CN109014783A - A kind of IC engine link rod manufacturing process - Google Patents

A kind of IC engine link rod manufacturing process Download PDF

Info

Publication number
CN109014783A
CN109014783A CN201810929944.5A CN201810929944A CN109014783A CN 109014783 A CN109014783 A CN 109014783A CN 201810929944 A CN201810929944 A CN 201810929944A CN 109014783 A CN109014783 A CN 109014783A
Authority
CN
China
Prior art keywords
connecting rod
major part
blank
manufacturing process
processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810929944.5A
Other languages
Chinese (zh)
Inventor
尤建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QUANJIAO POWER MACHINERY CO Ltd
Original Assignee
QUANJIAO POWER MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QUANJIAO POWER MACHINERY CO Ltd filed Critical QUANJIAO POWER MACHINERY CO Ltd
Priority to CN201810929944.5A priority Critical patent/CN109014783A/en
Publication of CN109014783A publication Critical patent/CN109014783A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C7/00Connecting-rods or like links pivoted at both ends; Construction of connecting-rod heads
    • F16C7/02Constructions of connecting-rods with constant length

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Shafts, Cranks, Connecting Bars, And Related Bearings (AREA)

Abstract

本发明提出一种内燃机连杆制造工艺,包括以下步骤:铸造毛坯、热处理、铣削处理、粗磨加工、钻孔及扩孔、加工螺栓孔、胀断处理、大头孔与小头孔的精加工和端面精加工;本发明提出通过对铸造成型的连杆毛坯进行热处理可以提高连杆毛坯的刚度、强度、塑性和韧性同时可以改善连杆毛坯内部组织不均匀、不致密和内部化学成分偏差较大的问题,提高连杆毛坯的物理性能,通过在铸造成型前在模具型腔内加入金属粉末形成的断裂界限可以方便后期在胀断处理分离连杆的大头时胀断效果好,不会出现胀断口豁口碎裂问题,提高了胀断处理的效率和成品合格率。

The invention proposes a manufacturing process of an internal combustion engine connecting rod, which includes the following steps: casting blank, heat treatment, milling treatment, rough grinding, drilling and reaming, machining bolt holes, expansion treatment, finishing of big head hole and small head hole and end surface finishing; the present invention proposes that the rigidity, strength, plasticity and toughness of the connecting rod blank can be improved by heat-treating the casting-formed connecting rod blank, and at the same time, the internal structure of the connecting rod blank can be improved. The big problem is to improve the physical properties of the connecting rod blank. The fracture limit formed by adding metal powder into the mold cavity before casting can facilitate the later expansion when the large end of the separating connecting rod is processed. The expansion effect is good and will not appear The cracking problem of the gap at the expansion fracture improves the efficiency of the expansion treatment and the qualified rate of the finished product.

Description

A kind of IC engine link rod manufacturing process
Technical field
The present invention relates to combustion engine manufacture field more particularly to a kind of IC engine link rod manufacturing process.
Background technique
Connecting rod is the main movement component of internal combustion engine, and the effect of connecting rod is that the power for bearing piston is transmitted to crankshaft, and makes to live The reciprocating motion of plug is changed into the rotary motion of crankshaft, and connecting rod is mainly by gonnecting rod body, big end and small end of connecting rod and connecting rod spiral shell The composition such as bolt (or screw), connecting rod will not only have high tension, Compressive Strength and high fatigue strength, and have enough rigidity And toughness.
The intensity that existing IC engine link rod processing technology is easy to appear the connecting rod processed is inadequate, connecting rod easy fracture, existing Some IC engine link rod processing processing is most of for integration casting, the heat treatment temperature used for different location and cooling temperature Degree is consistent, but since the intensity requirement of different parts is different, therefore what existing Machining of Connecting Rod technique produced The some positions of connecting rod can be unfavorable for the post-production of connecting rod, will increase manufacturing process difficulty.Therefore, the present invention proposes a kind of internal combustion Machine connecting rod manufacturing process, to solve shortcoming in the prior art.
Summary of the invention
In view of the above-mentioned problems, the present invention proposes that carrying out heat treatment by the connecting rod blank to casting and forming can be improved connecting rod Rigidity, intensity, plasticity and the toughness of blank can improve that connecting rod blank interior tissue is uneven, not fine and close and internal chemical simultaneously The larger problem of composition tolerances, improves the physical property of connecting rod blank.
1. a kind of IC engine link rod manufacturing process, it is characterised in that: the following steps are included:
Step 1: cast blank
It selects the metallic solution of model 40Cr steel alloy to carry out casting and forming, carries out cooling treatment, the company of being made after casting and forming Bar blank;
Step 2: heat treatment
Connecting rod blank is heated, connecting rod blank is kept the temperature after heating, then the connecting rod blank after heat preservation is heated, Heat preservation and cooling treatment, finally carry out heating of rising again for the connecting rod blank after cooling treatment, rise again and heat subsequent continuous isothermal holding, Quenched/tempered connecting rod blank is made;
Step 3: milling processing
Quenched/tempered connecting rod blank is subjected to milling processing;
Step 4: corase grinding processing
Milling treated quenched/tempered connecting rod blank is subjected to grinding machine coarse grinding treatment, obtains connecting rod;
Step 5: drilling and reaming
The microcephaly of the major part of connecting rod and connecting rod is subjected to drilling processing, obtains big end hole and small head bore, then by big end hole and microcephaly Hole carries out expanding treatment;
Step 6: processing bolt hole
Carry out bore hole in the big both sides of head drill bolt hole of connecting rod, then by bolt hole, tapping carried out to bolt after bore hole, bolt hole with The body of rod of connecting rod is parallel to each other, and two bolts hole are symmetrical on the basis of the body of rod of connecting rod;
Step 7: swollen disconnected processing
Connecting rod is put on swollen off line, swollen disconnected processing is carried out to the major part of connecting rod, separated the major part of connecting rod, become the first major part Separation unit and the second major part separation unit, then the first major part separation unit and the second major part separation unit are bolted;
Step 8: the finishing of big end hole and small head bore
Right boring processing is carried out to small head bore with boring machine tool, right boring is carried out to big end hole as positioning datum using small head bore after processing and is added Work;
Step 9: end face finishing
The end face of the body of rod of the major part of connecting rod, the microcephaly of connecting rod and connecting rod is subjected to fine grinding, allows the major part of connecting rod, connecting rod The roughness of the end face of the body of rod of microcephaly and connecting rod meets design drawing requirement.
Further improvement lies in that: casting and forming temperature is 1200 degrees Celsius in the step 1, and the casting and forming time is 1- 1.5 hours, the casting and forming error in the step 1 was less than 0.6 millimeter.
Further improvement lies in that: need before casting and forming in the step 1 in the intracavitary connecting rod cap of casting mould type and Connecting rod, which is in, is put into dusty material, and dusty material and metallic solution is made to form fracture circle after casting and forming and cooling treatment Limit.
Further improvement lies in that: cooling treatment is cooling by water in the step 1, and water cooling temperature is 15-25 degrees Celsius, Cooling time is 40-50 minutes.
Further improvement lies in that: first connecting rod blank is carried out in the step 2 to be heated to 580-620 degrees Celsius, after heating Heat preservation 1.5-2.5 hours is carried out to connecting rod blank, then the connecting rod blank after heat preservation is carried out to be heated to 950-1000 degrees Celsius, is protected It is 4-6 hours warm, connecting rod blank is cooled to 580 degrees Celsius again after heat preservation, is finally returned the connecting rod blank after cooling treatment Temperature heating, heating temperature of rising again are 180 degrees Celsius, rise again and heat subsequent continuous isothermal holding 10-13 hours, quenched/tempered connecting rod hair is made Base.
Further improvement lies in that: milling processing is at machining center milling processing or CNC milling machine milling in the step 3 One of reason, the milling processing surplus error is less than 0.15 millimeter.
Further improvement lies in that: the symmetry in the step 4 in coarse grinding treatment between quenched/tempered connecting rod blank upper and lower end face It is 0.4 millimeter for error.
Further improvement lies in that: it first drills in the microcephaly of connecting rod in the step 5, obtains small head bore, then be with small head bore Positioning datum drills in the major part of connecting rod, big end hole is obtained, then small head bore is carried out expanding treatment, finally on the basis of small head bore Expanding treatment is carried out to big end hole, coarse positioning goes out the positions and dimensions of small head bore and big end hole.
Further improvement lies in that: connecting rod is placed on swollen off line in the step 7, swollen disconnected place is carried out to the major part of connecting rod Reason, separate the major part of connecting rod, becomes the first major part separation unit and the second major part separation unit, then will even the first major part separation unit with Second major part separation unit, which is bolted, to be integrated, then using angle method to tools for bolts ' pretension.
Further improvement lies in that: right boring mismachining tolerance is less than 0.05 millimeter in the step 8, run-out error 0.03- 0.05 millimeter, the surface roughness error in the step 9 is less than 0.02 millimeter.
Of the invention is effective are as follows: carrying out heat treatment by the connecting rod blank to casting and forming can be improved connecting rod blank Rigidity, intensity, plasticity and toughness can improve that connecting rod blank interior tissue is uneven, not fine and close and internal chemical ingredient is inclined simultaneously The larger problem of difference, improves the physical property of connecting rod blank, by the way that metal powder is added in mold cavity before casting and forming The fracture boundary of formation can be convenient the later period it is swollen it is disconnected processing separation connecting rod major part when swollen disconnected effect it is good, be not in swollen fracture Gap fragmentation problem, improves the efficiency and product qualified rate of swollen disconnected processing, and spiral shell can be improved to tools for bolts ' pretension by angle method Bolt, can be with the precision of positioning datum in following process to the pretightning force of the major part of the connecting rod after separation, and the connecting rod processed is smart It spends higher, it is possible to reduce connecting rod extends the service life of connecting rod in the loss of internal combustion engine.
Detailed description of the invention
Fig. 1 is process flow chart of the invention;
Fig. 2 is schematic structural view of the invention.
Specific embodiment
In order to realize invention technological means, reach purpose and effect is easy to understand, below with reference to specific implementation Mode, the present invention is further explained.
A kind of IC engine link rod manufacturing process
Step 1: cast blank
The metallic solution of model 40Cr steel alloy is selected to be added in casting mould, in the intracavitary connecting rod cap of casting mould type and company It is put into dusty material at shaft, dusty material and metallic solution is made to form fracture circle after casting and forming and cooling by water Limit, is made connecting rod blank, and casting and forming error is less than 0.6 millimeter, and casting and forming temperature is 1200 degrees Celsius, when casting and forming Between be 1.4 hours, water cooling temperature be 20 degrees Celsius, cooling time be 50 minutes;
Step 2: heat treatment
First connecting rod is carried out to be heated to 600 degrees Celsius, heat preservation 2 hours is carried out to connecting rod blank after heating, then by the company after heat preservation Bar blank carries out being heated to 1000 degrees Celsius, keeps the temperature 5 hours, connecting rod blank is cooled to 580 degrees Celsius again after heat preservation, finally will Connecting rod blank after cooling treatment carries out heating of rising again, and heating temperature of rising again is 180 degrees Celsius, rises again and heats at subsequent continuation of insurance temperature Reason 12 hours, is made quenched/tempered connecting rod blank;
Step 3: milling processing
The end face of quenched/tempered connecting rod blank is subjected to milling processing in machining center, milling processing surplus error is less than 0.15 milli Rice;
Step 4: corase grinding processing
The end face of milling treated quenched/tempered connecting rod blank is subjected to grinding machine coarse grinding treatment, guarantees quenched/tempered connecting rod blank upper and lower side Symmetry between face is that error is 0.4 millimeter;
Step 5: drilling and reaming
It first drills in the microcephaly of connecting rod, obtains small head bore, then the major part using small head bore as positioning datum in connecting rod drills, and obtains big Head bore, then small head bore is subjected to expanding treatment, expanding treatment finally is carried out to big end hole on the basis of small head bore, coarse positioning is small out The positions and dimensions of head bore and big end hole;
Step 6: processing bolt hole
Carry out bore hole in the big both sides of head drill bolt hole of connecting rod, then by bolt hole, tapping carried out to bolt after bore hole, bolt hole with The body of rod of connecting rod is parallel to each other, and two bolts hole are symmetrical on the basis of the body of rod of connecting rod;
Step 7: swollen disconnected processing
Connecting rod is placed on swollen off line, swollen disconnected processing is carried out to the major part of connecting rod, separated the major part of connecting rod, become the first major part Separation unit and the second major part separation unit, then will even the first major part separation unit and the second major part separation unit are bolted is one Body, then using angle method to tools for bolts ' pretension;
Step 8: the finishing of big end hole and small head bore
Right boring processing is carried out to small head bore with boring machine tool, right boring is carried out to big end hole as positioning datum using small head bore after processing and is added Work, for right boring mismachining tolerance less than 0.05 millimeter, run-out error is 0.03 millimeter;
Step 9: end face finishing
The end face of the body of rod of the major part of connecting rod, the microcephaly of connecting rod and connecting rod is subjected to fine grinding, allows the major part of connecting rod, connecting rod The roughness error of the end face of the body of rod of microcephaly and connecting rod is less than 0.02 millimeter.
Rigidity, intensity, plasticity and the toughness for the IC engine link rod that manufacturing process of the embodiment of the present invention produces are good by force, simultaneously It is good that the fracture boundary of formation can be convenient later period swollen disconnected effect in swollen disconnected processing separation connecting rod cap and connecting rod shank, is not in swollen Fracture gap fragmentation problem.
Of the invention is effective are as follows: carrying out heat treatment by the connecting rod blank to casting and forming can be improved connecting rod blank Rigidity, intensity, plasticity and toughness can improve that connecting rod blank interior tissue is uneven, not fine and close and internal chemical ingredient is inclined simultaneously The larger problem of difference, improves the physical property of connecting rod blank, by the way that metal powder is added in mold cavity before casting and forming The fracture boundary of formation can be convenient the later period it is swollen it is disconnected processing separation connecting rod major part when swollen disconnected effect it is good, be not in swollen fracture Gap fragmentation problem, improves the efficiency and product qualified rate of swollen disconnected processing, and spiral shell can be improved to tools for bolts ' pretension by angle method Bolt, can be with the precision of positioning datum in following process to the pretightning force of the major part of the connecting rod after separation, and the connecting rod processed is smart It spends higher, it is possible to reduce connecting rod extends the service life of connecting rod in the loss of internal combustion engine.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe originals of the invention Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (10)

1. a kind of IC engine link rod manufacturing process, it is characterised in that: the following steps are included:
Step 1: cast blank
It selects the metallic solution of model 40Cr steel alloy to carry out casting and forming, carries out cooling treatment, the company of being made after casting and forming Bar blank;
Step 2: heat treatment
Connecting rod blank is heated, connecting rod blank is kept the temperature after heating, then the connecting rod blank after heat preservation is heated, Heat preservation and cooling treatment, finally carry out heating of rising again for the connecting rod blank after cooling treatment, rise again and heat subsequent continuous isothermal holding, Quenched/tempered connecting rod blank is made;
Step 3: milling processing
Quenched/tempered connecting rod blank is subjected to milling processing;
Step 4: corase grinding processing
Milling treated quenched/tempered connecting rod blank is subjected to grinding machine coarse grinding treatment, obtains connecting rod;
Step 5: drilling and reaming
The microcephaly of the major part of connecting rod and connecting rod is subjected to drilling processing, obtains big end hole and small head bore, then by big end hole and microcephaly Hole carries out expanding treatment;
Step 6: processing bolt hole
Carry out bore hole in the big both sides of head drill bolt hole of connecting rod, then by bolt hole, tapping carried out to bolt after bore hole, bolt hole with The body of rod of connecting rod is parallel to each other, and two bolts hole are symmetrical on the basis of the body of rod of connecting rod;
Step 7: swollen disconnected processing
Connecting rod is put on swollen off line, swollen disconnected processing is carried out to the major part of connecting rod, separated the major part of connecting rod, become the first major part Separation unit and the second major part separation unit, then the first major part separation unit and the second major part separation unit are bolted;
Step 8: the finishing of big end hole and small head bore
Right boring processing is carried out to small head bore with boring machine tool, right boring is carried out to big end hole as positioning datum using small head bore after processing and is added Work;
Step 9: end face finishing
The end face of the body of rod of the major part of connecting rod, the microcephaly of connecting rod and connecting rod is subjected to fine grinding, allows the major part of connecting rod, connecting rod The roughness of the end face of the body of rod of microcephaly and connecting rod meets design drawing requirement.
2. a kind of IC engine link rod manufacturing process according to claim 1, it is characterised in that: be cast as in the step 1 Type temperature is 1200 degrees Celsius, and the casting and forming time is 1-1.5 hour, the casting and forming error in the step 1 for less than 0.6 millimeter.
3. a kind of IC engine link rod manufacturing process according to claim 1, it is characterised in that: be cast as in the step 1 It needs to be put into dusty material at casting mould type intracavitary the first major part separation unit and the second major part separation unit before type, makes powder Powder material and metallic solution are forming fracture boundary after casting and forming and cooling treatment.
4. a kind of IC engine link rod manufacturing process according to claim 1, it is characterised in that: at cooling in the step 1 Reason is cooling by water, and water cooling temperature is 15-25 degrees Celsius, and cooling time is 40-50 minutes.
5. a kind of IC engine link rod manufacturing process according to claim 1, it is characterised in that: first will be even in the step 2 Bar blank carries out being heated to 580-620 degrees Celsius, carries out heat preservation 1.5-2.5 hours to connecting rod blank after heating, then will be after heat preservation Connecting rod blank be heated to 950-1000 degrees Celsius, keep the temperature 4-6 hours, connecting rod blank be cooled to 580 again after heat preservation and is taken the photograph Connecting rod blank after cooling treatment is finally carried out heating of rising again by family name's degree, and heating temperature of rising again is 180 degrees Celsius, heating of rising again Subsequent continuous isothermal holding 10-13 hours, quenched/tempered connecting rod blank is made.
6. a kind of IC engine link rod manufacturing process according to claim 1, it is characterised in that: in the step 3 at milling Reason is one of machining center milling processing or CNC milling machine milling processing, and the milling processing surplus error is less than 0.15 millimeter.
7. a kind of IC engine link rod manufacturing process according to claim 1, it is characterised in that: in the step 4 at corase grinding Symmetry in reason between quenched/tempered connecting rod blank upper and lower end face is that error is 0.4 millimeter.
8. a kind of IC engine link rod manufacturing process according to claim 1, it is characterised in that: first even in the step 5 The microcephaly of bar drills, and obtains small head bore, then the major part using small head bore as positioning datum in connecting rod drills, and obtains big end hole, then will Small head bore carries out expanding treatment, finally carries out expanding treatment to big end hole on the basis of small head bore, and coarse positioning goes out small head bore and big The positions and dimensions of head bore.
9. a kind of IC engine link rod manufacturing process according to claim 1, it is characterised in that: by connecting rod in the step 7 It is placed on swollen off line and swollen disconnected processing is carried out to the major part of connecting rod, separate the major part of connecting rod, become the first major part separation unit and the Two major part separation units, then even the first major part separation unit and the second major part separation unit are bolted and are integrated, then use Angle method is to tools for bolts ' pretension.
10. a kind of IC engine link rod manufacturing process according to claim 1, it is characterised in that: right boring in the step 8 Mismachining tolerance is less than 0.05 millimeter, and run-out error is 0.03-0.05 millimeters, and the surface roughness error in the step 9 is small In 0.02 millimeter.
CN201810929944.5A 2018-08-15 2018-08-15 A kind of IC engine link rod manufacturing process Pending CN109014783A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810929944.5A CN109014783A (en) 2018-08-15 2018-08-15 A kind of IC engine link rod manufacturing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810929944.5A CN109014783A (en) 2018-08-15 2018-08-15 A kind of IC engine link rod manufacturing process

Publications (1)

Publication Number Publication Date
CN109014783A true CN109014783A (en) 2018-12-18

Family

ID=64630414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810929944.5A Pending CN109014783A (en) 2018-08-15 2018-08-15 A kind of IC engine link rod manufacturing process

Country Status (1)

Country Link
CN (1) CN109014783A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113146154A (en) * 2021-04-12 2021-07-23 徐州新大隆化工泵业制造有限公司 Processing technology of connecting rod of high-pressure plunger pump
CN115519324A (en) * 2022-11-03 2022-12-27 苏州耀玮彤机械有限公司 A surface precision milling method for automotive special-shaped hardware parts

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2296752A (en) * 1995-01-09 1996-07-10 Fischer Georg Fahrzeugtech Method of manufacturing a connecting rod
CN101352795A (en) * 2007-07-27 2009-01-28 云南西仪工业股份有限公司 Expansion processing method of connecting rod for automobile engine
CN102626770A (en) * 2012-04-17 2012-08-08 江苏大学 Manufacturing method of splitting-type connecting rod

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2296752A (en) * 1995-01-09 1996-07-10 Fischer Georg Fahrzeugtech Method of manufacturing a connecting rod
CN101352795A (en) * 2007-07-27 2009-01-28 云南西仪工业股份有限公司 Expansion processing method of connecting rod for automobile engine
CN102626770A (en) * 2012-04-17 2012-08-08 江苏大学 Manufacturing method of splitting-type connecting rod

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
干勇等: "《现代连续铸钢实用手册》", 31 March 2010, 冶金工业出版社 *
日本钢铁协会编: "《炼钢与炼铁》", 30 April 1981, 上海科学技术出版社 *
范培耕: "《金属学及热处理》", 31 January 2017, 冶金工业出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113146154A (en) * 2021-04-12 2021-07-23 徐州新大隆化工泵业制造有限公司 Processing technology of connecting rod of high-pressure plunger pump
CN115519324A (en) * 2022-11-03 2022-12-27 苏州耀玮彤机械有限公司 A surface precision milling method for automotive special-shaped hardware parts

Similar Documents

Publication Publication Date Title
CN103341735B (en) Hollow shaft and manufacturing method thereof
Gronostajski et al. The main aspects of precision forging
CN102218647B (en) Texturing and self-lubricating treatment method for metal plastic forming die
EP2763804B1 (en) A process for making forged and machined components
CN110193580A (en) A kind of H13 material forging mold technique
CN104550838B (en) The technique that a kind of radial forging strain-induced method prepares semisolid iron and steel camshaft
CN103962802A (en) Warm extrusion forming process of internal thread joint of petroleum drill rod
CN109014783A (en) A kind of IC engine link rod manufacturing process
CN105132637A (en) Two-liquid quenching tempering local strengthening heat treatment technology for oil press 5CrMnMo upper die
CN105525230A (en) Method for manufacturing cutting tools from high-speed W18Cr4Nb material
CN103639648A (en) Machining process for internal combustion engine expansion breaking connecting rod
CN101526044A (en) Dual-alloy compound cylinder body and manufacture method thereof
CN110857458A (en) Aluminum alloy cold forging treatment process
CN108690925A (en) A kind of aluminium silicon titanium alloy cylinder jacket and its processing technology
CN105195673B (en) A method of investment casting of bimetal composite cracking connecting rod
JP5249832B2 (en) Crankshaft and manufacturing method thereof
CN102380920A (en) Air valve forming die and machining method thereof
CN105522158A (en) Method of molding and manufacturing cam by using Se-Sb-Zn-Mn series aluminum alloy as material through powder metallurgy
CN104175081A (en) Method for machining female mold for countersunk head angle rivet
CN105479124A (en) Processing method for aluminum die for rotor die casting
JPH0566338B2 (en)
CN107030453A (en) The cold-forging technique of clutch sleeve
JP2869440B2 (en) Method for manufacturing camshaft coarse material
AU2018277621B2 (en) A process of manufacturing of segments for carbon thrust bearing
CN105274299A (en) Process for producing a component made of heat-treated cast iron

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218

RJ01 Rejection of invention patent application after publication