screw is located in fixed case extends in the through-hole opened up on fixed block, and logical Mobile bar is slidably connected in hole, second spring is wound in the mobile bar, and the both ends of second spring are respectively fixedly connected with On the side wall of mobile bar and on the side wall of through-hole, the limit to match with mobile bar is offered on the inner sidewall of the fixed case Slot.
Preferably, the one end of the mobile bar far from the second screw is in round end structure.
Preferably, fixing sleeve is connected to one layer of non-skid film on second screw.
Preferably: the upper end of the fixed case is fixedly connected with pedestal, and chamber door is rotatably connected on pedestal, the case The lower end of door is fixedly connected with the first fixed link, and the 4th to match with the first fixed link is offered on the fixed block and is fixed Slot, the side wall of the chamber door are fixedly connected with the first locking plate, and the second screw hole internal screw thread opened up on the first locking plate is connected with One screw, the lateral wall of the fixed case are fixedly connected with the second locking plate, and offer on the second locking plate and the first screw phase The third screw hole matched.
Preferably, the lower end of first fixed link is in round end structure, and fixing sleeve is connected to rubber pad in the first fixed link, Anti-skid chequer is offered on the rubber pad.
Preferably, fixing sleeve is connected to one layer of rubber sleeve on first screw, and anti-skid chequer is offered on rubber sleeve.
Preferably, the one end of the third fixed link far from telescopic rod is in round end structure, and fixing sleeve in third fixed link It is connected to installation set, anti-skid chequer is offered in the installation set, the quantity of the third fixed link is more than or equal to six, and in equidistant From annular spread.
Preferably, the one end of the third fixed link far from rotation pipe is in round end structure, and the quantity of third fixed link is greater than Equal to six, and it is isodistantly spaced annular spread.
Compared with prior art, the beneficial effects of the present invention are:
1, the presence of chamber door and the combination of the first fixed link makes the first fixed link enter the 4th fixing groove by closing chamber door In, to have the function that fixed.
2, the presence that movable plate, telescopic rod, push plate and third fixed link combine, pushes away push plate by turning the second screw Movable plate movement, the movement of movable plate can enter in the second fixing groove with third fixed link, to achieve the effect that fixed.
3, the presence of screw rod, gag lever post, stressed plate and the combination of third fixed link, can pull rotation pipe by steel cable Rotation to achieve the effect that for third fixed link to be pushed into third fixing groove, and then achievees the effect that fixed.
To sum up, which can be achieved the effect that efficiently fixed by more measures.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is structure of the invention side view;
Fig. 3 is B structure enlarged diagram of the present invention;
Fig. 4 is Section A-A figure of the present invention;
Fig. 5 is C-structure enlarged diagram of the present invention.
In figure: vertical bar 1, fixed case 2, fixed block 3, cross bar 4, pedestal 5, chamber door 6, the first fixed link 7, the first locking plate 8, One screw 9, the second locking plate 10, the second fixed link 11, the second screw 12, movable plate 13, telescopic rod 14, push plate 15, third are fixed Bar 16, mobile bar 17, roll 18, steel cable 19, the first fixed pulley 20, the second fixed pulley 21, rotation pipe 22, screw rod 23, limit Bar 24, stressed plate 25, third fixed link 26.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-5 is please referred to, the present invention provides a kind of technical solution:
A kind of architectural engineering scaffold being easily installed, including vertical bar 1, the side wall of vertical bar 1 are fixedly connected with fixed case 2, the inner bottom wall of fixed case 2 is fixedly connected with the second fixed link 11, and the upper end of the second fixed link 11 extends on fixed block 3 and opens If the first fixing groove in, fixed block 3 and the one end close to each other of fixed case 2 contradict and connect, the first spiral shell opened up on fixed case 2 Hole internal screw thread is connected with the second screw 12, and one end fixing sleeve that the second screw 12 is located in fixed case 2 is connected to push plate 15, push plate 15 side wall conflict is connected with movable plate 13, and movable plate 13 is actively socketed on the second screw 12, and the side wall of movable plate 13 is solid Surely multiple telescopic rods 14 are connected with, and the other end of telescopic rod 14 is fixedly connected on the inner sidewall of fixed case 2, movable plate 13 is remote One end from telescopic rod 14 is fixedly connected with multiple third fixed links 16, and the other end of third fixed link 16 extends to third and consolidates In the second fixing groove opened up in fixed pole 16.
Fixing sleeve is connected to roll 18 on second screw 12, and is intertwined and connected on roll 18 and has steel cable 19, steel cable 19 The other end successively bypasses the first fixed pulley 20 and the second fixed pulley 21 and is intertwined and connected on the lateral wall of rotation pipe 22, and first Fixed pulley 20 is rotatably connected on the inner sidewall of fixed case 2, and the second fixed pulley 21 is rotatably connected on the inner sidewall of fixed case 2, One end of rotation pipe 22 is rotatably connected on the inner sidewall of fixed case 2, and the inner sidewall of rotation pipe 22 is threaded with screw rod 23, Gag lever post 24 is slidably connected in the groove opened up on screw rod 23, and gag lever post 24 is located at one end in groove and is fixedly connected with The other end of one end of one spring, the first spring is fixedly connected on the side wall of groove, and gag lever post 24 is located at one end outside groove It being fixedly connected on the inner sidewall of fixed case 2, one end that screw rod 23 is located at outside rotation pipe 22 is fixedly connected with stressed plate 25, and by The other end of power plate 25 is fixedly connected with multiple third fixed links 26, and the other end of third fixed link 26 extends on fixed block 3 In the third fixing groove opened up.
One end that second screw 12 is located in fixed case 2 extends in the through-hole opened up on fixed block 3, and sliding in through-hole It is connected with mobile bar 17, second spring is wound in mobile bar 17, the both ends of second spring are respectively fixedly connected in mobile bar 17 Side wall on and through-hole side wall on, the limiting slot to match with mobile bar 17 is offered on the inner sidewall of fixed case 2, is played more Good fixed effect.
The one end of mobile bar 17 far from the second screw 12 is in round end structure, prevents the case where being stuck during exercise.
Fixing sleeve is connected to one layer of non-skid film on second screw 12, plays better antiskid effect.
The upper end of fixed case 2 is fixedly connected with pedestal 5, and chamber door 6 is rotatably connected on pedestal 5, and the lower end of chamber door 6 is fixed It is connected with the first fixed link 7, the 4th fixing groove to match with the first fixed link 7, the side wall of chamber door 6 are offered on fixed block 3 It is fixedly connected with the first locking plate 8, and the second screw hole internal screw thread opened up on the first locking plate 8 is connected with the first screw 9, fixed case 2 Lateral wall be fixedly connected with the second locking plate 10, and the third screw hole to match with the first screw 9 is offered on the second locking plate 10, Play better fixed effect.
The lower end of first fixed link 7 is in round end structure, and fixing sleeve is connected to rubber pad in the first fixed link 7, on rubber pad Anti-skid chequer is offered, better fixed effect is played.
Fixing sleeve is connected to one layer of rubber sleeve on first screw 9, and anti-skid chequer is offered on rubber sleeve, plays preferably anti-skidding Effect.
The one end of third fixed link 16 far from telescopic rod 14 is in round end structure, and fixing sleeve is connected to peace in third fixed link 16 Encapsulation offers anti-skid chequer in installation set, and the quantity of third fixed link 16 is more than or equal to six, and is isodistantly spaced annular spread, Play better fixed effect.
The one end of third fixed link 26 far from rotation pipe 22 is in round end structure, and the quantity of third fixed link 26 is more than or equal to six It is a, and it is isodistantly spaced annular spread, play better fixed effect.
In this case, in fixed scaffold, the first fixing groove on fixed block 3 matches clamping with the second fixed link 11;
Chamber door 6 is rotated, the movement meeting of chamber door 6 is so that the first fixed link 7 turns the first screw 9, make into the 4th fixing groove It obtains the first screw 9 to be threadedly coupled with third screw hole, to achieve the effect that fixed;
The second screw 12 is turned, the mobile of the second screw 12 can push the movement of movable plate 13 by push plate 15, so that Third fixed link 16 enters in the second fixing groove, achievees the effect that fixed;
The rotation meeting of second screw 12 is so that steel cable 19 is wrapped on roll 18, so that rotation pipe 22 occurs to turn It is dynamic because the inner sidewall of rotation pipe 22 is threadedly coupled with screw rod 23, the rotation meeting of rotation pipe 22 so that the movement of screw rod 23, from And third fixed link 26 is push by stressed plate 25 and is entered in third fixing groove, and then is achieved the effect that fixed;
The movement of second screw 12 can push mobile bar 17 and enter in limiting slot, to have the function that fixed;
Therefore the device can be achieved the effect that efficiently fixed by more measures.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (10)

1. the side wall of a kind of architectural engineering scaffold being easily installed, including vertical bar (1), the vertical bar (1) is fixedly connected with Fixed case (2);
It is characterized by: the inner bottom wall of the fixed case (2) is fixedly connected with the second fixed link (11), and the second fixed link (11) Upper end extend in the first fixing groove opened up on fixed block (3), the fixed block (3) and fixed case (2) it is close to each other One end contradicts connection, and the first screw hole internal screw thread opened up on the fixed case (2) is connected with the second screw (12), and the second screw (12) one end fixing sleeve being located in fixed case (2) is connected to push plate (15), and the side wall conflict of the push plate (15) is connected with movement Plate (13), and movable plate (13) is actively socketed on the second screw (12), the side wall of the movable plate (13) is fixedly connected with more A telescopic rod (14), and the other end of telescopic rod (14) is fixedly connected on the inner sidewall of fixed case (2), the movable plate (13) One end far from telescopic rod (14) is fixedly connected with multiple third fixed links (16), and the other end of third fixed link (16) extends In the second fixing groove opened up on to third fixed link (16).
2. a kind of architectural engineering scaffold being easily installed according to claim 1, it is characterised in that: second spiral shell Fixing sleeve is connected to roll (18) on nail (12), and is intertwined and connected and has steel cable (19) on roll (18), the steel cable (19) The other end successively bypasses the first fixed pulley (20) and the second fixed pulley (21) and is intertwined and connected on the lateral wall of rotation pipe (22), And first fixed pulley (20) be rotatably connected on the inner sidewall of fixed case (2), second fixed pulley (21) is rotatably connected on solid On the inner sidewall for determining case (2), one end of the rotation pipe (22) is rotatably connected on the inner sidewall of fixed case (2), and rotation pipe (22) inner sidewall is threaded with screw rod (23), slidably connects gag lever post in the groove opened up on the screw rod (23) (24), and gag lever post (24) is located at one end that one end in groove is fixedly connected with the first spring, and the other end of the first spring is solid Surely it is connected on the side wall of groove, the gag lever post (24) is located at the inside that one end outside groove is fixedly connected on fixed case (2) On wall, the screw rod (23) is located at the one end of rotation pipe (22) outside and is fixedly connected with stressed plate (25), and stressed plate (25) is another One end is fixedly connected with multiple third fixed links (26), and the other end of the third fixed link (26) extends on fixed block (3) In the third fixing groove opened up.
3. a kind of architectural engineering scaffold being easily installed according to claim 1, it is characterised in that: second spiral shell Nail (12) is located at one end in fixed case (2) and extends in the through-hole opened up on fixed block (3), and shifting is slidably connected in through-hole Lever (17) is wound with second spring on the mobile bar (17), and the both ends of second spring are respectively fixedly connected in mobile bar (17) it on side wall and on the side wall of through-hole, offers on the inner sidewall of the fixed case (2) and to match with mobile bar (17) Limiting slot.
4. a kind of architectural engineering scaffold being easily installed according to claim 3, it is characterised in that: the mobile bar (17) one end far from the second screw (12) is in round end structure.
5. a kind of architectural engineering scaffold being easily installed according to claim 1, it is characterised in that: second spiral shell Fixing sleeve is connected to one layer of non-skid film on nail (12).
6. a kind of architectural engineering scaffold being easily installed according to claim 1, it is characterised in that: the fixed case (2) upper end is fixedly connected with pedestal (5), and chamber door (6) are rotatably connected on pedestal (5), and the lower end of the chamber door (6) is fixed It is connected with the first fixed link (7), offers the 4th fixing groove to match with the first fixed link (7), institute on the fixed block (3) The side wall for stating chamber door (6) is fixedly connected with the first locking plate (8), and the second screw hole internal screw thread connection opened up on the first locking plate (8) Have the first screw (9), the lateral wall of the fixed case (2) is fixedly connected with the second locking plate (10), and is opened on the second locking plate (10) Equipped with the third screw hole to match with the first screw (9).
7. a kind of architectural engineering scaffold being easily installed according to claim 6, it is characterised in that: described first is solid The lower end of fixed pole (7) is in round end structure, and fixing sleeve is connected to rubber pad in the first fixed link (7), offers on the rubber pad Anti-skid chequer.
8. a kind of architectural engineering scaffold being easily installed according to claim 6, it is characterised in that: first spiral shell Fixing sleeve is connected to one layer of rubber sleeve on nail (9), and anti-skid chequer is offered on rubber sleeve.
9. a kind of architectural engineering scaffold being easily installed according to claim 1, it is characterised in that: the third is solid The one end of fixed pole (16) far from telescopic rod (14) is in round end structure, and fixing sleeve is connected to installation set in third fixed link (16), institute It states and offers anti-skid chequer in installation set, the quantity of the third fixed link (16) is more than or equal to six, and is isodistantly spaced annular point Cloth.
10. a kind of architectural engineering scaffold being easily installed according to claim 2, it is characterised in that: the third The one end of fixed link (26) far from rotation pipe (22) is in round end structure, and the quantity of third fixed link (26) is more than or equal to six, and It is isodistantly spaced annular spread.
CN201810833330.7A 2018-07-26 2018-07-26 Scaffold frame for building engineering convenient to installation Active CN109025246B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810833330.7A CN109025246B (en) 2018-07-26 2018-07-26 Scaffold frame for building engineering convenient to installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810833330.7A CN109025246B (en) 2018-07-26 2018-07-26 Scaffold frame for building engineering convenient to installation

Publications (2)

Publication Number Publication Date
CN109025246A true CN109025246A (en) 2018-12-18
CN109025246B CN109025246B (en) 2020-10-27

Family

ID=64645441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810833330.7A Active CN109025246B (en) 2018-07-26 2018-07-26 Scaffold frame for building engineering convenient to installation

Country Status (1)

Country Link
CN (1) CN109025246B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284701A (en) * 2019-05-29 2019-09-27 安徽长青建筑制品有限公司 A kind of convenient and fast new type scaffold assembly and connection device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206753020U (en) * 2017-05-26 2017-12-15 青岛中嘉建设集团有限公司 A kind of building buckle
CN207469725U (en) * 2017-10-23 2018-06-08 郑州天维模板有限公司 Scaffold lapping structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206753020U (en) * 2017-05-26 2017-12-15 青岛中嘉建设集团有限公司 A kind of building buckle
CN207469725U (en) * 2017-10-23 2018-06-08 郑州天维模板有限公司 Scaffold lapping structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284701A (en) * 2019-05-29 2019-09-27 安徽长青建筑制品有限公司 A kind of convenient and fast new type scaffold assembly and connection device

Also Published As

Publication number Publication date
CN109025246B (en) 2020-10-27

Similar Documents

Publication Publication Date Title
CN105518234B (en) The method of precast reinforced net
CN100476159C (en) Adjustable device for protecting door or window opening and modular adjustable safety device
CN109025246A (en) Scaffold frame for building engineering convenient to installation
US2827265A (en) Tension controlling fence structure
US8807153B2 (en) Support unit of a roof element and lightweight shelter comprising such support unit
CN205908105U (en) Electric power facility rail guard
CN207177450U (en) Municipal construction fence
KR20100030720A (en) Multi-functional net structured safety net
KR20110004717A (en) The safety fence of balcony
CN109230279B (en) Building construction hoisting device
KR20050120582A (en) A climbing-prevention ladder
CN206329028U (en) A kind of construction site scaffold rotation connection structure
CN206607966U (en) A kind of construction protective fence
KR20170000701U (en) Building vertical safety net
CN211597807U (en) Rail guard is used in elevartor shaft construction in room
CN206409014U (en) A kind of electric pole for being easy to climb
CN112593692B (en) Scaffold
CN204877201U (en) Full -automatic folding telescopic anti -theft device
CN204715720U (en) The attachment supporting arrangement of the attachment type raise scaffold outside the building section of receipts within the walls
CN111963864B (en) Wind power monitoring device for large-span railway bridge
JP2004239038A (en) Earthquake resistant reinforcing construction method of wooden house
KR20090020358A (en) Assembly type safety balustrade
CN207122175U (en) A kind of electric pole for preventing climbing
CN207633250U (en) A kind of ground fixing device with parking ground lock
CN221346438U (en) Assembled temporary stair passageway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200929

Address after: No.54 Jianshe Road, Wuhang street, Changle District, Fuzhou City, Fujian Province, 350005

Applicant after: FUJIAN HUAHANG CONSTRUCTION GROUP Co.,Ltd.

Address before: 230000, Anhui province Hefei economic and Technological Development Zone prosperous Avenue North, Furong Road East platinum Jue mansion 1 1503 rooms

Applicant before: HEFEI ZHENXUN LOW TEMPERATURE TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant