CN108984866A - A kind of preparation method of test load spectrum - Google Patents

A kind of preparation method of test load spectrum Download PDF

Info

Publication number
CN108984866A
CN108984866A CN201810684838.5A CN201810684838A CN108984866A CN 108984866 A CN108984866 A CN 108984866A CN 201810684838 A CN201810684838 A CN 201810684838A CN 108984866 A CN108984866 A CN 108984866A
Authority
CN
China
Prior art keywords
stress
invalid
time section
reference point
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810684838.5A
Other languages
Chinese (zh)
Other versions
CN108984866B (en
Inventor
赵方伟
张关震
吴斯
吴毅
张澎湃
丛韬
尹鸿祥
张弘
张斌
付秀琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Railway Sciences Corp Ltd CARS
Metals and Chemistry Research Institute of CARS
Beijing CARS Advanced Material Technology Co Ltd
Original Assignee
China Academy of Railway Sciences Corp Ltd CARS
Metals and Chemistry Research Institute of CARS
Beijing CARS Advanced Material Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Railway Sciences Corp Ltd CARS, Metals and Chemistry Research Institute of CARS, Beijing CARS Advanced Material Technology Co Ltd filed Critical China Academy of Railway Sciences Corp Ltd CARS
Priority to CN201810684838.5A priority Critical patent/CN108984866B/en
Publication of CN108984866A publication Critical patent/CN108984866A/en
Application granted granted Critical
Publication of CN108984866B publication Critical patent/CN108984866B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M17/00Testing of vehicles
    • G01M17/08Railway vehicles
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/06Power analysis or power optimisation

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The present invention relates to a kind of preparing methods of test load spectrum, and this method includes the selection of stress reference point, measured data signal processing, the setting of invalid Cyclic Stress threshold value, the differentiation of invalid Cyclic Stress, the determination of invalid load-time section and breakpoint joint step.This method can shorten the test period, true to reflect critical component loading conditions, and front and back is concentrated and meets the damage consistency principle.

Description

A kind of preparation method of test load spectrum
Invention field
The invention belongs to test system fields, in particular to a kind of preparation method of test load spectrum.
Technical background
Rolling stock critical component is one of the important factor in order for influencing safe train operation, and test is to critical component The important means of design and evaluation.Test aspect, road test method can reflect the real working condition of critical component, but test week Phase is long, at high cost, it is impossible to accomplish that each vehicle of every route carries out route measured test.Indoor simulation route bench test Method can be tested with shorter period, higher efficiency.Therefore, analog line bench test is for critical component It designs and evaluates and is very necessary.
When the enterprising row line simulation loading of testing stand is tested indoors, need to work out the test load spectrum conduct for load Drive pumping signal.The source of test load spectrum is the load history of treated road test actual measurement.Due to vehicle On the line when actual motion, can cause structure fatigue damage big load be it is relatively small number of, fatigue damage is contributed little Or undamaged side crops industry accounts for most times, therefore, to shorten the test period, testing expenses is effectively reduced, it need to be to load Lotus time history carries out concentration simplification.
When vehicle is run on the line, collective effect of the critical component moment by various load, various load are It is coupled, the collective effect of a variety of load causes the fatigue rupture of critical component, so being difficult to analyze certain load Lotus is much can to cause fatigue damage to critical component, cannot also directly determine that certain load is much to be retained, how small to answer The deletion.Even if remaining the biggish load of each load type by relevant calculation, the corresponding of each load is also destroyed Temporal regularity can not be used for analog line bench test.
No matter how load acts on critical component, load is all by internal stress to the fatigue rupture of critical component Come what is characterized.Stress is unique foundation of fatigue rupture, when the range of stress of certain time segment structure is higher than its tired cutoff limiting, Illustrate that the structure of the period generates fatigue damage, the load of corresponding period is considered damage can be caused to have critical component Imitate load.The period that the range of stress is lower than tired cutoff limiting is rejected in Stressing history, and synchronous rejecting is corresponding Load-time section can retain effective load history.The concentration of load history is simplified, there is no strengthen to carry Lotus, without changing load cycle sequence, the reservation that each load is synchronized does not change the coefficient rule of each load yet, Situations such as coupled relation will not change, the loaded situation of true reappearance critical component, vibration mode and fatigue rupture.
In existing technology, there are mainly two types of the preparing methods of the test load spectrum of rolling stock critical component, one is Load history based on actual measurement obtains loading spectrum block using rain flow method, and passes through damage consistency principle establishment examination Loading spectrum block is tested, time-domain signal is converted to frequency-region signal by this method, does not account for the change procedure of load, can not reproduce key The true loading conditions of component;Another method is that the load history of actual measurement is carried out load examination directly as test load spectrum It tests, this method test period is too long, considerably increases research and development cost.
Summary of the invention
In order to overcome the drawbacks of the prior art, present inventor proposes a kind of rolling stock based on stress foundation point The preparation method of critical component analog line load test loading spectrum, this method can shorten the test period, and true reflection is crucial Component loading conditions, and front and back is concentrated and meets the damage consistency principle.
Above-mentioned purpose of the invention adopts the following technical scheme that realize.
The present invention proposes a kind of preparation method of test load spectrum, and this method comprises the following steps:
Step 1: the selection of stress reference point
Tired dangerous position is chosen, is then selected imitative in conjunction with critical component practice situation using emulated computation method It is true calculate in the point that often goes wrong in the relatively large point of stress and practice as stress reference point.The present invention with Tired dangerous position as stress reference point, can be reduced route measured test and test load spectrum establishment workload and at This.
Step 2: measured data signal processing
Before establishment test load spectrum, the Stressing history and load history obtain to synchronism detection removes flash removed Signal processing, removal null offset processing, removal interference filter processing.
Step 3: the setting of invalid Cyclic Stress threshold value
The stress amplitude threshold value σ of invalid Cyclic Stress is setaHWith stress average value threshold value σmH
Step 4: the differentiation of invalid Cyclic Stress
Obtain the Cyclic Stress of Stressing history using rain flow method, first by the stress amplitude of Cyclic Stress with answer Power amplitude threshold value σaHComparison is determined as effective stress circulation if being higher than stress amplitude threshold value;If being lower than stress amplitude It is worth threshold value, then is temporarily determined as small Cyclic Stress;By the stress average value of small Cyclic Stress and stress average value threshold value σmH Comparison is determined as effective stress circulation if being higher than stress average value threshold value;If being lower than stress average value threshold value, It is then determined as invalid Cyclic Stress, and records corresponding invalid stress time section.
Step 5: the determination of invalid load-time section
The invalid stress time section for determining all stress reference points, seeks common ground, and then obtain invalid load on a timeline Period.
Step 6: breakpoint joint
Invalid load history is deleted using invalid load-time section, is put down between two neighboring breakpoint with half-sinusoid Slip, and then obtain effective test load spectrum.
In step 5, the invalid stress time section such as following formula of stress reference point:
The invalid stress time section of 1st stress reference point:
The invalid stress time section of 2nd stress reference point:
The invalid stress time section of 3rd stress reference point:
·
·
·
The invalid stress time section of i-th of stress reference point:
·
·
·
The invalid stress time section of n-th of stress reference point:
Then invalid load-time section are as follows:
In formula, Δ T1For the invalid stress time section of i-th of stress reference point;For a of i-th of stress reference pointi A invalid stress time section;N is the quantity of stress reference point;Oeprator ∩ indicates the intersection operation on time shaft.
Compared with prior art, the application has following excellent technical effect:
1, stress is the true response of load, with load corresponding relationship synchronous with stress, with the establishment of stress reference point Test load spectrum, accuracy are high;
2, due to having deleted the section of the ineffective time in load history, so shortening the test period, test is reduced Cost.
3, this patent requires the selection of stress reference point, gives the specific optimum option side of stress reference point Method can be reduced the workload of route measured test and test load spectrum establishment using tired dangerous position as stress reference point And cost.
4, this patent introduces stress average value threshold value, considers the influence of average value, is differentiated using stress amplitude threshold value And then invalid Cyclic Stress is differentiated using stress average value threshold value.The meeting of stress amplitude threshold value is only set in the prior art Accidentally delete that stress amplitude is small, but the Cyclic Stress that stress average value is big, it is to have tribute that this part Cyclic Stress, which is to critical component damage, It offers.The method of this patent is more accurate.
5, prior art point of interruption straight line connection is easily introduced a large amount of singular points, test load spectrum and the reality thus worked out Situation is not inconsistent, and in load test, easily leads to testing stand load failure or damage test platform.This patent semisinusoidal song Line is smoothly connected breakpoint, avoids above situation.
6, the prior art is readily incorporated extra " Efficient Cycle " to the extension of stress cycling wave form, reduces test load spectrum Accuracy.This patent is smoothly connected breakpoint using half-sinusoid, avoids above situation.
Detailed description of the invention
Fig. 1 is analog line test load spectrum Planning procedure figure;
Fig. 2 lorry body measured stress time history and load history processing result;
Fig. 3 is that invalid Cyclic Stress differentiates flow chart;
Fig. 4 lorry body test load spectrum establishment result;
The Stressing history of Fig. 5 lorry body stress reference point 1;
The adjacent breakpoint of Fig. 6 load history;
The adjacent breakpoint joint mode of Fig. 7 load history, (a) are straight line connection, (b) are connected for half-sinusoid.
Specific embodiment
The present invention is made with the determination of certain lorry body test load spectrum with reference to the accompanying drawings and embodiments further It is described in detail.
Embodiment 1
As shown in Figure 1, a kind of preparation method of rolling stock critical component analog line load test loading spectrum, including with Lower step:
Step 1: the selection of stress reference point
Tired dangerous position is chosen, is then selected imitative in conjunction with critical component practice situation using emulated computation method It is true calculate in the point that often goes wrong in the relatively large point of stress and practice as stress reference point.Certain railway goods The results are shown in Table 1 for the selection of vehicle car body stress reference point.
The selection result of certain the lorry body stress reference point of table 1
Number Position
1 Rest the head on outer sleeper beam lower cover plate and central sill join domain
2 Sleeper beam lower cover plate and central sill join domain in resting the head on
3 Middle part cross bearer lower cover plate and central sill junction
Step 2: measured data signal processing
Before establishment test load spectrum, the Stressing history and load history obtain to synchronism detection removes flash removed Signal processing, removal null offset processing, removal interference filter processing.Certain lorry body measured stress time history and load Lotus time history processing result is as shown in Figure 2.
Step 3: the setting of invalid Cyclic Stress threshold value
The stress amplitude threshold value σ of invalid Cyclic Stress is setaHWith stress average value threshold value σmH.Certain railway freight-car vehicle The invalid Cyclic Stress threshold value definitive result of body stress reference point is as shown in table 2.
The invalid Cyclic Stress threshold value definitive result of certain the lorry body stress reference point of table 2
Step 4: the differentiation of invalid Cyclic Stress
The Cyclic Stress of Stressing history is obtained using rain flow method, first by the stress amplitude of Cyclic Stress and door Threshold value σaHComparison is determined as effective stress circulation if being higher than threshold value;If being lower than threshold value, temporarily it is determined as small Cyclic Stress;The stress average value of small Cyclic Stress is taken absolute value and threshold value σmHComparison differentiates if being higher than threshold value For effective stress circulation;If being lower than threshold value, it is determined as invalid Cyclic Stress, and records corresponding invalid stress time section (process is shown in Fig. 3).The invalid stress time section definitive result of certain lorry body is as shown in table 3.
The invalid stress time section definitive result of certain lorry body of table 3
Step 5: the determination of invalid load-time section
The invalid stress time section for determining all stress reference points, seeks common ground, and then obtain invalid load on a timeline Period, such as following formula:
The invalid stress time section of 1st stress reference point:
The invalid stress time section of 2nd stress reference point:
The invalid stress time section of 3rd stress reference point:
·
·
·
The invalid stress time section of i-th of stress reference point:
·
·
·
The invalid stress time section of n-th of stress reference point:
Then invalid load-time section are as follows:
In formula, Δ T1For the invalid stress time section of i-th of stress reference point;For a of i-th of stress reference pointi A invalid stress time section;N is the quantity of stress reference point;Oeprator ∩ indicates the intersection operation on time shaft.Certain railway The invalid load-time section definitive result of truck body is as shown in table 4.
The invalid load-time section definitive result of certain lorry body of table 4
Step 6: breakpoint joint
Invalid load history is deleted using invalid load-time section, is put down between two neighboring breakpoint with half-sinusoid Slip, and then obtain effective test load spectrum.Certain lorry body test load spectrum establishment result is as shown in Figure 4.
Embodiment 2
Unless otherwise specified, using method same as Example 1, the present embodiment is compared to be not introduced into and be answered the present embodiment The difference of stress amplitude threshold value and method of the invention is only arranged in power average value threshold value.
The Stressing history of certain lorry body stress reference point 1 obtains two Cyclic Stress 1 through rain flow method With Cyclic Stress 2, as shown in Figure 5.The statistical result of Cyclic Stress 1 and Cyclic Stress 2 is as shown in table 5.Cyclic Stress 1 and stress The stress amplitude of circulation 2 is lower than stress amplitude threshold value σaH, stress average value is higher than stress average value threshold value σmH, according to existing There is technology judgement, two Cyclic Stress belong to invalid Cyclic Stress, but it is to have that this part Cyclic Stress, which is to critical component damage, Contribution, belong to effective stress circulation.
The statistical result of table 5 Cyclic Stress 1 and Cyclic Stress 2
Number Stress amplitude (MPa) Stress average value (MPa)
Cyclic Stress 1 6.62 21.24
Cyclic Stress 2 9.51 26.86
Embodiment 3
Unless otherwise specified, using method same as Example 1, it is invalid that the present embodiment compares deletion to the present embodiment Using straight line connection and the difference on effect partly just dazzling curve and connect after invalid load-time section.
After deleting invalid load-time section, there is breakpoint in load history, as shown in Figure 6.Between two neighboring breakpoint Connection type as shown in fig. 7, Fig. 7 (a) be conventional coupling arrangement, ineffective time section delete after, breakpoint 2 moves to and breakpoint 1 Same time point, straight line connection between two breakpoints.A large amount of singular point is introduced by the test load spectrum of this connection type establishment, This is not inconsistent with actual conditions, and in load test, and test bench running cannot achieve smooth transition, easily testing stand is caused to add Carry failure or damage test platform.Fig. 7 (b) is the connection type that this patent is chosen, and is smoothly connected between two breakpoints with half-sinusoid It connects, is composed by the test load of this connection type establishment, avoid the generation of singular point, it is more efficient to be used for bench test.

Claims (2)

1. a kind of preparation method of test load spectrum, this method comprises the following steps:
Step 1: the selection of stress reference point
Tired dangerous position is chosen in conjunction with critical component practice situation using emulated computation method, then selects emulation meter The point often to go wrong in the relatively large point of stress and practice in calculation is as stress reference point;
Step 2: measured data signal processing
Before establishment test load spectrum, the Stressing history and load history obtain to synchronism detection removes burr signal Processing, removal null offset processing, removal interference filter processing;
Step 3: the setting of invalid Cyclic Stress threshold value
The stress amplitude threshold value σ of invalid Cyclic Stress is setaHWith stress average value threshold value σmH
Step 4: the differentiation of invalid Cyclic Stress
The Cyclic Stress of Stressing history is obtained using rain flow method, first by the stress amplitude of Cyclic Stress and stress amplitude It is worth threshold value σaHComparison is determined as effective stress circulation if being higher than stress amplitude threshold value;If being lower than stress amplitude door Threshold value is then temporarily determined as small Cyclic Stress;The stress average value of small Cyclic Stress is taken absolute value and stress average value threshold Value σmHComparison is determined as effective stress circulation if being higher than stress average value threshold value;If being lower than stress average value threshold Value, then be determined as invalid Cyclic Stress, and records corresponding invalid stress time section;
Step 5: the determination of invalid load-time section
The invalid stress time section for determining all stress reference points, seeks common ground, and then obtain invalid load-time on a timeline Section;
Step 6: breakpoint joint
Invalid load history is deleted using invalid load-time section, is smoothly connected between two neighboring breakpoint with half-sinusoid It connects, and then obtains effective test load spectrum.
2. method according to claim 1, which is characterized in that in step 5, stress reference point without efficacy when Between section such as following formula:
The invalid stress time section of 1st stress reference point:
The invalid stress time section of 2nd stress reference point:
The invalid stress time section of 3rd stress reference point:
The invalid stress time section of i-th of stress reference point:
The invalid stress time section of n-th of stress reference point:
Then invalid load-time section are as follows:
In formula, Δ T1For the invalid stress time section of i-th of stress reference point;For a of i-th of stress reference pointiIt is a invalid Stress time section;N is the quantity of stress reference point;Oeprator ∩ indicates the intersection operation on time shaft.
CN201810684838.5A 2018-06-28 2018-06-28 Compilation method of test load spectrum Active CN108984866B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810684838.5A CN108984866B (en) 2018-06-28 2018-06-28 Compilation method of test load spectrum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810684838.5A CN108984866B (en) 2018-06-28 2018-06-28 Compilation method of test load spectrum

Publications (2)

Publication Number Publication Date
CN108984866A true CN108984866A (en) 2018-12-11
CN108984866B CN108984866B (en) 2022-09-30

Family

ID=64539178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810684838.5A Active CN108984866B (en) 2018-06-28 2018-06-28 Compilation method of test load spectrum

Country Status (1)

Country Link
CN (1) CN108984866B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110954338A (en) * 2019-11-22 2020-04-03 上海理工大学 Standardized load spectrum for four-column bench test of whole vehicle and standardization method thereof
CN112749683A (en) * 2021-01-27 2021-05-04 吉林大学 Rain flow counting method capable of reserving load time sequence
CN116187041A (en) * 2023-02-10 2023-05-30 南京航空航天大学 Load spectrum filtering method based on continuous fiber reinforced composite material microscopic damage threshold

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2730908A2 (en) * 2012-11-13 2014-05-14 DB Systemtechnik GmbH Method for determining the remaining service life of a railway wheel set shaft using test bench tests
CN104034576A (en) * 2014-06-16 2014-09-10 中国飞机强度研究所 Load spectrum simplification method for aircraft construction crack extension test
CN106096262A (en) * 2016-06-08 2016-11-09 南京航空航天大学 A kind of aero-engine loading spectrum Calculation of correlation factor method based on rain-flow counting circulation
CN106096210A (en) * 2016-07-06 2016-11-09 北京航空航天大学 A kind of fatigue load spectrum establishment technique for accelerated test
CN106446809A (en) * 2016-09-09 2017-02-22 南京航空航天大学 Aeroengine load spectrum filtering method based on rain-flow counting method
CN107122521A (en) * 2017-03-28 2017-09-01 湖南大学 A kind of two-dimensional random load acts on the computational methods of lower fatigue life

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2730908A2 (en) * 2012-11-13 2014-05-14 DB Systemtechnik GmbH Method for determining the remaining service life of a railway wheel set shaft using test bench tests
CN104034576A (en) * 2014-06-16 2014-09-10 中国飞机强度研究所 Load spectrum simplification method for aircraft construction crack extension test
CN106096262A (en) * 2016-06-08 2016-11-09 南京航空航天大学 A kind of aero-engine loading spectrum Calculation of correlation factor method based on rain-flow counting circulation
CN106096210A (en) * 2016-07-06 2016-11-09 北京航空航天大学 A kind of fatigue load spectrum establishment technique for accelerated test
CN106446809A (en) * 2016-09-09 2017-02-22 南京航空航天大学 Aeroengine load spectrum filtering method based on rain-flow counting method
CN107122521A (en) * 2017-03-28 2017-09-01 湖南大学 A kind of two-dimensional random load acts on the computational methods of lower fatigue life

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
MICHELE MATTETTI 等: "Methodology for the realisation of accelerated structural tests on tractors", 《BIOSYSTEMS ENGINEERING》 *
XIAOLING SHI 等: "Research on Structural Fatigue Damage Based on the Superimposed Load Spectrum Method", 《ADVANCES IN MATERIALS AND MATERIALS PROCESSING》 *
安中伟、赵方伟: "货车车体疲劳试验载荷谱编制方法研究", 《铁道机车车辆》 *
胡珈铭: "北京地铁转向架构架应力与载荷谱研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *
赵方伟、谢基龙: "小应力循环对C70E型车体疲劳损伤的影响研究", 《机械工程学报》 *
赵方伟: "铁路货车车体载荷谱测试及疲劳强度评价研究", 《中国博士学位论文全文数据库工程科技Ⅱ辑》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110954338A (en) * 2019-11-22 2020-04-03 上海理工大学 Standardized load spectrum for four-column bench test of whole vehicle and standardization method thereof
CN110954338B (en) * 2019-11-22 2021-09-28 上海理工大学 Method for standardizing standard load spectrum of four-column bench test of whole vehicle
CN112749683A (en) * 2021-01-27 2021-05-04 吉林大学 Rain flow counting method capable of reserving load time sequence
CN116187041A (en) * 2023-02-10 2023-05-30 南京航空航天大学 Load spectrum filtering method based on continuous fiber reinforced composite material microscopic damage threshold
CN116187041B (en) * 2023-02-10 2023-10-20 南京航空航天大学 Load spectrum filtering method based on continuous fiber reinforced composite material microscopic damage threshold

Also Published As

Publication number Publication date
CN108984866B (en) 2022-09-30

Similar Documents

Publication Publication Date Title
CN107727338B (en) A kind of bridge damnification diagnostic method based on Vehicle-Bridge Coupling System
CN108984866A (en) A kind of preparation method of test load spectrum
CN106092619B (en) A kind of bonded structure life-span prediction method of high-speed EMUs
CN109308393B (en) Method and system for evaluating fatigue life of vehicle body
CN105718633A (en) Method for analyzing load of chassis part
CN108170925A (en) A kind of bridge damnification method for early warning based on arma modeling
CN111754463B (en) Method for detecting CA mortar layer defects of ballastless track based on convolutional neural network
JP6314359B2 (en) Method for evaluating changes in natural frequency of railway bridges
CN110033160A (en) A kind of performance appraisal system and method
CN112945489A (en) Method for testing bridge deflection based on millimeter wave radar
CN102914594A (en) Method for quantitatively diagnosing transverse cracks of pipeline on basis of frequency contour lines
CN109592075A (en) A kind of dynamic monitoring and controlling method of aircraft structure fatigue test measurement data
CN111460702A (en) Structural part damage identification method based on forward and reverse damage feature fusion
CN102944609A (en) Complete multichannel white body welding spot detection system
CN110487576A (en) The uniform beam damnification recognition method of the symmetrical slope in faulted condition inclination angle
CN105891756A (en) Method for verifying precision of overhead contact line equipment dynamic detection system
KR101097414B1 (en) Pipe vibration estimation method
CN104374689B (en) Pipe applicability testing device for conveying pipeline and test judgment method
CN113609565A (en) Acceptance method and device for static long-wave irregularity of railway bridge track
CN116046302B (en) Method for identifying damage of assembled beam bridge based on strain time curve
CN112945490A (en) Method for testing bearing capacity of bridge based on deflection influence line
CN114485681B (en) Method for evaluating consistency rate of precision map data by utilizing DR track
Derler et al. Distortion–induced fatigue failure at main girders of a railway bridge–strain measurements in service and analyses based on fracture mechanics
Zofka et al. Traffic speed deflectometer (TSD) measurements for pavement evaluation
Chen et al. Maintenance strategies and life-cycle cost analysis of inspection robots in metro tunnels

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant