- CN108999155A CN108999155A CN201810777194.4A CN201810777194A CN108999155A CN 108999155 A CN108999155 A CN 108999155A CN 201810777194 A CN201810777194 A CN 201810777194A CN 108999155 A CN108999155 A CN 108999155A
- Authority
- CN
- China
- Prior art keywords
- valve
- dam
- fish
- pipeline
- induction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/08—Fish passes or other means providing for migration of fish; Passages for rafts or boats
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/60—Ecological corridors or buffer zones
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Farming Of Fish And Shellfish (AREA)
- Electrically Driven Valve-Operating Means (AREA)
Abstract
A kind of induction drives integrated form dam and crosses fish device and its application method, belongs to hydraulic and hydroelectric engineering and ecological, environmental protective engineering field.Described device includes valve a, valve b, valve c, water supply pipe, decompression endless tube, induction pipeline, comprehensive pipeline, screw rod, screw bracket, drives disk, end plate, spiro driving device, described comprehensive pipeline one end is set to dam upstream, the other end is set to dam downstream, the water supply pipe is set to dam upstream, and the induction pipeline is set to dam downstream.The present invention utilizes the habit of shoal of fish adverse current migration, in conjunction with the Practical Project feature of the water retaining structures such as dam, the pressure flow of dam upstream is flowed into dam downstream river course after gravity flow decompression using decompression endless tube, is driven the shoal of fish induction of downstream adverse current migration to upstream by spiro driving device.With land occupation less, it is with low investment, quick, high-efficient, water provenance is high, and installation, operation, maintenance, maintenance such as facilitate at the remarkable advantages.
Description
Technical field
The present invention relates to hydraulic and hydroelectric engineerings and ecological, environmental protective engineering field, and in particular to integrated water is driven in a kind of induction
Fish device and its application method are crossed in dam.
Background technique
Due to the various engineering demands such as power generation, irrigation, landscape, water conservancy, people often build dam in the water systems such as river
Equal water retaining structures, these water retaining structures often hinder or have intercepted the migration of the aquatic organisms such as straddling fish stocks in river, right
The water-based aquatic organism such as original river causes direct or indirect injury even to destroy.With China's water energy and the development of aquatic resources
The continuous improvement of degree, mainstream and the branch that will there are the water retaining structures such as more and more various barrages to be built in river
On stream.Although people are also studying and are paying close attention to always the migration of the aquatic organisms such as straddling fish stocks before building barrage, inhabiting, breed
The problems such as, fish pass and ecological flow bleeder have been built in many conditional power stations, and some power stations are also specially built
Fish multiplication station.But for various reasons, guarantee fish migration, the engineering effect inhabited, bred are barely satisfactory.Such as it repairs
It is built in the East China some hydropower station of 1970s, although having built one between its dam spillway and power plant building
Fish pass, attempt allow straddling fish stocks to sail against the current by artificial fish pass, the upper pond of dam are swum over to from the downstream river course of dam, but
Actual effect is very unsatisfactory, also almost discards because no fish passes through at present.
With the enhancing of compatriots' environmental consciousness, the power station for having fish system is increasing, but really has fish function
Effect crosses fish system almost without then having to look for another way --- such as built fish elevator, fish multiplication station, using people
Work fishing rear vehicle the methods of is had bad luck and means, to mitigate obstruction and injury to aquatic organisms such as straddling fish stocks.Regrettably
Often things turn out contrary to one's wishes or effect is extremely limited or operating cost is high for the above method and means.Straddling fish stocks it is inverse
Flowing migration habit is that it is formed in very long evolutionary process.The artificial fish pass generally used in engineering at present crosses fish mode, although
The partial parameters such as flow rate of water flow, flow have catered to part straddling fish stocks, but often project scale is huge, and cost and O&M are costly
It is high, and cross fish effect and be difficult to reach perfect condition.Traditional dam crosses fish system and generallys use the artificial fish pass of gravity flow, the fish
Not only structure is complicated in road, takes up a large area, and project cost is high, and limitation is larger.It is more than particularly with upstream and downstream water-head
For 50 meters of dam, traditional gravity flow fish pass is almost difficult to realize, even if realizing reluctantly, construction scale, construction investment
And it is considerable, more fatal defect was that fish effect is often barely satisfactory.It is other similar in manually arresting the fish having bad luck
Class crosses dam mode, and the scaring and injury for fish are also conceivable.
Summary of the invention
The technical issues of solution: aiming at the problems existing in the prior art, the present invention provides a kind of induce and drives integrated form
Dam crosses fish device and its application method, has and takes up an area less, is with low investment, quick, and installation, operation, maintenance, maintenance etc. are more
The advantages that facilitating.
Technical solution: a kind of induction drives integrated form dam and crosses fish device, and described device includes valve a, valve b, valve
C, water supply pipe, decompression endless tube, induction pipeline, comprehensive pipeline, screw rod, screw bracket, drive disk, end plate, spiro driving device,
Described comprehensive pipeline one end is set to dam upstream, and the other end is set to dam downstream, and the water supply pipe is set to dam upstream, described
Pipeline is induced to be set to dam downstream, the valve a is set to water supply pipe water inlet, and the pressure-reducing ring pipe sleeve is set to integrated pipe road
The outside of trip, and the decompression endless tube both ends seal, the tube wall that the comprehensive pipeline outer sheath sets decompression endless tube is equipped at least
One row depressurizes through-hole, and the water supply pipe water outlet is connected by decompression endless tube with the side of comprehensive line upstream, the induction
Pipeline water inlet connects with the side of comprehensive pipe line downstream, and the valve b is set to induction pipeline and comprehensive pipeline joint, described
Valve c is set to one end of comprehensive line upstream, and the end plate is set to one end of comprehensive pipe line downstream, and the screw bracket is set to comprehensive
The insides of pipes between line upstream and the valve c and the decompression endless tube is closed, the screw rod is respectively and in the middle part of screw bracket
It is rotatablely connected in the middle part of end plate, described drive is equipped with screw pair matched with screw rod among disk, described to drive disk middle screw rod pair
Connect with screw rod, the inside driven disk and be set to comprehensive pipeline, the spiro driving device includes motor, and the screw rod drives
Dynamic device is set to end plate downstream side, and the spiro driving device is connected by end plate with screw rod.
Preferably, described device further includes ultrasonoscope fish device and integrated control device, the ultrasonoscope fish dress
Be arranged in the upstream of valve b, the integrated control device respectively with ultrasonoscope fish device, valve a, valve b, valve c and spiral shell
Rod driving device electrical connection.
Preferably, the valve a, valve b, valve c are motor-driven valve, and the position for being equipped with valve wide open, closing entirely
Set feedback switch.
Preferably, the spiro driving device further includes retarder, rotary encoder and the time relay, the deceleration
Device is gear reduction unit or worm type of reduction gearing, and the retarder is motor drive, is set to motor upstream side, described to subtract
Fast device is equipped with output shaft, and the downstream of the reducer output shaft connects with rotary encoder and the time relay, described to subtract
Connect in the middle part of the upstream end of fast device output shaft and end plate, the integrated control device respectively with retarder, rotary encoder and when
Between relay be electrically connected.
Preferably, the disk middle screw rod pair of driving is water-fast self-lubricating screw pair, the screw rod is stainless steel screw rod
Structure, the screw bracket centre are equipped with a bearing, and the screw bracket intermediate bearing is water-fast self-lubricating bearing, the end
Be equipped with a bearing among plate, the end plate intermediate bearing is mechanical seal and water-fast self-lubricating bearing, the screw rod respectively with
Screw bracket intermediate bearing and the rotation connection of end plate intermediate bearing.
Preferably, the comprehensive pipeline downstream be equipped with a sealing manhole, with facilitate device corresponding component installation,
Maintenance and maintenance.
Preferably, the disk of driving is stainless steel disk shape multi-pass pore structure.
It is led under disk preferably, the comprehensive pipeline inner wall top and bottom end are respectively equipped with to drive disk upper rail and drive
Rail, it is described drive disk be set to drive disk upper rail and drive between disk lower guideway.
Preferably, described drive disk and drive disk upper rail and drive disk lower guideway joint equipped with idler wheel.
The application method that integrated form dam crosses fish device is driven in a kind of induction, the described method comprises the following steps: by valve a
It is opened with valve b, so that the high pressure water flow of dam upstream is flowed into comprehensive pipeline by water supply pipe and decompression endless tube, then from induction
It is flowed out in pipeline, flows into dam downstream, the shoal of fish in dam downstream follows induction pipeline and sail against the current, pass through under the luring of water flow
It crosses open valve b and enters comprehensive pipeline, after the number of fish school reaches setting value or reaches the time interval of requirement, close valve
Then b and valve a opens valve c, start the motor in spiro driving device, is driven and is driven by screw rod and screw rod screw pair
It catches up with disk to move to dam updrift side, is driven disk into the shoal of fish for integrating pipeline and rushes for dam upstream, until driving disk movement
To at the screw bracket of upstream side, valve c is closed, then motor is inverted, disk will be driven and send original place back to, then open valve
B and valve a so far completes the once induction to the migration shoal of fish, drives, and for next time to the induction of the migration shoal of fish, drive and do
It is good to prepare.
Preferably, the described method comprises the following steps: being beaten by integrated control device autocontrol valve a and valve b
It opens, the high pressure water flow of dam upstream is made to flow into comprehensive pipeline by water supply pipe and decompression endless tube, then flowed from induction pipeline
Out, dam downstream is flowed into, the shoal of fish in dam downstream follows induction pipeline and sail against the current, by open under the luring of water flow
Valve b and ultrasonoscope fish device enter comprehensive pipeline, and integrated control device receives the shoal of fish of ultrasonoscope fish device sending
Quantity reaches metering setting value or the time relay when reaching the signal of time setting value, successively closes valve b and valve in order
Door a, then open valve c, start spiro driving device in motor, by screw rod and screw rod screw pair drive drive disk to
The movement of dam updrift side, is driven disk into the shoal of fish for integrating pipeline and rushes for dam upstream, until driving disk moves to upstream
At the screw bracket of side, valve c is closed, then the reversion of integrated control device control motor, will drive disk and send original place back to, then
Valve b and valve a is opened, the once induction to the migration shoal of fish is so far completed, drives, and to lure the migration shoal of fish next time
It leads, drive and be ready.
The utility model has the advantages that 1. present invention are the habits using the migration of fish adverse current, in conjunction with the reality of the water retaining structures such as dam
Engineering characteristic, by what is obtained on the basis of extensive investigations research and thoroughgoing and painstaking analytic demonstration.By utilizing decompression endless tube
The pressure flow of dam upstream is flowed into dam downstream river course after gravity flow decompression, the shoal of fish of downstream adverse current migration can be induced certainly
It is dynamic to enter fish device.
2. the present invention passes through screw rod and spiral shell using the motor in spiro driving device by setting spiro driving device
The drive of bar screw pair is driven disk and is moved to dam updrift side, and the shoal of fish for entering comprehensive pipeline is rushed for dam upstream, will not be right
The shoal of fish damages.
3. the present invention is additionally provided with integrated control device, the integrated control device respectively with ultrasonoscope fish device, valve
A, valve b, valve c and spiro driving device are electrically connected and connect, and can be realized the automatic control to device of the present invention, finally
The shoal of fish is driven to dam upstream, and disk to be driven moves at the screw bracket of upstream side, motor reversion can be controlled,
Disk will be driven and send original place back to.Entirely induce, the process of driving moves in circles, be automatically performed.Compared with traditional fish pass system, this hair
It is bright have land occupation less, it is with low investment, quick, high-efficient, water provenance is high, and installation, operation, maintenance, maintenance are convenient
Equal remarkable advantages.Compared with manually arresting the fish having bad luck and crossing dam mode, the present invention has almost to fish fanout free region and mistake fish
It is high-efficient, hardly by weather, the advantages that natural conditions are limited, and operating cost is cheap round the clock etc..
It, will 4. technical solutions according to the invention can be to take up to implement in the water retaining structures design phase such as dam
Induction drives integrated form dam and crosses the unified arrangement of the water retaining structures such as fish system device and dam, is that a kind of effect with low investment is good,
Conveniently novel dam crosses fish system device for installation, operation, maintenance, maintenance etc..It can also be in water retaining structures such as dams
Set about implementing when technological transformation.Technical solutions according to the invention are suitable for most of dams for having fish demand, water blocking building
Etc. other similar place.Compared with traditional gravity flow fish pass mode, economic benefit and have the technical effect that it will be apparent that using this
Invention can easily solve the water for perplexing hydraulic and hydroelectric engineering and ecological, environmental protective engineering field professional technician always
Dam and other water blocking built the serious restriction of fish mode, difficult and deficiency.The technology of the present invention effect is obvious, economic benefit, life
State environmental benefit is significant.
Detailed description of the invention
Fig. 1 is that the top view that integrated form dam crosses fish device is driven in induction of the present invention.
Fig. 2 is that the diagrammatic cross-section that integrated form dam crosses fish device is driven in induction of the present invention.
Each number designation represents as follows in figure: 1. valve a;2. valve b;3. valve c;4. water supply pipe;5. depressurizing endless tube;
6. inducing pipeline;7. comprehensive pipeline;8. ultrasonoscope fish device;9. driving disk;10. spiro driving device;11. integrated control fills
It sets;12. screw rod;13. screw bracket;14. end plate;15. manhole;16. driving disk upper rail;17. driving disk lower guideway.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples.
Embodiment 1
A kind of induction drives integrated form dam and crosses fish device, and referring to Fig.1, described device includes valve a 1, valve b 2, valve c
3, water supply pipe 4, decompression endless tube 5, induction pipeline 6, comprehensive pipeline 7, screw rod 12, screw bracket 13, drive disk 9, end plate 14,
Spiro driving device 10, described comprehensive 7 one end of pipeline are set to dam upstream, and the other end is set to dam downstream, the water supply pipe 4
Set on dam upstream, the induction pipeline 6 is set to dam downstream, and the valve a 1 is set to 4 water inlet of water supply pipe, described to subtract
Pressure ring pipe 5 is sheathed on the outside of comprehensive 7 upstream of pipeline, and 5 both ends of decompression endless tube seal, comprehensive 7 outer sheath of pipeline
If the tube wall for depressurizing endless tube 5 is equipped with four rows and depressurizes through-hole, 4 water outlet of water supply pipe passes through decompression endless tube 5 and integrated pipe
The side of 7 upstream of road connects, and induction 6 water inlet of pipeline connects with the side in comprehensive 7 downstream of pipeline, and the valve b 2 is set
In induction pipeline 6 and comprehensive 7 joint of pipeline, the valve c 3 is set to one end of comprehensive 7 upstream of pipeline, and the end plate 14 is set
In the one end in comprehensive 7 downstream of pipeline, the screw bracket 13 is set to comprehensive 7 upstream of pipeline, the valve c 3 and the pressure-reducing ring
Insides of pipes between pipe 5 is equipped with a bearing among the screw bracket 13, is equipped with a bearing among the end plate 14,
The screw rod 12 is rotatablely connected with 13 intermediate bearing of screw bracket and 14 intermediate bearing of end plate respectively, and described drive sets among disk 9
There is screw pair matched with screw rod 12, the 9 middle screw rod pair of disk of driving connects with screw rod 12, and the spiro driving device 10 wraps
Motor is included, the spiro driving device 10 is set to 14 downstream of end plate, and the spiro driving device 10 passes through 14 jackshaft of end plate
It holds and connects with screw rod 12.
The application method that integrated form dam crosses fish device is driven in the induction, comprising the following steps: by valve a 1 and valve
B 2 is opened, and the high pressure water flow of dam upstream is made to flow into comprehensive pipeline 7, the pressure-reducing ring by water supply pipe 4 and decompression endless tube 5
Pipe 5 is connected with the end of water supply pipe 4, and it is logical that four rows decompression is drilled on the tube wall of the circular synthesis pipeline 7 of decompression endless tube 5
Hole flows into comprehensive pipeline 7 after capable of depressurizing the high pressure water of dam upstream, then flow out, flowed under dam from induction pipeline 6
Trip has the life habit of adverse current migration using part fish, makes the shoal of fish in dam downstream under the luring of water flow, follow induction
Pipeline 6 is sailed against the current, and is entered comprehensive pipeline 7 by open valve b 2, is reached setting value to the number of fish school or reach requirement
After time interval, valve b 2 and valve a 1 is closed, then opens valve c 3, starts the motor in spiro driving device 10,
It drives disk 9 by screw rod 12 and the drive of screw rod screw pair and is moved to dam updrift side, the shoal of fish into comprehensive pipeline 7 is driven
Disk 9 rushes for dam upstream, moves at the screw bracket 13 of upstream side until driving disk 9, closes valve c 3, then will be electronic
Machine reversion, will drive disk 9 and sends original place back to, then opens valve b 2 and valve a 1, so far completes once to lure the migration shoal of fish
Lead, drive, and for next time to the induction of the migration shoal of fish, drive and be ready.
Embodiment 2
A kind of induction drives integrated form dam and crosses fish device, and referring to Fig.1, described device includes valve a 1, valve b 2, valve c
3, water supply pipe 4, decompression endless tube 5, induction pipeline 6, comprehensive pipeline 7, screw rod 12, screw bracket 13, drive disk 9, end plate 14,
Spiro driving device 10, described comprehensive 7 one end of pipeline are set to dam upstream, and the other end is set to dam downstream, the water supply pipe 4
Set on dam upstream, the induction pipeline 6 is set to dam downstream, and the valve a 1 is set to the water inlet of water supply pipe 4, described
Decompression endless tube 5 is sheathed on the outside of comprehensive 7 upstream of pipeline, and 5 both ends of decompression endless tube seal, comprehensive 7 outside of pipeline
The tube wall for being arranged decompression endless tube 5 depressurizes through-hole equipped with four rows, and 4 water outlet of water supply pipe passes through decompression endless tube 5 and synthesis
The side of 7 upstream of pipeline connects, and induction 6 water inlet of pipeline connects with the side in comprehensive 7 downstream of pipeline, the valve b 2
Set on induction pipeline 6 and comprehensive 7 joint of pipeline, the valve c 3 is set to one end of comprehensive 7 upstream of pipeline, the end plate 14
Set on the one end in comprehensive 7 downstream of pipeline, the screw bracket 13 is set to comprehensive 7 upstream of pipeline, the valve c 3 and the decompression
Insides of pipes between endless tube 5 is equipped with a bearing among the screw bracket 13, is equipped with an axis among the end plate 14
It holds, the screw rod 12 is rotatablely connected with 13 intermediate bearing of screw bracket and 14 intermediate bearing of end plate respectively, described to drive among disk 9
Equipped with screw pair matched with screw rod 12, the 9 middle screw rod pair of disk of driving connects with screw rod 12, the spiro driving device 10
Including motor, the spiro driving device 10 is set to 14 downstream of end plate, and the spiro driving device 10 passes through among end plate 14
Bearing connects with screw rod 12.Valve a 1, valve b 2, the valve c 3 of described device are motor-driven valve, and are equipped with Quan Guan, complete
Open position feedback switch.Described device further includes ultrasonoscope fish device 8 and integrated control device 11, the ultrasonoscope fish dress
Set 8 be set to valve b 2 upstreams, the integrated control device 11 respectively with ultrasonoscope fish device 8, valve a 1, valve b 2,
Valve c 3 and spiro driving device 10 are electrically connected.
The application method that integrated form dam crosses fish device is driven in the induction, comprising the following steps: is filled by integrated control
It sets 11 control valve a 1 and valve b 2 to open, flows into the high pressure water flow of dam upstream by water supply pipe 4 and decompression endless tube 5
Comprehensive pipeline 7, the decompression endless tube 5 are connected with the end of water supply pipe 4, in the circular synthesis pipeline 7 of decompression endless tube 5
It is drilled with decompression through-hole on tube wall, comprehensive pipeline 7 is flowed into after the high pressure water of dam upstream capable of being depressurized, then from induction pipeline 6
Middle outflow flows into dam downstream, has the life habit of adverse current migration using part fish, makes the shoal of fish in dam downstream in water flow
Luring under, follow induction pipeline 6 and sail against the current, enter comprehensive pipeline by open valve b 2 and ultrasonoscope fish device 8
7, the number of fish school that integrated control device 11 receives the sending of ultrasonoscope fish device 8 reaches metering setting value or reaches the time
When being spaced the signal of setting value, valve b 2 and valve a 1 is successively closed in order, then opens valve c 3, and starting screw rod drives
Motor in dynamic device 10 is driven disk 9 and is moved to dam updrift side by screw rod 12 and the drive of screw rod screw pair, and entrance is comprehensive
The shoal of fish for closing pipeline 7 is driven disk 9 and rushes for dam upstream, moves at the screw bracket 13 of upstream side until driving disk 9, closes
Then valve c 3 controls motor reversion, will drive disk 9 and send original place back to, then open valve b 2 and valve a 1, so far complete
At once to the migration shoal of fish induction, drive, and for next time to the induction of the migration shoal of fish, drive and be ready.
Embodiment 3
Now how to be driven using induction of the present invention for integrated form dam crosses fish system device by checkdam, referring to Fig.1 and
Fig. 2.
Described device is arranged in inside dam structure, wherein a gallery is arranged in dam downstream side, and dam upstream side is set
A valve chamber is set, described device includes valve a 1, valve b 2, valve c 3, water supply pipe 4, decompression endless tube 5, induction pipeline
6, pipeline 7 is integrated, ultrasonoscope fish device 8, screw rod 12, screw bracket 13, disk 9 is driven, end plate 14, manhole 15, drives on disk
Guide rail 16 drives disk lower guideway 17, spiro driving device 10 and integrated control device 11.The valve a 1, valve c 3 are
Motor-driven valve, and it is equipped with full pass, fully open position feedback switch, dam upstream side valve chamber can facilitate valve a's 1 and valve c 3
Installation, maintenance and maintenance.The valve b 2, ultrasonoscope fish device 8, spiro driving device 10 and integrated control device 11 are set
In in the gallery in dam downstream side, facilitate installation, maintenance and maintenance.The comprehensive pipeline 7 is embedded in downstream side gallery and upstream
Between side valve room, comprehensive 7 downstream of pipeline is equipped with a sealing manhole 15, to facilitate the phase being laid in comprehensive pipeline 7
Answer the installation, maintenance and maintenance of component or device.The water supply pipe 4 is set to dam upstream, and the induction pipeline 6 is set to dam
Downstream, the valve a 1 are set to 4 water inlet of water supply pipe, and the valve a 1 is used for the water being shut on or off in water supply pipe 4
Stream, the decompression endless tube 5 is sheathed on the outside of comprehensive 7 upstream of pipeline, and 5 both ends of decompression endless tube seal, the integrated pipe
Four rows are drilled on the corresponding pipeline section for being arranged decompression endless tube 5 in road 7 and depressurize through-hole, are flowed into after capable of depressurizing the high pressure water of dam upstream
The water outlet of comprehensive pipeline 7, the water supply pipe 4 is connected by decompression endless tube 5 with the side of comprehensive 7 upstream of pipeline, described to lure
The water inlet of rodding 6 connects with the side in comprehensive 7 downstream of pipeline, and the valve b 2 is set to induction pipeline 6 and comprehensive pipeline 7
Joint, the valve b 2 are used to be shut on or off the induction water flow in induction pipeline 6.The valve c 3 is set to comprehensive pipeline
One end of 7 upstreams, the valve c 3 are set to comprehensive 7 downstream of pipeline for opening or closing comprehensive pipeline 7, the end plate 14
One end, the screw bracket 13 are set in the pipeline between comprehensive 7 upstream of pipeline, the valve c 3 and the decompression endless tube 5
Side is equipped with a bearing among the screw bracket 13, is equipped with a bearing among the end plate 14, the screw rod 12 respectively with
13 intermediate bearing of screw bracket and the rotation connection of 14 intermediate bearing of end plate.The disk 9 of driving is stainless steel disk shape multi-through hole knot
Structure, described drive are equipped with screw pair matched with screw rod 12 among disk 9, the 9 middle screw rod pair of disk of driving connects with screw rod 12.
The 7 inner wall top of comprehensive pipeline and bottom end, which are respectively equipped with, drives disk upper rail 16 and drives disk lower guideway 17, described to drive disk 9
Set on driving disk upper rail 16 and drive between disk lower guideway 17.It is described to drive disk 9 and drive disk upper rail 16 and drive under disk
17 joint of guide rail is equipped with idler wheel.13 intermediate bearing of screw bracket is water-fast self-lubricating bearing, 14 jackshaft of end plate
It holds as mechanical seal and water-fast self-lubricating bearing, the 9 middle screw rod pair of disk of driving is water-fast self-lubricating screw pair.The screw rod
12 be stainless steel wire bumper structure.The spiro driving device 10 includes motor, retarder, rotary encoder and time relay
Device, the retarder are worm type of reduction gearing, and the retarder is motor drive, is set to motor upstream side, described to subtract
Fast device is equipped with output shaft, and the downstream of the reducer output shaft connects with rotary encoder and the time relay, described to subtract
The upstream end of fast device output shaft and the bearing among end plate 14 connect, and the spiro driving device 10 is set to 14 downstream of end plate, institute
Spiro driving device 10 is stated to connect by 14 intermediate bearing of end plate with screw rod 12.Described device further includes ultrasonoscope fish device 8
With integrated control device 11, the ultrasonoscope fish device 8 is set to the upstream of valve b 2, and the ultrasonoscope fish device 8 is used for
Capture, record and fed back through the movement pattern of fish of the shoal of fish in induction pipeline 6.The integrated control device 11 is filled with ultrasonoscope fish respectively
8, valve a 1, valve b 2, valve c 3, retarder, rotary encoder and time relay electrical connection are set, can be realized pair
The automatic control of main device of the present invention.
The application method that integrated form dam crosses fish device is driven in the induction, comprising the following steps: is filled by integrated control
It sets 11 autocontrol valve a 1 and valve b 2 to open, the high pressure water flow of dam upstream is made to pass through water supply pipe 4 and decompression endless tube 5
Comprehensive pipeline 7 is flowed into, the decompression endless tube 5 is connected with the end of water supply pipe 4, in the circular integrated pipe of decompression endless tube 5
Be drilled with four rows on the tube wall on road 7 and depressurize through-hole, can will flow into comprehensive pipeline 7 after the decompression of the high pressure water of dam upstream, then from
It is flowed out in induction pipeline 6, flows into dam downstream, there is the life habit of adverse current migration using part fish, make dam downstream
The shoal of fish follows induction pipeline 6 and sails against the current under the luring of water flow, by open valve b 2 and ultrasonoscope fish device 8 into
Enter comprehensive pipeline 7, the number of fish school that integrated control device 11 receives the sending of ultrasonoscope fish device 8 reach metering setting value or
When the time relay reaches the signal of time setting value, valve b 2 and valve a 1 is successively closed in order, then opens valve c
3, start the motor in spiro driving device 10, disk 9 is driven to dam party upstream by screw rod 12 and the drive of screw rod screw pair
To movement, disk 9 is driven into the shoal of fish for integrating pipeline 7 and rushes for dam upstream, until driving the screw rod that disk 9 moves to upstream side
At bracket 13, valve c 3 is closed, then integrated control device 11 controls motor reversion, will drive disk 9 and sends original place back to, then
Valve b 2 and valve a 1 is opened, the once induction to the migration shoal of fish is so far completed, drives, and for next time to the migration shoal of fish
It induces, drive and be ready.
Undeclared part involved in the present invention is same as the prior art or is realized using the prior art.
Claims (10)
1. a kind of induction drives integrated form dam and crosses fish device, which is characterized in that described device includes valve a(1), valve b
(2), valve c(3), water supply pipe (4), decompression endless tube (5), induction pipeline (6), comprehensive pipeline (7), screw rod (12), screw rod branch
Frame (13) drives disk (9), end plate (14), spiro driving device (10), and described comprehensive pipeline (7) one end is set to dam upstream, separately
One end is set to dam downstream, and the water supply pipe (4) is set to dam upstream, and the induction pipeline (6) is set to dam downstream, described
Valve a(1) it is set to water supply pipe (4) water inlet, decompression endless tube (5) is sheathed on the outside of comprehensive pipeline (7) upstream, and institute
The sealing of decompression endless tube (5) both ends is stated, the tube wall that pressure-reducing ring pipe (5) is arranged on the outside of the comprehensive pipeline (7) is equipped with an at least row
Through-hole is depressurized, water supply pipe (4) water outlet is connected by decompression endless tube (5) with the side of comprehensive pipeline (7) upstream, described
Induction pipeline (6) water inlet connects with the side in comprehensive pipeline (7) downstream, the valve b(2) it is pipeline (6) and comprehensive set on inducing
Close pipeline (7) joint, the valve c(3) it is set to one end of comprehensive pipeline (7) upstream, the end plate (14) is set to integrated pipe
The one end in road (7) downstream, the screw bracket (13) are set to comprehensive pipeline (7) upstream and the valve c(3) and the pressure-reducing ring
The insides of pipes between (5) is managed, the screw rod (12) is rotatablely connected in the middle part of screw bracket (13) and in the middle part of end plate (14) respectively,
Described drive is equipped with screw rod (12) matched screw pair among disk (9), described to drive disk (9) middle screw rod pair and screw rod (12)
Connect, described drive disk (9) are set to comprehensive pipeline (7) inside, and the spiro driving device (10) includes motor, the screw rod
Driving device (10) is set to end plate (14) downstream side, and the spiro driving device (10) passes through end plate (14) and screw rod (12) phase
It connects.
2. a kind of induction according to claim 1 drives integrated form dam and crosses fish device, which is characterized in that described device is also
Including ultrasonoscope fish device (8) and integrated control device (11), the ultrasonoscope fish device (8) is upper set on valve b's)
Trip, the integrated control device (11) respectively with ultrasonoscope fish device (8), valve a(1), valve b(2), valve c(3) and spiral shell
Rod driving device (10) electrical connection.
3. a kind of induction according to claim 2 drives integrated form dam and crosses fish device, which is characterized in that the screw rod drives
Dynamic device (10) further include retarder, rotary encoder and the time relay, and the retarder is gear reduction unit or worm gear snail
Bar retarder, the retarder are set to motor upstream side, and the retarder is equipped with output shaft, the reducer output shaft
Downstream connects with rotary encoder and the time relay, connects in the middle part of the upstream end of the reducer output shaft and end plate, institute
Integrated control device (11) is stated to be electrically connected with retarder, rotary encoder and the time relay respectively.
4. a kind of induction according to claim 1 drives integrated form dam and crosses fish device, which is characterized in that described to drive disk
(9) middle screw rod pair is water-fast self-lubricating screw pair, and the screw rod (12) is stainless steel wire bumper structure, the screw bracket (13)
Centre is equipped with a bearing, and screw bracket (13) intermediate bearing is water-fast self-lubricating bearing, sets among the end plate (14)
Have a bearing, end plate (14) intermediate bearing is mechanical seal and water-fast self-lubricating bearing, the screw rod (12) respectively with
Screw bracket (13) intermediate bearing and the rotation connection of end plate (14) intermediate bearing.
5. a kind of induction according to claim 1 drives integrated form dam and crosses fish device, which is characterized in that the integrated pipe
Road (7) downstream is equipped with a manhole (15).
6. a kind of induction according to claim 1 drives integrated form dam and crosses fish device, which is characterized in that described to drive disk
It (9) is stainless steel disk shape multi-pass pore structure.
7. a kind of induction according to claim 1 drives integrated form dam and crosses fish device, which is characterized in that the integrated pipe
Road (7) inner wall top and bottom end, which are respectively equipped with, drives disk upper rail (16) and drives disk lower guideway (17), and the disk (9) of driving is set
In driving disk upper rail (16) and drive between disk lower guideway (17).
8. a kind of induction according to claim 7 drives integrated form dam and crosses fish device, which is characterized in that described to drive disk
(9) it and drives disk upper rail (16) and drives disk lower guideway (17) joint equipped with idler wheel.
9. driving the application method that integrated form dam crosses fish device based on a kind of induction described in claim 1, which is characterized in that
It the described method comprises the following steps: valve a(1) and valve b(2) being opened, the high pressure water flow of dam upstream is made to pass through water supplying pipe
Road (4) and decompression endless tube (5) inflow are comprehensive pipeline (7), the then outflow from induction pipeline (6), inflow dam downstream, under dam
The shoal of fish of trip follows induction pipeline (6) and sails against the current, by open valve b(2 under the luring of water flow) enter comprehensive pipeline
(7), after the number of fish school reaches setting value or reaches the time interval of requirement, orderly close-down valve b(2) and valve a(1), so
Valve c(3 is opened afterwards), start the motor in spiro driving device (10), passes through screw rod (12) and screw rod screw pair drives and drives
It catches up with disk (9) to move to dam updrift side, is moved at the screw bracket (13) of upstream side until driving disk (9), into synthesis
The shoal of fish of pipeline (7) is driven disk (9) and rushes for dam upstream, closes valve c(3), then motor is inverted, disk will be driven
(9) send original place back to, then open valve b(2) and valve a(1), it so far completes the once induction to the migration shoal of fish, drive, and be
Next time to the induction of the migration shoal of fish, drive and be ready.
10. driving the application method that integrated form dam crosses fish device, feature based on a kind of induction described in claim 2 or 3
It is, the described method comprises the following steps: by integrated control device (11) autocontrol valve a(1) and valve b(2) open,
So that the high pressure water flow of dam upstream is flowed into comprehensive pipeline (7) by water supply pipe (4) and decompression endless tube (5), is then managed from induction
Outflow in road (6), flows into dam downstream, the shoal of fish in dam downstream under the luring of water flow, follow induction pipeline (6) adverse current and
On, by open valve b(2) and ultrasonoscope fish device (8) entrance synthesis pipeline (7), when integrated control device (11) connects
The number of fish school for receiving ultrasonoscope fish device (8) sending reaches metering setting value or the time relay reaches time setting value
When signal, automatically control and close valve b(2 in order) and valve a(1), then open valve c(3), start spiro driving device
(10) motor in is driven disk (9) and is moved to dam updrift side by screw rod (12) and the drive of screw rod screw pair, and entrance is comprehensive
The shoal of fish for closing pipeline (7) is driven disk (9) and rushes for dam upstream, until driving the screw bracket that disk (9) moves to upstream side
(13) at, valve c(3 is closed in then integrated control device (11) control), starting motor reversion will drive disk (9) and send original back to
Place then opens valve b(2) and valve a(1), it so far completes the once induction to the migration shoal of fish, drive, and be next time right
The induction of the migration shoal of fish is driven and is ready.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810777194.4A CN108999155B (en) | 2018-07-16 | 2018-07-16 | Induced driving integrated dam fish passing device and using method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810777194.4A CN108999155B (en) | 2018-07-16 | 2018-07-16 | Induced driving integrated dam fish passing device and using method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108999155A true CN108999155A (en) | 2018-12-14 |
CN108999155B CN108999155B (en) | 2020-06-02 |
Family
ID=64598453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810777194.4A Active CN108999155B (en) | 2018-07-16 | 2018-07-16 | Induced driving integrated dam fish passing device and using method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108999155B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112160912A (en) * | 2020-09-28 | 2021-01-01 | 山东黄河工程集团有限公司 | Dykes and dams flood prevention flood fighting system |
CN113463581A (en) * | 2021-07-07 | 2021-10-01 | 水利部中国科学院水工程生态研究所 | Fishway for passing fish through water intake of dam and control method thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202705996U (en) * | 2012-07-25 | 2013-01-30 | 中国水电顾问集团成都勘测设计研究院 | Sectional water supply system for fishway entrance |
CN203939013U (en) * | 2014-05-13 | 2014-11-12 | 中国水电顾问集团华东勘测设计研究院有限公司 | The collection that can move continuously/put fishpond system |
CN204356755U (en) * | 2014-12-17 | 2015-05-27 | 长江勘测规划设计研究有限责任公司 | Cross the fish gathering attracting system of fish formula ship lock |
CN107034861A (en) * | 2017-05-23 | 2017-08-11 | 水利部交通运输部国家能源局南京水利科学研究院 | A kind of mixed type fish pass that can adapt to upstream high water-level amplitude |
-
2018
- 2018-07-16 CN CN201810777194.4A patent/CN108999155B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202705996U (en) * | 2012-07-25 | 2013-01-30 | 中国水电顾问集团成都勘测设计研究院 | Sectional water supply system for fishway entrance |
CN203939013U (en) * | 2014-05-13 | 2014-11-12 | 中国水电顾问集团华东勘测设计研究院有限公司 | The collection that can move continuously/put fishpond system |
CN204356755U (en) * | 2014-12-17 | 2015-05-27 | 长江勘测规划设计研究有限责任公司 | Cross the fish gathering attracting system of fish formula ship lock |
CN107034861A (en) * | 2017-05-23 | 2017-08-11 | 水利部交通运输部国家能源局南京水利科学研究院 | A kind of mixed type fish pass that can adapt to upstream high water-level amplitude |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112160912A (en) * | 2020-09-28 | 2021-01-01 | 山东黄河工程集团有限公司 | Dykes and dams flood prevention flood fighting system |
CN112160912B (en) * | 2020-09-28 | 2021-05-14 | 山东黄河工程集团有限公司 | Dykes and dams flood prevention flood fighting system |
CN113463581A (en) * | 2021-07-07 | 2021-10-01 | 水利部中国科学院水工程生态研究所 | Fishway for passing fish through water intake of dam and control method thereof |
CN113463581B (en) * | 2021-07-07 | 2024-01-09 | 水利部中国科学院水工程生态研究所 | Fishway for taking water through dam water port and control method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN108999155B (en) | 2020-06-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104480914B (en) | The fish pass structure that fish pass combines with ship lock and method | |
CN108999155A (en) | A kind of induction drives integrated form dam and crosses fish device and its application method | |
CN105735210B (en) | Tunnel formula imitates the arragement construction and its application method of nature fish pass combination fish lock | |
CN108005040A (en) | Minisize ecological natural flow station | |
CN106320294B (en) | A kind of fish pass for adapting to the level of tail water and changing | |
CN101512073B (en) | Fish way of turbine structure and gate structure for tidal power plant | |
CN106369217B (en) | A kind of low-temperature protection device | |
CN206189368U (en) | Floating gate irrigation equipment | |
CN106320293A (en) | Rotary gate for fishway inlet | |
CN205012292U (en) | Water conservancy regulation and control gate | |
CN104535249B (en) | One automatically controls dam hydraulic pressure force checking device and monitoring method thereof | |
CN204825814U (en) | Rotatory gate -type fishway of hydrodynamic force | |
CN209429073U (en) | Hoisting type fish channel structure | |
CN106702986A (en) | Assembly type farmland automatic water irrigation and stop device | |
CN207553055U (en) | A kind of water conservancy and hydropower dam crosses fish device | |
CN106122122B (en) | A kind of large aperture flow-controllable siphoning installation | |
CN201272958Y (en) | Multifunctional ecological fish lock | |
EP1377750B1 (en) | Moveable, over-flowable and under-flowable hydro-electric power plant | |
CN208748626U (en) | A kind of pipeline formula suitable for complicated landform crosses fish device | |
CN206396725U (en) | A kind of turning gate control system | |
CN105756177B (en) | Hydraulic-floating non-return Vatch basin | |
SU1493750A2 (en) | Spillway tunnel of high-head hydraulic power station | |
CN108755613A (en) | A kind of steel dam having generating function | |
CN209339108U (en) | A kind of fish device excessively of water conservancy and hydropower dam | |
CN219449480U (en) | Ecological prosthetic devices of hydraulic engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |