CN109024138A - Town road crosses bituminous grout concrete pavement construction engineering method - Google Patents
Town road crosses bituminous grout concrete pavement construction engineering method Download PDFInfo
- Publication number
- CN109024138A CN109024138A CN201810876486.3A CN201810876486A CN109024138A CN 109024138 A CN109024138 A CN 109024138A CN 201810876486 A CN201810876486 A CN 201810876486A CN 109024138 A CN109024138 A CN 109024138A
- Authority
- CN
- China
- Prior art keywords
- layer
- bituminous
- concrete
- laid
- sand stone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/32—Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/225—Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a kind of town roads to cross bituminous grout concrete pavement construction engineering method, is made of base course, sand stone layer, water layer, Bituminous Concrete Permeable Pavement layer and phase-change microcapsule excessively, construction procedure is as follows: a, the impurity for clearing up roadbed layer surface;B, it is laid with sand stone layer after the completion of base course is cleared up and is compacted;C, water layer was laid in sand stone layer;D, pitch and concrete are subjected to mixing proportion, obtain the mixture with certain coefficient of permeability, then phase-change microcapsule is incorporated into bituminous concrete mixture, and carries out mixing;E, the resulting mixed material of step d was laid on water layer, and obtained Bituminous Concrete Permeable Pavement layer;F, sprinkling maintenance.Advantage is: water penetration of the present invention is preferable and can alleviate bituminous pavement high temperature.
Description
Technical field
The invention belongs to town road technical fields, cross bituminous grout concrete road surface more particularly, to a kind of town road and apply
Work engineering method.
Background technique
Currently, asphalt concrete pavement has been widely used on each provincial, and municipal level road with the development of the city,
Mainly have the characteristics that allow evenness of road surface to lack dirt, durable;Its water penetration of existing asphalt concrete pavement is poor, in this way
So that road often generates serious waterlogging in rainy season, Public Traveling safety and efficiency are influenced;In addition, since asphalt material is to the sun
The absorption of energy, bituminous pavement surface temperature can be higher in summer, this makes the high-temperature stability of bituminous pavement by tight
High test seriously affects the service performance and traffic safety of bituminous pavement.
Summary of the invention
The purpose of the present invention is in view of the deficiency of the prior art, provide a kind of town road to cross bituminous grout coagulation
Soil surface construction, it has the characteristics that water penetration is preferable and can alleviate bituminous pavement high temperature.
To achieve the goals above, the technical scheme adopted by the invention is that: a kind of town road crosses bituminous grout concrete
Pavement construction engineering method is made of base course, sand stone layer, water layer, Bituminous Concrete Permeable Pavement layer and phase-change microcapsule excessively, applies
Steps are as follows for work:
A, the impurity of roadbed layer surface is cleared up;
B, it is laid with sand stone layer after the completion of base course is cleared up, sand stone layer is collectively formed by rubble or gravel, and uses road roller
Compacting;
C, it was laid with water layer in sand stone layer, crosses water layer and is made of natural coarse sand or fine aggregate, to material before laying
Material is matched, and the coefficient of permeability of 1.5~2mm/s is reached;
D, pitch and concrete are subjected to mixing proportion, the mixture with certain coefficient of permeability are obtained, then by phase transformation
Microcapsules are incorporated into bituminous concrete mixture, and carry out mixing;
E, the resulting mixed material of step d was laid on water layer, and obtained Bituminous Concrete Permeable Pavement layer;
F, sprinkling maintenance.
The phase-change microcapsule is paraffin microcapsule.
The outer diameter crossed water space and be less than phase-change microcapsule crossed on water layer.
It can effectively be restored the invention has the advantages that compared with the prior art: the present invention, recharge of groundwater, dimension
Belowground ecosystem balance is held, prevents urban waterlogging and road surface from collapsing;The suction that phase-change microcapsule can be converted by solid-liquid phase change
Heat-exothermic process adjusts the temperature on road surface, mitigates the temperature on hot weather road surface, improves the service performance on road surface and promoted and handed over
Logical safety.
Specific embodiment
As described below is only presently preferred embodiments of the present invention, is not intended to limit the scope of the present invention.
Embodiment: a kind of town road crosses bituminous grout concrete pavement construction engineering method, by base course, sand stone layer, crosses water
Layer, Bituminous Concrete Permeable Pavement layer and phase-change microcapsule composition, construction procedure are as follows:
A, the impurity of cleaning roadbed layer surface, the section basal plane that base course is generally old pavement to be rebuilt or newly opens up,
It generally all has more impurity particle, these sundries impact construction in order to prevent, are generally all carried out clearly with tool
Reason, base course generally tamp plain soil layer, and with preferable water penetration, the rainwater for collecting in this layer can be fed directly to underground
Water layer.
B, it is laid with sand stone layer after the completion of base course is cleared up, sand stone layer is collectively formed by rubble or gravel, and uses road roller
Compacting;Sand stone layer also has more lower water space after compaction, flows down convenient for rainwater due to being made up of rubble or gravel
To base course.
C, it was laid with water layer in sand stone layer, crosses water layer and is made of natural coarse sand or fine aggregate, to material before laying
Material is matched, and the coefficient of permeability of 1.5~2mm/s is reached.
D, pitch and concrete are subjected to mixing proportion, the mixture with certain coefficient of permeability are obtained, then by phase transformation
Microcapsules are incorporated into bituminous concrete mixture, and carry out mixing;Phase-change microcapsule is paraffin microcapsule, can be passed through
Heat absorption-exothermic process of solid-liquid phase change conversion adjusts the temperature on road surface, mitigates the temperature on hot weather road surface, improves road surface
Service performance and promoted traffic safety;The outer diameter of phase-change microcapsule, which was greater than in water layer, crosses water space, can place in this way
Mutually become microcapsule permeable to arrive in water layer.
E, the resulting mixed material of step d was laid on water layer, and obtained Bituminous Concrete Permeable Pavement layer.
F, sprinkling maintenance.
Claims (3)
1. a kind of town road crosses bituminous grout concrete pavement construction engineering method, it is characterised in that: it is by base course, sand stone layer, mistake
Water layer, Bituminous Concrete Permeable Pavement layer and phase-change microcapsule composition, construction procedure are as follows:
A, the impurity of roadbed layer surface is cleared up;
B, it is laid with sand stone layer after the completion of base course is cleared up, sand stone layer is collectively formed by rubble or gravel, and is compacted with road roller;
C, be laid with water layer in sand stone layer, and crossed water layer and be made of natural coarse sand or fine aggregate, before laying to material into
Row proportion, reaches the coefficient of permeability of 1.5~2mm/s;
D, pitch and concrete are subjected to mixing proportion, the mixture with certain coefficient of permeability are obtained, then by the micro- glue of phase transformation
Capsule is incorporated into bituminous concrete mixture, and carries out mixing;
E, the resulting mixed material of step d was laid on water layer, and obtained Bituminous Concrete Permeable Pavement layer;
F, sprinkling maintenance.
2. town road according to claim 1 crosses bituminous grout concrete pavement construction engineering method, it is characterised in that: the phase
Change microcapsules is paraffin microcapsules.
3. town road according to claim 1 crosses bituminous grout concrete pavement construction engineering method, it is characterised in that: the mistake
The outer diameter crossed water space and be less than phase-change microcapsule on water layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810876486.3A CN109024138A (en) | 2018-08-03 | 2018-08-03 | Town road crosses bituminous grout concrete pavement construction engineering method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810876486.3A CN109024138A (en) | 2018-08-03 | 2018-08-03 | Town road crosses bituminous grout concrete pavement construction engineering method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109024138A true CN109024138A (en) | 2018-12-18 |
Family
ID=64649129
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810876486.3A Pending CN109024138A (en) | 2018-08-03 | 2018-08-03 | Town road crosses bituminous grout concrete pavement construction engineering method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109024138A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100830986B1 (en) * | 2007-12-21 | 2008-05-20 | 주식회사 태영알이씨 | The flex road elasticity pavement for a bicycle and the method for executing the flex road elasticity pavement |
CN101293763A (en) * | 2008-06-26 | 2008-10-29 | 河南国基建设集团有限公司 | Water permeable concrete and pavement construction method |
CN205874873U (en) * | 2016-07-20 | 2017-01-11 | 新天一集团有限公司 | Phase transition road surface structure that adjusts temperature |
CN103866668B (en) * | 2012-12-14 | 2017-09-15 | 北京中景橙石科技股份有限公司 | A kind of cement permeable concrete ground structure of surface pervious asphalt and preparation method thereof |
CN207062672U (en) * | 2017-08-24 | 2018-03-02 | 胡云友 | A kind of permeable pavement structure |
CN207405427U (en) * | 2017-10-23 | 2018-05-25 | 吕剑 | A kind of combined type permeable pavement structure |
-
2018
- 2018-08-03 CN CN201810876486.3A patent/CN109024138A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100830986B1 (en) * | 2007-12-21 | 2008-05-20 | 주식회사 태영알이씨 | The flex road elasticity pavement for a bicycle and the method for executing the flex road elasticity pavement |
CN101293763A (en) * | 2008-06-26 | 2008-10-29 | 河南国基建设集团有限公司 | Water permeable concrete and pavement construction method |
CN103866668B (en) * | 2012-12-14 | 2017-09-15 | 北京中景橙石科技股份有限公司 | A kind of cement permeable concrete ground structure of surface pervious asphalt and preparation method thereof |
CN205874873U (en) * | 2016-07-20 | 2017-01-11 | 新天一集团有限公司 | Phase transition road surface structure that adjusts temperature |
CN207062672U (en) * | 2017-08-24 | 2018-03-02 | 胡云友 | A kind of permeable pavement structure |
CN207405427U (en) * | 2017-10-23 | 2018-05-25 | 吕剑 | A kind of combined type permeable pavement structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101973726B (en) | Porous pavement partially taking steel slag as coarse aggregate | |
CN108316089B (en) | Method for repairing pavement by adopting plain concrete and reinforced concrete | |
CN104878678A (en) | Construction method for water-permeable and water-retaining water-permeable pavement structure | |
CN106758642A (en) | A kind of colorful water-permeable concrete entirety pavement structure and its construction method | |
CN103850164B (en) | The construction method of penetrating induction type drainage pavement of a kind of long-life | |
CN204875416U (en) | Porous pavement structure | |
CN101824326A (en) | Soil stabilizer and application method thereof | |
CN111455772A (en) | Road structure based on sponge city technology and construction method thereof | |
CN107938480A (en) | A kind of microorganism cures the desert highway embankment and its construction method of joint TGXG | |
CN112211198A (en) | Municipal road engineering pavement construction technology | |
CN106677003A (en) | Pervious concrete structure and preparation method thereof | |
CN207484193U (en) | Permeable road structure | |
CN107558324B (en) | A kind of Steel Fibre Concrete Pavement and its construction technology of tramcar and road usual friendship mouth | |
CN206359847U (en) | A kind of asphalt pavement structure of clinker silty filler | |
CN102807869B (en) | Soil stabilizer | |
CN209211198U (en) | A kind of urban environmental protection road surface | |
CN207159749U (en) | A kind of high intensity high water-permeability road paving structure for sponge city | |
CN111549603A (en) | Pavement considering water load coupling and construction method thereof | |
CN105887616A (en) | Method for reinforcing water absorption by paving biochar under sponge city pavement | |
CN109024138A (en) | Town road crosses bituminous grout concrete pavement construction engineering method | |
CN206752237U (en) | Stealthy passageway for fire apparatus | |
CN110205895A (en) | A kind of green low-carbon environment-friendly type road structure using regrown material | |
KR101014184B1 (en) | Ground pavement method without expansion joint | |
CN114182595B (en) | Construction method of long-life asphalt road | |
CN109024139A (en) | Town road crosses bituminous grout concrete road surface structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181218 |
|
WD01 | Invention patent application deemed withdrawn after publication |