CN109024496A - A kind of construction method of Fast Installation gate - Google Patents
A kind of construction method of Fast Installation gate Download PDFInfo
- Publication number
- CN109024496A CN109024496A CN201810791724.0A CN201810791724A CN109024496A CN 109024496 A CN109024496 A CN 109024496A CN 201810791724 A CN201810791724 A CN 201810791724A CN 109024496 A CN109024496 A CN 109024496A
- Authority
- CN
- China
- Prior art keywords
- gate
- block
- cushion block
- hound
- thickness direction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/20—Movable barrages; Lock or dry-dock gates
Abstract
The invention discloses a kind of construction methods of Fast Installation gate, gate lifting is detached from cushion block by each elevating mechanism, the verticality of gate is adjusted by the way that the thickness direction one side of gate to be bonded completely with the one side of the gate object of the block, the levelness of gate is adjusted by adjusting the height of each elevating mechanism.Construction method of the present invention is simple, assistant apparatus structure used is simple, it is easy production, easy to use, cooperation loop wheel machine can quickly adjust the levelness of gate and verticality to meeting the requirements, and guarantee steel-slag sand once mounting fix in position, crane can be greatly reduced uses the time, operating efficiency is improved, mitigates the labor intensity of worker, reduces the cost of gate installation.
Description
Technical field
The present invention relates to gate construction fields, relate in particular to a kind of construction method of Fast Installation gate.
Background technique
In existing steel-slag sand installation Technology, large-scale crane is mostly used to carry out long-time installation greatly, and using whole
Integral installation is transported, and can just be withdrawn after gate installation, because steel-slag sand needs to adjust gate water during the installation process
Gentle verticality, the activity duration is long, low efficiency, and safety is also difficult to control, and quality also cannot be guaranteed.
To ensure gate installation quality, realization is safely and fast constructed, and urgent need, which has invented one kind, can quickly fix steel-slag sand
The method of construction technique.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of method is simple, it is easy to implement, crane can be greatly reduced
Using the time, the levelness of gate and verticality can quickly be adjusted to the construction party of satisfactory Fast Installation gate
Method.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme: a kind of construction party of Fast Installation gate
Method, comprising the following steps:
(1) prepare auxiliary device
The auxiliary device includes that levelness adjusts unit and verticality adjusting unit;The levelness adjusts unit
More than two elevating mechanisms;It includes more than two cushion blocks that the verticality, which adjusts unit, is fixed with block on the cushion block,
In use, the block is located at the thickness direction side of gate, when gate thickness direction one side and the block towards
When the one side of gate is bonded completely, gate is defined in vertical state;The auxiliary device further includes and the cushion block quantity phase
Same is used for diagonal brace in the first hound of the thickness direction one side of gate;
(2) handling
Each cushion block interval is arranged in a row, then gate is placed on each cushion block with handling appliance, and enables
The block is located at the thickness direction side of gate, then by each first hound diagonal brace in the thickness direction side of gate
Face and respectively correspond be fixed on each cushion block, finally withdraw handling appliance;
(3) verticality and levelness are adjusted
Gate lifting is detached from cushion block by each elevating mechanism, by by the thickness direction one side of gate and institute
The one side for stating the gate object of block is bonded completely to adjust the verticality of gate, by adjusting the height of each elevating mechanism
To adjust the levelness of gate.
Further, the one side of the gate object of the block is vertical plane.
Further, the upper end of first hound has the use coplanar with the one side of the gate object of the block
In the supporting surface that the thickness direction one side with gate is bonded.
Further, first hound passes through the singletree that is engaged between first hound and the cushion block
It is fixed on the cushion block.
Further, plane where the one side of the gate object of the singletree and first hound in the block
On projection be each perpendicular to horizontal line.
Further, the auxiliary device further includes the diagonal brace that is used for identical with the cushion block quantity in the thickness side of gate
To the second hound of another side, and in step (2), after gate is placed on each cushion block, by each described second
Hound diagonal brace gate thickness direction another side and also respectively correspond be fixed on each cushion block.
Further, the elevating mechanism selects jack.
Further, there are two the elevating mechanism configures altogether, the cushion block also altogether configuration there are two, in use, two
The elevating mechanism is arranged between two cushion blocks.
Further, the cushion block is formed by one section of I-steel.
Further, first hound is formed by one section of I-steel.
Further, the singletree is formed by one section of I-steel.
The beneficial effects of the present invention are embodied in:
Construction method of the present invention is simple, is easy to implement, and assistant apparatus structure used is simple, is easy production, easy to use, matches
Closing loop wheel machine can quickly adjust the levelness of gate and verticality to meeting the requirements, and guarantee that steel-slag sand once mounting is fixed to
Position, can greatly reduce crane use the time, improve operating efficiency, mitigate the labor intensity of worker, reduce gate installation at
This.
Detailed description of the invention
Fig. 1 is the Construction State schematic perspective view of one embodiment of the invention.
Fig. 2 is the Construction State planar structure schematic diagram of one embodiment of the invention.
The label of each component in attached drawing are as follows: 1 gate, 2 elevating mechanisms, 3 cushion blocks, 4 blocks, 5 first hounds, 6 singletrees.
Specific embodiment
It is next below with reference to the accompanying drawings that the present invention will be described in detail.It should be noted that in the absence of conflict, in the application
Embodiment and embodiment in feature can be combined with each other.
Referring to Fig. 1 and Fig. 2.
The construction method of Fast Installation gate of the present invention, comprising the following steps:
(1) prepare auxiliary device
The auxiliary device includes that levelness adjusts unit and verticality adjusting unit;The levelness adjusts unit
More than two elevating mechanisms 2;It includes more than two cushion blocks 3 that the verticality, which adjusts unit, is fixed with gear on the cushion block 3
Block 4, in use, the block 4 is located at the thickness direction side of gate 1, when the thickness direction one side and the block of gate 1
When the one side of 4 gate object 1 is bonded completely, gate 1 is defined in vertical state;The auxiliary device further includes and the pad
Identical the first hound 6 for thickness direction one side of the diagonal brace in gate 1 of 3 quantity of block;
(2) handling
Each interval of cushion block 3 is arranged in a row, then gate 1 is placed on each cushion block 3 with handling appliance, and
The block 4 is enabled to be located at the thickness direction side of gate 1, then by each first hound, 6 diagonal brace in the thickness side of gate
It corresponds to one side and respectively and is fixed on each cushion block 3, finally withdraw handling appliance;
(3) verticality and levelness are adjusted
Gate 1 is lifted by each elevating mechanism 2 and is detached from cushion block 3, by by the thickness direction one side of gate 1
It is bonded completely with the one side of the gate object 1 of the block 4 to adjust the verticality of gate 1, by adjusting each elevator
The height of structure 2 adjusts the levelness of gate 1.
In the present invention:
On the one hand first hound can support gate, gate is made to be unlikely to tilt, and on the other hand, supporting mechanism is fixed
Integral on cushion block, therefore, when thickness direction one side of the first hound diagonal brace in gate, the first hound is again
It can act on cushion block, it is mobile to prevent cushion block, and block thereon is made to be close to gate, have the first hound, as long as crane exists
It can be withdrawn after gate handling is placed on cushion block, subsequently through the levelness that can manually adjust gate at any time and vertically
Degree, greatly reduces the activity duration of crane;
The verticality of gate and the verticality of its thickness direction one side are to be mutually related, therefore, as long as by gate
Angle state under the restriction in vertical state of thickness direction one side, it will be able to guarantee the verticality of gate, and the present invention is exactly
It is realized using the one side of the gate object of block, as long as the one side of the gate object of the thickness direction one side and block of gate
Fitting completely, it will be able to which the angle of the thickness direction one side of gate is defined as the angle state under plumbness, this side
Formula precision is high, easy to operate;
And the Level-adjusting side of gate realizes which end of gate is shorter by adjusting the height of each elevating mechanism,
It is then using the elevating mechanism for being located at the one end which end of the lifting of the one end of gate or gate is higher, then using being located at
The elevating mechanism of the one end declines the one end of gate, until the levelness of gate reaches requirement, in addition, this process will protect
Demonstrate,proving gate will not be more than block upwards.
In one embodiment, the one side of the gate object 1 of the block 4 is vertical plane.Such as without particular/special requirement, gate is rule
Whole slab construction, when gate is in plumbness, thickness direction one side be also it is vertical, therefore, block is accordingly set
The one side for counting into gate object is vertical plane, is suitable for this gate.
In one embodiment, there are two the elevating mechanism configures altogether, the cushion block also altogether configuration there are two, in use,
Two elevating mechanisms are arranged between two cushion blocks.It designing in this way, structure is the simplest, meanwhile, and can guarantee
Overall function.
In one embodiment, the upper end of first hound 5 has total with the one side of the gate object 1 of the block 4
The supporting surface for being bonded with the thickness direction one side of gate 1 of plane.It designs in this way, which can also limit gate
Thickness direction one side, to guarantee the verticality of gate.
In one embodiment, first hound 5 is by being engaged between first hound 5 and the cushion block 3
Singletree 6 be fixed on the cushion block 3.Singletree plays supplement the distance between the first hound and cushion block missing, makes to prop up
Support mechanism is fixed to each other with cushion block.
In one embodiment, the one side of the singletree 6 and first hound 5 in the gate object 1 of the block 4
Projection in the plane be each perpendicular to horizontal line.It designs in this way, singletree is to the active force of cushion block, and the first hound is to gate
Active force can more normal incidence act in respective face, structure is more stable, reliable.
In one embodiment, the auxiliary device further includes the diagonal brace that is used for identical with 3 quantity of cushion block in gate 1
Second hound 7 of thickness direction another side, and in step (2), it, will be each after gate 1 is placed on each cushion block 3
Second hound, 7 diagonal brace gate thickness direction another side and also respectively correspond be fixed on each cushion block 3
On.Second hound can also support gate, make gate be unlikely to towards the other side tilt, and also can lip block, prevent from padding
Block is mobile, in this way, the present invention can support gate strongerly, guarantees the stability of structure.
In one embodiment, the elevating mechanism 2 selects jack.Jack can directly be bought, and easy to operate, real
It is more preferable with property.Jack can form a line, or after gate handling is good, then be placed in gate when arranging cushion block with cushion block
Lower section is not particularly limited.
In one embodiment, the cushion block 3, the singletree 6 and first hound 5 are respectively by one section of I-steel shape
At.Using I-steel, production can be directly intercepted, it is very convenient, and also I-shaped hardness of steel is high, can satisfy requirement.
It should be understood that example as described herein and embodiment are not intended to restrict the invention, this field only for explanation
Technical staff can make various modifications or variation according to it, all within the spirits and principles of the present invention, made any modification,
Equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of construction method of Fast Installation gate, it is characterised in that: the following steps are included:
(1) prepare auxiliary device
The auxiliary device includes that levelness adjusts unit and verticality adjusting unit;It includes two that the levelness, which adjusts unit,
Above elevating mechanism;It includes more than two cushion blocks that the verticality, which adjusts unit, and block is fixed on the cushion block, is used
When, the block is located at the thickness direction side of gate, when the thickness direction one side of gate and the gate object of the block
One side when being bonded completely, gate is defined in vertical state;The auxiliary device further includes identical with the cushion block quantity
For diagonal brace the thickness direction one side of gate the first hound;
(2) handling
Each cushion block interval is arranged in a row, then gate is placed on each cushion block with handling appliance, and described in order
Block is located at the thickness direction side of gate, then by each first hound diagonal brace gate thickness direction one side simultaneously
It corresponds and is fixed on each cushion block respectively, finally withdraw handling appliance;
(3) verticality and levelness are adjusted
Gate lifting is detached from cushion block by each elevating mechanism, by by the thickness direction one side of gate and the gear
The one side of the gate object of block is bonded to adjust the verticality of gate completely, adjusts by adjusting the height of each elevating mechanism
The levelness of whole gate.
2. the construction method of Fast Installation gate as described in claim 1, it is characterised in that: the gate object of the block
It is on one side vertical plane.
3. the construction method of Fast Installation gate as claimed in claim 1 or 2, it is characterised in that: first hound
Upper end has the branch for the thickness direction one side of gate be bonded coplanar with the one side of the gate object of the block
Support face.
4. the construction method of Fast Installation gate as claimed in claim 1 or 2, it is characterised in that: first hound is logical
The singletree being engaged between first hound and the cushion block is crossed to be fixed on the cushion block.
5. the construction method of Fast Installation gate as claimed in claim 4, it is characterised in that: the singletree and described first
Hound the gate object of the block one side projection in the plane be each perpendicular to horizontal line.
6. the construction method of Fast Installation gate as claimed in claim 1 or 2, it is characterised in that: the auxiliary device also wraps
The second hound for thickness direction another side of the diagonal brace in gate identical with the cushion block quantity is included, and in step
(2) in, after gate is placed on each cushion block, by each second hound diagonal brace in the thickness direction other side of gate
Face and also respectively correspond be fixed on each cushion block.
7. the construction method of Fast Installation gate as claimed in claim 1 or 2, it is characterised in that: the elevating mechanism is selected
Jack.
8. the construction method of Fast Installation gate as claimed in claim 1 or 2, it is characterised in that: the elevating mechanism is matched altogether
There are two setting, the cushion block is also altogether there are two configurations, in use, two elevating mechanisms settings two cushion blocks it
Between.
9. the construction method of Fast Installation gate as claimed in claim 1 or 2, it is characterised in that: the cushion block is by one section of work
Word steel is formed.
10. the construction method of Fast Installation gate as claimed in claim 1 or 2, it is characterised in that: first hound by
One section of I-steel is formed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810791724.0A CN109024496B (en) | 2018-07-18 | 2018-07-18 | Construction method for quickly installing gate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810791724.0A CN109024496B (en) | 2018-07-18 | 2018-07-18 | Construction method for quickly installing gate |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109024496A true CN109024496A (en) | 2018-12-18 |
CN109024496B CN109024496B (en) | 2020-05-01 |
Family
ID=64643363
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810791724.0A Active CN109024496B (en) | 2018-07-18 | 2018-07-18 | Construction method for quickly installing gate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109024496B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101253650B1 (en) * | 2011-05-04 | 2013-04-11 | 주식회사 신정기공 | The automatic gate device using weight plummet |
CN203866854U (en) * | 2014-05-26 | 2014-10-08 | 中国葛洲坝集团股份有限公司 | Built tower base section adjusting and reinforcing device |
CN104100094A (en) * | 2013-04-02 | 2014-10-15 | 中国核工业第五建设有限公司 | Installation method of personnel air lock of steel containment of nuclear power plant |
CN206873955U (en) * | 2017-04-07 | 2018-01-12 | 中铁上海工程局集团有限公司 | A kind of prefabricated stand column perpendicularity and horizontal plane adjusting means |
-
2018
- 2018-07-18 CN CN201810791724.0A patent/CN109024496B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101253650B1 (en) * | 2011-05-04 | 2013-04-11 | 주식회사 신정기공 | The automatic gate device using weight plummet |
CN104100094A (en) * | 2013-04-02 | 2014-10-15 | 中国核工业第五建设有限公司 | Installation method of personnel air lock of steel containment of nuclear power plant |
CN203866854U (en) * | 2014-05-26 | 2014-10-08 | 中国葛洲坝集团股份有限公司 | Built tower base section adjusting and reinforcing device |
CN206873955U (en) * | 2017-04-07 | 2018-01-12 | 中铁上海工程局集团有限公司 | A kind of prefabricated stand column perpendicularity and horizontal plane adjusting means |
Also Published As
Publication number | Publication date |
---|---|
CN109024496B (en) | 2020-05-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103437297B (en) | Non-bracket closure method for upper cross beam of steel tower and construction system | |
CN201729642U (en) | Horizontal adjusting device for jack | |
CN104278843B (en) | The deviation correcting device of a kind of steel structure girder lifting docking and using method | |
CN206571180U (en) | It is a kind of to adjust the inclination angle fixing device installed and tilt steel member | |
CN210510510U (en) | Fine adjustment aligning device for axes of pipeline thermal pipeline | |
CN109024496A (en) | A kind of construction method of Fast Installation gate | |
CN208485501U (en) | A kind of auxiliary device for Fast Installation gate | |
CN204849778U (en) | Lattice column hoist and mount positioner | |
CN102983517B (en) | A kind of integral installation device for transformer test bench | |
CN101509228A (en) | Large-block beam section three-dimensional positioning apparatus | |
CN206539858U (en) | A kind of computer network controller lowering or hoisting gear | |
CN108691277A (en) | The three-dimensional adjustment tooling positioned in erection process for precast segment spliced girder | |
KR20100011048A (en) | Hook for lifting of h-beam | |
CN209722744U (en) | A kind of Bracing Systems for steel box girder assembling | |
CN203463792U (en) | Cable support | |
CN204470882U (en) | The positioning welding bracing or strutting arrangement of steel construction railing crossbeam | |
CN104727549B (en) | Confined space liftable integral installation form removal system construction installation method | |
CN209368825U (en) | A kind of solid mechanical device of stake for building | |
CN204304325U (en) | Cable disk wire-unfolding rack | |
CN204112752U (en) | A kind of deviation correcting device of steel structure girder lifting docking | |
CN207811062U (en) | A kind of special hanger of nuclear power plant's concrete barrel shape disposal container | |
CN208470712U (en) | A kind of power station pipe mother's travelling bogie | |
CN207878662U (en) | Combined type pre-embedded steel slab | |
CN206911667U (en) | Injecting glue auxiliary equipment for filter | |
CN206455633U (en) | A kind of supporting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |