CN108979144A - The method that floor roof is poured using aluminum dipping form - Google Patents

The method that floor roof is poured using aluminum dipping form Download PDF

Info

Publication number
CN108979144A
CN108979144A CN201810854211.XA CN201810854211A CN108979144A CN 108979144 A CN108979144 A CN 108979144A CN 201810854211 A CN201810854211 A CN 201810854211A CN 108979144 A CN108979144 A CN 108979144A
Authority
CN
China
Prior art keywords
material transfer
dipping form
aluminum dipping
transfer hole
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810854211.XA
Other languages
Chinese (zh)
Other versions
CN108979144B (en
Inventor
杨华超
邱军
罗鹏
杨波
张超洋
姜淑清
冉华
寇利红
王昭
蒋健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 8 Engineering Group Co Ltd
Construction Co of China Railway No 8 Engineering Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Priority to CN201810854211.XA priority Critical patent/CN108979144B/en
Publication of CN108979144A publication Critical patent/CN108979144A/en
Application granted granted Critical
Publication of CN108979144B publication Critical patent/CN108979144B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • E04G15/063Re-usable forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/483Supporting heads

Abstract

The invention discloses a kind of methods for pouring floor roof using aluminum dipping form, it is used to make the aluminum dipping form assembly in material transfer hole by installation Aided design, so that forming material transfer hole after the completion of the concrete floor slab placement of top, to facilitate the small sizes such as aluminum alloy pattern plate Architectural Equipment from lower layer toward neighbouring upper layer transfers, avoid the intervention of big machinery, the multiplicating for also avoiding worker is carried, and is reduced labor intensity of workers, is effectively increased construction efficiency.

Description

The method that floor roof is poured using aluminum dipping form
Technical field
The invention belongs to technical field of building construction, in particular to a kind of method that floor roof is poured using aluminum dipping form.
Background technique
Aluminum alloy pattern plate is the building template made by aluminium alloy, and aluminum alloy pattern plate is made after special equipment squeezes, by aluminium face There are complete matching used universal accessories, energy composite assembly is not at composed by plate, bracket and connector tripartite system With the whole mould bases of the overall dimensions complexity of size, the system template of assembling, industrialized construction solves previous conventional template Existing defect, substantially increases construction efficiency.Aluminum template system is suitable for the higher construction of standardization level.With applying The work period is short, reuses often, and easy for construction, stability is good, bearing capacity is high, and application range, piece is few, and precision is high, tears open Concrete surface effect is good after mould, and site operation rubbish is few, and support system is succinct, standard, versatile, and aluminum template system All material is recyclable materials, meet country to construction project energy-saving and environmental protection, low-carbon, emission reduction regulation, in recent years in state Inside it is widely used.
For existing aluminum alloy pattern plate during building construction, the building of aluminum alloy pattern plate and some other small size equipment all can be It is reused in proper order between upper and lower level in construction, the aluminum alloy pattern plate as lower layer dismantles needs to transport to upper layer, but existing Have in technology, generally requires the transhipment that could carry out aluminum alloy pattern plate upwards from the outside of building by crane or tower crane, Gong Renxu It carries out repeating carrying, causes the low problem of transfer efficiency.
Summary of the invention
It is an object of the invention to: it is directed to above-mentioned technical problem of the existing technology, provides and a kind of is poured using aluminum dipping form The method for building floor roof can disassemble aluminum alloy pattern plate assembly to form material transfer hole, to facilitate aluminium after the completion of concrete floor slab placement Construction efficiency greatly improved from lower layer to upper layer transfers in template.
The technical solution of the technology of the present invention is achieved in that a kind of method for pouring floor roof using aluminum dipping form, described Method the following steps are included:
S1: shear force wall reinforcing steel bar net and pillar steel mesh are first worked out;
S2: setting up wall form and model of the column again, completes the envelope mould to shear force wall reinforcing steel bar net and pillar steel mesh;
S3: after the completion of step S2, then beam forms peace paving top template is set up, then works out upper beam steel mesh and top plate steel Muscle net;
S4: making the aluminum dipping form assembly to pour material transfer hole, then installs in the position in the quasi- reserved material transfer hole of top template Good aluminum dipping form assembly;
S5: it carries out monolithic concrete and pours, and the concrete structure for pouring completion is conserved;
S6: after the completion of conserving, aluminum alloy pattern plate dismounting is carried out;Aluminum dipping form assembly is removed simultaneously, forms the concrete of new floor Frame, and material transfer hole is formed on top plate.
The method of the present invention that floor roof is poured using aluminum dipping form, in step s3 when tiling top template, in backform Also evenly spaced under plate to be supported by supporting device, two rows of adjacent top templates are directly connected to by end-to-end, and at two pieces Top template end junction directly supports supporting device.
The method of the present invention that floor roof is poured using aluminum dipping form, in step s 4, the aluminum dipping form assembly and aluminium Top template under die combination is bolted to connection.
The method of the present invention that floor roof is poured using aluminum dipping form, in step s 5, after the completion of pouring construction In 2-2.5 hours, front and rear, left and right shaking is carried out to aluminum dipping form assembly, it, will even in 6-6.5 hour after the completion of pouring construction Connect aluminum dipping form assembly nut pine 2-3 circle, and again front and rear, left and right, teetertotter aluminum dipping form assembly, after the completion of shaking, then will Nut fastening.
The method of the present invention for pouring floor roof using aluminum dipping form, after the completion of step S6, the shape in material transfer hole is Be inverted truncated rectangular pyramids structure, and the upper edge in material transfer hole also extend out and it is recessed be provided be inverted truncated rectangular pyramids structure cover plate support Platform.
The method of the present invention that floor roof is poured using aluminum dipping form, after the completion of step S6, the two sides in material transfer hole It is respectively corresponded with both ends of the surface and is formed with side reinforcement installation slot and end face reinforcement installation slot.
The method of the present invention that floor roof is poured using aluminum dipping form, after material transfer hole effect complete after, further include To the step S7 that material transfer hole is closed, part is carried out in the lower part in material transfer hole and reinstalls top template, then in material transfer hole Set up laterally supplement reinforcing bar and longitudinal supplement reinforcing bar, and the intersection steel wire of laterally supplement reinforcing bar and longitudinal supplement reinforcing bar into Row is connected and fixed, and to form material transfer hole steel mesh, last teeming concrete again, after completing curing period, material transfer hole is completed in demoulding Closing.
The method of the present invention that floor roof is poured using aluminum dipping form, in the step s 7, the material transfer hole steel in material transfer hole Muscle net is equipped with two layers.
The method of the present invention for pouring floor roof using aluminum dipping form is blended with accelerator in the concrete of teeming.
The method of the present invention for pouring floor roof using aluminum dipping form, the aluminum alloy pattern plate assembly include truncated rectangular pyramids the following group Zoarium, and under truncated rectangular pyramids assembly on along the truncated rectangular pyramids that equal proportion extends out assembly, on truncated rectangular pyramids under assembly It is connected between the upper edge of assembly by horizontal bench portion under edge and truncated rectangular pyramids.
The invention has the benefit that in the methods of the invention, being used to make the aluminium in material transfer hole by installation Aided design Die combination, so that material transfer hole is formed after the completion of the concrete floor slab placement of top, to facilitate the small sizes such as aluminum alloy pattern plate Architectural Equipment from lower layer Toward neighbouring upper layer transfers, the intervention of big machinery is avoided, the multiplicating for also avoiding worker is carried, and worker's labor is reduced Fatigue resistance effectively increases construction efficiency.
Detailed description of the invention
Fig. 1 is the installation condition top view of aluminum dipping form assembly of the present invention;
Fig. 2 is the cross-sectional view of Fig. 1;
Fig. 3 is the top view of 1 aluminum alloy pattern plate assembly of embodiment;
Fig. 4 is the side view of 1 aluminum alloy pattern plate assembly of embodiment;
Fig. 5 is the main view of 1 aluminum alloy pattern plate assembly of embodiment;
Fig. 6 is the top view of top template at material transfer hole of the present invention;
Fig. 7 is the top view of material transfer blind patch of the present invention;
Fig. 8 is the top view of 2 aluminum alloy pattern plate assembly of embodiment;
Fig. 9 is the side view of 2 aluminum alloy pattern plate assembly of embodiment;
Figure 10 is the main view of 2 aluminum alloy pattern plate assembly of embodiment;
Figure 11 is the main view for supporting footstock;
Figure 12 is the side view for supporting footstock.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The technology of the present invention is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain this hair It is bright, it is not intended to limit the present invention.
Embodiment 1
As shown in Figs. 1-2, for making the aluminum dipping form assembly 2 in material transfer hole, when in the floor that bottom concrete floor slab placement is completed On the basis of when pouring top floor 4, including the top template 1 continuously to tile, 1 lower support of top template, which has, evenly spaced shores dress 3 are set, the supporting device includes the mandril 32 under the support footstock 31 and support footstock at top;It is also set up on the top template 1 There is aluminum dipping form assembly 2, after the completion of top floor 4 pours, material transfer hole can be formed on the floor of top, be used for the upward building of lower floor Layer transmitting aluminum alloy pattern plate and other construction materials and small operational instrument etc..Specifically, the aluminum dipping form assembly 2 includes side plate 21 With end plate 22, and it is interconnected to form rectangular cavity 23.After the completion of top floor 4 pours, i.e., dismountable aluminum dipping form assembly 2 And top template 1, so that material transfer hole is formed, to facilitate from lower layer toward related construction materials such as upper layer transfers aluminum alloy pattern plates.
After material transfer hole forming, one material transfer blind patch 5 can be set in the position in material transfer hole, to reinforce safety guarantee, Preventing personnel and article etc., floor is fallen downwards, and forms accident;The top both ends of the material transfer blind patch 5 are additionally provided with lid Plate handle 51, to facilitate artificial mobile material transfer blind patch 5.
The side plate male part 211 isometric with side plate 21, the side plate male part 211 are provided on the outside of 21 upper end of side plate Section be it is rectangular;End plate male part 221, the length etc. of the end plate male part 221 are provided on the outside of 22 upper end of end plate In the sum of the width of 22 length of end plate and two pieces of side plate male parts 211, the section of the end plate male part 221 and side plate male part 211 section is identical.The side plate male part 211 and the effect of end plate male part 221 are, can complete in top concrete floor slab placement Afterwards, recessed cover plate support platform is formed around material transfer hole, to facilitate material transfer blind patch 5 to be put into wherein, so that material transfer port lid The installation of plate 5 is more firm, in place.
The middle part of the side plate 21 is provided with the side rib that several evenly spaced bottom surfaces with side plate male part 211 are connect Plate 212.The effect of side rib plate 212 is, at the top of the completion after the pouring of floor 4, so that the two sides in material transfer hole form reinforcing bar The lateral connection head of steel mesh is placed in reinforcement installation slot, is then passing after facilitating material transfer hole to complete mission by mounting groove The lower part in material hole carries out part and shores top template 1 again, then topples over concrete material into material transfer hole, then shakes, to realize Final closure to material transfer hole.Likewise, being provided with several evenly spaced and end plate male part at the middle part of the end plate 22 The end rib plate 222 of 221 bottom surface connection makes to form reinforcement installation slot at the both ends in material transfer hole, longitudinally connected so as to steel mesh Head is placed therein, to enhance the intensity and quality of the closure of material transfer hole.
The side rib plate 212 has exceeded side plate male part 211, and 212 top margin of side rib plate and side plate male part 211 outwardly Top surface flushes;The end rib plate 222 has exceeded end plate male part 221, and 222 top margin of end rib plate and end plate male part 221 outwardly Top surface flush.
The side plate 21, towards side connecting plate 213 is provided in cavity 23, is provided with side on side connecting plate 213 in bottom margin Connect plate hole 214;The end plate 22, towards end connecting plate 223 is provided in cavity 23, is held and is arranged on connecting plate 223 in bottom margin There is end connection plate hole 224;It is provided with and the side connecting plate hole on the material transfer hole top template 6 being connect with aluminum dipping form assembly 2 214 connect the corresponding apical pore 61 of plate hole 224 with end, solid to facilitate material transfer hole template group 2 and material transfer hole top template 6 to be attached It is fixed.
Embodiment 2
As seen in figs. 8-10, the difference of the present embodiment and embodiment 1 essentially consists in the difference of aluminum alloy pattern plate assembly, this implementation The aluminum dipping form assembly 7 for making material transfer hole in example is welded by aluminum alloy pattern plate, generally inverted hollow truncated rectangular pyramids structure; The aluminum alloy pattern plate assembly 7 includes assembly 71 under truncated rectangular pyramids, and under truncated rectangular pyramids assembly on extended out along equal proportion Assembly 72 on truncated rectangular pyramids pass through horizontal platform between the upper edge of assembly 71 under the lower edge of assembly 72 and truncated rectangular pyramids on truncated rectangular pyramids Rank portion 73 connects.
The lateral surface of 7 surrounding of aluminum dipping form assembly is evenly spaced to be provided with several vertical gussets 74, the vertical gusset 74 Bottom edge be located at the middle part of assembly 71 under truncated rectangular pyramids, top margin is connect with the lower surface in the horizontal bench portion 73;Further, Edge of the outer side edges of the vertical gusset 74 beyond assembly 72 on truncated rectangular pyramids, and the top margin of the vertical gusset 74 with it is tetragonous The edge of assembly 72 flushes on platform.And there is the outer side edges of vertical gusset 74 inclination identical with connect lateral surface to become Gesture, so that when demoulding, it is easier to deviate from.
The lower edge of assembly 71 extends the horizontal connection portion 75 that is welded with inwardly under truncated rectangular pyramids, in the horizontal connection portion 75 It is circumferentially evenly spaced to be provided with several connecting holes 76.Connecting hole 76 is corresponding with the apical pore 61 of aforementioned material transfer hole top template 6, can lead to It crosses pin or bolt aluminum dipping form assembly 7 is fixed on material transfer hole top template 6.
The horizontal cross-section of aluminum dipping form assembly 7 is rectangle, and the rectangular long side length be 2 times of bond length with On;Several evenly spaced longitudinally reinforced floors 77 are provided between two longitudinally opposed aluminum alloy pattern plates;Further, the transverse direction Several evenly spaced transversely stiffened plates 78 are provided between two opposite aluminum alloy pattern plates.
The structure of falling truncated rectangular pyramids specific to aluminum dipping form assembly 7, so that removing aluminum dipping form assembly 7 after the completion of concreting Become to be more easier, because reducing the frictional force between aluminum dipping form assembly 7 and molded top floor 4.When material transfer hole After the completion of effect, when being closed, it is only necessary to carry out supporting top template 1 again in the part of material transfer bottom hole, and be put into steel After muscle net, pouring for concrete is carried out, to form the patch of armored concrete, at this point, because material transfer hole is also inverted truncated rectangular pyramids Structure enhances supplement and pours so that each inclined surface in material transfer hole forms stronger support to the patch of armored concrete Intensity and safety.
Embodiment 3
As shown in Figure 10,11, supporting device 3 includes support footstock 31 and forms support to it under support footstock 31 The more existing footstock with support function can be used in mandril 32, support footstock 31, and in the present embodiment, such as Figure 11- Shown in 12, support footstock 31 includes footstock bottom plate 311, and along the top of 311 longitudinally arranged two pieces of parallel intervals of footstock bottom plate Seat clamping plate 312, the spacing between two pieces of footstock clamping plates 312 are not less than the template side plate of two pieces of 4 end junctions of top template Overall thickness, support footstock 31 is inserted into mandril 32 by the footstock support column 313 of its bottom, when the end of two pieces of top templates 4 After alignment, the template side plate of top template 4 can be sandwiched in therebetween by support footstock 31 by two pieces of footstock clamping plates 312, to be formed with The support of effect.
311 lower weld of footstock bottom plate has footstock strengthening version 314, the footstock support column 313 and footstock strengthening version 314 are welded and fixed;The upper edge of two pieces of footstock clamping plates 312 is provided with two blocks of support wing plates 315 symmetrically extended outward. It directly directly contacts with the template plate of top template 4 in the support wing plate 315 of support footstock 31, to increase support contact surface, makes It must support more firm.
The laterally spaced stupefied plate 316 of footstock for being provided with 2 pieces or more between wing plate 315 and footstock bottom plate 311 is supported, with right Support wing plate 315 forms strong support, increases the integral strength of support footstock 31.
Footstock connecting hole 317, the spacing and size of the footstock connecting hole 317 are provided on two pieces of footstock clamping plates 312 It is equal with the spacing and size of the template side through hole of 4 end of top template;And on footstock connecting hole 317 to support wing plate 315 The distance on surface is equal to the distance between template plate with the template side through hole of 4 end of top template.
Embodiment 4
The method for pouring floor roof using aluminum dipping form, the described method comprises the following steps:
S1: shear force wall reinforcing steel bar net and pillar steel mesh are first worked out;
S2: setting up wall form and model of the column again, completes the envelope mould to shear force wall reinforcing steel bar net and pillar steel mesh;
S3: after the completion of step S2, then beam forms peace paving top template is set up, then works out upper beam steel mesh and top plate steel Muscle net;
S4: making the aluminum dipping form assembly to pour material transfer hole, then installs in the position in the quasi- reserved material transfer hole of top template Good aluminum dipping form assembly;
S5: it carries out monolithic concrete and pours, and the concrete structure for pouring completion is conserved;
S6: after the completion of conserving, aluminum alloy pattern plate dismounting is carried out;Aluminum dipping form assembly is removed simultaneously, forms the concrete of new floor Frame, and material transfer hole is formed on top plate.
It is also evenly spaced under top template to be supported by supporting device, Liang Paixiang in step s3 when tiling top template Adjacent top template is directly connected to by end-to-end, and directly supports supporting device in two pieces of top template ends junction.
In step s 4, the aluminum dipping form assembly is bolted to connection with the top template under aluminum dipping form assembly.
In step s 5, the 2-2.5 after the completion of pouring construction is interior when small, carries out front and rear, left and right rolling to aluminum dipping form assembly It is dynamic, in 6-6.5 hour after the completion of pouring construction, the nut pine 2-3 for connecting aluminum dipping form assembly is enclosed, and front and back, a left side again It is right, teetertotter aluminum dipping form assembly, after the completion of shaking, then nut fastened.
After the completion of step S6, the shape in material transfer hole is to be inverted truncated rectangular pyramids structure, and also extend out on the upper edge in material transfer hole And the recessed cover plate support platform for being provided with inversion truncated rectangular pyramids structure.
After the completion of step S6, the two sides in material transfer hole and both ends of the surface respectively correspond and are formed with side reinforcement installation slot and end Face reinforcement installation slot.
After the effect in material transfer hole is completed, include the steps that material transfer hole is carried out to close S7, in the lower part in material transfer hole It carries out part and reinstalls top template, laterally supplement reinforcing bar and longitudinal supplement reinforcing bar are then set up in material transfer hole, and in transverse direction The intersection of supplement reinforcing bar and longitudinal supplement reinforcing bar is attached fixation with steel wire, to form material transfer hole steel mesh, finally mends again Pouring concrete, after completing curing period, the closing in material transfer hole is completed in demoulding.
In the step s 7, the material transfer hole steel mesh in material transfer hole is equipped with two layers.
In the concrete of teeming, it is blended with accelerator.
The aluminum alloy pattern plate assembly includes assembly under truncated rectangular pyramids, and under truncated rectangular pyramids assembly on outside equal proportion Assembly on the truncated rectangular pyramids of expansion passes through horizontal bench between the upper edge of assembly under the lower edge of assembly and truncated rectangular pyramids on truncated rectangular pyramids Portion's connection.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of method for pouring floor roof using aluminum dipping form, which is characterized in that the described method comprises the following steps: S1: first compiling Shear force wall reinforcing steel bar net and pillar steel mesh processed;
S2: setting up wall form and model of the column again, completes the envelope mould to shear force wall reinforcing steel bar net and pillar steel mesh;
S3: after the completion of step S2, then beam forms peace paving top template is set up, then works out upper beam steel mesh and roof steel bar Net;
S4: making the aluminum dipping form assembly to pour material transfer hole, then installs aluminium in the position in the quasi- reserved material transfer hole of top template Die combination;
S5: it carries out monolithic concrete and pours, and the concrete structure for pouring completion is conserved;
S6: after the completion of conserving, aluminum alloy pattern plate dismounting is carried out;Aluminum dipping form assembly is removed simultaneously, forms the concrete frame of new floor, And material transfer hole is formed on top plate.
2. the method according to claim 1 for pouring floor roof using aluminum dipping form, it is characterised in that: tile in step s3 When top template, also evenly spaced under top template to be supported by supporting device, two rows of adjacent top templates pass through end-to-end straight It connects in succession, and directly supports supporting device in two pieces of top template ends junction.
3. the method according to claim 1 for pouring floor roof using aluminum dipping form, it is characterised in that: in step s 4, institute Aluminum dipping form assembly is stated to be bolted to connection with the top template under aluminum dipping form assembly.
4. the method according to claim 3 for pouring floor roof using aluminum dipping form, it is characterised in that: in step s 5, when In 2-2.5 hour after the completion of pouring construction, front and rear, left and right shaking is carried out to aluminum dipping form assembly, after the completion of pouring construction In 6-6.5 hours, will connect aluminum dipping form assembly nut pine 2-3 circle, and again front and rear, left and right, teetertotter aluminum dipping form assembly, After the completion of shaking, then nut fastened.
5. the method according to claim 1 for pouring floor roof using aluminum dipping form, it is characterised in that: completed in step S6 Afterwards, the shape in material transfer hole be inverted truncated rectangular pyramids structure, and the upper edge in material transfer hole also extend out and it is recessed be provided be inverted it is tetragonous The cover plate support platform of platform structure.
6. the method according to claim 5 for pouring floor roof using aluminum dipping form, it is characterised in that: completed in step S6 Afterwards, the two sides in material transfer hole and both ends of the surface, which respectively correspond, is formed with side reinforcement installation slot and end face reinforcement installation slot.
7. the method according to claim 6 for pouring floor roof using aluminum dipping form, it is characterised in that: the effect to material transfer hole After completion, include the steps that material transfer hole is carried out to close S7, carry out part in the lower part in material transfer hole and reinstall top template, Then laterally supplement reinforcing bar and longitudinal supplement reinforcing bar are set up in material transfer hole, and in laterally supplement reinforcing bar and longitudinal supplement reinforcing bar Intersection is attached fixation with steel wire, and to form material transfer hole steel mesh, finally teeming concrete is torn open after completing curing period again The closing in mould completion material transfer hole.
8. the method according to claim 7 for pouring floor roof using aluminum dipping form, it is characterised in that: in the step s 7, pass Expect that the material transfer hole steel mesh in hole is equipped with two layers.
9. the method according to claim 8 for pouring floor roof using aluminum dipping form, it is characterised in that: in the concrete of teeming In, it is blended with accelerator.
10. -9 any method for pouring floor roof using aluminum dipping form according to claim 1, it is characterised in that: the aluminium Template group zoarium includes assembly under truncated rectangular pyramids, and under truncated rectangular pyramids assembly on along the truncated rectangular pyramids that equal proportion extends out group Zoarium is connected under the lower edge of assembly and truncated rectangular pyramids between the upper edge of assembly by horizontal bench portion on truncated rectangular pyramids.
CN201810854211.XA 2018-07-30 2018-07-30 Method for pouring floor top plate by adopting aluminum die Active CN108979144B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810854211.XA CN108979144B (en) 2018-07-30 2018-07-30 Method for pouring floor top plate by adopting aluminum die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810854211.XA CN108979144B (en) 2018-07-30 2018-07-30 Method for pouring floor top plate by adopting aluminum die

Publications (2)

Publication Number Publication Date
CN108979144A true CN108979144A (en) 2018-12-11
CN108979144B CN108979144B (en) 2021-06-04

Family

ID=64551799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810854211.XA Active CN108979144B (en) 2018-07-30 2018-07-30 Method for pouring floor top plate by adopting aluminum die

Country Status (1)

Country Link
CN (1) CN108979144B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519900A (en) * 2020-04-20 2020-08-11 上海建工一建集团有限公司 Quick-release formwork supporting system for square hole in beam and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59143603A (en) * 1983-02-04 1984-08-17 住金鋼材工業株式会社 Method of patterning surface in extrusion molding for plastic material
CN2467297Y (en) * 2001-03-19 2001-12-26 奇美实业股份有限公司 Forming apparatus for concrete floorslab headspace open
CN103276891A (en) * 2013-06-08 2013-09-04 广东台澳特种铝材有限公司 Aluminum template system for building
CN103410344A (en) * 2013-07-08 2013-11-27 中冶天工上海十三冶建设有限公司 Reinforced concrete wall beam strengthening and reinforcing device and wall beam strengthening method
CN104196231A (en) * 2014-09-25 2014-12-10 成都市第六建筑工程公司 Concrete floor aluminum alloy template and construction method thereof
CN206438763U (en) * 2016-12-13 2017-08-25 深圳正高金属制品有限公司 A kind of aluminum alloy pattern plate conveying device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59143603A (en) * 1983-02-04 1984-08-17 住金鋼材工業株式会社 Method of patterning surface in extrusion molding for plastic material
CN2467297Y (en) * 2001-03-19 2001-12-26 奇美实业股份有限公司 Forming apparatus for concrete floorslab headspace open
CN103276891A (en) * 2013-06-08 2013-09-04 广东台澳特种铝材有限公司 Aluminum template system for building
CN103410344A (en) * 2013-07-08 2013-11-27 中冶天工上海十三冶建设有限公司 Reinforced concrete wall beam strengthening and reinforcing device and wall beam strengthening method
CN104196231A (en) * 2014-09-25 2014-12-10 成都市第六建筑工程公司 Concrete floor aluminum alloy template and construction method thereof
CN206438763U (en) * 2016-12-13 2017-08-25 深圳正高金属制品有限公司 A kind of aluminum alloy pattern plate conveying device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519900A (en) * 2020-04-20 2020-08-11 上海建工一建集团有限公司 Quick-release formwork supporting system for square hole in beam and construction method

Also Published As

Publication number Publication date
CN108979144B (en) 2021-06-04

Similar Documents

Publication Publication Date Title
WO2015131792A1 (en) Building structure and construction method for same
CN105143570B (en) Building structure and construction method for same
CN106088326B (en) Assembling frame rod structure based on 3D printing
CN105971276B (en) Integral aluminum formwork stair one-step continuous pouring forming structure and construction method
CN105569224A (en) Concrete-filled steel tube edge restraint overlapping integrated shear wall and preparing and installation methods thereof
CN111364350B (en) Large cantilever arm quickly-mounted light steel-concrete combined bent cap
US9422680B2 (en) Deck
CN105484403A (en) Assembly type concrete bidirectional ribbed floor and construction method therefor
CN109440634A (en) The prefabricated high strength concrete hollow bent cap structure that internal model can be taken off
CN106042173A (en) Bridge production system
CN106285002A (en) Cast-in-place walls difference of height tool-type hoisting die construction method
CN109853365A (en) A kind of high pier construction of modularization prefabrication and assembly construction based on high-strength bolt connection and production method
CN108979144A (en) The method that floor roof is poured using aluminum dipping form
CN108643395A (en) A kind of prefabricated prestressing Self-resetting shear wall structure and its construction method
CN107558351A (en) Abdomen bag bottom is trapezoidal(Waveform)Steel plate combination box beam and its construction method
CN210316690U (en) Roof elevator machine room structure
CN108979145A (en) Template assembling structure with aluminum dipping form assembly
CN108518005A (en) A kind of concrete hollow superimposed sheet
KR200398231Y1 (en) 1way-supporting bracket for girder and slab construction
CN107190898A (en) Exempt from formwork super thick floor and its construction method
CN205382595U (en) Integral shear force wall of steel pipe concrete edge constraint coincide
CN106522094B (en) A kind of Sarasota crosses segment structure and construction method
CN109083184A (en) A kind of prefabricated cushion cap of land sectional type and its production and installation method
CN208702144U (en) For making the aluminum dipping form assembly in material transfer hole
CN211548061U (en) Laminated arch shell structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210508

Address after: 610000 No.100, North 2nd section of 1st ring road, Jinniu District, Chengdu, Sichuan Province

Applicant after: CONSTRUCTION COMPANY OF CHINA RAILWAY NO.8 ENGNEERING GROUP Co.,Ltd.

Applicant after: CHINA RAILWAY EIGHTH ENGINEERING Co.,Ltd.

Address before: 610000 No.4, northwest Qiaodong street, Jinniu District, Chengdu, Sichuan Province

Applicant before: NO 4 ENGINEERING Co.,Ltd. OF CHINA RAILWAY NO 8 BUREAU

GR01 Patent grant
GR01 Patent grant