CN108999422A - A kind of method that bearing wall opens up door-window opening - Google Patents

A kind of method that bearing wall opens up door-window opening Download PDF

Info

Publication number
CN108999422A
CN108999422A CN201810926161.1A CN201810926161A CN108999422A CN 108999422 A CN108999422 A CN 108999422A CN 201810926161 A CN201810926161 A CN 201810926161A CN 108999422 A CN108999422 A CN 108999422A
Authority
CN
China
Prior art keywords
beam aperture
door
window opening
crosses
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810926161.1A
Other languages
Chinese (zh)
Inventor
刘甫山
叶良锐
叶莉婷
邬敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lujiang Rong Rui Construction Engineering Co Ltd
Original Assignee
Lujiang Rong Rui Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lujiang Rong Rui Construction Engineering Co Ltd filed Critical Lujiang Rong Rui Construction Engineering Co Ltd
Priority to CN201810926161.1A priority Critical patent/CN108999422A/en
Publication of CN108999422A publication Critical patent/CN108999422A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0244Increasing or restoring the load-bearing capacity of building construction elements of beams at places of holes, e.g. drilled in them
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging

Abstract

The invention discloses a kind of methods that bearing wall opens up door-window opening, comprising the following steps: 1) in the contour line of metope pop-up door-window opening, first is opened up at the top of contour line and crosses beam aperture, first, which crosses the interior installation of beam aperture, cooperates I-steel with it;2) it is crossed above beam aperture both ends first and opens up second respectively and cross beam aperture, the port position that beam aperture is crossed with first in the second middle position for crossing beam aperture be in same vertical position, and second crosses to install in beam aperture and cooperate I-steel with it;3) Concrete Filled is carried out to the I-steel in first excessively beam aperture and the second mistake beam aperture;4) door-window opening is opened up according to contour line.The present invention new second is arranged again crosses beam aperture by crossing above beam aperture two-port first, crosses in beam aperture and is respectively mounted I-steel, total and disperse the first bearing load for crossing beam aperture, whole load-carrying ability is improved, so that wall longer life expectancy, security performance are higher;Meanwhile common lintel is substituted by I-steel, installation is simpler, and performance is more preferably.

Description

A kind of method that bearing wall opens up door-window opening
Technical field
The present invention relates to technical field of building construction, method that specifically a kind of bearing wall opens up door-window opening.
Background technique
Load bearing wall, which refers to, supports the wall of upper floor weight, and whole building structure can be destroyed by destroying, load bearing wall be by Scientific algorithm, if punching finishing on load bearing wall, it just will affect the stability of ground.But in civil engineering construction, transformation In the process, we, which are frequently encountered, has to the problem of bearing wall opens up door-window opening, considers from technical standpoint merely, only To carry out subsequent reinforcement work, so that it may open up door-window opening in bearing wall.
Existing technical solution is to be installed by opening up beam aperture on the wall at the top of door-window opening crossing in beam aperture Beam, to be supported to the wall above door-window opening, such form of construction work makes the load of lintel larger, it may occur that The case where fracture, influences the safety and service life of building.
Summary of the invention
The purpose of the present invention is to provide a kind of methods that bearing wall opens up door-window opening, to solve above-mentioned background technique The problem of middle proposition.
To achieve the above object, the invention provides the following technical scheme:
A kind of method that bearing wall opens up door-window opening, comprising the following steps:
1) in the contour line of metope pop-up door-window opening, first is opened up at the top of contour line and crosses beam aperture, first crosses beam aperture both ends point Not Chao Guo door-window opening contour line 20-50cm, first, which crosses in beam aperture installation, cooperates I-steel with it;
2) first cross beam aperture both ends above 10-20cm place open up respectively second cross beam aperture, second cross beam aperture middle position and First port position for crossing beam aperture is in same vertical position, and second crosses the long 40-60cm of beam aperture, and second crosses the interior installation of beam aperture and its Cooperate I-steel;
3) Concrete Filled is carried out to the I-steel in first excessively beam aperture and the second mistake beam aperture;
4) after concrete is dry, door-window opening is opened up according to contour line;
5) it plasters to metope, maintenance 3-5 days after the completion of plastering;
6) wall is painted.
As a further solution of the present invention: first by I-steel and wall when step 3) is to I-steel progress Concrete Filled Gap between body is filled up, then is carried out integral-filled.
As the present invention further scheme: first in step 1) cross beam aperture, second in step 2 cross beam aperture and Door-window opening in step 4) is opened up by cutting machine.
As further scheme of the invention: being segmented progress when step 4) opens up door-window opening from lower to upper.
As further scheme of the invention: step 5) needs to be irrigated wall brick with water before plastering to metope.
Application of the above-mentioned method for opening up door-window opening in building field.
Compared with prior art, the beneficial effects of the present invention are:
The present invention crosses beam aperture by the way that new second is arranged again above first excessively beam aperture two-port, crosses in beam aperture and is respectively mounted I-shaped Steel, total and dispersion first cross the bearing load of beam aperture, whole load-carrying ability are improved, so that wall longer life expectancy, security performance It is higher;Meanwhile common lintel is substituted by I-steel, installation is simpler, and performance is more preferably.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described, Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all Belong to the scope of protection of the invention.
Embodiment 1
A kind of method that bearing wall opens up door-window opening, which comprises the following steps:
1) in the contour line of metope pop-up door-window opening, first is opened up at the top of contour line and crosses beam aperture, first crosses beam aperture both ends point Not Chao Guo door-window opening contour line 20cm, first, which crosses in beam aperture installation, cooperates I-steel with it;
2) first cross beam aperture both ends above 10cm place open up respectively second cross beam aperture, second mistake beam aperture middle position and first The port position for crossing beam aperture is in same vertical position, and second crosses the long 40cm of beam aperture, and second, which crosses the interior installation of beam aperture, cooperates work with it Word steel;
3) Concrete Filled is carried out to the I-steel in first excessively beam aperture and the second mistake beam aperture;
4) after concrete is dry, door-window opening is opened up according to contour line;
5) it plasters to metope, maintenance 3 days after the completion of plastering;
6) wall is painted.
Wherein, the gap between I-steel and wall is filled up first when step 3) carries out Concrete Filled to I-steel, then It carries out integral-filled.
Wherein, the door-window opening that the first mistake beam aperture in step 1), second in step 2 cross in beam aperture and step 4) is equal It is opened up by cutting machine.
Wherein, progress is segmented when step 4) opens up door-window opening from lower to upper.
Wherein, it needs to be irrigated wall brick with water before step 5) plasters to metope.
Embodiment 2
A kind of method that bearing wall opens up door-window opening, which comprises the following steps:
1) in the contour line of metope pop-up door-window opening, first is opened up at the top of contour line and crosses beam aperture, first crosses beam aperture both ends point Not Chao Guo door-window opening contour line 30cm, first, which crosses in beam aperture installation, cooperates I-steel with it;
2) first cross beam aperture both ends above 12cm place open up respectively second cross beam aperture, second mistake beam aperture middle position and first The port position for crossing beam aperture is in same vertical position, and second crosses the long 45cm of beam aperture, and second, which crosses the interior installation of beam aperture, cooperates work with it Word steel;
3) Concrete Filled is carried out to the I-steel in first excessively beam aperture and the second mistake beam aperture;
4) after concrete is dry, door-window opening is opened up according to contour line;
5) it plasters to metope, maintenance 4 days after the completion of plastering;
6) wall is painted.
Wherein, the gap between I-steel and wall is filled up first when step 3) carries out Concrete Filled to I-steel, then It carries out integral-filled.
Wherein, the door-window opening that the first mistake beam aperture in step 1), second in step 2 cross in beam aperture and step 4) is equal It is opened up by cutting machine.
Wherein, progress is segmented when step 4) opens up door-window opening from lower to upper.
Wherein, it needs to be irrigated wall brick with water before step 5) plasters to metope.
Embodiment 3
A kind of method that bearing wall opens up door-window opening, which comprises the following steps:
1) in the contour line of metope pop-up door-window opening, first is opened up at the top of contour line and crosses beam aperture, first crosses beam aperture both ends point Not Chao Guo door-window opening contour line 35cm, first, which crosses in beam aperture installation, cooperates I-steel with it;
2) first cross beam aperture both ends above 15cm place open up respectively second cross beam aperture, second mistake beam aperture middle position and first The port position for crossing beam aperture is in same vertical position, and second crosses the long 50cm of beam aperture, and second, which crosses the interior installation of beam aperture, cooperates work with it Word steel;
3) Concrete Filled is carried out to the I-steel in first excessively beam aperture and the second mistake beam aperture;
4) after concrete is dry, door-window opening is opened up according to contour line;
5) it plasters to metope, maintenance 4 days after the completion of plastering;
6) wall is painted.
Wherein, the gap between I-steel and wall is filled up first when step 3) carries out Concrete Filled to I-steel, then It carries out integral-filled.
Wherein, the door-window opening that the first mistake beam aperture in step 1), second in step 2 cross in beam aperture and step 4) is equal It is opened up by cutting machine.
Wherein, progress is segmented when step 4) opens up door-window opening from lower to upper.
Wherein, it needs to be irrigated wall brick with water before step 5) plasters to metope.
Embodiment 4
A kind of method that bearing wall opens up door-window opening, which comprises the following steps:
1) in the contour line of metope pop-up door-window opening, first is opened up at the top of contour line and crosses beam aperture, first crosses beam aperture both ends point Not Chao Guo door-window opening contour line 40cm, first, which crosses in beam aperture installation, cooperates I-steel with it;
2) first cross beam aperture both ends above 18cm place open up respectively second cross beam aperture, second mistake beam aperture middle position and first The port position for crossing beam aperture is in same vertical position, and second crosses the long 55cm of beam aperture, and second, which crosses the interior installation of beam aperture, cooperates work with it Word steel;
3) Concrete Filled is carried out to the I-steel in first excessively beam aperture and the second mistake beam aperture;
4) after concrete is dry, door-window opening is opened up according to contour line;
5) it plasters to metope, maintenance 4 days after the completion of plastering;
6) wall is painted.
Wherein, the gap between I-steel and wall is filled up first when step 3) carries out Concrete Filled to I-steel, then It carries out integral-filled.
Wherein, the door-window opening that the first mistake beam aperture in step 1), second in step 2 cross in beam aperture and step 4) is equal It is opened up by cutting machine.
Wherein, progress is segmented when step 4) opens up door-window opening from lower to upper.
Wherein, it needs to be irrigated wall brick with water before step 5) plasters to metope.
Embodiment 5
A kind of method that bearing wall opens up door-window opening, which comprises the following steps:
1) in the contour line of metope pop-up door-window opening, first is opened up at the top of contour line and crosses beam aperture, first crosses beam aperture both ends point Not Chao Guo door-window opening contour line 50cm, first, which crosses in beam aperture installation, cooperates I-steel with it;
2) first cross beam aperture both ends above 20cm place open up respectively second cross beam aperture, second mistake beam aperture middle position and first The port position for crossing beam aperture is in same vertical position, and second crosses the long 60cm of beam aperture, and second, which crosses the interior installation of beam aperture, cooperates work with it Word steel;
3) Concrete Filled is carried out to the I-steel in first excessively beam aperture and the second mistake beam aperture;
4) after concrete is dry, door-window opening is opened up according to contour line;
5) it plasters to metope, maintenance 5 days after the completion of plastering;
6) wall is painted.
Wherein, the gap between I-steel and wall is filled up first when step 3) carries out Concrete Filled to I-steel, then It carries out integral-filled.
Wherein, the door-window opening that the first mistake beam aperture in step 1), second in step 2 cross in beam aperture and step 4) is equal It is opened up by cutting machine.
Wherein, progress is segmented when step 4) opens up door-window opening from lower to upper.
Wherein, it needs to be irrigated wall brick with water before step 5) plasters to metope.
The present invention crosses beam aperture by the way that new second is arranged again above first excessively beam aperture two-port, crosses in beam aperture and is respectively mounted work Word steel, total and dispersion first cross the bearing load of beam aperture, whole load-carrying ability are improved, so that wall longer life expectancy, safety It can be higher;Meanwhile common lintel is substituted by I-steel, installation is simpler, and performance is more preferably.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (6)

1. a kind of method that bearing wall opens up door-window opening, which comprises the following steps:
1) in the contour line of metope pop-up door-window opening, first is opened up at the top of contour line and crosses beam aperture, first crosses beam aperture both ends point Not Chao Guo door-window opening contour line 20-50cm, first, which crosses in beam aperture installation, cooperates I-steel with it;
2) first cross beam aperture both ends above 10-20cm place open up respectively second cross beam aperture, second cross beam aperture middle position and First port position for crossing beam aperture is in same vertical position, and second crosses the long 40-60cm of beam aperture, and second crosses the interior installation of beam aperture and its Cooperate I-steel;
3) Concrete Filled is carried out to the I-steel in first excessively beam aperture and the second mistake beam aperture;
4) after concrete is dry, door-window opening is opened up according to contour line;
5) it plasters to metope, maintenance 3-5 days after the completion of plastering;
6) wall is painted.
2. the method that bearing wall according to claim 1 opens up door-window opening, which is characterized in that step 3) is to I-steel First fill up the gap between I-steel and wall when Concrete Filled, then carries out integral-filled.
3. the method that bearing wall according to claim 1 opens up door-window opening, which is characterized in that first in step 1) Cross beam aperture, the second door-window opening crossed in beam aperture and step 4) in step 2 is opened up by cutting machine.
4. the method that bearing wall according to claim 3 opens up door-window opening, which is characterized in that step 4) opens up door and window Progress is segmented when hole from lower to upper.
5. the method that bearing wall according to claim 1 opens up door-window opening, which is characterized in that step 5) to metope into It needs to be irrigated wall brick with water before row plastering.
6. application of -5 any methods for opening up door-window opening in building field according to claim 1.
CN201810926161.1A 2018-08-15 2018-08-15 A kind of method that bearing wall opens up door-window opening Pending CN108999422A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810926161.1A CN108999422A (en) 2018-08-15 2018-08-15 A kind of method that bearing wall opens up door-window opening

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810926161.1A CN108999422A (en) 2018-08-15 2018-08-15 A kind of method that bearing wall opens up door-window opening

Publications (1)

Publication Number Publication Date
CN108999422A true CN108999422A (en) 2018-12-14

Family

ID=64592826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810926161.1A Pending CN108999422A (en) 2018-08-15 2018-08-15 A kind of method that bearing wall opens up door-window opening

Country Status (1)

Country Link
CN (1) CN108999422A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008190169A (en) * 2007-02-02 2008-08-21 Sumitomo Forestry Co Ltd Column-beam frame of wooden building
CN102383505A (en) * 2011-11-23 2012-03-21 山东科技大学 Structure for forming door/window opening on bearing wall and construction technology for structure
CN102535741A (en) * 2010-12-17 2012-07-04 曹文国 Door window lintel
CN204386354U (en) * 2014-12-18 2015-06-10 中建八局第四建设有限公司 Partition board door head board fixer
CN204590650U (en) * 2015-02-10 2015-08-26 北京建筑大学 The flexible reinforcing construction of steam-pressing aero-concrete wall body door or window hole
CN106246042A (en) * 2016-09-23 2016-12-21 中建八局第建设有限公司 A kind of door-window opening light steel dark frame post and installation method thereof
CN107299773A (en) * 2016-03-02 2017-10-27 叶香竹 Load bearing wall reinforcing construction method
CN108071230A (en) * 2017-12-12 2018-05-25 北京崇建工程有限公司 A kind of construction method of door-window opening

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008190169A (en) * 2007-02-02 2008-08-21 Sumitomo Forestry Co Ltd Column-beam frame of wooden building
CN102535741A (en) * 2010-12-17 2012-07-04 曹文国 Door window lintel
CN102383505A (en) * 2011-11-23 2012-03-21 山东科技大学 Structure for forming door/window opening on bearing wall and construction technology for structure
CN204386354U (en) * 2014-12-18 2015-06-10 中建八局第四建设有限公司 Partition board door head board fixer
CN204590650U (en) * 2015-02-10 2015-08-26 北京建筑大学 The flexible reinforcing construction of steam-pressing aero-concrete wall body door or window hole
CN107299773A (en) * 2016-03-02 2017-10-27 叶香竹 Load bearing wall reinforcing construction method
CN106246042A (en) * 2016-09-23 2016-12-21 中建八局第建设有限公司 A kind of door-window opening light steel dark frame post and installation method thereof
CN108071230A (en) * 2017-12-12 2018-05-25 北京崇建工程有限公司 A kind of construction method of door-window opening

Similar Documents

Publication Publication Date Title
CN103225423B (en) A kind of existing building encloses shell type adding storey structure and construction method thereof
CN108277818A (en) Basement top-down method Combined tower crane foundation structure and construction method
CN204590048U (en) A kind of high slope rockmass structure
CN108049666B (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN102493459A (en) Building isolation support construction method for constructing deep foundation in narrow environment
CN204040026U (en) For the prefabricated sleeve-perfusion compound pile of strong corrosive environment
CN108999422A (en) A kind of method that bearing wall opens up door-window opening
CN101545267B (en) Method for closed construction of large-area factory building equipment foundations
CN105863068B (en) A kind of box type modularization building and its method of construction
CN105649091A (en) High slope support method and structure
Roy et al. Comparative cost analysis of possible seismic retrofitting schemes for multi-story unreinforced masonry building
Anagnostopoulou et al. Performance of churches during the Darfield earthquake of September 4, 2010
CN107313551A (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system and its construction method
CN208293599U (en) Basement top-down method Combined tower crane foundation structure
CN106499211A (en) Newly-increased outrigger framework Baogang anchor traction therapy structure and technique
Melkumyan New approach in design of seismic isolated buildings applying clusters of rubber bearings in isolation systems
CN112081092A (en) Construction method for improving horizontal bearing and anti-seismic performance of existing pile foundation
CN207739510U (en) A kind of reinforced cold-bent pipe concrete column and structural system
CN105162033A (en) Mechanized self-lifting portal crossing frame
CN212927024U (en) Cast-in-place gradual lifting plate mould lifting device for column mould
CN205135647U (en) Can prosthetic prevention and cure pucking structure
CN204876557U (en) U -shaped steel construction template
CN109138484A (en) A kind of jacking increasing layer steel core concrete column and basic connection construction method
CN109989394A (en) A kind of cast-in-place concrete pile section stake partition and its construction method
Castellano Italian experience in seismic retrofit of buildings through seismic isolation or energy dissipation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181214

RJ01 Rejection of invention patent application after publication