CN108979296A - A kind of building waste is used for the construction method of environmentally friendly enclosure wall - Google Patents
A kind of building waste is used for the construction method of environmentally friendly enclosure wall Download PDFInfo
- Publication number
- CN108979296A CN108979296A CN201810866699.8A CN201810866699A CN108979296A CN 108979296 A CN108979296 A CN 108979296A CN 201810866699 A CN201810866699 A CN 201810866699A CN 108979296 A CN108979296 A CN 108979296A
- Authority
- CN
- China
- Prior art keywords
- wall
- building waste
- environmentally friendly
- base station
- class
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B18/00—Use of agglomerated or waste materials or refuse as fillers for mortars, concrete or artificial stone; Treatment of agglomerated or waste materials or refuse, specially adapted to enhance their filling properties in mortars, concrete or artificial stone
- C04B18/04—Waste materials; Refuse
- C04B18/16—Waste materials; Refuse from building or ceramic industry
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/91—Use of waste materials as fillers for mortars or concrete
Abstract
The present invention provides the construction methods that a kind of building waste is used for environmentally friendly enclosure wall, are related to building waste utilization technology field, it is intended to solve the problems, such as that building waste recycling and reusing is at high cost in the prior art comprising following steps: S1: sifting sort;S2: broken apart;S3: reinforcing bar shaping;S4: foundation stabilization;S5: base station construction;S6: reinforcing steel bar frame is placed;S7: wall filling.The present invention is built by foundation stabilization, base station, wall pours the setting with wall skeleton, the quantity for recycling the scene of fractionation to generate most construction main body material and reinforcing bar, and its reprocessing difficulty is low, return period is short, recycles at low cost.
Description
Technical field
The present invention relates to building waste utilization technology fields more particularly to a kind of building waste to be used for environmentally friendly enclosure wall
Construction method.
Background technique
Building waste refers to that construction, all kinds of buildings of unit in charge of construction or personal team, structures, pipe network etc. are built, spread
If or removing, generated dregs, spoir, rejected material, remaining mud and other wastes in reparative processes;However, overwhelming majority building
Rubbish just transports countryside or rural area, air storage or landfill to by unit in charge of construction without any processing, consumes a large amount of land acquisition
Take, the pork barrels such as refuse collection expense, meanwhile, it clears and is made again with the problems such as being flown upward with dust, sand-lime of dropping in stacking process
At serious environmental pollution.
To solve the above-mentioned problems, the Chinese invention patent of notification number CN107377584A discloses a kind of building waste time
Regeneration method is received, after construction waste crushing, magnetic separation removes iron refuse, washing removal soil and light materials, screening
Obtain the rubbish of tri- kinds of particle size ranges of granulated garbage fines and 5-8mm, 8-12mm and 12-25mm of 0-5mm particle size range
Grain coarse fodder, being collected simultaneously the dust generated during refuse breaking and obtaining partial size is 0.3mm granulated garbage powder below;It will
The coarse fodder of powder, fines and corresponding type adds cement and water as brick-making raw material, according still further to proportion requirement, makes after being stirred
It is standby to obtain the cement brick made from raw material based on building waste.
Although this building waste recovery and reusing and recycling method is by crushing and screening, by the powder of different-grain diameter in building waste
Last particle distinguishes, to be used for being prepared for for cement brick;But this building waste recovery and reusing and recycling method is not
Only need the broken classification in scene, it is also necessary to the granulated garbage of broken generation be transported to brickmaking place and reprocess and can make
With return period is long, recycles at high cost.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides the construction parties that a kind of building waste is used for environmentally friendly enclosure wall
Method has processing convenience, return period short, recycles advantage at low cost.
To realize the above-mentioned technical purpose, a kind of building waste provided by the invention is used for the construction method of environmentally friendly enclosure wall, packet
Include following steps:
S1: sifting sort splits resulting material type according to construction site and manually classifies;
Wherein, classify according to following standard:
The first kind: plant material, plant material include woodwork and bamboo product;
Second class: textile material;
Third class: resinous material;
4th class: construction main body material comprising soil, brick, concrete block, reinforced concrete block;
5th class: glass;
6th class: other materials;
S2: it is broken apart, the reinforced concrete block containing reinforcing bar be tentatively crushed, screens out reinforcing bar part, and will screening
Remaining the 4th class material of clout afterwards is used as object is built;
S3: reinforcing bar shaping, the reinforcing bar that will be singled out carry out shaping, it is made to keep linear state substantially, and by bending, cut and
Welding manner is made into reinforcing steel bar frame, using as wall skeleton;
S4: average grain diameter is greater than the masonry of 100mm on ground along the pre- masonry position excavation and reinforcement slot of enclosure wall by foundation stabilization
Object is filled into reinforcement tank, and is handled using machine compacting, the gap built between object after ramming, in reinforcement tank
Average grain diameter is less than the masonry object of 10mm in middle filling, then carry out it is secondary ram, and pour at the top of filler by average grain
Mortar made of masonry object mixing of the diameter less than 10mm forms until flushing with the ground around reinforcement tank and reinforces platform;
S5: base station construction sets up the two rows of templates being oppositely arranged, the cavity surrounded between two rows of templates on reinforcing platform
In pour into the mortar as made of masonrys object mixing of the average grain diameter less than 10mm to the position of template half height, then the grain that will be averaged
In the mortar built between object indentation template of the diameter greater than 100mm, and back-grouting is carried out until forming base station;
S6: placing reinforcing steel bar frame, the demoulding after the firm molding of base station, and reinforcing steel bar frame is fixed on base station;
S7: wall filling will build object and be sequentially filled by the sequence of average grain diameter from big to small in the affixed baffle in reinforcing steel bar frame two sides
Into in the reinforcing steel bar frame between baffle, and leaching sand as made of masonry object mixing of the average grain diameter less than 10mm is poured from upper opening
Slurry, wait build bonded between object it is firm after remove baffle and form wall body structure.
By using above-mentioned technical proposal, all kinds of building wastes mixed in construction site are classified first, after convenient
Continuous broken and recycling, then the reinforcing bar in construction main body material is separated, to facilitate subsequent processing, and separate
Reinforcing bar the skeleton of environmentally friendly enclosure wall can be constituted by way of bending, cutting and welding, wall body structure is reinforced, is improved
Its stress intensity, and remove the construction main body material after reinforcing bar and can be used in consolidated subsoil, build base station and wall;In addition, applying
The filler and mortar used in work are all a part in construction main body material, to consume a large amount of building waste;It tears open
Resulting quantity mega structure material of main part part the most can be used for the masonry of environmentally friendly enclosure wall after point, without adding at the scene
After work, also needs finish and can use, but can transport after the scene of fractionation carries out preliminary treatment to environmentally friendly enclosure wall
Job location is recycled, and return period is short, is recycled at low cost.
In some embodiments, in the step S3, in framework reinforcing steel bar frame, polishing derusting is carried out to reinforcing bar.
By adopting the above technical scheme, when recycling reinforcing bar framework reinforcing steel bar frame, rebar surface of being gone out by way of polishing
Iron rust, can not only check whether reinforcing bar actual state meets requirement, moreover it is possible to avoid the further Corrosion Reinforcement frame of iron rust.
In some embodiments, in the step S3, the reinforcing bar periphery of the reinforcing steel bar frame is painted with antirust paint.
By using above-mentioned technical proposal, it is brushed on antirust paint in the reinforcing bar periphery for removing iron rust, avoids reinforcing steel bar frame certainly
It is corroded in right environment, and loses the support to environmentally friendly enclosure wall, blocks shield effect.
In some embodiments, in the step S4, separating reinforcement tank from bottom to top is multilayer, is filled using layer-by-layer,
The mode successively rammed is constructed.
By using above-mentioned technical proposal, multilayer filling, the multiple mode rammed can be reinforced and be filled in reinforcement tank
The compactness of construction main body material occurs significantly when wall part being avoided to be set on ground to improve its weight bearing power
Sedimentation or offset, and influence the stability of environmentally friendly enclosure wall.
In some embodiments, in the step S5, when building base station, upper several are plugged vertically between template
Fixed steel bars, and fixed steel bars top is made to stretch out base station setting, and reinforcing bar frame bottom is welded in setting at the top of fixed steel bars.
By adopting the above technical scheme, by the way that when base station is built, fixed steel bars are plugged between template in advance, thus
After base station forming, fixed steel bars can form an entirety with base station, can not only facilitate construction personnel that reinforcing steel bar frame is affixed
Onto base station, moreover it is possible to the connection structure of firm reinforcing steel bar frame and base station.
In some embodiments, in the step S5, when building base station, base station width is greater than reinforcing bar width of frame and sets
It sets, and in the reserved groove being adapted to reinforcing bar frame bottom in base station top, and stretches out and be arranged from groove at the top of fixed steel bars.
By using above-mentioned technical proposal, the groove of upper and reinforcing bar frame bottom cooperation is set at the top of base station, and will be fixed
In base station part below steel-bar arrangement and groove, so that reinforcing steel bar frame is installed in groove in construction personnel's installation, cooperate
The stability of the further stabilization wall of fixed steel bars.
In some embodiments, in the step S1, for first kind material, intact plant material can lead to
Cutting, assembled formation ornament or vegetation box are crossed, and is positioned on environmentally friendly enclosure wall;And more scrappy plant material can
Carry out pulverization process.
By using above-mentioned technical proposal, will there is the plant material of reprocessing value to process to form ornament or plant
Case, and will be secured on environmentally friendly enclosure wall, to beautify environmentally friendly enclosure wall while recycling plant material;And it is corresponding compared with
Low plant material is worth for scrappy, reprocessing and carries out pulverization process, be can be used for the compound preparation of Wood-plastic material, is realized it
It recycles.
In some embodiments, in the step S7, direction is extended along at the top of the wall and is provided with planting groove, will be spun
It knits class material cushion to be placed in planting groove, then transplants green plants in planting groove.
By adopting the above technical scheme, by extending along the root that the planting groove of direction setting is green plants at the top of wall
Portion provides embedded space, and the textile material cushion that fractionation scene obtains is set to the bottom of planting groove, can not only avoid planting
The planting soil planted in slot is largely lost under rainwater effect, moreover it is possible to be avoided the root growth of green plants into wall, be destroyed wall
Body structure, to realize the recycling of textile material.
In some embodiments, in the step S7, resinous material is divided into thermoplastic class and thermosetting class, thermoplastic class
Expect that material recovery recycles, thermosetting class material is processed as ornament according to its own characteristic, and is fixed in wall side wall.
By using above-mentioned technical proposal, the thermoplastic material that can be shaped again after recycling heating is recycled, and is added
The thermosetting class material for being difficult to shape again after heat can be reprocessed according to its own characteristic, and be secured to wall side wall
On, beautify wall.
In some embodiments, in the step S7, glass is cut, is spliced and reprocessing forms ornament,
And ornament is secured on wall side wall.
By using above-mentioned technical proposal, the glass after reprocessing is secured on wall side wall, is cooperated on wall side wall
Plant material, ornament made of resinous material beautify wall, improve its ornamental value.
In conclusion compared with prior art, the present invention having the advantage that
1. pouring the setting with wall skeleton by foundation stabilization, base station construction, wall, the quantity for recycling the scene of fractionation to generate
Most construction main body materials and reinforcing bar, and reprocessing difficulty is low, return period is short, recycles at low cost;
2. facilitate construction personnel that the textile material cushion that the scene of fractionation generates is located in planting groove by the setting of planting groove,
Realize the recycling of textile material;
3. by the way that plant material, resinous material and glass are reprocessed, realize plant material, resinous material and
The recycling of glass.
Specific embodiment
Embodiment:
A kind of building waste is used for the construction method of environmentally friendly enclosure wall, comprising the following steps:
S1: sifting sort splits resulting material type according to construction site and manually classifies, construction personnel is facilitated to divide
Class management, recycling and transport.
Wherein, classify according to following standard:
The first kind: plant material, plant material include woodwork and bamboo product;
Second class: textile material;
Third class: resinous material;
4th class: construction main body material comprising soil, brick, concrete block, reinforced concrete block;
5th class: glass;
6th class: other materials.
Wherein, the other materials of the 6th class is all kinds of composite articles of negligible amounts, battery and other items, is collected separately this kind of
Article, and classification processing is carried out according to its characteristic.
S2: it is broken apart, tentatively broken, recycling iron remover screening tapping is carried out to the reinforced concrete block containing reinforcing bar
Muscle portion point, had both been avoided that the waste of steel material, moreover it is possible to the presence of reinforcing bar be avoided to influence the subsequent processing of construction main body material;
Meanwhile it being used using remaining the 4th class material of the clout after screening as object is built.
S3: reinforcing bar shaping, the reinforcing bar that will be singled out carry out shaping by modes such as stretching, weight, reach basic guarantor
The state of straight line is held, then the reinforcing bar after shaping is made into reinforcing steel bar frame by bending, cutting and welding manner, here, setting
There is several segments reinforcing steel bar frame, wall skeleton is capable of forming by the splicing of reinforcing steel bar frame, realizes the recycling and reusing of reinforcing bar;
Wherein, after to reinforcing bar shaping, grinding process is carried out to reinforcing bar one by one, removes the iron rust of rebar surface, remove de-iron
It observes whether reinforcing bar meets requirement after rust, and the presence of iron rust is avoided to influence the subsequent processing to reinforcing bar;
In addition, using antirust paint brushing rebar surface, reinforcing steel bar frame is avoided to get rusty and shadow in the natural environment after reinforcing steel bar frame molding
The structural strength for arriving reinforcing steel bar frame is rung, to guarantee the service life of environmentally friendly enclosure wall.
S4: foundation stabilization is excavated with the reinforcement tank of the trapezoidal setting in section along the pre- masonry position of enclosure wall on ground, will put down
Equal masonry object of the partial size greater than 100mm is filled into reinforcement tank, and is handled using machine compacting, after ramming, in reinforcing
The masonry object that upper average grain diameter is less than 10mm is filled in the gap built between object in slot, then carry out it is secondary ram, and filling out
It fills and pours the mortar as made of masonry object mixing of the average grain diameter less than 10mm at the top of object, until with the ground around reinforcement tank
It flushes, is formed and reinforce platform;
Wherein, reinforcement tank is divided into multilayer from bottom to up, is filled in every layer and builds object, and carry out compacting processing, upper
One layer of compacting finishes the filling construction that rear carries out next layer, after successively tamping, pours mortar on reinforcement tank top and forms reinforcing
Platform forms firm supporting plane.
S5: base station construction sets up the two rows of templates being oppositely arranged on reinforcing platform, surrounds between two rows of templates
The mortar as made of masonry object mixing of the average grain diameter less than 10mm is poured into cavity to the position of template half height, then will be put down
In the mortar built between object indentation template of the equal partial size greater than 100mm, and back-grouting is carried out, it can shape after mortar solidification
At base station;
Wherein, the steel reinforcement cage bound in advance, and opening between steel reinforcement cage corresponding templates can be put into the cavity between template
Open setting at mouthful, while reinforcing base station, to avoid the pre-placing of steel reinforcement cage from influencing the dispensing of masonry object.
S601: when base station pours, setting groove template in two rows of die head lids, thus can be in base after forming base station
Countertop postpone its length direction formed groove;Wherein, before base station molding, interval is inserted along its length in two rows of templates
Fixed steel bars are set in the base station part immediately below groove, and make reinforced steel top by the fixed steel bars being vertically arranged on if
Groove setting is stretched out at end;
S602: reinforcing steel bar frame is clamped into groove, and reinforcing bar frame bottom is welded in fixed steel by the demoulding after the firm molding of base station
On muscle.
S701: wall filling, in the affixed baffle in reinforcing steel bar frame two sides, will build object by the sequence of average grain diameter from big to small according to
In the secondary reinforcing steel bar frame being filled between baffle, and pour from upper opening masonry object mixing of the leaching by average grain diameter less than 10mm and
At mortar, wait build bonded between object it is firm after remove baffle and form wall body structure;
S702: for first kind material, intact plant material forms ornament or vegetation box by cutting, assembly,
It is fixed on the side wall of wall, and plants upper green plants in vegetation box, beautify wall;And in first kind material
More scrappy plant material part is crushed, and the preparation of Wood-plastic material is carried out, and realizes that the recycling of first kind material is sharp again
With;
S703: for the second class material, direction is extended along at the top of wall and is provided with planting groove, and textile material cushion is being planted
Trench bottom is planted, to planting groove filling planting soil, and transplants upper green plants, on the one hand, the setting of textile material can encase
Planting soil avoids it from being lost under rainwater effect, and on the other hand, the setting of textile material can prevent the root system of green plants
It grows into wall, and destroys wall body structure, while further beautification wall, realize that the recycling of the second class material is sharp again
With;
S704: for third class material, resinous material is divided into thermoplastic class and thermosetting class, thermoplastic class material can be in high temperature
Again it is formed, realizes its recycling, and thermosetting class material is passed through according to its own characteristic (size, shape, color etc.)
It cuts, the mode of splicing is processed to form ornament, and is fixed on wall side wall, beautification wall side wall, realization third class
The recycling and reusing of material;
S705: for the 5th class material, glass being cut, is spliced, and reprocessing forms ornament, and is fixed in wall
On side wall, beautify wall side wall, realizes the recycling and reusing of the 5th class material.
In conclusion the main part (the five class material of the first kind-the) in building waste is used for ring by the above method
It protects in the construction of enclosure wall, building can be converted by building waste rapidly, return period is short, recycles cost compared to secondary
Recycling after processing is more cheap.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation
Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art
Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications
It should be regarded as protection scope of the present invention.
Claims (10)
1. the construction method that a kind of building waste is used for environmentally friendly enclosure wall, which comprises the following steps:
S1: sifting sort splits resulting material type according to construction site and manually classifies;
Wherein, classify according to following standard:
The first kind: plant material, plant material include woodwork and bamboo product;
Second class: textile material;
Third class: resinous material;
4th class: construction main body material comprising soil, brick, concrete block, reinforced concrete block;
5th class: glass;
6th class: other materials;
S2: it is broken apart, the reinforced concrete block containing reinforcing bar be tentatively crushed, screens out reinforcing bar part, and will screening
Remaining the 4th class material of clout afterwards is used as object is built;
S3: reinforcing bar shaping, the reinforcing bar that will be singled out carry out shaping, it is made to keep linear state substantially, and by bending, cut and
Welding manner is made into reinforcing steel bar frame, using as wall skeleton;
S4: average grain diameter is greater than the masonry of 100mm on ground along the pre- masonry position excavation and reinforcement slot of enclosure wall by foundation stabilization
Object is filled into reinforcement tank, and is handled using machine compacting, the gap built between object after ramming, in reinforcement tank
Average grain diameter is less than the masonry object of 10mm in middle filling, then carry out it is secondary ram, and pour at the top of filler by average grain
Mortar made of masonry object mixing of the diameter less than 10mm forms until flushing with the ground around reinforcement tank and reinforces platform;
S5: base station construction sets up the two rows of templates being oppositely arranged, the cavity surrounded between two rows of templates on reinforcing platform
In pour into the mortar as made of masonrys object mixing of the average grain diameter less than 10mm to the position of template half height, then the grain that will be averaged
In the mortar built between object indentation template of the diameter greater than 100mm, and back-grouting is carried out until forming base station;
S6: placing reinforcing steel bar frame, the demoulding after the firm molding of base station, and reinforcing steel bar frame is fixed on base station;
S7: wall filling will build object and be sequentially filled by the sequence of average grain diameter from big to small in the affixed baffle in reinforcing steel bar frame two sides
Into in the reinforcing steel bar frame between baffle, and leaching sand as made of masonry object mixing of the average grain diameter less than 10mm is poured from upper opening
Slurry, wait build bonded between object it is firm after remove baffle and form wall body structure.
2. the construction method that a kind of building waste according to claim 1 is used for environmentally friendly enclosure wall, which is characterized in that the step
In rapid S3, in framework reinforcing steel bar frame, polishing derusting is carried out to reinforcing bar.
3. the construction method that a kind of building waste according to claim 1 is used for environmentally friendly enclosure wall, which is characterized in that the step
In rapid S3, the reinforcing bar periphery of the reinforcing steel bar frame is painted with antirust paint.
4. the construction method that a kind of building waste according to claim 1 is used for environmentally friendly enclosure wall, which is characterized in that the step
In rapid S4, separating reinforcement tank from bottom to top is multilayer, and using layer-by-layer filling, the mode successively rammed is constructed.
5. the construction method that a kind of building waste according to claim 1 is used for environmentally friendly enclosure wall, which is characterized in that the step
In rapid S5, when building base station, upper several fixed steel bars are plugged vertically between template, and fixed steel bars top is made to stretch out base
Platform setting, and reinforcing bar frame bottom is welded in setting at the top of fixed steel bars.
6. the construction method that a kind of building waste according to claim 5 is used for environmentally friendly enclosure wall, which is characterized in that the step
In rapid S5, when building base station, base station width is arranged greater than reinforcing bar width of frame, and reserved suitable with reinforcing bar frame bottom on base station top
The groove matched, and stretch out and be arranged from groove at the top of fixed steel bars.
7. the construction method that a kind of building waste according to claim 1 is used for environmentally friendly enclosure wall, which is characterized in that the step
In rapid S7, for first kind material, intact plant material can form ornament or vegetation box by cutting, assembly,
And it is positioned on wall;And more scrappy plant material can carry out pulverization process.
8. the construction method that a kind of building waste according to claim 1 is used for environmentally friendly enclosure wall, which is characterized in that the step
In rapid S7, direction is extended along at the top of the wall and is provided with planting groove, textile material cushion is placed in planting groove, then is transplanted green
Change plant in planting groove.
9. the construction method that a kind of building waste according to claim 1 is used for environmentally friendly enclosure wall, which is characterized in that the step
In rapid S7, resinous material is divided into thermoplastic class and thermosetting class, thermal plastic material's recycling and reusing, thermosetting class material is according to it
Self-characteristic is processed as ornament, and is fixed in wall side wall.
10. the construction method that a kind of building waste stated according to claim 1 is used for environmentally friendly enclosure wall, which is characterized in that the step
In rapid S7, glass is cut, is spliced and reprocessing forms ornament, and is secured on wall side wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810866699.8A CN108979296B (en) | 2018-08-01 | 2018-08-01 | Construction method for using construction waste for environment-friendly enclosing wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810866699.8A CN108979296B (en) | 2018-08-01 | 2018-08-01 | Construction method for using construction waste for environment-friendly enclosing wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108979296A true CN108979296A (en) | 2018-12-11 |
CN108979296B CN108979296B (en) | 2020-01-24 |
Family
ID=64554891
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810866699.8A Expired - Fee Related CN108979296B (en) | 2018-08-01 | 2018-08-01 | Construction method for using construction waste for environment-friendly enclosing wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108979296B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113530235A (en) * | 2021-07-19 | 2021-10-22 | 屈志斌 | Clean and environment-friendly building construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4602765A (en) * | 1984-04-23 | 1986-07-29 | Loper Karl J | Fencing assembly and process |
CN101892764A (en) * | 2010-06-19 | 2010-11-24 | 张培霞 | Method for building enclosing wall |
CN102587542A (en) * | 2011-01-13 | 2012-07-18 | 谢兆坤 | Method for producing wall with building waste |
CN105198257A (en) * | 2015-09-06 | 2015-12-30 | 越艳 | Construction waste crushing and screening line method |
CN206385903U (en) * | 2017-01-16 | 2017-08-08 | 上海大越人居环境科技发展有限公司 | A kind of green building enclosure wall for recycling timber |
CN107143204A (en) * | 2017-05-31 | 2017-09-08 | 中国十九冶集团有限公司 | Detachable assembling enclosure construction method |
-
2018
- 2018-08-01 CN CN201810866699.8A patent/CN108979296B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4602765A (en) * | 1984-04-23 | 1986-07-29 | Loper Karl J | Fencing assembly and process |
CN101892764A (en) * | 2010-06-19 | 2010-11-24 | 张培霞 | Method for building enclosing wall |
CN102587542A (en) * | 2011-01-13 | 2012-07-18 | 谢兆坤 | Method for producing wall with building waste |
CN105198257A (en) * | 2015-09-06 | 2015-12-30 | 越艳 | Construction waste crushing and screening line method |
CN206385903U (en) * | 2017-01-16 | 2017-08-08 | 上海大越人居环境科技发展有限公司 | A kind of green building enclosure wall for recycling timber |
CN107143204A (en) * | 2017-05-31 | 2017-09-08 | 中国十九冶集团有限公司 | Detachable assembling enclosure construction method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113530235A (en) * | 2021-07-19 | 2021-10-22 | 屈志斌 | Clean and environment-friendly building construction method |
Also Published As
Publication number | Publication date |
---|---|
CN108979296B (en) | 2020-01-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105198257A (en) | Construction waste crushing and screening line method | |
CN201442005U (en) | Construction waste comprehensive treatment equipment | |
CN101913788A (en) | Method for comprehensively treating construction waste | |
CN105776930B (en) | A kind of microwave radiation technology picks the method for selecting recycled concrete coarse aggregate | |
CN102974420B (en) | Cut roll crusher and construction waste roll-in crushing station based on same | |
CN104711974B (en) | A kind of steel tube regeneration concrete complex carrier stake and preparation method thereof | |
CN209848991U (en) | Environment-friendly building solid waste treatment device | |
CN108188149A (en) | A kind of urban building waste treatment process and resource utilization process | |
CN102974596B (en) | Construction waste co-extrusion harmless treatment system and method thereof | |
CN203076009U (en) | Cutting roller crushing equipment and construction waste rolling crushing station based on same | |
CN102744236A (en) | Comprehensive processing method of construction wastes | |
CN109095826A (en) | A kind of production method of construction garbage brick | |
CN202410796U (en) | System for recycling building rubbish | |
CN108409287A (en) | A kind of Wetland ecological made using building waste is laid bricks and preparation method thereof | |
CN108979296A (en) | A kind of building waste is used for the construction method of environmentally friendly enclosure wall | |
CN208786539U (en) | A kind of building waste grinding device | |
CN104164822A (en) | Process for paving pedestrian pavement by utilizing building debris | |
CN201940415U (en) | Building rubbish disposal device | |
CN202280077U (en) | Novel retaining wall | |
KR101601611B1 (en) | Equipment for producing recycling aggrete using waste concrete | |
CN211597609U (en) | Gap plugging device for building decoration | |
CN201073653Y (en) | Recovery system of building recycled aggregate for construction site | |
CN212795371U (en) | Clout cleaning device of production cement pole | |
CN103936316A (en) | Waste-concrete regeneration system | |
CN113171865A (en) | Preparation method of high-quality machine-made sand |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |