CN108979693A - A kind of anti-method killed of Full-mechanized mining working face ended support - Google Patents

A kind of anti-method killed of Full-mechanized mining working face ended support Download PDF

Info

Publication number
CN108979693A
CN108979693A CN201710410728.5A CN201710410728A CN108979693A CN 108979693 A CN108979693 A CN 108979693A CN 201710410728 A CN201710410728 A CN 201710410728A CN 108979693 A CN108979693 A CN 108979693A
Authority
CN
China
Prior art keywords
end support
face end
support
killed
full
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710410728.5A
Other languages
Chinese (zh)
Inventor
朱世阳
苟科学
马志飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI BINZHANG WANJIAPO MINING CO Ltd
Original Assignee
SHAANXI BINZHANG WANJIAPO MINING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI BINZHANG WANJIAPO MINING CO Ltd filed Critical SHAANXI BINZHANG WANJIAPO MINING CO Ltd
Priority to CN201710410728.5A priority Critical patent/CN108979693A/en
Publication of CN108979693A publication Critical patent/CN108979693A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/14Telescopic props
    • E21D15/44Hydraulic, pneumatic, or hydraulic-pneumatic props
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/0004Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/06Transport of mined material at or adjacent to the working face

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention is a kind of anti-method killed of Full-mechanized mining working face ended support, the specific steps are as follows: (1) advanced frame to the single anchor cable of face end support people's row side complement;(2) advanced frame remains that forward tunneling boring is acted as a planted agent;(3) increase double individual prop before advanced frame as advance support;(4) timely complement anchor cable before advanced frame;(5) it is fallen by the way of planted agent to elevating conveyor at the face end support killed.The present invention takes the top plate before face end support and reinforces in advance, it can prevent top plate from further sinking, bigger pressure is generated to face end support, is acted as a planted agent in advance, it is ensured that face end support stroke, both it is crushed to death to face end support and plays prevention effect, it is handled killed to face end support again after, plays positive effect, take and act as a planted agent to elevating conveyor at face end support, the destruction generated to roof blasting is alleviated, the face end support that processing is crushed to death is more advantageous to.

Description

A kind of anti-method killed of Full-mechanized mining working face ended support
Technical field
The present invention relates to coal mining fields, and in particular to a kind of anti-method killed of Full-mechanized mining working face ended support.
Background technique
Coal mine fully-mechanized mining working faces end head bracket is in and cuts eye and haulage gate region of stress concentration, when periodic weighting or top plate When being crushed serious, it may occur that leakage emits type or push engine, so that Full-mechanized mining working face ended support is killed, causes face end support Column does not have stroke that can not move.After previous method is mostly hydraulic support pushed down, takes and explosion is carried out to top plate above face end support The method of unrestrained spoil restores face end support column stroke, but when top plate is extremely broken, explosion makes top plate more broken instead Broken more unfavorable to bracket is restored, processing face end support kills more difficult, it is seen that this method has topical type.Need a kind of synthesis The method that prevention and processing face end support are crushed to death.
Summary of the invention
Technical problem to be solved by the present invention lies in view of the above shortcomings of the prior art, provide a kind of fully-mechanized mining working The anti-method killed of face end support.
To solve the above problems, the present invention proposes a kind of anti-method killed of Full-mechanized mining working face ended support, specific steps It is as follows: (1) advanced frame to the single anchor cable of face end support people's row side complement;(2) advanced frame remains that forward tunneling boring is acted as a planted agent; (3) increase double individual prop before advanced frame as advance support;(4) timely complement anchor cable before advanced frame;(5) using sleeping The mode at bottom falls to elevating conveyor at face end support.
The step (1) method particularly includes: in advanced frame to the single anchor cable of the timely complement in the end side Jia Renhang, prevent from pushing up Plate further sinks, and specification chooses 18.9 ~ 21.6mm of Φ, the anchor cable of 7.1 ~ 8.8m of length.
The step (2) requires are as follows: 100 ~ 200m range remains that tunneling boring is acted as a planted agent to advanced frame forward, it is ensured that end branch There are enough strokes in frame progradation, will not be killed easily, the roadway floor after planted agent cannot be less than setting to ceiling height Meter height.
The step (3) increases double individual prop as advance support before advanced frame, increases individual prop range not It obtains and is less than 100m.
The step (4) timely complement anchor cable before advanced frame, further controlroof sink, the anchor cable quantity root of complement It is designed according to heading sizes.
The step (5) forbids to discharge face end support row by the way of to roof blasting after face end support is crushed to death Journey falls to the elevating conveyor at face end support by the way of planted agent, to discharge face end support stroke.
Compared with the prior art, the present invention has the following advantages.
The present invention takes the top plate before face end support and reinforces in advance, can prevent top plate from further sinking, to face end support Bigger pressure is generated, is acted as a planted agent in advance, it is ensured that face end support stroke is both crushed to death to face end support and plays prevention effect, It is handled killed to face end support again after, plays positive effect;It takes and acts as a planted agent to elevating conveyor at face end support, alleviate To the destruction that roof blasting generates, it is more advantageous to the face end support that processing is crushed to death.
Invention is further described in detail with reference to the accompanying drawings and examples.
Detailed description of the invention
Fig. 1 is flow chart of the present invention.
Specific embodiment
Example is the anti-method killed of certain mine Full-mechanized mining working face ended support, according to Fig. 1, the specific steps are as follows: (1) Advanced frame is to the single anchor cable of face end support people's row side complement;(2) advanced frame remains that forward tunneling boring is acted as a planted agent;(3) super Increase double individual prop before side arm as advance support;(4) timely complement anchor cable before advanced frame;(5) by the way of planted agent It falls to elevating conveyor at face end support.
Step (1) is to prevent top plate from further sinking, in advanced frame to the single anchor cable of the timely complement in the end side Jia Renhang, Specification chooses Φ 21.6mm, the anchor cable of length 8.8m.
In advanced frame, 100m range remains that tunneling boring is acted as a planted agent to step (2) forward, the roadway floor after planted agent to top plate Height 3.8m is greater than former design height 3.6m.
Step (3) increases double individual prop as advance support before advanced frame, and increasing individual prop range must not lack In 150 ~ 100m.
Step (4) timely complement anchor cable before advanced frame, further controlroof sink, between the anchor cable number of complement uses 1.4 × 1.4m of array pitch, tunnel clear span 5.6m, every row 3.
Step (5) is forbidden to discharge face end support stroke by the way of to roof blasting after face end support is crushed to death, It by the way of planted agent, falls to the elevating conveyor at face end support, to discharge face end support stroke.
All any simple modification, change and equivalence change to the above embodiments according to the present invention, still belong to In in protection scope of the present invention.

Claims (6)

1. a kind of anti-method killed of Full-mechanized mining working face ended support, the specific steps are as follows: (1) advanced frame to face end support people The single anchor cable of row side complement;(2) advanced frame remains that forward tunneling boring is acted as a planted agent;(3) increase double monomer before advanced frame Pillar is as advance support;(4) timely complement anchor cable before advanced frame;(5) at by the way of planted agent to the face end support killed Elevating conveyor falls.
2. a kind of anti-method killed of Full-mechanized mining working face ended support according to claim 1, which is characterized in that advanced Frame prevents top plate from further sinking, specification chooses 18.9 ~ 21.6mm of Φ, long to the single anchor cable of the timely complement in the end side Jia Renhang Spend the anchor cable of 7.1 ~ 8.8m.
3. a kind of anti-method killed of Full-mechanized mining working face ended support according to claim 1, which is characterized in that advanced frame 100 ~ 200m range remains that tunneling boring is acted as a planted agent forward, it is ensured that there are enough strokes in face end support progradation, it will not be by It kills easily, the roadway floor after planted agent to ceiling height cannot be less than design height.
4. a kind of anti-method killed of Full-mechanized mining working face ended support according to claim 1, which is characterized in that advanced Increase double individual prop before frame as advance support, 100m must not be less than by increasing individual prop range.
5. a kind of anti-method killed of Full-mechanized mining working face ended support according to claim 1, which is characterized in that advanced frame Preceding timely complement anchor cable, further controlroof sink, and the anchor cable quantity of complement is designed according to heading sizes.
6. a kind of anti-method killed of Full-mechanized mining working face ended support according to claim 1, which is characterized in that head bracket After being crushed to death, forbid to discharge face end support stroke by the way of to roof blasting, by the way of planted agent, at face end support Elevating conveyor fall, to discharge face end support stroke.
CN201710410728.5A 2017-06-04 2017-06-04 A kind of anti-method killed of Full-mechanized mining working face ended support Pending CN108979693A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710410728.5A CN108979693A (en) 2017-06-04 2017-06-04 A kind of anti-method killed of Full-mechanized mining working face ended support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710410728.5A CN108979693A (en) 2017-06-04 2017-06-04 A kind of anti-method killed of Full-mechanized mining working face ended support

Publications (1)

Publication Number Publication Date
CN108979693A true CN108979693A (en) 2018-12-11

Family

ID=64501780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710410728.5A Pending CN108979693A (en) 2017-06-04 2017-06-04 A kind of anti-method killed of Full-mechanized mining working face ended support

Country Status (1)

Country Link
CN (1) CN108979693A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109869170A (en) * 2019-03-06 2019-06-11 东北大学 A kind of mine hydraulic support column with anti-crushing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109869170A (en) * 2019-03-06 2019-06-11 东北大学 A kind of mine hydraulic support column with anti-crushing device
CN109869170B (en) * 2019-03-06 2020-08-21 东北大学 Mining hydraulic support stand with prevent pressing device

Similar Documents

Publication Publication Date Title
US10472963B2 (en) Method for stepwise construction of preferential gas migration pathway at stope in coal seam
CN102900460B (en) Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam
CN103742148B (en) The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam
CN103244122B (en) Trinity coupling support stability control method for gob-side entry-driving coal pillar
CN103147793B (en) Girdle roadside packing non chain pillar entryprotection method
CN109681248A (en) A kind of grouting cable anchor advanced support method
CN103216236A (en) Method for reducing subsidence of stope overburden bed separation by grouting
CN105422099A (en) Method for completely filling two sides of pillars with repeated mining and residual mining area remaining coal pillars
CN104100271B (en) Pre-pick is led cave filling artificial side secondary multiplexing roadside support and is become lane method
CN104088640B (en) A kind of deep orebody adopts the mining codes filling spatial separation
UA123770C2 (en) Anti-collapse structure beside roadway based on 110 construction method for breaking roof
CN104632219A (en) Large mining height gob-side entry retaining method for thick coal seams
CN108005655A (en) A kind of projecting coal bed double lane arrangements of high methane are without pillar mining method
CN104533419B (en) Method for partial recovery of residual coal from wide coal pillar
CN103758529A (en) Coal mine gob-side entry retaining side supporting method
CN108150206A (en) A kind of method by fully-mechanized mining working crossheading caving place
CN105545309A (en) Method for filling bilateral parts beside pillar with repeatedly-mined left-over coal pillars in residual mining area
CN108979693A (en) A kind of anti-method killed of Full-mechanized mining working face ended support
CN112610258A (en) Impact mine stoping roadway advanced support method applied to smart mine
CN205172609U (en) Asymmetric supporting device in tunnel
Trueman et al. Understanding the causes of roof control problems on a longwall face from shield monitoring data-a case study
Haile Observations of the dynamic performance of South African tunnel support systems
CN104727847A (en) Non chain pillar gob-side entry retaining method with filling wall self-erasure
CN103557029B (en) A kind of by sublevel caving method without sill pillar upwards to the method for horizontal cut and fill stoping transition
CN108843390A (en) Mine absciss layer water hazard prediction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181211

WD01 Invention patent application deemed withdrawn after publication