CN109005070A - A kind of hot standby equipment of dual-computer redundancy based on shared drive - Google Patents

A kind of hot standby equipment of dual-computer redundancy based on shared drive Download PDF

Info

Publication number
CN109005070A
CN109005070A CN201811007393.3A CN201811007393A CN109005070A CN 109005070 A CN109005070 A CN 109005070A CN 201811007393 A CN201811007393 A CN 201811007393A CN 109005070 A CN109005070 A CN 109005070A
Authority
CN
China
Prior art keywords
main processor
processor board
machine
working
backup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811007393.3A
Other languages
Chinese (zh)
Other versions
CN109005070B (en
Inventor
卢秋实
王啸林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Institute of Computer Technology and Applications
Original Assignee
Beijing Institute of Computer Technology and Applications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Institute of Computer Technology and Applications filed Critical Beijing Institute of Computer Technology and Applications
Priority to CN201811007393.3A priority Critical patent/CN109005070B/en
Publication of CN109005070A publication Critical patent/CN109005070A/en
Application granted granted Critical
Publication of CN109005070B publication Critical patent/CN109005070B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0654Management of faults, events, alarms or notifications using network fault recovery
    • H04L41/0663Performing the actions predefined by failover planning, e.g. switching to standby network elements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/40Bus networks
    • H04L12/40169Flexible bus arrangements
    • H04L12/40176Flexible bus arrangements involving redundancy
    • H04L12/40195Flexible bus arrangements involving redundancy by using a plurality of nodes
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/40Bus networks
    • H04L2012/40208Bus networks characterized by the use of a particular bus standard
    • H04L2012/40241Flexray

Abstract

The invention discloses a kind of hot standby equipment of the dual-computer redundancy based on shared drive, wherein include: first the second main processor board of main processor board after the power-up, determining one through consultation be working host one is backup host;The FLEXRAY bus of working host sends activation, and the operation result that backup machine generates is not enabled to be sent;The data of backup machine monitoring work host, which export, to be simultaneously compared with the operation result of backup machine, and is recorded working machine and sent progress, when backup machine is upgraded to working machine, is sent from comparing difference;Backup host is according to heartbeat signal and heartbeat message monitoring Host Status, and when reaching switching condition, backup machine can upgrade to working host while reset working host, and the business of adapter tube working machine, backs up and be switched to working machine.The hot standby equipment of dual-computer redundancy based on shared drive of the invention, guarantees that normal workflow can be completed in the case where any one board faults in host, improves system reliability.

Description

A kind of hot standby equipment of dual-computer redundancy based on shared drive
Technical field
The present invention relates to a kind of dual-machine redundancy backup host framework, especially a kind of dual-computer redundancy based on shared drive is standby Part host framework.
Background technique
In the higher field of the reliability requirements such as aerospace, it is real that each equipment production firm takes various methods The redundancy of existing computer system, to improve the reliability of host.Traditional dual-computer redundancy host includes that arbitration board is realized more To the status monitoring and function switch of two-shipper.Therefore arbitration plate becomes the weak link of dual systems, once arbitrate board Damage dual systems can not work normally.
Summary of the invention
It is above-mentioned existing for solving the purpose of the present invention is to provide a kind of hot standby equipment of the dual-computer redundancy based on shared drive There is the problem of technology.
The hot standby equipment of a kind of dual-computer redundancy based on shared drive of the invention, wherein include: the first main processor board second Main processor board;First the second main processor board of main processor board obtains identical data by network interface and inputs;First main process task After the power-up, it is backup host that determining one is working host one through consultation to the second main processor board of device plate;Working host FLEXRAY bus send activation, operation result can be sent to external equipment by FLEXRAY bus, backup machine generates Operation result not enabled send;The data of backup machine monitoring work host export and are compared with the operation result of backup machine Compared with, and record working machine and send progress, when backup machine is upgraded to working machine, sent from comparing difference;Backup master Machine is according to heartbeat signal and heartbeat message monitoring Host Status, and when reaching switching condition, backup machine can upgrade to work Host resets working host, and the business of adapter tube working machine simultaneously, backs up and be switched to working machine.
One embodiment of the hot standby equipment of the dual-computer redundancy according to the present invention based on shared drive, wherein the first main process task After the second main processor board of device plate carries out slot position detection after powering on, confirmation work registration, both sides' job class is all original state 0x00, healthy score it is big upgrade to working machine, it is working machine, Ling Yizhu that any main processor board, which is arranged, when the same in healthy score Processor plate is backup machine;Backup machine can not receive working machine heartbeat signal in a ms, and healthy score is greater than threshold value, then rises Grade backs up and is working machine.
One embodiment of the hot standby equipment of the dual-computer redundancy according to the present invention based on shared drive, wherein when backup and inspection When measuring working machine parameter and changing, first the second main processor board of main processor board passes through Ethernet or the second primary processor The shared RAM of plate realizes data exchange and parameter synchronization.
One embodiment of the hot standby equipment of the dual-computer redundancy according to the present invention based on shared drive, wherein the first main process task It is linked between the second main processor board of device plate by the data link of shared data, the first main processor board is passed by data link The FPGA of defeated data to be shared to the second main processor board passes through PCIe after the FPGA of the second main processor board receives data DMA transfer is initiated, data are sent to the buffer area opened up into the second primary processor board memory.
One embodiment of the hot standby equipment of the dual-computer redundancy according to the present invention based on shared drive, wherein the first main process task Device plate and the second main processor board open up transmission caching in memory and receive caching;First main processor board and the second main process task Buffer area information is notified the first main place by the access space PCIeBAR by the processor module of device plate in a manner of writing register Manage the FPGA of device plate and the second main processor board;When first main processor board is needed to the second main processor board shared data, The processor module of one main processor board writes data to transmission caching, and the FPGA of the first main processor board is notified to share to the second master Processor plate;The FPGA of first main processor board initiates PCIe DMA transfer, takes out the first main processor board one by one and sends caching In data, the FPGA of the first main processor board is sent to by memory sharing data link;Second main processor board FPGA is received To after data, PCIE DMA transfer is initiated, writes data into the reception caching of the second main processor board, is led in the form of interrupting Know that the second main processor board receives shared data;After second main processor board has handled interruption, the FPGA of the second main processor board A confirmation message is sent to the FPGA of the first main processor board, after the FPGA of the first main processor board receives confirmation message, in It is open close to know the success of this shared data transmission of processor module, and start next packet shared data transmission as needed.
One embodiment of the hot standby equipment of the dual-computer redundancy according to the present invention based on shared drive, wherein the first main process task Data link between device plate and the second main processor board is LVDS bus.
One embodiment of the hot standby equipment of the dual-computer redundancy according to the present invention based on shared drive, wherein backup machine can not Working machine heartbeat signal is received, executes handover operation at once;Backup machine can receive working machine heartbeat signal, according to reception To heartbeat message calculate the healthy score of working host and proceed as follows: backup machine health score >=2, working machine health Score < 2 executes handover operation;Backup machine health score >=2, working machine health score >=2, backup machine is to the defeated of working machine Enter, output information carry out complete monitoring, and according to system input, output information agreement, when its working condition of ordered pair carry out in real time Interpretation, when discovery working machine cannot carry out normal control instruction interaction according to system input, output information agreement, timing agreement When, execute handover operation;Backup machine health score >=2 do not receive heartbeat message more than 50ms, execute handover operation;Backup machine Healthy score < 2, does not execute handover operation.
One embodiment of the hot standby equipment of the dual-computer redundancy according to the present invention based on shared drive, wherein when backup machine is wanted Following handover operation is carried out when upgrading to working machine: being resetted working machine by the FPGA of backup machine, enables backup machine work letter Number for height, can be detected when being again introduced into program self-test after the working machine reset working signal be it is high after enter standby mode;Make Energy backup machine FLEXRAY interface enters normal transmission mode, and upgrading backup machine working condition is working machine.
One embodiment of the hot standby equipment of the dual-computer redundancy according to the present invention based on shared drive, wherein main processor board It is upper to be loaded with Godson 3A2000 processor module respectively.
One embodiment of the hot standby equipment of the dual-computer redundancy according to the present invention based on shared drive, wherein host supplying power is adopted With the first power panel and second source plate dual power supply redundancy, the first main processor board and second are supplied electricity to simultaneously by two pieces of power panels Main processor board.
The hot standby equipment of dual-computer redundancy based on shared drive of the invention, does not depend on arbitration system, by the first primary processor Plate and the second main processor board are voluntarily negotiated to determine the functions such as working host, working condition, mian engine changeover, guarantee to appoint in host Normal workflow can be completed in the case where a board faults by anticipating, and improve system reliability.
Detailed description of the invention
Fig. 1 show that the present invention is based on the module maps of the hot standby equipment of the dual-computer redundancy of shared drive;
Specific embodiment
To keep the purpose of the present invention, content and advantage clearer, with reference to the accompanying drawings and examples, to of the invention Specific embodiment is described in further detail.
Fig. 1 is shown the present invention is based on the module map of the hot standby equipment of the dual-computer redundancy of shared drive, as shown in Figure 1, host Take two-node cluster hot backup redundancy, main processor board A machine and main processor board B equipment for identical hardware configuration, main processor board A1 With B2 through consultation determine one be working host, one be backup host.Two main processor boards A1 and B2 pass through combination pair The gigabit networking interface of external tapping obtains identical data input from combination external interface 1, and is generated respectively respectively according to input Operation result, but the FLEXRAY bus transmission of only working host is activated, can be by FLEXRAY bus by operation knot Fruit is sent to external equipment.The operation result that backup machine generates is not enabled to be sent.But the data of backup machine meeting monitoring work host It exports and is compared with the operation result of backup machine, and record working machine and send progress, when backup machine is upgraded to working machine, It is sent from comparing difference.
As shown in Figure 1, host supplying power is designed using power panel A3 and power panel B4 dual power supply redundancy, it is same by two pieces of power panels When power, use seamless power switching, in the case where any one piece of power panel works normally, host supplying power all can be normal.
As shown in Figure 1, Godson 3A2000 processor module 12 and 22 is loaded on main processor board A1 and B2 respectively as core Heart processing module, two Godson 3A2000 processor modules 12 and 22 have 1 road gigabit Ethernet for sending heartbeat message;Main process task Fpga chip 11 and 21 is loaded on device plate A1 and B2 respectively for generating heartbeat signal and monitoring other side's Main Processing Unit heartbeat letter Number, while thering is one section of memory block to can be used for storing the shared system parameter of two-shipper in fpga chip 11 and 21.
As shown in Figure 1, host can first determine working host and backup host after powering on, it is assumed that main processor board A1 is work Host, main processor board B2 are backup host, and backup host B2 can be according to heartbeat signal and heartbeat message monitoring host A 1 State, when reaching switching condition, backup machine can upgrade to working host while reset working host, the phase of rapid adapter tube A machine Pass business.
As shown in Figure 1, the workflow of the hot standby equipment of dual-computer redundancy based on shared drive includes:
Working machine confirms
Main processor board A1 and B2 carry out slot position detection after powering on, it is primary processor that board address (GA0-GA4), which is 11110, Plate A1,11101 be main processor board B2, and main processor board A1 and B2 self-test starts to be sent out heartbeat signal and heartbeat after passing through Message, message period 20ms can determine the healthy score of main processor board A1 and B2 according to message content.
Confirm that job class includes:
Both sides' job class is all original state 0x00, healthy score it is big upgrade to working machine, when healthy score is the same Setting main processor board A1 is working machine, and main processor board B2 is backup machine.Main processor board B2 determines main processor board A1 work When to make grade not be 0x00, setting job class is main processor board A1 grade+1.
Main processor board A1 heartbeat signal can not be received in main processor board B2200ms, and healthy score is greater than 2, upgrading Main processor board B2 is working machine.
Tasks synchronization includes:
When working machine parameter changes, main processor board A1 and B2 can pass through Ethernet or main processor board B2 RAM is shared in FPGA21 realizes data exchange and parameter synchronization;
By the data link link dedicated for shared data between main processor board A1 and B2, main processor board A1 is logical The FPGA21 of data link transmission data to be shared to main processor board B2 is crossed, the FPGA21 of main processor board B2 receives number According to rear, DMA transfer is initiated by PCIe, data are sent to the buffer area opened up into main processor board B2 memory, primary processor When plate B2 is to main processor board A1 shared data, process is identical, and detailed step is as follows:
Main processor board A1 and main processor board B2 opens up transmission caching in memory in advance and receives caching (such as without special It is required that a relatively simple agreement best arrange in advance between FPGA, if buffer area number has a upper limit, size is fixed And meet address alignment requirements);
The processor module of main processor board A1 and main processor board B2 is believed buffer area by the access space PCIeBAR Breath notifies respective FPGA11 and 21 in a manner of writing register;
When main processor board A1 is needed to main processor board B2 shared data, the processor module 12 of main processor board A1 is write Data are needed to caching, notice FPGA11 is sent by the data sharing of which transmission caching to main processor board B2;
FPGA11 initiates PCIe DMA transfer, takes out main processor board A1 one by one and sends the data in caching, passes through memory Shared data link is sent to the FPGA22 of main processor board B2;
After the FPGA22 of main processor board B2 receives data, PCIE DMA transfer is initiated, primary processor is write data into In the reception caching of plate B2, notifier processes device module 22 receives shared data in the form of interrupting;
After processor module 22 has handled interruption, the FPGA of main processor board B2 is sent to the FPGA11 of main processor board A1 One confirmation message, after the FPGA11 of main processor board A1 receives confirmation message, this is shared for interrupt notification processor module 12 Data transmission success, and start next packet shared data transmission as needed;
Data link between main processor board A1 and main processor board B2 is LVDS bus.
3, working host, which switches, includes:
After confirming that main processor board A1 and main processor board B2 is working machine A1 and backup machine B2, backup machine B2 can pass through prison The heartbeat signal and heartbeat message for listening working machine are made whether to carry out the judgement of mian engine changeover.
Backup machine B2 can not receive working machine A1 heartbeat signal, execute handover operation at once;
Backup machine B2 can receive working machine A1 heartbeat signal, calculate working host according to the heartbeat message received Healthy score proceed as follows:
Backup machine health score >=2, working machine health score < 2 execute handover operation;
Backup machine health score >=2, working machine health score >=2, backup machine B2 to the input of working machine, output information into Row complete monitoring, and according to system input, output information agreement, when its working condition of ordered pair carry out real-time interpretation, when discovery work When normal control instruction interaction cannot be carried out according to system input, output information agreement, timing agreement by making machine, switching behaviour is executed Make;
Backup machine B2 health score >=2 do not receive heartbeat message more than 50ms, execute handover operation;
Backup machine B2 health score < 2, does not execute handover operation.
Following handover operation is carried out when backup machine B2 will upgrade to working machine A1:
Working machine A1 is resetted by the FPGA22 of backup machine B2, enabling backup machine B2 working signal is height, works as working machine A1 can detect B2 working signal to enter standby mode after height when being again introduced into program self-test after resetting.
Enabled backup machine flexray interface enters normal transmission mode, and upgrading backup machine B2 working condition is working machine.
The hot standby equipment of dual-computer redundancy based on shared drive of the invention, does not depend on arbitration system, by the first primary processor Plate and the second main processor board are voluntarily negotiated to determine the functions such as working host, working condition, mian engine changeover, guarantee to appoint in host Normal workflow can be completed in the case where a board faults by anticipating, and improve system reliability.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and deformations can also be made, these improvement and deformations Also it should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of hot standby equipment of dual-computer redundancy based on shared drive characterized by comprising the first main processor board second is main Processor plate;First the second main processor board of main processor board obtains identical data by network interface and inputs;
After the power-up, it is backup that determining one is working host one through consultation to first the second main processor board of main processor board Host;
The FLEXRAY bus of working host sends activation, operation result can be sent to outside by FLEXRAY bus and set Standby, the operation result that backup machine generates is not enabled to be sent;The data of backup machine monitoring work host export and the fortune with backup machine It calculates result to be compared, and records working machine and send progress, it, can be since at comparing difference when backup machine is upgraded to working machine It sends;Backup host is according to heartbeat signal and heartbeat message monitoring Host Status, when reaching switching condition, backup machine meeting Upgrade to working host while resetting working host, and the business of adapter tube working machine, backs up and be switched to working machine.
2. the hot standby equipment of dual-computer redundancy as described in claim 1 based on shared drive, which is characterized in that the first primary processor After the second main processor board of plate carries out slot position detection after powering on, confirmation work registration, both sides' job class is all original state 0x00, healthy score it is big upgrade to working machine, it is working machine, Ling Yizhu that any main processor board, which is arranged, when the same in healthy score Processor plate is backup machine;Backup machine can not receive working machine heartbeat signal in a ms, and healthy score is greater than threshold value, then rises Grade backs up and is working machine.
3. the hot standby equipment of dual-computer redundancy as described in claim 1 based on shared drive, which is characterized in that when backup and detection When changing to working machine parameter, first the second main processor board of main processor board passes through Ethernet or the second main processor board Shared RAM realize data exchange and parameter synchronization.
4. the hot standby equipment of dual-computer redundancy as described in claim 1 based on shared drive, which is characterized in that the first primary processor It is linked between the second main processor board of plate by the data link of shared data, the first main processor board passes through data link transmission The FPGA of data to be shared to the second main processor board is sent out after the FPGA of the second main processor board receives data by PCIe DMA transfer is played, data are sent to the buffer area opened up into the second primary processor board memory.
5. the hot standby equipment of dual-computer redundancy as described in claim 1 based on shared drive, which is characterized in that
First main processor board and the second main processor board open up transmission caching in memory and receive caching;
The processor module of first main processor board and the second main processor board is believed buffer area by the access space PCIeBAR Breath notifies the FPGA of the first main processor board and the second main processor board in a manner of writing register;
When first main processor board is needed to the second main processor board shared data, the processor module of the first main processor board is write Data notify the FPGA of the first main processor board to share to the second main processor board to caching is sent;
The FPGA of first main processor board initiates PCIe DMA transfer, takes out the first main processor board one by one and sends the number in caching According to being sent to the FPGA of the first main processor board by memory sharing data link;
After second main processor board FPGA receives data, PCIE DMA transfer is initiated, the second main processor board is write data into Reception caching in, notify the second main processor board to receive shared data in the form of interruption;
After second main processor board has handled interruption, the FPGA of the second main processor board is sent to the FPGA of the first main processor board One confirmation message, after the FPGA of the first main processor board receives confirmation message, this shared number of interrupt notification processor module According to transmission success, and start next packet shared data transmission as needed.
6. the hot standby equipment of dual-computer redundancy as described in claim 1 based on shared drive, which is characterized in that the first primary processor Data link between plate and the second main processor board is LVDS bus.
7. the hot standby equipment of dual-computer redundancy as described in claim 1 based on shared drive, which is characterized in that backup machine can not connect Working machine heartbeat signal is received, executes handover operation at once;Backup machine can receive working machine heartbeat signal, according to receiving Heartbeat message calculate the healthy score of working host and proceed as follows: backup machine health score >=2, working machine health point Number < 2, executes handover operation;Backup machine health score >=2, working machine health score >=2, backup machine to the input of working machine, Output information carries out complete monitoring, and according to system input, output information agreement, when ordered pair its working condition sentenced in real time It reads, when finding that working machine cannot carry out normal control instruction interaction according to system input, output information agreement, timing agreement, Execute handover operation;Backup machine health score >=2 do not receive heartbeat message more than 50ms, execute handover operation;Backup machine health Score < 2, does not execute handover operation.
8. the hot standby equipment of dual-computer redundancy as described in claim 1 based on shared drive, which is characterized in that when backup machine will rise Grade carries out following handover operation when being working machine:
Working machine is resetted by the FPGA of backup machine, enable backup machine working signal be height, when working machine reset after again into Working signal can be detected when entering program self-test to enter standby mode after height;Enabled backup machine FLEXRAY interface enters normal Sending mode, upgrading backup machine working condition are working machine.
9. the hot standby equipment of dual-computer redundancy as described in claim 1 based on shared drive, which is characterized in that on main processor board It is loaded with Godson 3A2000 processor module respectively.
10. the hot standby equipment of dual-computer redundancy as described in claim 1 based on shared drive, which is characterized in that host supplying power is adopted With the first power panel and second source plate dual power supply redundancy, the first main processor board and second are supplied electricity to simultaneously by two pieces of power panels Main processor board.
CN201811007393.3A 2018-08-31 2018-08-31 Dual-computer redundant hot standby equipment based on shared memory Active CN109005070B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811007393.3A CN109005070B (en) 2018-08-31 2018-08-31 Dual-computer redundant hot standby equipment based on shared memory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811007393.3A CN109005070B (en) 2018-08-31 2018-08-31 Dual-computer redundant hot standby equipment based on shared memory

Publications (2)

Publication Number Publication Date
CN109005070A true CN109005070A (en) 2018-12-14
CN109005070B CN109005070B (en) 2021-09-10

Family

ID=64590562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811007393.3A Active CN109005070B (en) 2018-08-31 2018-08-31 Dual-computer redundant hot standby equipment based on shared memory

Country Status (1)

Country Link
CN (1) CN109005070B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109823375A (en) * 2019-01-07 2019-05-31 北京全路通信信号研究设计院集团有限公司 A kind of applied to the double of automatic train operation system is hot standby switch method and system
CN110096473A (en) * 2019-04-16 2019-08-06 苏州浪潮智能科技有限公司 A kind of framework of the edge calculations server applied to Unmanned Systems
CN111400214A (en) * 2020-02-27 2020-07-10 深圳震有科技股份有限公司 Method for realizing dual-core shared network port, intelligent terminal and storage medium
CN111478947A (en) * 2020-03-20 2020-07-31 珠海高凌信息科技股份有限公司 Real-time synchronization method and system for main control board and standby control board
CN111885431A (en) * 2020-08-03 2020-11-03 北京环境特性研究所 Communication control method and device
CN113420038A (en) * 2021-08-23 2021-09-21 浙江中控技术股份有限公司 Redundant data transmission method and device for industrial control system
CN114157528A (en) * 2021-11-28 2022-03-08 浙江中控技术股份有限公司 Redundant communication method, system, electronic device, and storage medium
CN114237990A (en) * 2021-11-18 2022-03-25 通号万全信号设备有限公司 FPGA chip-based two-multiplication redundancy switching method and device
CN115408239A (en) * 2022-09-09 2022-11-29 中国兵器装备集团自动化研究所有限公司 Redundancy system based on bus arbitration
CN116545845A (en) * 2023-07-04 2023-08-04 四川万流数据服务有限责任公司 Redundant backup device, system and method for production server

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101997727A (en) * 2010-12-16 2011-03-30 广州智光电气股份有限公司 Device for seamless switching of host and standby of communication management machine and method thereof
CN103532753A (en) * 2013-10-11 2014-01-22 中国电子科技集团公司第二十八研究所 Double-computer hot standby method based on memory page replacement synchronization
CN104199353A (en) * 2014-08-22 2014-12-10 山东超越数控电子有限公司 Cold backup and hot backup combined double-host command and control system
CN107203484A (en) * 2017-06-27 2017-09-26 北京计算机技术及应用研究所 A kind of PCIe based on FPGA and SRIO bus bridge systems
CN108462529A (en) * 2018-04-27 2018-08-28 上海欣诺通信技术股份有限公司 Active and standby board switching method, optical transport network device and storage medium

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101997727A (en) * 2010-12-16 2011-03-30 广州智光电气股份有限公司 Device for seamless switching of host and standby of communication management machine and method thereof
CN103532753A (en) * 2013-10-11 2014-01-22 中国电子科技集团公司第二十八研究所 Double-computer hot standby method based on memory page replacement synchronization
CN104199353A (en) * 2014-08-22 2014-12-10 山东超越数控电子有限公司 Cold backup and hot backup combined double-host command and control system
CN107203484A (en) * 2017-06-27 2017-09-26 北京计算机技术及应用研究所 A kind of PCIe based on FPGA and SRIO bus bridge systems
CN108462529A (en) * 2018-04-27 2018-08-28 上海欣诺通信技术股份有限公司 Active and standby board switching method, optical transport network device and storage medium

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109823375A (en) * 2019-01-07 2019-05-31 北京全路通信信号研究设计院集团有限公司 A kind of applied to the double of automatic train operation system is hot standby switch method and system
CN110096473A (en) * 2019-04-16 2019-08-06 苏州浪潮智能科技有限公司 A kind of framework of the edge calculations server applied to Unmanned Systems
CN111400214A (en) * 2020-02-27 2020-07-10 深圳震有科技股份有限公司 Method for realizing dual-core shared network port, intelligent terminal and storage medium
CN111400214B (en) * 2020-02-27 2021-06-18 深圳震有科技股份有限公司 Method for realizing dual-core shared network port, intelligent terminal and storage medium
CN111478947B (en) * 2020-03-20 2023-02-17 珠海高凌信息科技股份有限公司 Method and system for real-time synchronization of main control board and standby control board
CN111478947A (en) * 2020-03-20 2020-07-31 珠海高凌信息科技股份有限公司 Real-time synchronization method and system for main control board and standby control board
CN111885431A (en) * 2020-08-03 2020-11-03 北京环境特性研究所 Communication control method and device
CN113420038A (en) * 2021-08-23 2021-09-21 浙江中控技术股份有限公司 Redundant data transmission method and device for industrial control system
CN114237990A (en) * 2021-11-18 2022-03-25 通号万全信号设备有限公司 FPGA chip-based two-multiplication redundancy switching method and device
CN114237990B (en) * 2021-11-18 2024-04-26 通号万全信号设备有限公司 Method and device for switching square redundancy based on FPGA chip
CN114157528A (en) * 2021-11-28 2022-03-08 浙江中控技术股份有限公司 Redundant communication method, system, electronic device, and storage medium
CN115408239A (en) * 2022-09-09 2022-11-29 中国兵器装备集团自动化研究所有限公司 Redundancy system based on bus arbitration
CN116545845A (en) * 2023-07-04 2023-08-04 四川万流数据服务有限责任公司 Redundant backup device, system and method for production server
CN116545845B (en) * 2023-07-04 2023-09-08 四川万流数据服务有限责任公司 Redundant backup device, system and method for production server

Also Published As

Publication number Publication date
CN109005070B (en) 2021-09-10

Similar Documents

Publication Publication Date Title
CN109005070A (en) A kind of hot standby equipment of dual-computer redundancy based on shared drive
CN105974879B (en) Redundant control device, system and control method in digital I&amp;C system
JP4107083B2 (en) High-availability disk controller, its failure handling method, and high-availability disk subsystem
CN104111881B (en) A kind of arbitration device for dual-computer redundancy Hot Spare computing machine
CN203786723U (en) Dual redundant system based on X86 PC/104 embedded CPU modules
CN201909961U (en) Redundancy control system
EP2163994A1 (en) SAS paired substractive routing
CN104570721B (en) Redundant manipulator master slave mode determines method
JPH01154240A (en) Double-rail processor with error check function added to single-rail interface
EP2163996A1 (en) Method for providing path failover for multiple SAS expanders operating as a single SAS expander
JPH01154241A (en) Synchronized double computer system
EP2163997A1 (en) Specifying lanes for SAS wide port connections
JP2007323648A (en) Device and method for operating usb interface equipment
WO2020143243A1 (en) Dual-system hot backup switching method and system applied to automatic running system of train
US9081910B2 (en) Methods and structure for fast context switching among a plurality of expanders in a serial attached SCSI domain
US20190012245A1 (en) Failover Method, Apparatus and System
JPH0934809A (en) Highly reliable computer system
CN102664755A (en) Control channel fault determining method and device
CN112596371A (en) Control card switching method and device, electronic equipment and storage medium
CN111858187A (en) Electronic equipment and service switching method and device
CN115408240A (en) Redundant system active/standby method, device, equipment and storage medium
CN104182307A (en) Serial port redundancy switching method on basis of independent redundancy server
JP6030998B2 (en) Information processing system
CN107885621B (en) Hot standby computer based on Feiteng platform
JP2000148664A (en) Device and method for controlling extension of pci function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant