CN109024274A - A kind of novel parallel steel wire HiAm anchorage and preparation method thereof - Google Patents

A kind of novel parallel steel wire HiAm anchorage and preparation method thereof Download PDF

Info

Publication number
CN109024274A
CN109024274A CN201810785480.5A CN201810785480A CN109024274A CN 109024274 A CN109024274 A CN 109024274A CN 201810785480 A CN201810785480 A CN 201810785480A CN 109024274 A CN109024274 A CN 109024274A
Authority
CN
China
Prior art keywords
steel wire
fixing sleeve
anchor cup
parallel steel
hiam anchorage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810785480.5A
Other languages
Chinese (zh)
Inventor
周成顺
曾利
宋强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Anchor Polytron Technologies Inc
Original Assignee
Zhejiang Anchor Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Anchor Polytron Technologies Inc filed Critical Zhejiang Anchor Polytron Technologies Inc
Priority to CN201810785480.5A priority Critical patent/CN109024274A/en
Publication of CN109024274A publication Critical patent/CN109024274A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

A kind of novel parallel steel wire HiAm anchorage provided by the invention, comprising: anchor cup, inside are equipped with several fixing sleeves, and fixation hole is equipped in the fixing sleeve, and the fixation hole and steel wire one end are interference fitted.First aspect, the present invention provides a kind of novel parallel steel wire HiAm anchorage, in the form of the diameter being inserted in every steel wire end is slightly less than the fixing sleeve of steel wire, substitute the wire sub-panel structure of original HiAm anchorage, when production, it is not required to only to be inserted in the fixing sleeve that internal diameter is slightly less than steel wire by the steel wire correspondence hole location for penetrating wire sub-panel one by one every steel wire end, connect between fixing sleeve and steel wire for interference.The present invention is solved existing novel parallel steel wire HiAm anchorage and is fixed parallel steel wire, bothersome defect that is laborious, being easy error using wire sub-panel.

Description

A kind of novel parallel steel wire HiAm anchorage and preparation method thereof
Technical field
The present invention relates to bridge construction fields, and in particular to a kind of novel parallel steel wire HiAm anchorage and preparation method thereof.
Background technique
Currently, largely with parallel wire stay system as its main bearing member, Yi Taoping in Bridges in Our Country engineering Row wire digging line system mainly bears the load of structure with cable body and both ends anchorage.Parallel wire stay system is as bridge An important component in engineering, production are typically all to be made in workshop in specialized factory, by steel wire essence Manufacture crafts, the last reels such as true blanking, steel wire row silk twisting, extrusion molding, HiAm anchorage perfusion transport to engineering site.
The essential step as parallel wire stay manufacture craft is perfused in HiAm anchorage, and fabrication cycle and production quality are serious Production Time and the quality of parallel steel wire oblique pull cable system are restrict, to influence the construction procedure of science of bridge building, and to whole The safety of a bridge generates strong influence.
Currently used HiAm anchorage mainly by: anchor cup, wire sub-panel, chill casting filler etc. form.Anchorage is packed into rope when production In body, steel wire is respectively penetrated in the corresponding hole location of wire sub-panel, and carries out pier nose processing in the end of steel wire, finally carries out chill casting The perfusion of material.
In the filling process of HiAm anchorage, steel wire, which penetrates wire sub-panel this process, will expend a lot of manpower and time, When especially parallel steel wire quantity increases, and during wearing silk, steel wire fallibility hole is done over again, and need to be taken a substantial amount of time.
For example number of patent application is " the chill casting anchorage equipped with spherical surface wire sub-panel " of CN201120041747.3, uses and divides Filament plate fixes parallel steel wire, to expend a lot of manpower and time, steel wire easily misdraws hole and does over again, while in the process of pier nose In, steel wire end can be by certain damage.
Summary of the invention
(1) technical problems to be solved
The object of the present invention is to provide a kind of novel parallel steel wire HiAm anchorages, and solving existing novel parallel steel wire HiAm anchorage makes Parallel steel wire, bothersome defect that is laborious, being easy error are fixed with wire sub-panel.
It is a further object to provide a kind of novel parallel steel wire HiAm anchorages, solve the existing mistake in pier nose Cheng Zhong, steel wire end can be by certain damage, and pier nose quality always will appear difference, will lead to steel wire anchoring efficiency it is insufficient and It is variant between each other, to generate stress unevenness, have the defect having a certain impact to the pouring quality of chill casting.
(2) technical solution
In order to solve the above technical problem, the present invention provides a kind of novel parallel steel wire HiAm anchorage, comprising: anchor cup, inside dress There are several fixing sleeves, fixation hole is equipped in the fixing sleeve, the fixation hole and steel wire one end are interference fitted.In a first aspect, The present invention provides a kind of novel parallel steel wire HiAm anchorage, and the fixing sleeve of steel wire is slightly less than with the diameter being inserted in every steel wire end Form, substitute the wire sub-panel structure of original HiAm anchorage, when production, be not required to the correspondence for penetrating wire sub-panel one by one by steel wire In hole location, only it need to be inserted in the fixing sleeve that internal diameter is slightly less than steel wire every steel wire end, connected between fixing sleeve and steel wire for interference It connects.The present invention is solved existing novel parallel steel wire HiAm anchorage and is fixed parallel steel wire using wire sub-panel, bothersome laborious, easy The defect of error.This invention also solves parallel steel wire HiAm anchorages in the prior art during filling anchor, and steel wire penetrates wire sub-panel The problem of Shi Gangsi and wire sub-panel corresponding aperture dislocation position are done over again provides a kind of novel parallel steel wire HiAm anchorage, and every steel wire is certainly The fixing sleeve for being slightly less than steel wire by being inserted in diameter under state, it is mutually indepedent between fixing sleeve, to steel wire before axial force preload Radial position there is no limit effect, each steel wire may be at optimum position, when having avoided wire sub-panel structure, because misdrawing hole location And lead to the case where frequently doing over again.
Second aspect, existing during pier nose, steel wire end can be by certain damage, and pier nose quality always goes out Existing difference, the anchoring efficiency that will lead to steel wire is insufficient and variant between each other, so that stress unevenness is generated, to chill casting Pouring quality tool have a certain impact.This invention also solves parallel steel wire HiAm anchorages in the prior art in the process for filling anchor In, when steel wire end carries out pier nose operation, damage and pier nose qualitative difference to steel wire end, and the anchoring of steel wire is caused to be imitated The problem of rate and stress unevenness, provides a kind of novel parallel steel wire HiAm anchorage, and every steel wire only need to be inserted in internal diameter in end It is slightly less than the fixing sleeve of steel wire, is connected between fixing sleeve and steel wire for interference, be not required to again operate steel wire ontology, avoid The damage of steel wire, when parallel steel wire cable body blanking, every steel wire length is consistent, and internal diameter is slightly less than the ruler of the fixing sleeve of steel wire It is very little to be also consistent, therefore can guarantee that the stress of every steel wire is consistent.
Preferably, the lateral surface of the fixing sleeve is truncated cone-shaped, and the outer diameter of bottom end is greater than top outer diameter;The anchor cup Inner sidewall at least locally has the conical surface compatible with fixing sleeve lateral surface.On the other hand, " inner sidewall of anchor cup at least locally has Have the conical surface compatible with fixing sleeve lateral surface " with reference to first aspect, change the interior coning angle of existing anchor cup, cooperates fixing sleeve shape The auto-lock anchorage of pairs of parallel wire unit end.
Preferably, the fixation hole penetrates through fixing sleeve.
Preferably, chill casting material is filled in the anchor cup.
Preferably, the fixing sleeve side is equipped with sealing plate, and the sealing plate is for sealing anchor cup.
Preferably, the anchor cup is recessed inwardly to form heavy platform far from one end of sealing plate, and the heavy platform is provided with constraint circle.
Preferably, the anchor cup inner wall has mounting groove, and the mounting groove is located at heavy platform side, and the fixing sleeve is located at peace In tankage.
Preferably, the mounting groove internal diameter is gradually restrained from sealing plate one end to heavy platform one end.
The present invention also provides a kind of novel parallel steel wire HiAm anchorage production method, comprising the following steps:
1) after parallel steel wire penetrates anchor cup, the small one end of fixing sleeve diameter is penetrated in hawser body, big one end of diameter after installation Concordant with steel wire distal end faces, the fixing sleeve being inserted in by steel wire end is expanding by the progress of parallel wire unit anchored end, after expansion Steel wire beam diameter be greater than anchor cup material filling section, to cooperate the interior coning angle of anchor cup;
2) parallel steel wire penetrate fixing sleeve it is in place after, in parallel steel wire end and anchor cup far from installing anchor cup between steel wire side The sealing plate of close contact;
3) chill casting material is filled into anchor cup and is solidified.Steel wire beam diameter after expanding in the present invention is greater than anchor cup material filling section, And cooperate the interior coning angle of anchor cup, to guarantee that there are enough tension pulls out force in steel tendon end.The present invention penetrates cone in parallel steel wire After set is in place before perfusion chill casting material, in parallel steel wire end and anchor cup far from installing sealing plate, sealing plate and anchor between steel wire side Cup is in close contact, and forms confined space with grout compartment, prevents the possibility of chill casting material leakage that may occur when perfusion chill casting material.
Preferably, after anchor cup perfusion chill casting material solidification, sealing plate is removed, wait reuse.
Preferably, the anchor cup internal diameter of parallel steel wire extension diameter section with it is expanding after the outer diameter of parallel wire unit it is identical.The present invention Anchor cup installation it is in place after, anchor cup will increase its globality to the radial pressure of parallel wire unit, while generate anchor to steel tendon Gu effect.
(3) beneficial effect
A kind of novel parallel steel wire HiAm anchorage provided by the invention, has the advantage that
1, it in a first aspect, the present invention provides a kind of novel parallel steel wire HiAm anchorage, is omited with the diameter being inserted in every steel wire end Less than the form of the fixing sleeve of steel wire, the wire sub-panel structure of original HiAm anchorage is substituted, when production, be not required to steel wire one by one Penetrate in the correspondence hole location of wire sub-panel, only need to be inserted in the fixing sleeve that internal diameter is slightly less than steel wire every steel wire end, fixing sleeve with It is connected between steel wire for interference.The present invention is solved existing novel parallel steel wire HiAm anchorage and is fixed parallel steel using wire sub-panel Silk, bothersome defect that is laborious, being easy error.This invention also solves parallel steel wire HiAm anchorages in the prior art to fill anchor process In, the problem of steel wire and wire sub-panel corresponding aperture dislocation position are done over again when steel wire penetrates wire sub-panel, it is cold to provide a kind of novel parallel steel wire Anchor is cast, every steel wire is inserted in the fixing sleeve that diameter is slightly less than steel wire in a free state, and it is mutually indepedent between fixing sleeve, in axial direction To the radial position of steel wire there is no limit effect before power preload, each steel wire may be at optimum position, avoid wire sub-panel When structure, lead to the case where frequently doing over again because misdrawing hole location.
2, every steel wire only need to be inserted in the fixing sleeve that internal diameter is slightly less than steel wire in end in the present invention, fixing sleeve and steel wire it Between connected for interference, be not required to again operate steel wire ontology, avoid the damage of steel wire, when parallel steel wire cable body blanking, often Root steel wire length is consistent, and the size that internal diameter is slightly less than the fixing sleeve of steel wire is also consistent, therefore can guarantee every steel The stress of silk is consistent.
3, " inner sidewall of anchor cup at least locally has the conical surface compatible with fixing sleeve lateral surface " with reference to first aspect, changes The interior coning angle for having anchor cup is cashed, cooperation fixing sleeve forms the auto-lock anchorage to parallel wire unit end.
Detailed description of the invention
Fig. 1 is the novel parallel steel wire HiAm anchorage structural schematic diagram of the embodiment of the present invention 1;
Fig. 2 is the fixing sleeve the schematic diagram of the section structure of the novel parallel steel wire HiAm anchorage of the embodiment of the present invention 1;
Fig. 3 is the fixing sleeve overlooking structure diagram of the novel parallel steel wire HiAm anchorage of the embodiment of the present invention 2;
Fig. 4 is the fixing sleeve the schematic diagram of the section structure of the novel parallel steel wire HiAm anchorage of the embodiment of the present invention 2;
Fig. 5 is the anchor cup and fixing sleeve mounting structure schematic diagram of the novel parallel steel wire HiAm anchorage of the embodiment of the present invention 2.
1, anchor cup;2, chill casting material;3, fixing sleeve;4, fixation hole;5, the conical surface;6, heavy platform;7, constraint circle;8, mounting groove;9, Rotary table;10, annular base;11, fixed link;12, fixed plate;13, card slot;14, polygonal grooves;15, sealing plate.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Following instance For illustrating the present invention, but it is not intended to limit the scope of the invention.
The bottom of fixing sleeve in the present invention is steel wire end side, otherwise is top, the mounting structure left side of comparative diagram 1 For bottom, right side is top.
Embodiment 1:
As shown in Figure 1 and Figure 2, a kind of novel parallel steel wire HiAm anchorage provided by the invention, comprising: anchor cup 1 is filled out in the anchor cup Filled with chill casting material 2.Several fixing sleeves 3 are housed inside the anchor cup, are equipped with fixation hole 4, the fixation hole in the fixing sleeve It is interference fitted with steel wire one end.The lateral surface of the fixing sleeve is truncated cone-shaped, and the outer diameter of bottom end is greater than top outer diameter;The anchor The inner sidewall of cup at least locally has the conical surface 5 compatible with fixing sleeve lateral surface.The lateral surface of the truncated cone-shaped of the fixing sleeve With anchor cup inner sidewall to the inclined angle of same one side.The fixation hole penetrates through fixing sleeve.The fixing sleeve side is equipped with Sealing plate 15, the sealing plate is for sealing anchor cup.
The anchor cup is recessed inwardly to form heavy platform 6 far from one end of sealing plate, and the heavy platform is provided with constraint circle 7.The anchor Cup inner wall has mounting groove 8, and the mounting groove is located at heavy platform side, and the fixing sleeve is located in mounting groove.In the mounting groove Diameter is gradually restrained from sealing plate one end to heavy platform one end.
When the embodiment of the present invention is implemented, after parallel steel wire penetrates anchor cup, the small one end of fixing sleeve diameter penetrates hawser In vivo, the big one end of diameter is concordant with steel wire distal end faces after installation, and the fixing sleeve being inserted in by steel wire end is by parallel steel wire The progress of beam anchored end is expanding, and the steel wire beam diameter after expansion is greater than anchor cup material filling section, to cooperate the interior coning angle of anchor cup.Parallel Steel wire penetrate fixing sleeve it is in place after, in parallel steel wire end and anchor cup far from the envelope installing anchor cup between steel wire side and being in close contact Plate.Chill casting material is filled into anchor cup and is solidified.Steel wire beam diameter after expanding in the present invention is greater than anchor cup material filling section, and matches The interior coning angle of anchor cup is closed, to guarantee that steel tendon end there are enough tension pulls out force.After anchor cup perfusion chill casting material solidification, remove Sealing plate, wait reuse.
Embodiment 2:
As shown in figure 3, figure 4 and figure 5, a kind of novel parallel steel wire HiAm anchorage provided by the invention, comprising: anchor cup, the anchor cup It is interior to be filled with chill casting material.Several fixing sleeves are housed inside the anchor cup, are equipped with fixation hole, the fixation hole in the fixing sleeve It is interference fitted with steel wire one end.The lateral surface of the fixing sleeve is truncated cone-shaped, and the outer diameter of bottom end is greater than top outer diameter;The anchor The inner sidewall of cup at least locally has the conical surface compatible with fixing sleeve lateral surface.Described fixing sleeve one end is equipped with rotary table 9, bottom end Annular base 10 equipped with regular hexagon, the pedestal are connected and fixed the rotary table in hole by the conical surface.The fixation hole perforation is fixed Set and its pedestal.There is the fixed link 11 of evagination on the pedestal bottom face, be less than in the fixed link equipped with multiple length The fixed plate 12 of anchor cup internal diameter, the fixed plate are equipped with card slot 13 compatible with fixed link.The anchor cup bottom has Polygonal grooves 14 compatible with the fixing sleeve assembled.
The anchor cup is recessed inwardly to form heavy platform far from one end of fixing sleeve, and the heavy platform is provided with constraint circle.The anchor Cup inner wall has mounting groove, and the mounting groove is located at heavy platform side, and the fixing sleeve is located in mounting groove.The mounting groove internal diameter It is gradually restrained from fixing sleeve one end to heavy platform one end.Present invention combination fixing sleeve does not need sealing plate to seal anchor cup, reduces by a step Operating procedure, operation is simpler, is overlapped mutually between hexagonal fixing sleeve, structural strength is higher.
When the embodiment of the present invention is implemented, after parallel steel wire penetrates anchor cup, the small one end of fixing sleeve diameter penetrates hawser In vivo, the big one end of diameter is concordant with steel wire distal end faces after installation, and the fixing sleeve being inserted in by steel wire end is by parallel steel wire The progress of beam anchored end is expanding, and the steel wire beam diameter after expansion is greater than anchor cup material filling section, to cooperate the interior coning angle of anchor cup.Parallel Steel wire penetrate fixing sleeve it is in place after, fixed plate is loaded onto the fixed link of fixing sleeve to fix the fixing sleeve that multiple groups are arranged in juxtaposition. Chill casting material is filled into anchor cup and is solidified.
Embodiment 3
The present invention also provides a kind of novel parallel steel wire HiAm anchorage production method, comprising the following steps:
1) after parallel steel wire penetrates anchor cup, the small one end of fixing sleeve diameter is penetrated in hawser body, big one end of diameter after installation Concordant with steel wire distal end faces, the fixing sleeve being inserted in by steel wire end is expanding by the progress of parallel wire unit anchored end, after expansion Steel wire beam diameter be greater than anchor cup material filling section, to cooperate the interior coning angle of anchor cup;The wherein anchor cup internal diameter of parallel steel wire extension diameter section It is identical as the outer diameter of parallel wire unit after expanding;
2) parallel steel wire penetrate fixing sleeve it is in place after, in parallel steel wire end and anchor cup far from installing anchor cup between steel wire side The sealing plate of close contact;
3) chill casting material is filled into anchor cup and is solidified.Steel wire beam diameter after expanding in the present invention is greater than anchor cup material filling section, And cooperate the interior coning angle of anchor cup, to guarantee that there are enough tension pulls out force in steel tendon end.The present invention penetrates cone in parallel steel wire After set is in place before perfusion chill casting material, in parallel steel wire end and anchor cup far from installing sealing plate, sealing plate and anchor between steel wire side Cup is in close contact, and forms confined space with grout compartment, prevents the possibility of chill casting material leakage that may occur when perfusion chill casting material.
4) after anchor cup perfusion chill casting material solidification, sealing plate is removed, wait reuse.
The various embodiments described above are merely to illustrate the present invention, wherein the structure of each component, connection type etc. are all can be Variation, all equivalents and improvement carried out based on the technical solution of the present invention should not be excluded of the invention Except protection scope.

Claims (10)

1. a kind of novel parallel steel wire HiAm anchorage characterized by comprising
Anchor cup, inside are equipped with several fixing sleeves, are equipped with fixation hole, the fixation hole and the interference of steel wire one end in the fixing sleeve Cooperation.
2. novel parallel steel wire HiAm anchorage as described in claim 1, which is characterized in that the lateral surface of the fixing sleeve is rotary table The outer diameter of shape, bottom end is greater than top outer diameter;The inner sidewall of the anchor cup at least locally has to be adapted with fixing sleeve lateral surface The conical surface.
3. novel parallel steel wire HiAm anchorage as claimed in claim 2, which is characterized in that the fixation hole penetrates through fixing sleeve.
4. novel parallel steel wire HiAm anchorage as described in claim 1, which is characterized in that be filled with chill casting material in the anchor cup.
5. novel parallel steel wire HiAm anchorage as claimed in claim 1 or 2 or 3 or 4, which is characterized in that the fixing sleeve side Sealing plate is installed, the sealing plate is for sealing anchor cup.
6. novel parallel steel wire HiAm anchorage as claimed in claim 1 or 2 or 3 or 4, which is characterized in that the anchor cup is far from envelope One end of plate is recessed inwardly to form heavy platform, and the heavy platform is provided with constraint circle.
7. novel parallel steel wire HiAm anchorage as claimed in claim 6, which is characterized in that the anchor cup inner wall has mounting groove, The mounting groove is located at heavy platform side, and the fixing sleeve is located in mounting groove.
8. novel parallel steel wire HiAm anchorage as claimed in claim 7, which is characterized in that the mounting groove internal diameter is by sealing plate one end It is gradually restrained to heavy platform one end.
9. a kind of production method of novel parallel steel wire HiAm anchorage, which is characterized in that the novel parallel steel wire HiAm anchorage is power Benefit requires novel parallel steel wire HiAm anchorage described in 1 to 8 any one claim;The following steps are included:
1) after parallel steel wire penetrates anchor cup, the small one end of fixing sleeve diameter is penetrated in hawser body, big one end of diameter after installation Concordant with steel wire distal end faces, the fixing sleeve being inserted in by steel wire end is expanding by the progress of parallel wire unit anchored end, after expansion Steel wire beam diameter be greater than anchor cup material filling section, to cooperate the interior coning angle of anchor cup;
2) parallel steel wire penetrate fixing sleeve it is in place after, in parallel steel wire end and anchor cup far from installing anchor cup between steel wire side The sealing plate of close contact;3) chill casting material is filled into anchor cup and is solidified.
10. the production method of novel parallel steel wire HiAm anchorage as claimed in claim 9, which is characterized in that the parallel steel wire The anchor cup internal diameter of extension diameter section with it is expanding after the outer diameter of parallel wire unit it is identical.
CN201810785480.5A 2018-07-17 2018-07-17 A kind of novel parallel steel wire HiAm anchorage and preparation method thereof Pending CN109024274A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810785480.5A CN109024274A (en) 2018-07-17 2018-07-17 A kind of novel parallel steel wire HiAm anchorage and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810785480.5A CN109024274A (en) 2018-07-17 2018-07-17 A kind of novel parallel steel wire HiAm anchorage and preparation method thereof

Publications (1)

Publication Number Publication Date
CN109024274A true CN109024274A (en) 2018-12-18

Family

ID=64642898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810785480.5A Pending CN109024274A (en) 2018-07-17 2018-07-17 A kind of novel parallel steel wire HiAm anchorage and preparation method thereof

Country Status (1)

Country Link
CN (1) CN109024274A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306430A (en) * 2019-07-27 2019-10-08 浙锚科技股份有限公司 A kind of perception parallel steel wire HiAm anchorage and production method certainly
CN110306430B (en) * 2019-07-27 2024-05-24 浙锚科技股份有限公司 Self-sensing parallel steel wire cold cast anchor and manufacturing method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2255354A (en) * 1991-05-03 1992-11-04 Bridon Plc Strand anchorage
EP0554161A1 (en) * 1992-01-31 1993-08-04 Sondages Injections Forages "S.I.F." Entreprise Bachy Anchorage device for a bundle of fibre filaments
CN203049919U (en) * 2013-01-18 2013-07-10 杭州浙锚预应力有限公司 Epoxy coating steel strand anchoring structure
CN106320609A (en) * 2016-08-17 2017-01-11 杭州浙锚预应力有限公司 Steel strand stayed cable and manufacturing method thereof
CN205954480U (en) * 2016-08-17 2017-02-15 杭州浙锚预应力有限公司 Packing type epoxy steel strand wires extrusion anchor cable

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2255354A (en) * 1991-05-03 1992-11-04 Bridon Plc Strand anchorage
EP0554161A1 (en) * 1992-01-31 1993-08-04 Sondages Injections Forages "S.I.F." Entreprise Bachy Anchorage device for a bundle of fibre filaments
CN203049919U (en) * 2013-01-18 2013-07-10 杭州浙锚预应力有限公司 Epoxy coating steel strand anchoring structure
CN106320609A (en) * 2016-08-17 2017-01-11 杭州浙锚预应力有限公司 Steel strand stayed cable and manufacturing method thereof
CN205954480U (en) * 2016-08-17 2017-02-15 杭州浙锚预应力有限公司 Packing type epoxy steel strand wires extrusion anchor cable

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306430A (en) * 2019-07-27 2019-10-08 浙锚科技股份有限公司 A kind of perception parallel steel wire HiAm anchorage and production method certainly
CN110306430B (en) * 2019-07-27 2024-05-24 浙锚科技股份有限公司 Self-sensing parallel steel wire cold cast anchor and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN107575257B (en) The anchoring process of anchor tool system for fibre-reinforced high molecular material bar
CN103987959A (en) Rotor blade and connecting device
US10273706B2 (en) Tower section for a tethered wind turbine tower
CN105421231B (en) Bridge CFRP muscle Group anchor for inhaul cable anchorages and manufacture craft
US20160002874A1 (en) Connection between a foundation pile of a structure and an in particular tubular transition piece, and method for producing same
KR20110111907A (en) Saddle assembly
US20160053503A1 (en) Fiber reinforced anchors and connectors, methods of making anchors and connectors, and processes for reinforcing a structure
CN105339654A (en) Wind turbine foundation
US20110225796A1 (en) Providing a transverse filling inside and elongated narrow cavity
CN109056526A (en) A kind of HiAm anchorage and production method of parallel steel wire intelligence rope
CN209211275U (en) A kind of novel parallel steel wire HiAm anchorage
CN109024274A (en) A kind of novel parallel steel wire HiAm anchorage and preparation method thereof
KR200474975Y1 (en) Mooring bollard apparatus for ship
CN103043203A (en) Device for manoeuvring a watercraft
KR20180025422A (en) Tower structure and wind turbine tower
CN209211276U (en) A kind of HiAm anchorage of parallel steel wire intelligence rope
CA2970576C (en) A reinforcement system and a method of reinforcing a structure with a tendon
US8186923B2 (en) Connecting arrangement and method of fastening a bolt
KR102068608B1 (en) Construction method for suspension girder using pws cable
CN109252518B (en) Variable-diameter anchor rod and anchoring method thereof
EP2650447B1 (en) Pinning of a Multi-walled Structure
KR101889151B1 (en) Tower structure and wind turbine tower
US20230295891A1 (en) Post-tensioned wind turbine foundation
CN110761810A (en) Composite cavity reinforcing structure adopting prestressed cable and application method thereof
EP3613927B1 (en) Attachment member, tower arrangement and method for obtaining a tower arrangement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Changle

Inventor after: Cha Yu

Inventor after: Zhou Chengshun

Inventor after: Zeng Li

Inventor after: Song Qiang

Inventor after: Hu Yaoqing

Inventor before: Zhou Chengshun

Inventor before: Zeng Li

Inventor before: Song Qiang

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218