CN108978898B CN201810872358.1A CN201810872358A CN108978898B CN 108978898 B CN108978898 B CN 108978898B CN 201810872358 A CN201810872358 A CN 201810872358A CN 108978898 B CN108978898 B CN 108978898B
Authority
CN
China
Prior art keywords
corner
external corner
waterproof coiled
coiled material
edge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810872358.1A
Other languages
Chinese (zh)
Other versions
CN108978898A (en
Inventor
叶吉
侯永神
田俊
陈香志
王昌成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Keshun Waterproof Engineering Co ltd
Original Assignee
Shenzhen Keshun Waterproof Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Keshun Waterproof Engineering Co ltd filed Critical Shenzhen Keshun Waterproof Engineering Co ltd
Publication of CN108978898A publication Critical patent/CN108978898A/en
Application granted granted Critical
Publication of CN108978898B publication Critical patent/CN108978898B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/665Sheets or foils impervious to water and water vapor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/025Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D5/00Roof covering by making use of flexible material, e.g. supplied in roll form
    • E04D5/10Roof covering by making use of flexible material, e.g. supplied in roll form by making use of compounded or laminated materials, e.g. metal foils or plastic films coated with bitumen
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/383Waterproofing; Heat insulating; Soundproofing; Electric insulating by applying waterproof flexible sheets; Means for fixing the sheets to the tunnel or cavity wall

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Building Environments (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The method discloses a method for integrally paving an external corner and an internal corner of a PVC waterproof coiled material, which comprises the following steps: overlapping a plurality of plane waterproof coiled materials, and pre-laying the waterproof coiled materials on a plane until the plane is fully paved; pre-fixing a plane waterproof coiled material on a plane and welding; sequentially overlapping the vertical surface waterproof coiled materials, pre-fixing the vertical surface waterproof coiled materials on the vertical surface and welding the vertical surface waterproof coiled materials until the vertical surface waterproof coiled materials are fully paved at the positions except the internal corner and the external corner; the vertical face waterproof coiled material is 0-50cm away from the internal corner and the external corner, a first internal corner waterproof coiled material or a second internal corner waterproof coiled material is paved at the internal corner, and a first external corner waterproof coiled material is paved at the external corner. The invention is provided with two different internal corner waterproof rolls, which can better meet the actual requirements, reduce the phenomenon of rainwater infiltration at the internal corner and improve the waterproof performance. And the second way improves the waterproofing performance of the whole assembled structure by adding a second external corner waterproofing membrane.

Description

Method for integrally laying external corner and internal corner of PVC waterproof coiled material
Technical Field
The invention relates to the technical field of building construction, in particular to a method for integrally paving an external corner and an internal corner of a PVC waterproof coiled material.
Background
The waterproof coiled material is mainly used for building walls, roofs, tunnels, highways, refuse landfills and the like, can be curled into a roll-shaped flexible building material product which can resist external rainwater and underground water leakage, is used as a leakage-free connection between an engineering foundation and a building, is a first barrier for waterproofing of the whole engineering, plays a vital role in the whole engineering, and is continuously applied to various buildings. For example, patent CN201510614921.1 discloses an integrated construction method of basement floor and waterproof roll and a waterproof structure, in which a pre-laid self-adhesive film waterproof roll is laid on the horizontal plane of the basement floor mat, a self-adhesive modified asphalt waterproof roll is laid on the positions of the internal and external corners of the structure, a cement binder is coated on the lap joint part of the pre-laid self-adhesive film waterproof roll and the self-adhesive modified asphalt waterproof roll, and the basement floor is poured on the pre-laid self-adhesive film waterproof roll and the self-adhesive modified asphalt waterproof roll to form an integrated waterproof layer. This method has good waterproof performance, but finally needs cement pouring, so the cost is increased, and the method is not suitable for large-scale use.
Disclosure of Invention
The invention aims to provide a simple method for integrally paving an external corner of a PVC waterproof coiled material, which can prevent rainwater on a plane, a vertical surface, an internal corner and the external corner from permeating, has low cost and is simple to operate.
In order to achieve the purpose, the invention provides the following technical scheme:
a method for integrally paving an external corner and an internal corner of a PVC waterproof coiled material comprises the following steps:
s1: overlapping a plurality of plane waterproof coiled materials, and pre-laying the waterproof coiled materials on a plane until the plane is fully paved;
s2: pre-fixing a plane waterproof coiled material on a plane and welding;
s3: sequentially overlapping the vertical surface waterproof coiled materials, pre-fixing the vertical surface waterproof coiled materials on the vertical surface and welding the vertical surface waterproof coiled materials until the vertical surface waterproof coiled materials are fully paved at the positions except the internal corner and the external corner; the vertical surface waterproof coiled material is 0-50cm away from the internal corner and the external corner.
S4: paving a first internal corner waterproof coiled material or a second internal corner waterproof coiled material at an internal corner and paving a first external corner waterproof coiled material at an external corner;
in step S4, when the facade waterproof roll at the internal corner is attached to the internal corner, a first internal corner waterproof roll is laid; and when the vertical surface waterproof coiled material at the internal corner is not attached to the internal corner, laying a second internal corner waterproof coiled material. When the facade waterproof coiled material is paved, the distance between the facade waterproof coiled material and the internal corner is 0-5cm, the facade waterproof coiled material is considered to be attached to the internal corner,
the first internal corner waterproof roll and the second internal corner waterproof roll are folded to form a shape consistent with the shape of the internal corner.
When the vertical waterproof coiled material is laid, the longitudinal overlapping edge of the vertical waterproof coiled material is preferably separated from the longitudinal overlapping edge of the plane waterproof coiled material by a certain distance, so that the flowing distance of rainwater on the overlapping edge is increased, and the vertical waterproof coiled material cannot be attached to an internal corner frequently. So the design of two types of inside corner waterproofing membrane is required, so that the actual demand is met better, and the possibility of rainwater infiltration is reduced.
Preferably, in step S3, the waterproof roll further includes a first external corner waterproof roll, the first external corner waterproof roll includes a first external corner edge overlapped with the planar waterproof roll and a second external corner edge overlapped with the adjacent vertical waterproof roll, the first external corner edge is overlapped above the edge of the planar waterproof roll to form a first external corner overlapping edge, and the second external corner edge of the first external corner waterproof roll is overlapped above the edge of the vertical waterproof roll to form a second external corner overlapping edge.
Preferably, welding the first external corner waterproofing membrane and the plane waterproofing membrane together along the first external corner overlapping edge by using a welding gun; and welding the second external corner waterproof coiled material and the vertical face waterproof coiled material together along the second external corner overlapping edge by using a welding gun.
Preferably, in step S3, the rectangular first external corner waterproofing membrane is folded to form two left and right first external corner portions and a second external corner portion and a first folding mark in the middle, the first external corner waterproofing membrane is cut along the folding mark of the first external corner waterproofing membrane from bottom to top by 8-10cm, and then the first external corner waterproofing membrane is folded at a position 8-10cm away from the lower edge of the first external corner waterproofing membrane to form a rectangular first external corner edge, and the first external corner edge is also divided into a left part of the first external corner edge and a right part of the second external corner edge due to the first folding mark.
Preferably, in step S4, when the first external corner waterproofing roll is laid at the external corner, after the first fold of the first external corner waterproofing roll is aligned with the boundary of the two vertical faces of the external corner, the first external corner waterproofing roll is attached to the external corner, so that the first external corner is attached to one vertical face of the external corner, the second external corner is attached to the other vertical face of the external corner, the left part of the edge of the first external corner is attached to the plane waterproofing roll on the left side of the external corner, and the right part of the edge of the first external corner is attached to the plane waterproofing roll on the right side of the external corner.
Preferably, the method for laying the external corner further comprises the step S31:
and laying a second external corner waterproof coiled material at the external corner, wherein the second external corner waterproof coiled material is laid above the corner, opposite to the external corner, of the plane waterproof coiled material at the external corner, and is overlapped on the left part of the first external corner edge and the right part of the first external corner edge.
Because the lower part of the first external corner waterproof coiled material is divided into the left part of the first external corner edge and the right part of the first external corner edge on the left side and the right side, the external corner cannot be well protected at the junction, and rainwater can easily permeate to the ground through a gap.
Preferably, step S1 further includes locating one edge of the flat waterproof sheet at the lowest position of the flat surface and laying the flat waterproof sheet, so that the adjacent flat waterproof sheets are overlapped, and when the flat waterproof sheets are overlapped, the flat waterproof sheet close to the edge at the lowest position of the flat surface is overlapped on the flat waterproof sheet far from the edge at the lowest position of the flat surface.
Preferably, the distance between the longitudinal overlapping edge of the plane waterproof coiled material arranged on the plane edge and the longitudinal overlapping edge of the adjacent vertical face waterproof coiled material arranged on the lower end part of the vertical face is not less than 30 cm.
The first internal corner waterproofing membrane comprises a first internal corner edge for overlapping with the already laid plane waterproofing membrane and
and the second internal corner edge is used for overlapping with the laid facade waterproof coiled material.
The second female-angle waterproofing membrane comprises a third female-angle edge for overlapping with the already laid plane waterproofing membrane and
and the fourth internal corner edge is used for overlapping with the laid facade waterproof coiled material.
Preferably, in step S4, the operation of folding the first inside-corner waterproofing membrane further includes the following steps:
s41, folding the first internal corner waterproof roll along the edge of the first internal corner, and then spreading the first internal corner waterproof roll;
s42, folding the first internal corner waterproof roll along the second internal corner edge, and spreading the first internal corner waterproof roll out to enable the rectangular first internal corner waterproof roll to be divided into a first rectangular part, a first internal corner edge, a second internal corner edge and a second rectangular part, wherein the first part is used for being attached to the vertical surface of the other surface of the internal corner;
s43, folding the first internal corner edge to press the first internal corner edge on the second part and form the first internal corner waterproof coiled material into a shape consistent with the internal corner
Or the second internal corner edge is folded, so that the second internal corner edge is pressed on the second part, and the first internal corner waterproof coiled material is shaped in accordance with the internal corner.
In step S4, the operation of folding the second inside corner waterproofing membrane further includes the following steps:
s44, folding the second internal corner waterproof roll along the edge of the third internal corner, and then spreading the roll;
s45, folding the second internal corner waterproof roll along the fourth internal corner edge, and then spreading the second internal corner waterproof roll;
s46, folding the second internal corner waterproof roll left and right, and spreading out the second internal corner waterproof roll to enable the rectangular first internal corner waterproof roll to be divided into a third part, a third internal corner edge and a fourth internal corner edge which are all rectangular, wherein the third part 41 is used for being attached to two vertical surfaces of the internal corner;
and S47, folding the third internal corner edge and the third part to ensure that the third internal corner edge becomes ∟', and simultaneously forming the first internal corner waterproof coiled material into a shape consistent with the internal corner.
The beneficial effects are that:
according to the invention, the condition that the vertical face waterproof coiled material is possibly overlapped is considered, two different internal corner waterproof coiled materials are arranged, the actual requirements can be met, the phenomenon that rainwater permeates at the internal corner is reduced, and the waterproof performance is improved. The second is owing to inevitably will prune first external corner waterproofing membrane in external corner department, has increased the place that needs prevent the rainwater infiltration, so improve the waterproof performance of whole assembled structure through increasing second external corner waterproofing membrane.
Drawings
Fig. 1 is a schematic structural view of an installed external corner by the method of the present invention.
Fig. 2 is a schematic structural view of a first external corner waterproofing membrane.
Fig. 3 is a schematic structural diagram of the flat waterproof roll material when being lapped.
Fig. 4 is a schematic structural diagram of a flat waterproof roll and a vertical waterproof roll when they are lapped.
Fig. 5 is a schematic structural view of a first inside corner waterproofing membrane.
Fig. 6 is a schematic structural view of the first internal corner waterproofing membrane laid at the internal corner.
Fig. 7 is a schematic structural view of a second inside corner waterproofing membrane.
Fig. 8 is a schematic structural view of the second internal corner waterproofing membrane laid on the internal corner.
The labels in the figure are: 1. a flat waterproof roll; 2. waterproof roll material of elevation; 3. a first inside corner waterproofing membrane; 31. a first part; 32. a second section; 33. a first reentrant corner edge; 34. a second reentrant corner edge; 4. a second inside corner waterproofing membrane; 41. a third section; 42. a third reentrant corner edge; 43. a fourth reentrant corner edge; 5. a first external corner waterproofing membrane; 51. a first external corner lap edge; 52. a second external corner lap edge; 53. a first male corner portion; 54. a second male corner portion; 6. a second external corner waterproof roll; 7. a plane; 8. and (6) erecting.
Detailed Description
The invention will be further illustrated with reference to the following specific examples. It should be understood that these examples are for illustrative purposes only and are not intended to limit the scope of the present invention. Further, it should be understood that various changes or modifications of the present invention may be made by those skilled in the art after reading the teaching of the present invention, and such equivalents may fall within the scope of the present invention as defined in the appended claims.
A method for integrally paving an external corner and an internal corner of a PVC waterproof coiled material comprises the following steps:
s1: overlapping a plurality of plane waterproof coiled materials 1, and pre-laying the waterproof coiled materials on a plane 7 until the plane 7 is fully paved;
s2: pre-fixing the plane waterproof coiled material 1 on a plane 7 and welding;
s3: sequentially overlapping the vertical surface waterproof coiled materials 2, pre-fixing the vertical surface waterproof coiled materials on the vertical surface 8 and welding the vertical surface waterproof coiled materials until the vertical surface 8 is fully paved at the positions of the vertical surface waterproof coiled materials 2 except the internal corner and the external corner; the vertical surface waterproof coiled material 2 is 0-50cm away from the internal corner and the external corner.
S4: laying a first internal corner waterproof coiled material 3 or a second internal corner waterproof coiled material 4 at an internal corner and laying a first external corner waterproof coiled material 5 at an external corner and welding;
in step S4, when the facade waterproofing membrane 2 at the internal corner is attached to the internal corner, the first internal corner waterproofing membrane 3 is laid; and when the vertical surface waterproof coiled material 2 at the internal corner is not attached to the internal corner, laying a second internal corner waterproof coiled material 4. When the facade waterproof coiled material 2 is paved, the distance between the facade waterproof coiled material and the internal corner is 0-5cm, the facade waterproof coiled material is considered to be attached to the internal corner,
the first internal corner waterproofing membrane 3 and the second internal corner waterproofing membrane 4 are folded to form a shape consistent with the shape of the internal corner.
Preferably, in step S3, the waterproof roll further includes a first external corner waterproof roll 5, the first external corner waterproof roll 5 includes a first external corner edge overlapping with the planar waterproof roll 1 and a second external corner edge overlapping with the adjacent vertical face waterproof roll 2, the first external corner edge is overlapped over the edge of the planar waterproof roll 1 to form a first external corner overlapping edge 51, and the second external corner edge of the first external corner waterproof roll 5 is overlapped over the edge of the vertical face waterproof roll 2 to form a second external corner overlapping edge 52.
Preferably, welding the first external corner waterproofing membrane 5 and the plane waterproofing membrane 1 together along the first external corner overlapping edge 51 by using a welding gun; the second external corner waterproofing sheet 6 and the facade waterproofing sheet 2 are welded together along the second external corner overlap 52 by using a welding gun.
Preferably, in step S3, the rectangular first external corner waterproof roll 5 is folded to form two left and right first external corner portions 53 and second external corner portions 54 and a first fold line in the middle, preferably folded to form two left and right first external corner portions 53 and second external corner portions 54, the first external corner waterproof roll 5 is cut along the fold line of the first external corner waterproof roll 5 from bottom to top by 8-10cm, and the first external corner waterproof roll 5 is folded at a position 8-10cm away from the lower edge of the first external corner waterproof roll 5 to form a rectangular first external corner edge, and the first external corner edge is also divided into a left first external corner edge and a right second external corner edge by the first fold line.
Preferably, in step S4, when the first external corner waterproofing roll 5 is laid on the external corner, after the first fold of the first external corner waterproofing roll 5 is aligned with the boundary of the two vertical faces 8 of the external corner, the first external corner waterproofing roll 5 is attached to the external corner so that the first external corner 53 is attached to one vertical face 8 of the external corner, the second external corner 54 is attached to the other vertical face 8 of the external corner, and the left part of the first external corner edge is attached to the planar waterproofing roll 1 on the left side of the external corner to form the first external corner overlapping edge 51, and similarly, the right part of the first external corner edge is attached to the planar waterproofing roll 1 on the right side of the external corner to form the first external corner overlapping edge 51.
Preferably, the method for laying the external corner further comprises the step S31:
at the external corner a second external corner waterproofing roll 6 is also laid, said second external corner waterproofing roll 6 being laid over the corner of the planar waterproofing roll 1 at the external corner opposite to the external corner and overlapping on the first external corner edge left and right.
Because the lower part of the first external corner waterproof coiled material 5 is divided into the left part of the first external corner edge and the right part of the first external corner edge on the left side and the right side, the external corner cannot be protected at the junction, and rainwater can easily permeate to the ground through a gap, therefore, the second external corner waterproof coiled material 6 is added in the method to lay the second external corner waterproof coiled material 6 at the intersection of the junction of the two surfaces of the external corner and the plane waterproof coiled material 1, so that the rainwater is prevented from permeating to the ground.
Preferably, step S1 further includes the steps of finding one side of the flat waterproof sheet 1 located at the lowest position of the flat surface 7 and laying the flat waterproof sheet 1, so that the adjacent flat waterproof sheets 1 are overlapped, and when the flat waterproof sheet 1 is overlapped, the flat waterproof sheet 1 close to the side of the lowest position of the flat surface 7 is overlapped on the flat waterproof sheet 1 far from the side of the lowest position of the flat surface 7.
Preferably, the distance between the longitudinal overlapping edge of the plane waterproof coiled material 1 arranged at the edge of the plane 7 and the longitudinal overlapping edge of the adjacent vertical face waterproof coiled material 2 arranged at the lower end part of the vertical face 8 is not less than 30 cm.
The first inside-corner waterproofing membrane 3 comprises a first inside-corner edge for overlapping with the already laid flat waterproofing membrane 1 and
for the second inside corner edge to overlap with the already laid facade waterproofing roll 2.
The second inside-corner waterproofing membrane 4 comprises a third inside-corner edge for overlapping the already laid flat waterproofing membrane 1 and
for the fourth inside corner edge to overlap with the already laid facade waterproofing roll 2.
Preferably, as shown in fig. 5 and 6, in the operation of folding the first inside corner waterproofing membrane 3 in step S4, the following steps are further included:
s41, folding the first internal corner waterproof roll 3 along the first internal corner edge, and spreading out;
s42, folding the first internal corner waterproof roll 3 along the second internal corner edge, and spreading out the first internal corner waterproof roll 3 so that the rectangular first internal corner waterproof roll 3 is divided into a first portion 31, a first internal corner edge 33, a second internal corner edge 34 and a second portion 32, which are all rectangular, wherein the first portion 31 is used for being attached to the vertical surface 8 on the other side of the internal corner;
s43, folding the first inside corner edge to make the first inside corner edge 33 press on the second part 32 and make the first inside corner waterproof coiled material 3 form the same shape with the inside corner
Or folding the second inside corner edge so that the second inside corner edge 33 is pressed onto the second portion 32, while also forming the first inside corner roll 3 into a shape conforming to the inside corner.
Also preferably, as shown in fig. 7 and 8, in the operation of folding the second inside corner waterproofing membrane 4 in step S4, the following steps are further included:
s44, folding the second inside corner waterproofing membrane 4 along the third inside corner edge 42, and then spreading out;
s45, folding the second inside corner waterproofing membrane 4 along the fourth inside corner edge 43, and then spreading it out;
s46, folding the second internal corner waterproof roll 4 left and right, and spreading out the first internal corner waterproof roll to enable the first rectangular internal corner waterproof roll to be divided into a third part 41, a third internal corner edge 42 and a fourth internal corner edge 43 which are rectangular, wherein the third part is used for being attached to two vertical surfaces 8 of the internal corner;
and S47, folding the third internal corner edge and the third part to change the third internal corner edge into ∟', and simultaneously forming the second internal corner waterproof roll 4 into a shape consistent with the internal corner.
In step S1, when laying flat waterproof sheet 1, the method includes the steps of:
s11, the plane waterproof coiled material 1 comprises a peripheral waterproof coiled material which is contacted with the edge of a plane 7, the peripheral waterproof coiled material comprises a first plane edge and a second plane edge, the first plane edge is aligned with the edge of the plane 7, the second plane edge is lapped with another plane waterproof coiled material 1, the first plane edge of the plane waterproof coiled material 1 is aligned with the edge of the plane 7 from one edge of the plane 7, then the plane waterproof coiled material 1 is fixed by a pressing strip, the pressing strip is arranged on the first plane edge, then the plane waterproof coiled material 1 is sequentially paved on the plane 7, so that the second plane edges of the adjacent plane waterproof coiled materials 1 are lapped with each other to form a first lapping edge;
s12, the plane waterproof coiled material 1 further comprises an internal waterproof coiled material which is not contacted with the edge of the plane 7, the internal waterproof coiled material comprises a second plane edge, and then the internal waterproof coiled material is sequentially paved on the plane 7, so that the internal waterproof coiled material and the second plane edge of the adjacent internal waterproof coiled material and/or the peripheral waterproof coiled material are mutually lapped to form a first lapping edge;
s13, fixing the inner waterproof roll and/or the peripheral waterproof roll on the plane 7 by a fixing piece, wherein the fixing piece is arranged in the first overlapping edge and positioned above the inner waterproof roll or the peripheral waterproof roll at the lowest layer;
s14, placing gaskets at two ends of the first overlapping edge and between the gaps of the adjacent inner waterproof coiled materials and/or the adjacent peripheral waterproof coiled materials, and welding the adjacent inner waterproof coiled materials and/or the adjacent peripheral waterproof coiled materials together by using a welding trolley;
and S15, welding the corners of the inner waterproof coiled material and/or the peripheral waterproof coiled material together by a welding gun in a manual welding mode.
Preferably, in step S3, the fixing member is provided with an opening, and the fixing member and the waterproof roll are fixed on the plane 7 by a bolt structure. The first overlapping edge is a mutual overlapping and overlapping part of second plane edges of the peripheral waterproof coiled materials or a mutual overlapping and overlapping part of the second plane edges of the internal waterproof coiled materials and the adjacent internal waterproof coiled materials or the peripheral waterproof coiled materials, the outermost end of the first overlapping edge is the edge of the waterproof coiled material on the upper layer, and the innermost end of the first overlapping edge is the edge of the waterproof coiled material on the lower layer.
The first plane edge and the second plane edge are both rectangular.
Preferably, in step S15, the method includes the following steps:
s151: performing primary pre-welding on the waterproof coiled material, wherein the pre-welding position is positioned in the first overlapping edge and is 8-15cm away from the outermost end of the first overlapping edge;
s152: and carrying out one-time real welding on the waterproof coiled material, wherein the real welding position is positioned in the first overlapping edge and is 0-8cm away from the outermost end of the first overlapping edge.
In step S2, when the waterproof roll for a facade 2 is laid, the method includes the steps of:
s21: the vertical waterproof coiled material 2 comprises a first vertical surface 8 edge lapped with a peripheral waterproof coiled material; overlapping the edge of the first vertical face 8 of the vertical face waterproof coiled material 2 above the edge of the first plane of the peripheral waterproof coiled material to form a second overlapping edge;
s22, pre-fixing the facade waterproof coiled material 2 on the facade 8 by using fixing glue, and fixing the facade waterproof coiled material 2 on the facade 8 by using a welding gun;
s23, welding the facade waterproof coiled material 2 and the peripheral waterproof coiled material together along the second overlapping edge by a welding gun in a manual welding mode;
s24, the facade waterproof coiled material 2 comprises a second facade 8 edge lapped with the adjacent facade waterproof coiled material 2, and the second facade 8 edge of the adjacent facade waterproof coiled material 2 is lapped on the second facade 8 edge of the adjacent facade waterproof coiled material 2, so as to form a third lapping edge;
s25: welding the facade waterproof coiled material 2 and the adjacent facade waterproof coiled material 2 together along the third overlapping edge by using a welding gun in a manual welding mode;
s26: and repeating the steps S21-S26 until the bottom of the vertical surface 8 is fully paved by the vertical surface waterproof coiled material 2.
The edges of the first vertical surface 8 and the second vertical surface 8 are rectangular.
Preferably, when the welding gun is used for manual welding, the included angle between the welding gun and the waterproof coiled material is 30-60 degrees, after the welding head is inserted into the waterproof coiled material, the welding gun translates along the extending direction of the edge of the waterproof coiled material, and the roller follows behind the welding gun and is used for compacting the welding position.
Preferably, the waterproof roll may be a homogeneous PVC waterproof roll, a fiber-backed PVC waterproof roll, a fabric-internally reinforced PVC waterproof roll, a glass fiber-internally reinforced PVC waterproof roll, and a glass fiber-internally reinforced fiber-backed PVC waterproof roll.
It should be understood that the above-described embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the claims of the present invention.

Claims (6)

1. A method for integrally paving an external corner and an internal corner of a PVC waterproof coiled material is characterized by comprising the following steps:
s1: pre-paving a plurality of plane waterproof coiled materials on a plane until the plane is fully paved;
s2: pre-fixing a plane waterproof coiled material on a plane and welding;
s3: pre-fixing the vertical waterproof coiled material on the vertical surface in sequence and welding the vertical waterproof coiled material until the vertical waterproof coiled material is fully paved on the vertical surface except for the positions of the internal corner and the external corner;
s4: paving a first internal corner waterproof coiled material or a second internal corner waterproof coiled material at an internal corner and paving a first external corner waterproof coiled material at an external corner; in step S4, when the facade waterproof roll at the internal corner is attached to the internal corner, a first internal corner waterproof roll is laid;
when the vertical surface waterproof coiled material at the internal corner is not attached to the internal corner, a second internal corner waterproof coiled material is laid, and the first internal corner waterproof coiled material and the second internal corner waterproof coiled material are folded to form a shape consistent with the shape of the internal corner;
in step S3, the waterproof roll further includes a first external corner waterproof roll, where the first external corner waterproof roll includes a first external corner edge overlapped with the planar waterproof roll and a second external corner edge overlapped with the adjacent vertical waterproof roll, the first external corner edge is overlapped above the edge of the planar waterproof roll to form a first external corner overlapping edge, and the second external corner edge of the first external corner waterproof roll is overlapped above the edge of the vertical waterproof roll to form a second external corner overlapping edge;
further comprising step S31: at the external corner a second external corner waterproofing roll is also laid, which is laid over the corner of the planar waterproofing roll at the external corner opposite to the external corner and overlaps the first external corner edge.
2. The method for integrally laying the external corner and the internal corner of the PVC waterproof coiled material as claimed in claim 1, wherein a welding gun is used for welding the first external corner waterproof coiled material and the plane waterproof coiled material together along the overlapping edge of the first external corner; and welding the second external corner waterproof coiled material and the vertical face waterproof coiled material together along the second external corner overlapping edge by using a welding gun.
3. The method of claim 1, wherein in step S3, a rectangular first external corner waterproofing membrane is folded to form a first external corner part and a second external corner part on the left and right and a first folding mark in the middle, the first external corner waterproofing membrane is cut along the folding mark of the first external corner waterproofing membrane from bottom to top by 8-10cm, and then the first external corner waterproofing membrane is folded at a distance of 8-10cm from the lower edge to form a rectangular first external corner edge.
4. The method of claim 1, wherein in step S4, when the first external corner waterproofing roll is laid on the external corner, after the first fold of the first external corner waterproofing roll is aligned with the junction of two vertical faces of the external corner, the first external corner waterproofing roll is attached to the external corner, so that the first external corner is attached to one vertical face of the external corner, the second external corner is attached to the other vertical face of the external corner, and the edge of the first external corner is attached to the plane waterproofing roll.
5. The method of claim 1, further comprising, in step S1, starting to lay the flat waterproofing membrane by finding one side of the flat waterproofing membrane at the lowest position of the flat surface, so that the adjacent flat waterproofing membranes are overlapped, and when the adjacent flat waterproofing membranes are overlapped, the flat waterproofing membrane near the side of the lowest position of the flat surface is overlapped above the flat waterproofing membrane far from the side of the lowest position of the flat surface.
6. The method for integrally laying an external corner and an internal corner of a PVC waterproof coiled material as claimed in claim 1, wherein in step S1, the plane waterproof coiled material is formed by overlapping each other, and in step S3, the vertical waterproof coiled material is formed by overlapping each other; the distance between the longitudinal overlapping edge of the plane waterproof coiled material and the longitudinal overlapping edge of the vertical face waterproof coiled material is not less than 30 cm.
CN201810872358.1A 2018-03-31 2018-08-02 Method for integrally laying external corner and internal corner of PVC waterproof coiled material Active CN108978898B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201810278016 2018-03-31
CN2018102780167 2018-03-31

Publications (2)

Publication Number Publication Date
CN108978898A CN108978898A (en) 2018-12-11
CN108978898B true CN108978898B (en) 2020-06-23

Family

ID=64555287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810872358.1A Active CN108978898B (en) 2018-03-31 2018-08-02 Method for integrally laying external corner and internal corner of PVC waterproof coiled material

Country Status (1)

Country Link
CN (1) CN108978898B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114809112A (en) * 2022-04-19 2022-07-29 中铁建工集团有限公司 Basement waterproof construction process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586381A (en) * 2008-05-20 2009-11-25 北京森聚柯高分子材料有限公司 Waterproof structure and manufacturing method thereof
CN102661015A (en) * 2012-05-16 2012-09-12 中国江苏国际经济技术合作公司 Single-layer waterproof prepared roofing and construction method thereof
CN104695486A (en) * 2013-12-04 2015-06-10 五冶集团上海有限公司 Construction method of basement roof polyvinyl chloride root thorn resistance waterproof roll
CN204898901U (en) * 2015-08-11 2015-12-23 游捷 Waterproof prefab structure of special effect
KR101616285B1 (en) * 2016-02-15 2016-04-28 (주)종합건축사사무소그룹케이 Building floor leakage protection system structure
CN206971580U (en) * 2017-07-04 2018-02-06 中铁北京工程局集团有限公司 A kind of flat roof waterproof constructing structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586381A (en) * 2008-05-20 2009-11-25 北京森聚柯高分子材料有限公司 Waterproof structure and manufacturing method thereof
CN102661015A (en) * 2012-05-16 2012-09-12 中国江苏国际经济技术合作公司 Single-layer waterproof prepared roofing and construction method thereof
CN104695486A (en) * 2013-12-04 2015-06-10 五冶集团上海有限公司 Construction method of basement roof polyvinyl chloride root thorn resistance waterproof roll
CN204898901U (en) * 2015-08-11 2015-12-23 游捷 Waterproof prefab structure of special effect
KR101616285B1 (en) * 2016-02-15 2016-04-28 (주)종합건축사사무소그룹케이 Building floor leakage protection system structure
CN206971580U (en) * 2017-07-04 2018-02-06 中铁北京工程局集团有限公司 A kind of flat roof waterproof constructing structure

Also Published As

Publication number Publication date
CN108978898A (en) 2018-12-11

Similar Documents

Publication Publication Date Title
US10851542B2 (en) Fire and water resistant, integrated wall and roof expansion joint seal system
CN101146966A (en) Improved structural insulated panel and panel joint
CN104612254B (en) The viscous waterproof roll paving waterproof construction method of reaction
CN108978898B (en) Method for integrally laying external corner and internal corner of PVC waterproof coiled material
CN206426543U (en) Coiled material lock seaming structure and lock seaming coiled material
KR102239566B1 (en) Waterproofing structure
CN110145038B (en) Construction process for sealing waterproof coiled material through pressure grouting
CN102587598A (en) Split mounting type heat-insulation and waterproof roof structure
CN208309638U (en) A kind of outer waterproof construction of underground pipe gallery
CN111794392A (en) Assembled side fascia
CN108868137B (en) Method for integrally paving vertical face and internal corner of PVC waterproof coiled material
CN107100208B (en) Anti-floating waterproof structure of underground building and construction method
CN212827208U (en) PVC pre-paved anti-sticking inner-reinforced waterproof roll
CN210031455U (en) Small box girder bridge floor connecting structure
CN211850791U (en) Leak protection thick liquid structure of plastics turnover membrane shell piece
CN210002439U (en) underground station
CN207954893U (en) A kind of waterproof roll
CN106700962A (en) Novel waterproof coiled material
CN209683076U (en) A kind of tunnel Special waterproof coiled material
CN212827206U (en) Wet anti-waterproofing membrane that glues of shop PVC in advance that paves
CN207110081U (en) Buildings waterproof standard component
CN207105806U (en) A kind of wet-laying self-adhesive coiled material
CN108442615B (en) Installation method of waterproof coiled material
CN210263656U (en) Lapping structure of waterproof roll
CN220790338U (en) Roof special self-adhesive asphalt waterproof coiled material

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant