CN108979693A - A kind of anti-method killed of Full-mechanized mining working face ended support - Google Patents
A kind of anti-method killed of Full-mechanized mining working face ended support Download PDFInfo
- Publication number
- CN108979693A CN108979693A CN201710410728.5A CN201710410728A CN108979693A CN 108979693 A CN108979693 A CN 108979693A CN 201710410728 A CN201710410728 A CN 201710410728A CN 108979693 A CN108979693 A CN 108979693A
- Authority
- CN
- China
- Prior art keywords
- end support
- face end
- support
- killed
- full
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000005065 mining Methods 0.000 title claims abstract description 16
- 230000000295 complement effect Effects 0.000 claims abstract description 17
- 230000003028 elevating effect Effects 0.000 claims abstract description 9
- 230000005641 tunneling Effects 0.000 claims abstract description 7
- 238000005422 blasting Methods 0.000 claims abstract description 5
- 239000003795 chemical substances by application Substances 0.000 claims description 16
- 239000000178 monomer Substances 0.000 claims 1
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 claims 1
- 230000002265 prevention Effects 0.000 abstract description 3
- 230000006378 damage Effects 0.000 abstract description 2
- 230000000694 effects Effects 0.000 abstract description 2
- 230000008092 positive effect Effects 0.000 abstract description 2
- 239000003245 coal Substances 0.000 description 2
- 238000004880 explosion Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- 230000000699 topical effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D15/00—Props; Chocks, e.g. made of flexible containers filled with backfilling material
- E21D15/14—Telescopic props
- E21D15/44—Hydraulic, pneumatic, or hydraulic-pneumatic props
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/0004—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F13/00—Transport specially adapted to underground conditions
- E21F13/06—Transport of mined material at or adjacent to the working face
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The present invention is a kind of anti-method killed of Full-mechanized mining working face ended support, the specific steps are as follows: (1) advanced frame to the single anchor cable of face end support people's row side complement;(2) advanced frame remains that forward tunneling boring is acted as a planted agent;(3) increase double individual prop before advanced frame as advance support;(4) timely complement anchor cable before advanced frame;(5) it is fallen by the way of planted agent to elevating conveyor at the face end support killed.The present invention takes the top plate before face end support and reinforces in advance, it can prevent top plate from further sinking, bigger pressure is generated to face end support, is acted as a planted agent in advance, it is ensured that face end support stroke, both it is crushed to death to face end support and plays prevention effect, it is handled killed to face end support again after, plays positive effect, take and act as a planted agent to elevating conveyor at face end support, the destruction generated to roof blasting is alleviated, the face end support that processing is crushed to death is more advantageous to.
Description
Technical field
The present invention relates to coal mining fields, and in particular to a kind of anti-method killed of Full-mechanized mining working face ended support.
Background technique
Coal mine fully-mechanized mining working faces end head bracket is in and cuts eye and haulage gate region of stress concentration, when periodic weighting or top plate
When being crushed serious, it may occur that leakage emits type or push engine, so that Full-mechanized mining working face ended support is killed, causes face end support
Column does not have stroke that can not move.After previous method is mostly hydraulic support pushed down, takes and explosion is carried out to top plate above face end support
The method of unrestrained spoil restores face end support column stroke, but when top plate is extremely broken, explosion makes top plate more broken instead
Broken more unfavorable to bracket is restored, processing face end support kills more difficult, it is seen that this method has topical type.Need a kind of synthesis
The method that prevention and processing face end support are crushed to death.
Summary of the invention
Technical problem to be solved by the present invention lies in view of the above shortcomings of the prior art, provide a kind of fully-mechanized mining working
The anti-method killed of face end support.
To solve the above problems, the present invention proposes a kind of anti-method killed of Full-mechanized mining working face ended support, specific steps
It is as follows: (1) advanced frame to the single anchor cable of face end support people's row side complement;(2) advanced frame remains that forward tunneling boring is acted as a planted agent;
(3) increase double individual prop before advanced frame as advance support;(4) timely complement anchor cable before advanced frame;(5) using sleeping
The mode at bottom falls to elevating conveyor at face end support.
The step (1) method particularly includes: in advanced frame to the single anchor cable of the timely complement in the end side Jia Renhang, prevent from pushing up
Plate further sinks, and specification chooses 18.9 ~ 21.6mm of Φ, the anchor cable of 7.1 ~ 8.8m of length.
The step (2) requires are as follows: 100 ~ 200m range remains that tunneling boring is acted as a planted agent to advanced frame forward, it is ensured that end branch
There are enough strokes in frame progradation, will not be killed easily, the roadway floor after planted agent cannot be less than setting to ceiling height
Meter height.
The step (3) increases double individual prop as advance support before advanced frame, increases individual prop range not
It obtains and is less than 100m.
The step (4) timely complement anchor cable before advanced frame, further controlroof sink, the anchor cable quantity root of complement
It is designed according to heading sizes.
The step (5) forbids to discharge face end support row by the way of to roof blasting after face end support is crushed to death
Journey falls to the elevating conveyor at face end support by the way of planted agent, to discharge face end support stroke.
Compared with the prior art, the present invention has the following advantages.
The present invention takes the top plate before face end support and reinforces in advance, can prevent top plate from further sinking, to face end support
Bigger pressure is generated, is acted as a planted agent in advance, it is ensured that face end support stroke is both crushed to death to face end support and plays prevention effect,
It is handled killed to face end support again after, plays positive effect;It takes and acts as a planted agent to elevating conveyor at face end support, alleviate
To the destruction that roof blasting generates, it is more advantageous to the face end support that processing is crushed to death.
Invention is further described in detail with reference to the accompanying drawings and examples.
Detailed description of the invention
Fig. 1 is flow chart of the present invention.
Specific embodiment
Example is the anti-method killed of certain mine Full-mechanized mining working face ended support, according to Fig. 1, the specific steps are as follows: (1)
Advanced frame is to the single anchor cable of face end support people's row side complement;(2) advanced frame remains that forward tunneling boring is acted as a planted agent;(3) super
Increase double individual prop before side arm as advance support;(4) timely complement anchor cable before advanced frame;(5) by the way of planted agent
It falls to elevating conveyor at face end support.
Step (1) is to prevent top plate from further sinking, in advanced frame to the single anchor cable of the timely complement in the end side Jia Renhang,
Specification chooses Φ 21.6mm, the anchor cable of length 8.8m.
In advanced frame, 100m range remains that tunneling boring is acted as a planted agent to step (2) forward, the roadway floor after planted agent to top plate
Height 3.8m is greater than former design height 3.6m.
Step (3) increases double individual prop as advance support before advanced frame, and increasing individual prop range must not lack
In 150 ~ 100m.
Step (4) timely complement anchor cable before advanced frame, further controlroof sink, between the anchor cable number of complement uses
1.4 × 1.4m of array pitch, tunnel clear span 5.6m, every row 3.
Step (5) is forbidden to discharge face end support stroke by the way of to roof blasting after face end support is crushed to death,
It by the way of planted agent, falls to the elevating conveyor at face end support, to discharge face end support stroke.
All any simple modification, change and equivalence change to the above embodiments according to the present invention, still belong to
In in protection scope of the present invention.
Claims (6)
1. a kind of anti-method killed of Full-mechanized mining working face ended support, the specific steps are as follows: (1) advanced frame to face end support people
The single anchor cable of row side complement;(2) advanced frame remains that forward tunneling boring is acted as a planted agent;(3) increase double monomer before advanced frame
Pillar is as advance support;(4) timely complement anchor cable before advanced frame;(5) at by the way of planted agent to the face end support killed
Elevating conveyor falls.
2. a kind of anti-method killed of Full-mechanized mining working face ended support according to claim 1, which is characterized in that advanced
Frame prevents top plate from further sinking, specification chooses 18.9 ~ 21.6mm of Φ, long to the single anchor cable of the timely complement in the end side Jia Renhang
Spend the anchor cable of 7.1 ~ 8.8m.
3. a kind of anti-method killed of Full-mechanized mining working face ended support according to claim 1, which is characterized in that advanced frame
100 ~ 200m range remains that tunneling boring is acted as a planted agent forward, it is ensured that there are enough strokes in face end support progradation, it will not be by
It kills easily, the roadway floor after planted agent to ceiling height cannot be less than design height.
4. a kind of anti-method killed of Full-mechanized mining working face ended support according to claim 1, which is characterized in that advanced
Increase double individual prop before frame as advance support, 100m must not be less than by increasing individual prop range.
5. a kind of anti-method killed of Full-mechanized mining working face ended support according to claim 1, which is characterized in that advanced frame
Preceding timely complement anchor cable, further controlroof sink, and the anchor cable quantity of complement is designed according to heading sizes.
6. a kind of anti-method killed of Full-mechanized mining working face ended support according to claim 1, which is characterized in that head bracket
After being crushed to death, forbid to discharge face end support stroke by the way of to roof blasting, by the way of planted agent, at face end support
Elevating conveyor fall, to discharge face end support stroke.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710410728.5A CN108979693A (en) | 2017-06-04 | 2017-06-04 | A kind of anti-method killed of Full-mechanized mining working face ended support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710410728.5A CN108979693A (en) | 2017-06-04 | 2017-06-04 | A kind of anti-method killed of Full-mechanized mining working face ended support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108979693A true CN108979693A (en) | 2018-12-11 |
Family
ID=64501780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710410728.5A Pending CN108979693A (en) | 2017-06-04 | 2017-06-04 | A kind of anti-method killed of Full-mechanized mining working face ended support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108979693A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109869170A (en) * | 2019-03-06 | 2019-06-11 | 东北大学 | A kind of mine hydraulic support column with anti-crushing device |
-
2017
- 2017-06-04 CN CN201710410728.5A patent/CN108979693A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109869170A (en) * | 2019-03-06 | 2019-06-11 | 东北大学 | A kind of mine hydraulic support column with anti-crushing device |
CN109869170B (en) * | 2019-03-06 | 2020-08-21 | 东北大学 | Mining hydraulic support stand with prevent pressing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10472963B2 (en) | Method for stepwise construction of preferential gas migration pathway at stope in coal seam | |
CN102900460B (en) | Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam | |
CN103742148B (en) | The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam | |
CN103244122B (en) | Trinity coupling support stability control method for gob-side entry-driving coal pillar | |
CN103147793B (en) | Girdle roadside packing non chain pillar entryprotection method | |
CN109681248A (en) | A kind of grouting cable anchor advanced support method | |
CN103216236A (en) | Method for reducing subsidence of stope overburden bed separation by grouting | |
CN105422099A (en) | Method for completely filling two sides of pillars with repeated mining and residual mining area remaining coal pillars | |
CN104100271B (en) | Pre-pick is led cave filling artificial side secondary multiplexing roadside support and is become lane method | |
CN104088640B (en) | A kind of deep orebody adopts the mining codes filling spatial separation | |
UA123770C2 (en) | Anti-collapse structure beside roadway based on 110 construction method for breaking roof | |
CN104632219A (en) | Large mining height gob-side entry retaining method for thick coal seams | |
CN108005655A (en) | A kind of projecting coal bed double lane arrangements of high methane are without pillar mining method | |
CN104533419B (en) | Method for partial recovery of residual coal from wide coal pillar | |
CN103758529A (en) | Coal mine gob-side entry retaining side supporting method | |
CN108150206A (en) | A kind of method by fully-mechanized mining working crossheading caving place | |
CN105545309A (en) | Method for filling bilateral parts beside pillar with repeatedly-mined left-over coal pillars in residual mining area | |
CN108979693A (en) | A kind of anti-method killed of Full-mechanized mining working face ended support | |
CN112610258A (en) | Impact mine stoping roadway advanced support method applied to smart mine | |
CN205172609U (en) | Asymmetric supporting device in tunnel | |
Trueman et al. | Understanding the causes of roof control problems on a longwall face from shield monitoring data-a case study | |
Haile | Observations of the dynamic performance of South African tunnel support systems | |
CN104727847A (en) | Non chain pillar gob-side entry retaining method with filling wall self-erasure | |
CN103557029B (en) | A kind of by sublevel caving method without sill pillar upwards to the method for horizontal cut and fill stoping transition | |
CN108843390A (en) | Mine absciss layer water hazard prediction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181211 |
|
WD01 | Invention patent application deemed withdrawn after publication |