CN108999209A - A method of it is installed using the fixed rim of a cup basis steel column of oblique angle I-steel centering - Google Patents
A method of it is installed using the fixed rim of a cup basis steel column of oblique angle I-steel centering Download PDFInfo
- Publication number
- CN108999209A CN108999209A CN201811143484.XA CN201811143484A CN108999209A CN 108999209 A CN108999209 A CN 108999209A CN 201811143484 A CN201811143484 A CN 201811143484A CN 108999209 A CN108999209 A CN 108999209A
- Authority
- CN
- China
- Prior art keywords
- steel
- oblique angle
- rim
- cup
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Abstract
A method of it is installed using the fixed rim of a cup basis steel column of oblique angle I-steel centering, belongs to rim of a cup basis steel column mounting technique field.Step: according to rim of a cup basic (3) and steel column (2) sectional dimension processing oblique angle I-steel (1);When steel column (2) is installed, fixed using oblique angle I-steel (1) in steel column (2) root surrounding centering;To rim of a cup basic (3) perfusion concrete (4) for the first time, guarantee that first time concrete perfusion (4) are lower than oblique angle I-steel (1) lower end above;Oblique angle I-steel (1) is removed after concrete solidification, then to basic (3) second of the concrete perfusion (5) of rim of a cup, until rim of a cup basis (3) concrete pouring is complete.The advantage is that not only reusing oblique angle I-steel, section has remained material, and the centering set time shortens, and saves a large amount of adjustment times, greatly reduces construction cost, achieves good economic benefit for company.
Description
Technical field
The invention belongs to rim of a cup basis steel column installing area, in particular, provides and a kind of fixed using oblique angle I-steel centering
The method of rim of a cup basis steel column installation.
Background technique
When steel column with rim of a cup basis is installed, the steel column centering before rim of a cup concrete perfusion is fixed, general using not
Regular fashioned iron and steel plate are filled from steel column foot surrounding, are fixed temporarily again after measurement correction, later according to field condition to steel
Column rim of a cup basis carries out filling concrete, using this method generation as a result, first is that fashioned iron and steel plate that centering is fixed can be mixed
Solidifying soil is filled into rim of a cup basis, cannot be recycled;Second is that after centering is fixed, such as concrete perfusion not in time, steel plate deformed meeting
Steel column installation deviation is caused, the later period adjusts steel column and increases expense.
Summary of the invention
The purpose of the present invention is to provide a kind of methods using the fixed rim of a cup basis steel column installation of oblique angle I-steel centering.
The installation method not only reuses oblique angle I-steel, and section has remained material, and the centering set time shortens, and saves
A large amount of adjustment times, greatly reduce construction cost.Installation smoothly success has accumulated invaluable experience for similar construction later.
The present invention processes oblique angle I-steel when steel column is installed according to rim of a cup basis and steel column sectional dimension and utilizes oblique angle work
Word steel is fixed in steel column root surrounding centering, then to the basic first time concrete perfusion of rim of a cup, guarantees to be lower than oblique angle above concrete
Oblique angle I-steel is removed in I-steel lower end after concrete solidification, then to basic second of the concrete perfusion of rim of a cup, until rim of a cup basis is mixed
Solidifying soil has been perfused.Specific step is as follows:
The first step, according to rim of a cup basis 3 and 2 sectional dimension of steel column processing oblique angle I-steel 1 (Fig. 1);
Second step fixes (Fig. 2) in 2 root surrounding centering of steel column using oblique angle I-steel 1 when steel column 2 is installed;
Third step, to rim of a cup basis 3, perfusion concrete 4, guarantee first time concrete perfusion 4 are lower than oblique angle I-shaped above for the first time
1 lower end of steel (Fig. 3);
4th step removes oblique angle I-steel 1 after concrete solidification, then to basic 3 second of the concrete perfusion 5 of rim of a cup, until cup
Basic 3 concrete pourings of mouth are complete (Fig. 4).
The installation method not only reuses oblique angle I-steel, and section has remained material, and the centering set time contracts
It is short, a large amount of adjustment times are saved, construction cost is greatly reduced, achieve good economic benefit for company.
Detailed description of the invention
Fig. 1 is oblique angle I-steel manuscript.
Fig. 2 installs the fixed figure (cross-section diagram) of centering to steel column on rim of a cup basis for oblique angle I-steel.
Fig. 3 is the basic first time concrete perfusion figure (cross-section diagram) of rim of a cup.
Fig. 4 is second of the concrete perfusion figure (cross-section diagram) in rim of a cup basis after removing oblique angle I-steel.
In figure, oblique angle I-steel 1, steel column 2, rim of a cup basis 3, first time concrete perfusion 4, second of concrete perfusion 5.
Specific embodiment
Fig. 1-Fig. 4 is a kind of specific embodiment of the invention.Specific embodiment is as follows:
The first step processes oblique angle I-steel 1 according to rim of a cup basis 3 and 2 sectional dimension of steel column;
Second step is fixed using oblique angle I-steel 1 in 2 root surrounding centering of steel column when steel column 2 is installed;
Third step, to rim of a cup basis 3, perfusion concrete 4, guarantee first time concrete perfusion 4 are lower than oblique angle I-shaped above for the first time
1 lower end of steel;
4th step removes oblique angle I-steel 1 after concrete solidification, then to basic 3 second of the concrete perfusion 5 of rim of a cup, until cup
Basic 3 concrete pourings of mouth are complete.
Claims (1)
1. a kind of method using the fixed rim of a cup basis steel column installation of oblique angle I-steel centering, which is characterized in that steps are as follows:
The first step, according to rim of a cup basic (3) and steel column (2) sectional dimension processing oblique angle I-steel (1);
Second step is fixed using oblique angle I-steel (1) in steel column (2) root surrounding centering when steel column (2) is installed;
Third step guarantees that first time concrete perfusion (4) are lower than oblique angle work above to rim of a cup basic (3) perfusion concrete (4) for the first time
Word steel (1) lower end;
4th step removes oblique angle I-steel (1) after concrete solidification, then to basic (3) second of the concrete perfusion (5) of rim of a cup, until
Rim of a cup basis (3) concrete pouring is complete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811143484.XA CN108999209A (en) | 2018-09-28 | 2018-09-28 | A method of it is installed using the fixed rim of a cup basis steel column of oblique angle I-steel centering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811143484.XA CN108999209A (en) | 2018-09-28 | 2018-09-28 | A method of it is installed using the fixed rim of a cup basis steel column of oblique angle I-steel centering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108999209A true CN108999209A (en) | 2018-12-14 |
Family
ID=64589764
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811143484.XA Pending CN108999209A (en) | 2018-09-28 | 2018-09-28 | A method of it is installed using the fixed rim of a cup basis steel column of oblique angle I-steel centering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108999209A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU387087A1 (en) * | 1971-01-12 | 1973-06-21 | FOUNDATION OF GLASS TYPE FOR COLUMNS | |
CN202170645U (en) * | 2011-07-15 | 2012-03-21 | 中国十七冶集团有限公司 | Aligning positioner for cup-rim steel column |
CN203080546U (en) * | 2013-02-06 | 2013-07-24 | 陕西建工集团机械施工有限公司 | Prefabricated column concrete cup opening base double-layer limiting fixed structure |
CN104265000A (en) * | 2014-09-12 | 2015-01-07 | 北京首钢建设集团有限公司 | Column mounting method for cup foundation |
CN205476528U (en) * | 2016-03-01 | 2016-08-17 | 中国十七冶集团有限公司 | Precast pile device of taking one's place fast |
CN106368234A (en) * | 2016-09-08 | 2017-02-01 | 中国航天建设集团有限公司 | Novel cup foundation box-shaped steel column installation constructing technology |
-
2018
- 2018-09-28 CN CN201811143484.XA patent/CN108999209A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU387087A1 (en) * | 1971-01-12 | 1973-06-21 | FOUNDATION OF GLASS TYPE FOR COLUMNS | |
CN202170645U (en) * | 2011-07-15 | 2012-03-21 | 中国十七冶集团有限公司 | Aligning positioner for cup-rim steel column |
CN203080546U (en) * | 2013-02-06 | 2013-07-24 | 陕西建工集团机械施工有限公司 | Prefabricated column concrete cup opening base double-layer limiting fixed structure |
CN104265000A (en) * | 2014-09-12 | 2015-01-07 | 北京首钢建设集团有限公司 | Column mounting method for cup foundation |
CN205476528U (en) * | 2016-03-01 | 2016-08-17 | 中国十七冶集团有限公司 | Precast pile device of taking one's place fast |
CN106368234A (en) * | 2016-09-08 | 2017-02-01 | 中国航天建设集团有限公司 | Novel cup foundation box-shaped steel column installation constructing technology |
Non-Patent Citations (1)
Title |
---|
江正荣: "工业厂房柱子采用钢垫板找平的安装工艺", 《建筑技术》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104727223B (en) | A kind of hoop platform for bridge pier column construction and construction method | |
CN102444285A (en) | Method for manufacturing reinforced concrete basement external wall | |
CN105464216A (en) | Construction method for ultrahigh oblique post with super-large cross section based on integral lifting formwork reinforcing system | |
CN108999209A (en) | A method of it is installed using the fixed rim of a cup basis steel column of oblique angle I-steel centering | |
CN104727339B (en) | Power equipment basis two-step construction method | |
CN110293622A (en) | A kind of tunnel reinforced concrete lining cutting test model pours device and casting method | |
CN208966022U (en) | A kind of template poured for large-scale beam column | |
CN102518046B (en) | Method for eliminating secondary internal force of sinking of support saddle of continuous beam during cantilever construction | |
CN106284428A (en) | A kind of concrete column method for supporting of building structure post-cast strip | |
CN105155843A (en) | Construction method and construction device of constructional columns | |
CN105908752B (en) | Formwork supporting and stripping system for pouring concrete on side wall and working process of formwork supporting and stripping system | |
CN104265000A (en) | Column mounting method for cup foundation | |
CN204098488U (en) | A kind of fixed structure of end bay beam forms | |
CN109853948A (en) | The integrated template system and mold method of the cast-in-place overhanging windowsill of secondary structure | |
CN103015328B (en) | Continuous splicing construction method of pier column for jacking broken beam of bridge | |
CN205296201U (en) | Positioner suitable for post installation of rim of a cup basis | |
CN104775831B (en) | A kind of tunnel double-lining inverted arch exempts from short abutment wall arcing construction method with arch wall joint portion | |
KR101099689B1 (en) | Mounting method for structure for vessel | |
CN208662509U (en) | Chassis mould | |
CN107338811B (en) | Construction method that is a kind of while pouring two structural columns of deformation joint | |
CN107642240B (en) | A method of strengthening concrete girder steel is installed in concrete bearing | |
CN105755943A (en) | Arch bridge arch ring block section and construction method thereof | |
JP6345328B1 (en) | Original position building method and original position structure | |
CN206681375U (en) | Thrust block installation system | |
CN109098438A (en) | A kind of template poured for large-scale beam column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181214 |
|
WD01 | Invention patent application deemed withdrawn after publication |