CN108985504A - High dip angle oil reservoir optimizes and revises method - Google Patents

High dip angle oil reservoir optimizes and revises method Download PDF

Info

Publication number
CN108985504A
CN108985504A CN201810714510.3A CN201810714510A CN108985504A CN 108985504 A CN108985504 A CN 108985504A CN 201810714510 A CN201810714510 A CN 201810714510A CN 108985504 A CN108985504 A CN 108985504A
Authority
CN
China
Prior art keywords
data
reservoir
oil
well
dip angle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810714510.3A
Other languages
Chinese (zh)
Inventor
康博
闫志军
王鹤
柳世成
张艺久
欧阳静芸
刘家材
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu North Petroleum Exploration & Development Technology Ltd
Original Assignee
Chengdu North Petroleum Exploration & Development Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu North Petroleum Exploration & Development Technology Ltd filed Critical Chengdu North Petroleum Exploration & Development Technology Ltd
Priority to CN201810714510.3A priority Critical patent/CN108985504A/en
Publication of CN108985504A publication Critical patent/CN108985504A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Agronomy & Crop Science (AREA)
  • General Health & Medical Sciences (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Mining & Mineral Resources (AREA)
  • Primary Health Care (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Animal Husbandry (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses high dip angle oil reservoirs to optimize and revise method, takes full advantage of the cheer and bright characteristic of old filed development behavior data abundance, geologic structure thoroughly research, detail stratigraphic division, carries out carry out synthetic geology research, reservoir engineering research.And combine pilot test result, obtain oil reservoir integrally complete numerical simulation result, to immediately arrive at the remaining oil distribution situation that do not developed according to numerical simulation result, to provide sufficient theoretical foundation for secondary development, convenient for the arrangement adjustment well pattern directly in remaining oil distribution close quarters, adjustment well is avoided to repeat to arrange or arrange very few problem, it solves the problems, such as to lack in the prior art development strategy that is whole to high dip angle old filed, reasonable, can implementing in full, realizes and the secondary of high dip angle old filed is started to provide the purpose of integral layout thinking.

Description

High dip angle oil reservoir optimizes and revises method
Technical field
The present invention relates to low pressure reservoirs secondary development fields, and in particular to high dip angle oil reservoir optimizes and revises method.
Background technique
In the world, it for some old fileds, is developed after a century, still there is biggish potentiality to be exploited, but It develops based on still being developed with natural energy, does bit by bit, yield rises and meets with bottleneck up to now.When this kind of oil field is due to exploitation Between it is extremely long, stratum energy is extremely low, shows to be exactly ultralow pressure on strata pressure.And zero is beaten since this kind of old filed all has Broken problem, cause secondary development adjustment well be difficult to it is whole be laid out, lack it is a kind of it is whole, rationally, opening of can implementing in full Hair strategy is instructed.For the oil reservoir of high dip angle, each oil field is all to exploit institute according to early period in the prior art The experience of accumulation is rule of thumb adjusted the layout of well pattern.
Summary of the invention
The purpose of the present invention is to provide high dip angle oil reservoirs to optimize and revise method, to solve to lack in the prior art to incline to height Angle old filed is whole, rationally, the development strategy that can implement in full the problem of, realization starts to provide to the secondary of high dip angle old filed The purpose of integral layout thinking.
The present invention is achieved through the following technical solutions:
High dip angle oil reservoir optimizes and revises method, comprising the following steps:
(a) drilling data, well-log information, coring data, survey data early period, oil test data, PVT data, production are collected Dynamic data establishes early development database;
(b) according to the data in early development database, synthetic geology research, reservoir engineering research, pilot test are carried out;
The synthetic geology research obtains the following steps are included: to reservoirs all within the scope of oil reservoir progress rhythm detail stratigraphic division Take deposition characteristics data, reservoir characteristic data, characteristics of reservoirs data;According to rhythm detail stratigraphic division result, deposition characteristics data, storage Layer characteristic, characteristics of reservoirs data, determine reservoir distribution and oil in place, are carried out by reservoir distribution and oil in place data Geologic modeling;
The reservoir engineering research is the following steps are included: carry out development behavior analysis, well pattern reformation analysis, Well Pattern And Spacing survey Examination, recovery ratio analysis;
(c) combine synthetic geology research, reservoir engineering research, pilot test as a result, progress numerical simulation, according to described Numerical simulation result determines remaining oil distribution, arranges adjustment well pattern in remaining oil distribution close quarters.
This method takes full advantage of old filed development behavior data abundance, geologic structure thoroughly research, detail stratigraphic division understand Clear characteristic has sufficiently carried out synthetic geology research, reservoir engineering research, pilot test.Wherein synthetic geology research It is that can accurately be determined according to rhythm detail stratigraphic division result, deposition characteristics data, reservoir characteristic data, characteristics of reservoirs data Remaining reservoir distribution and remaining geologic reserves.Analyzed in conjunction with the development behavior in reservoir engineering research mid-early stage development process, Well pattern reformation analysis, Well Pattern And Spacing test, recovery ratio analysis, and pilot test is combined as a result, obtaining the whole complete number of oil reservoir It is worth analog result, so that the remaining oil distribution situation that do not developed is immediately arrived at according to numerical simulation result, to open to be secondary Hair provides sufficient theoretical foundation, convenient for the arrangement adjustment well pattern directly in remaining oil distribution close quarters, avoids adjustment well weight Arrange or arrange very few problem again, solve lack in the prior art it is whole to high dip angle old filed, rationally, can implement in full Development strategy the problem of, realize to high dip angle old filed it is secondary start provide integral layout thinking purpose.
It further, further include that the well data that are drilled in the first development process of ultralow pressure oil reservoir are extracted, with first Well data are drilled in secondary development process to optimize referring to the secondary well that is drilled of progress.This programme is that the well construction that is drilled of adjustment well mentions Sufficient data supporting has been supplied, engineering risk is reduced, has improved engineering construction efficiency.
Preferably, the pilot test is to decline to carry out exploration well oil test operation near most slow oil well in yield.
Compared with prior art, the present invention having the following advantages and benefits:
High dip angle oil reservoir of the present invention optimizes and revises method, takes full advantage of old filed development behavior data abundance, geology knot The cheer and bright characteristic of structure thoroughly research, detail stratigraphic division has sufficiently carried out synthetic geology research, reservoir engineering research, elder generation Lead test.Wherein synthetic geology research is according to rhythm detail stratigraphic division result, deposition characteristics data, reservoir characteristic data, oil reservoir Characteristic can accurately determine remaining reservoir distribution and remaining geologic reserves.It is opened in conjunction with reservoir engineering research mid-early stage Development behavior analysis, well pattern reformation analysis, Well Pattern And Spacing test, recovery ratio analysis during hair, and combine pilot test knot Fruit obtains oil reservoir integrally complete numerical simulation result, to immediately arrive at the residue that do not developed according to numerical simulation result Oil distribution situation, so that sufficient theoretical foundation is provided for secondary development, convenient for the cloth directly in remaining oil distribution close quarters Set adjustment well pattern, avoid adjustment well repeat arrange or arrange very few problem, solve lack in the prior art it is old to high dip angle Oil field is whole, rationally, the development strategy that can implement in full the problem of, realize to high dip angle old filed it is secondary start to provide it is whole The purpose of body layout thinking.
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the flow diagram of the specific embodiment of the invention.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment and attached drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation for explaining only the invention, are not made For limitation of the invention.
Embodiment 1:
High dip angle oil reservoir as shown in Figure 1 optimizes and revises method, comprising the following steps: (a) collects drilling data, well logging money Material, coring data, survey data early period, oil test data, PVT data, Production development data, establish early development database;(b) According to the data in early development database, synthetic geology research, reservoir engineering research, pilot test are carried out;
The synthetic geology research obtains the following steps are included: to reservoirs all within the scope of oil reservoir progress rhythm detail stratigraphic division Take deposition characteristics data, reservoir characteristic data, characteristics of reservoirs data;According to rhythm detail stratigraphic division result, deposition characteristics data, storage Layer characteristic, characteristics of reservoirs data, determine reservoir distribution and oil in place, are carried out by reservoir distribution and oil in place data Geologic modeling;
The reservoir engineering research is the following steps are included: carry out development behavior analysis, well pattern reformation analysis, Well Pattern And Spacing survey Examination, recovery ratio analysis;
(c) combine synthetic geology research, reservoir engineering research, pilot test as a result, progress numerical simulation, according to described Numerical simulation result determines remaining oil distribution, arranges adjustment well pattern in remaining oil distribution close quarters.
It further include that the well data that are drilled in the first development process of ultralow pressure oil reservoir are extracted, with first development process In be drilled well data for referring to carry out it is secondary be drilled well optimization.The pilot test is to decline near most slow oil well in yield Carry out exploration well oil test operation.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects It is described in detail, it should be understood that being not intended to limit the present invention the foregoing is merely a specific embodiment of the invention Protection scope, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (3)

1. high dip angle oil reservoir optimizes and revises method, which comprises the following steps:
(a) drilling data, well-log information, coring data, survey data early period, oil test data, PVT data, Production development are collected Data establishes early development database;
(b) according to the data in early development database, synthetic geology research, reservoir engineering research, pilot test are carried out;
For the synthetic geology research the following steps are included: carrying out rhythm detail stratigraphic division to reservoirs all within the scope of oil reservoir, it is heavy to obtain Product characteristic, reservoir characteristic data, characteristics of reservoirs data;It is special according to rhythm detail stratigraphic division result, deposition characteristics data, reservoir Data, characteristics of reservoirs data are levied, determine reservoir distribution and oil in place, geology is carried out by reservoir distribution and oil in place data Modeling;
The reservoir engineering research the following steps are included: carry out development behavior analysis, well pattern reformation analysis, Well Pattern And Spacing test, Recovery ratio analysis;
(c) combine synthetic geology research, reservoir engineering research, pilot test as a result, progress numerical simulation, according to the numerical value Analog result determines remaining oil distribution, arranges adjustment well pattern in remaining oil distribution close quarters.
2. high dip angle oil reservoir according to claim 1 optimizes and revises method, which is characterized in that further include to the ultralow pressure oil The well data that are drilled hidden in first development process extract, to be drilled well data in first development process as referring to progress two It is secondary to be drilled well optimization.
3. high dip angle oil reservoir according to claim 1 optimizes and revises method, which is characterized in that the pilot test is to produce Amount declines most slow oil well and nearby carries out exploration well oil test operation.
CN201810714510.3A 2018-07-03 2018-07-03 High dip angle oil reservoir optimizes and revises method Withdrawn CN108985504A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810714510.3A CN108985504A (en) 2018-07-03 2018-07-03 High dip angle oil reservoir optimizes and revises method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810714510.3A CN108985504A (en) 2018-07-03 2018-07-03 High dip angle oil reservoir optimizes and revises method

Publications (1)

Publication Number Publication Date
CN108985504A true CN108985504A (en) 2018-12-11

Family

ID=64539911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810714510.3A Withdrawn CN108985504A (en) 2018-07-03 2018-07-03 High dip angle oil reservoir optimizes and revises method

Country Status (1)

Country Link
CN (1) CN108985504A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110838175A (en) * 2019-11-07 2020-02-25 成都北方石油勘探开发技术有限公司 Geological model building method for gas injection oil reservoir development
CN111894537A (en) * 2019-05-06 2020-11-06 中国石油天然气股份有限公司 Method and device for exploiting oil field in high water cut period
CN112836857A (en) * 2021-01-07 2021-05-25 中国石油天然气股份有限公司 Oil-gas exploration optimization method and device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111894537A (en) * 2019-05-06 2020-11-06 中国石油天然气股份有限公司 Method and device for exploiting oil field in high water cut period
CN110838175A (en) * 2019-11-07 2020-02-25 成都北方石油勘探开发技术有限公司 Geological model building method for gas injection oil reservoir development
CN110838175B (en) * 2019-11-07 2023-05-09 成都北方石油勘探开发技术有限公司 Geological model building method for gas injection development oil reservoir
CN112836857A (en) * 2021-01-07 2021-05-25 中国石油天然气股份有限公司 Oil-gas exploration optimization method and device

Similar Documents

Publication Publication Date Title
CN103901478B (en) The method that a kind of well shake information consolidation determines Reservoir Depositional Characteristics and distribution
US20160376885A1 (en) Method and Apparatus for Performance Prediction of Multi-Layered Oil Reservoirs
CN104975808B (en) A kind of deep water horizontal well wellbore trace method of adjustment
CN104750896B (en) A kind of fractured-cavernous carbonate reservoir method for numerical simulation
CN108985504A (en) High dip angle oil reservoir optimizes and revises method
CN103993862A (en) Layering development method for complex fault block thin oil reservoir
US9422800B2 (en) Method of developing a petroleum reservoir from a technique for selecting the positions of the wells to be drilled
CN110056346B (en) Oil reservoir three-dimensional original water saturation simulation method based on trend change function
NO340044B1 (en) Procedure for creating facies probability cubes based on geological interpretation
CN101236257A (en) Oil well location determination technical method
CN105629310B (en) Well-constraint-free geostatistical inversion method and device for carbonate reservoir
CN106501854A (en) Oil gas drilling target geological quantifying risk evaluation methodology
CN108846540A (en) Recovery ratio calibration method and device for tight sandstone gas field
US9411915B2 (en) Method of selecting positions of wells to be drilled for petroleum reservoir development
CN105631754B (en) Method and device for determining production profile data of offshore oil field
CN110824563A (en) Reservoir lithology prediction method based on Xgboost algorithm
CN106597543A (en) Stratum sedimentary facies division method
CN109783944A (en) Three-dimensional Flow model of element method for building up, device and equipment
Morosov et al. Field-development process revealing uncertainty-assessment pitfalls
CN106570262A (en) Reservoir configuration structure description method
CN108663714A (en) A kind of sedimentary micro depicting method
CN105629304A (en) Sand body superposition mode identification method based on multiple attributes
CN111444621A (en) High-water-content oil reservoir flow unit dividing method based on dynamic and static seepage interface
CN110533224B (en) Oil shale continuous exploration drilling position optimization method
CN109270578A (en) Beach shallow sea law quality reservoirs rolling development method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181211