CN108978664A - Remove the device and its application method of cast-in-situ bored pile casing inner wall mud - Google Patents

Remove the device and its application method of cast-in-situ bored pile casing inner wall mud Download PDF

Info

Publication number
CN108978664A
CN108978664A CN201811064726.6A CN201811064726A CN108978664A CN 108978664 A CN108978664 A CN 108978664A CN 201811064726 A CN201811064726 A CN 201811064726A CN 108978664 A CN108978664 A CN 108978664A
Authority
CN
China
Prior art keywords
wall
water
mud
casing
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811064726.6A
Other languages
Chinese (zh)
Other versions
CN108978664B (en
Inventor
卢辉
王有力
徐保永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Three Kay Engineering Management Co Ltd
Original Assignee
Zhejiang Three Kay Engineering Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Three Kay Engineering Management Co Ltd filed Critical Zhejiang Three Kay Engineering Management Co Ltd
Priority to CN201811064726.6A priority Critical patent/CN108978664B/en
Publication of CN108978664A publication Critical patent/CN108978664A/en
Application granted granted Critical
Publication of CN108978664B publication Critical patent/CN108978664B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/08Removing obstacles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of devices and its application method for removing cast-in-situ bored pile casing inner wall mud, belong to construction technology of cast-in-place bored field, including hanging cylinder, the bottom wall rotation for hanging cylinder is provided with shaft, the top of shaft is connected with water inlet pipe, sparge pipe is provided in the shaft, the sparge pipe is provided with spray head, connecting shaft has been fixedly and coaxially connected in the shaft, captation is provided in the connecting shaft, the bottom end of the connecting shaft is provided with the scraper assembly for striking off the mud on casing inner wall, it is described to hang the driving source being provided in cylinder for drive shaft rotation.In use, starting driving source, driving source drives scraper assembly work to strike off the mud on casing, shaft drives sparge pipe rotation simultaneously, and by entering pipe water flowing into shaft, the mud flush attached on casing inner wall is fallen, realizes the purpose for removing the mud that casing inner wall is stained with.

Description

Remove the device and its application method of cast-in-situ bored pile casing inner wall mud
Technical field
The present invention relates to construction technology of cast-in-place bored field, in particular to a kind of removing cast-in-situ bored pile casing inner wall mud The device and its application method of slurry.
Background technique
Cast-in-situ bored pile is common substructure form in science of bridge building, before drilling that certain wall thickness is (general Greater than 10mm) steel pile casting squeeze into supporting course.Exterior sheathing, bearing platform construction when steel pile casting is both pile foundation concreting face When fixed point or pile foundation durability addition thereto, but determine steel pile casting wall thickness is usually to squeeze into the construction of supporting course to want It asks.The often soft layers such as soil or muck soil, the pore forming process that can be constructed with churning driven be easy to cause mud to attach to Steel pile casting inner wall, borehole cleaning process are difficult to thoroughly remove the mud of steel pile casting inner wall attachment.The presence of mud layer greatly reduces stake Cohesive force and steel pile casting between base concrete and steel pile casting to the restraining force of pile foundation concrete, do not send out by so thick steel pile casting Wave its due effect.Steel pile casting is generally used for pile foundation top, and the stress at this is more complicated, if considering steel pile casting to concrete Hoop constraint power, then the reducible pile foundation ratio of reinforcement, reduce Pile Diameter, not only taken full advantage of the mechanical property of steel pile casting but also Save engineering material.
Steel pile casting is improved to the hoop constraint power of pile foundation, it is necessary to assure steel pile casting inner wall is combined closely with concrete, nothing The weak intercalated layers such as mud, but there has been no the devices and construction technical requirement of removing cast-in-situ bored pile steel pile casting inner wall mud at present.
Summary of the invention
One of the objects of the present invention is to provide a kind of devices for removing cast-in-situ bored pile casing inner wall mud, have and remove The advantages of mud that casing inner wall is stained with.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of device for removing cast-in-situ bored pile casing inner wall mud, including hangs cylinder, during the bottom wall rotation for hanging cylinder is provided with Empty shaft, the top of shaft is connected with water inlet pipe, the sparge pipe being connected to shaft, the spray is fixedly installed in the shaft Water pipe is provided with spray head close to one end of casing inner wall, and the connecting shaft extended downwardly, institute are fixedly and coaxially connected in the shaft It states and is provided with captation in connecting shaft, the bottom end of the connecting shaft is provided with for striking off striking off for the mud on casing inner wall Component, it is described to hang the driving source being provided in cylinder for drive shaft rotation.
Implement above-mentioned technical proposal, in use, starting driving source, driving source drives shaft rotation, and shaft drives connecting shaft Rotation, connecting shaft drive scraper assembly work to strike off the mud on casing, while shaft drives sparge pipe rotation, and by into Entering pipe water flowing into shaft, water is sprayed by sparge pipe from spray head, so that casing inner wall is cleaned, it will be on casing inner wall The mud flush attached is fallen, and realizes the purpose for removing the mud that casing inner wall is stained with;And the water sprayed out is received by captation Collection gets up, and prevents water flow from influencing construction into the foundation pit of installation casing.
Preferably, the scraper assembly includes fixed plate, movable plate and pressure spring, and the fixed plate is fixedly installed on connecting shaft Above and to the inner wall of casing extend, offers sliding slot, the movable plate sliding setting along length direction in the fixed plate In in sliding slot, sliding slot is square groove, and movable plate is square plate compatible with square groove to prevent movable plate relative to fixation Plate rotation, the pressure spring are set in sliding slot for driving movable plate and casing inner wall to push against.
Implement above-mentioned technical proposal, it is dynamic that connecting shaft rotation drives fixed plate to walk around, and fixed plate drives movable plate rotation, so that Movable plate is rotated along casing inner wall to strike off mud, and the pressure of pressure spring drives movable plate and casing inner wall to push against, and raising is struck off Effect, and the place for having protrusion to hinder is encountered, movable plate can slide a small distance into sliding slot, make movable plate smoothly along casing Inner wall rotation.
Preferably, the anti-delinking part for preventing movable plate to be detached from fixed plate is provided on the fixed plate and movable plate.
Implement above-mentioned technical proposal, the purpose for preventing movable plate to be detached from fixed plate is played in the setting of anti-delinking part.
Preferably, the anti-delinking part includes the flange for being fixedly installed on movable plate and protruding into one end in sliding slot, and fixed It is set to the surrounding edge that for flange abut prevents movable plate disengaging sliding slot of the fixed plate close to movable plate one end.
Implement above-mentioned technical proposal, during pressure spring drives movable plate to slide to outside sliding slot, when flange and surrounding edge support When connecing, the purpose for preventing movable plate to be detached from fixed plate is realized in movable plate stop motion.
Preferably, the movable plate is provided with scraper plate close to one end of casing inner wall, and the scraper plate is biased to movable plate rotation Direction is obliquely installed.
Implement above-mentioned technical proposal, scraper plate is obliquely installed to the direction that movable plate rotates, is effectively improved to mud Scraping effect.
Preferably, the captation includes weather board and hollow Water collecting tube, and the Water collecting tube, which rotates coaxially, to be sheathed on In connecting shaft, Water collecting tube includes top plate and bottom plate, and the adapting table abutted with the bottom wall of top plate is fixedly installed in the connecting shaft, Offer at least two layers of water-guiding hole group on Water collecting tube, every layer of water-guiding hole group includes that be circumferentially uniformly arranged along Water collecting tube multiple lead Water hole is provided with for directing water into the weather board in Water collecting tube, the projection of weather board in the horizontal plane at each water-guiding hole It overlaps, weather board is provided with water fender along the two sides of water (flow) direction.
Implement above-mentioned technical proposal, the water sprayed from spray head drops on weather board, and by weather board water conservancy diversion to catchmenting In cylinder, the collection of water is realized, the water for rinsing casing inner wall is prevented to be flowed into foundation pit and influence construction, and the setting of water fender, Play the purpose for preventing the water on weather board from overflowing from the two sides of weather board.
Preferably, the weather board be articulated on Water collecting tube and one end pass through water-guiding hole protrude into Water collecting tube, weather board to Under be obliquely installed, the outer wall of the Water collecting tube is fixedly installed for driving side of the weather board far from Water collecting tube and casing inner wall The elastic component being adjacent to.
Implement above-mentioned technical proposal, when using the device, the elastic force of elastic component drives side of the weather board far from Water collecting tube It downwardly turns over to push against with casing inner wall, is flowed into the water on casing inner wall on weather board, finally enters by water-guiding hole In Water collecting tube.
Preferably, overflow hole is offered in the connecting shaft, and the height of overflow hole is not higher than undermost water-guiding hole, institute It is hollow structure to the bottom end of connecting shaft that connecting shaft, which is stated, from overflow hole, and the bottom end rotation of connecting shaft is provided with connection ring, described The water-collecting bag being connected to connecting shaft is fixedly installed in connection ring.
Implement above-mentioned technical proposal, after the water in Water collecting tube gradually increases, and the water surface rises to the equal-height position of overflow hole, Water in Water collecting tube will flow to connecting shaft from overflow hole, and flow into water-collecting bag, to store more water.
Preferably, the bottom wall of the Water collecting tube tilts down setting.
Implement above-mentioned technical proposal, the bottom wall of Water collecting tube is tilted down into setting, so that the bottom of Water collecting tube is tapered, outside When taper moves downward under the effect of gravity, the lower part of taper can not only feel relieved cylinder, and move downward more convenient, reduce Clamping stagnation.
Another object of the present invention is to provide a kind of application methods for removing cast-in-situ bored pile casing inner wall mud, have The advantages of removing the mud that casing inner wall is stained with.
A kind of application method of device that removing cast-in-situ bored pile casing inner wall mud, comprising the following steps:
The device: being placed in the tube port position of the casing of mud for clearance by S1, is in scraper assembly in casing.
S2: starting driving source, driving source drive shaft and connecting shaft rotation, connecting shaft to drive scraper assembly to work to scrape Except the mud on casing inner wall, then slowly cylinder is hung in lower section, so that device declines;
S3: after sparge pipe enters in casing, filling the water into water inlet pipe, and driving source is kept to work on, and continues slowly decentralization and hangs Cylinder, until sparge pipe drops to casing bottom;
S4: closing driving source, is simultaneously stopped into water inlet pipe plus cylinder, withdrawing device are hung in water, promotion.
Implement above-mentioned technical proposal and the device is placed in by crane or artificial clamping hanging cylinder by the casing of mud for clearance Tube port position, be in scraper assembly in casing, start driving source, driving source drive shaft and connecting shaft rotation, connecting shaft Scraper assembly is driven to work to strike off the mud on casing inner wall, then slowly cylinder is hung in lower section, so that device declines;To sparge pipe It after in into casing, can be filled the water by tools such as external water pumps into water inlet pipe, driving source is kept to work on, continued slow Cylinder is hung in decentralization, until sparge pipe drops to casing bottom;Driving source is closed, is simultaneously stopped into water inlet pipe plus water, promotion is hung Cylinder takes out the device.
In conclusion the present invention having the beneficial effect that in use, start driving source in contrast to the prior art, driving source band The rotation of turn axis, shaft drive connecting shaft rotation, and connecting shaft drives scraper assembly work to strike off the mud on casing, turns simultaneously Axis drives sparge pipe rotation, and by entering pipe water flowing into shaft, water is sprayed by sparge pipe from spray head, thus in casing Wall is cleaned, and the mud flush attached on casing inner wall is fallen, and realizes the purpose for removing the mud that casing inner wall is stained with;And The water sprayed out is collected by captation, prevents water flow from influencing construction into the foundation pit of installation casing.
Detailed description of the invention
Fig. 1 is the whole structural schematic diagram of the embodiment of the present invention;
Fig. 2 is the cross-sectional view of the embodiment of the present invention;
Fig. 3 is the portion the A enlarged drawing in Fig. 2;
Fig. 4 is the portion the B enlarged drawing in Fig. 2;
Fig. 5 is the cross-sectional view of the embodiment of the present invention, it is intended to embody the internal structure of Water collecting tube.
Appended drawing reference: 1, cylinder is hung;11, fixed link;12, shaft;121, water inlet pipe;1211, connecting tube;122, gear two; 13, sparge pipe;131, spray head;14, motor;141, gear one;2, connecting shaft;21, adapting table;22, overflow hole;23, connection ring; 31, weather board;311, water fender;32, Water collecting tube;321, top plate;322, bottom plate;323, water-guiding hole;324, tension spring;4, it catchments Bag;41, drainpipe;411, it switchs;5, scraper assembly;51, fixed plate;511, sliding slot;52, movable plate;521, scraper plate;53, it presses Spring;6, anti-delinking part;61, flange;62, surrounding edge;7, casing.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment one:
As shown in Figure 1, 2, a kind of device for removing cast-in-situ bored pile casing inner wall mud, including cylinder 1 is hung, the roof for hanging cylinder 1 is solid Surely there is fixed link 11, the bottom wall rotation for hanging cylinder 1 is provided with hollow shaft 12, and shaft 12 is protruded into and hung in cylinder 1, the top of shaft 12 End is connected with water inlet pipe 121, and water inlet pipe 121 is connect by connecting tube 1211 with shaft 12, one end of connecting tube 1211 and water inlet Pipe 121 is fixedly connected, the other end and shaft 12 are rotatablely connected, and water inlet pipe 121 can be connected to external water pump to increase hydraulic pressure;Turn The sparge pipe 13 being connected to shaft 12 is fixedly installed on axis 12, sparge pipe 13 is made of stainless steel tube, the setting of sparge pipe 13 three It is a, and be circumferentially uniformly distributed along shaft 12, sparge pipe 13 is provided with spray head 131 close to one end of 7 inner wall of casing.
As shown in Figure 2,3, the driving source for being provided in cylinder 1 and rotating for drive shaft 12 is hung, driving source is fixed setting The motor 14 in cylinder 1 is being hung, gear 1 is coaxially fixedly installed on the output shaft of motor 14, shaft 12, which protrudes into, hangs in cylinder 1 One end is coaxially fixedly installed and one 141 meshed gears 2 122 of gear.
As shown in Figure 2,3, it is fixedly and coaxially connected the connecting shaft 2 extended downwardly in shaft 12, is provided with collection in connecting shaft 2 Water installations, captation include weather board 31 and hollow Water collecting tube 32, and Water collecting tube 32, which rotates coaxially, to be sheathed in connecting shaft 2, In conjunction with Fig. 5, Water collecting tube 32 includes top plate 321 and bottom plate 322, is fixedly installed in connecting shaft 2 and abuts with the bottom wall of top plate 321 Adapting table 21, the bottom wall of Water collecting tube 32 tilt down setting, so that the bottom of Water collecting tube 32 is tapered, outer cylinder is under the effect of gravity When taper moves downward, the lower part of taper can not only feel relieved, and move downward more convenient, reduction clamping stagnation.
As shown in Figure 2,3, at least two layers of water-guiding hole group is offered on Water collecting tube 32, and three layers of water-guiding hole are set in the present embodiment Group, every layer of water-guiding hole group include the multiple water-guiding holes 323 being circumferentially uniformly arranged along Water collecting tube 32, and every layer of water-guiding hole group edge is catchmented Cylinder 32 is circumferential to be uniformly arranged three water-guiding holes 323, is provided at each water-guiding hole 323 for directing water into Water collecting tube 32 Weather board 31, the projection of weather board 31 in the horizontal plane overlap, and water are collected completely, weather board 31 is along water (flow) direction Two sides are provided with water fender 311, prevent the water on weather board 31 from overflowing from the two sides of weather board 31.
The water sprayed from spray head 131 drops on weather board 31, and by realizing in weather board 31 water conservancy diversion to Water collecting tube 32 The collection of water prevents the water for rinsing 7 inner wall of casing to be flowed into foundation pit and influence construction.
As shown in Figure 2,3, weather board 31 is articulated on Water collecting tube 32 and one end passes through water-guiding hole 323 and protrudes into Water collecting tube 32 Interior, weather board 31 tilts down setting, and the outer wall of Water collecting tube 32 is fixedly installed for driving weather board 31 far from Water collecting tube 32 Side and the elastic component that is adjacent to of 7 inner wall of casing, elastic component be tension spring 324, one end of tension spring 324 and the outer wall of Water collecting tube 32 are solid Fixed connection, the other end are fixedly connected with the bottom wall of weather board 31.
The elastic force of elastic component drives weather board 31 to downwardly turn over to support with 7 inner wall of casing far from the side of Water collecting tube 32 Tightly, it is flowed into the water on 7 inner wall of casing on weather board 31, finally enters in Water collecting tube 32 by water-guiding hole 323, to a certain degree The upper gap reduced between weather board 31 and 7 inner wall of casing, so that more water enter weather board 31.
As shown in Figure 2,4, the bottom end of connecting shaft 2 is provided with the scraper assembly 5 for striking off the mud on 7 inner wall of casing, Scraper assembly 5 includes fixed plate 51, movable plate 52 and pressure spring 53, and fixed plate 51 is fixedly installed in connecting shaft 2 and to casing 7 Inner wall extends, and fixed plate 51 is uniformly arranged three along the circumferential direction of connecting shaft 2, and fixed plate 51 is interior to offer cunning along length direction Slot 511, movable plate 52 are slideably positioned in sliding slot 511, and sliding slot 511 is square groove, and movable plate 52 is compatible with square groove Square plate is to prevent movable plate 52 from rotating relative to fixed plate 51.
As shown in Figure 2,4, movable plate 52 is provided with scraper plate 521,521 deviation activity of scraper plate close to one end of 7 inner wall of casing 52 direction of rotation of plate is obliquely installed, and the front of the one end of scraper plate 521 far from movable plate 52 towards 52 direction of rotation of movable plate tilts, To improve the scraping effect to mud;Pressure spring 53 is set in sliding slot 511 for driving movable plate 52 and 7 inner wall of casing to push against, One end of pressure spring 53 is abutted with the bottom wall of sliding slot 511, the other end is abutted with movable plate 52.
It is dynamic that the rotation of connecting shaft 2 drives fixed plate 51 to walk around, and fixed plate 51 drives movable plate 52 to rotate, so that 52 edge of movable plate The rotation of 7 inner wall of casing is to strike off mud, and the pressure of pressure spring 53 drives movable plate 52 and 7 inner wall of casing to push against, and effect is struck off in raising Fruit, and the place for having protrusion to hinder is encountered, movable plate 52 can slide a small distance into sliding slot 511, keep movable plate 52 smooth It is rotated along 7 inner wall of casing.
As shown in Figure 2,4, it is provided on fixed plate 51 and movable plate 52 for preventing movable plate 52 to be detached from fixed plate 51 Anti-delinking part 6, anti-delinking part 6 include the flange 61 for being fixedly installed on one end that movable plate 52 protrudes into sliding slot 511, and fixed setting In fixed plate 51 close to the surrounding edge for preventing the disengaging sliding slot 511 of movable plate 52 for abutting with flange 61 of 52 one end of movable plate 62, flange 61 is bumping square compatible with sliding slot 511;In the mistake that pressure spring 53 drives movable plate 52 to slide to outside sliding slot 511 Cheng Zhong, when flange 61 is abutted with surrounding edge 62, the mesh for preventing movable plate 52 to be detached from fixed plate 51 is realized in 52 stop motion of movable plate 's.
As shown in figure 5, offering overflow hole 22 in connecting shaft 2, and the height of overflow hole 22 is not higher than undermost water guide Hole 323, connecting shaft 2 are hollow structure to the bottom end of connecting shaft 2 from overflow hole 22, and the bottom end of connecting shaft 2 rotates the company of being provided with Ring 23 is connect, the water-collecting bag 4 being connected to connecting shaft 2 is fixedly installed in connection ring 23, drainpipe 41 is provided on water-collecting bag 4, is arranged Switch 411 is provided on water pipe 41;After the water in Water collecting tube 32 gradually increases, and the water surface rises to the contour of overflow hole 22 Locate, the water in Water collecting tube 32 will flow to connecting shaft 2 from overflow hole 22, and flow into water-collecting bag 4, to store more water.
Specific work process: in use, the device to be placed in the tube port position of the casing 7 of mud for clearance, starting motor 14, Motor 14 is rotated with moving gear 1, and one 141 band moving gear 2 122 of gear rotates, and gear 2 122 drives shaft 12 to rotate, and turns Axis 12 drives connecting shaft 2 to rotate, and connecting shaft 2 drives the work of scraper assembly 5 to strike off the mud on casing 7.12 band of shaft simultaneously Dynamic sparge pipe 13 rotates, and by entering pipe water flowing into shaft 12, water is sprayed by sparge pipe 13 from spray head 131, thus right 7 inner wall of casing is cleaned, and the mud flush attached on 7 inner wall of casing is fallen, and is realized and is removed the mud that 7 inner wall of casing is stained with Purpose;And the water sprayed out is collected by captation, prevents water flow from influencing to apply into the foundation pit of installation casing 7 Work.
Embodiment two:
A kind of application method of device that removing cast-in-situ bored pile casing inner wall mud, comprising the following steps:
The device: being placed in the tube port position of the casing 7 of mud for clearance by S1, is in scraper assembly 5 in casing 7.
S2: starting driving source, driving source drive shaft 12 and connecting shaft 2 to rotate, and connecting shaft 2 drives 5 work of scraper assembly Make to strike off the mud on 7 inner wall of casing, then slowly cylinder 1 is hung in lower section, so that device declines;
S3: after sparge pipe 13 enters in casing 7, filling the water into water inlet pipe 121, and driving source is kept to work on, and continues slow Cylinder 1 is hung in decentralization, until sparge pipe 13 drops to 7 bottom of casing;
S4: closing driving source, is simultaneously stopped into water inlet pipe 121 plus cylinder 1, withdrawing device are hung in water, promotion.
By crane or artificial clamping hanging cylinder 1, which is placed in the tube port position of the casing 7 of mud for clearance, makes to strike off Component 5 is in casing 7, starts driving source, and driving source drives shaft 12 and connecting shaft 2 to rotate, and connecting shaft 2, which drives, strikes off group Part 5 works to strike off the mud on 7 inner wall of casing, and then slowly cylinder 1 is hung in lower section, so that device declines;Enter to sparge pipe 13 It after in casing 7, can be filled the water by tools such as external water pumps into water inlet pipe 121, driving source is kept to work on, continued slow Cylinder 1 is hung in decentralization, until sparge pipe 13 drops to 7 bottom of casing;Driving source is closed, is simultaneously stopped into water inlet pipe 121 and adds water, Cylinder 1 is hung in promotion, which is taken out.
In order to improve cleaning effect, device can be promoted into the tube port position to 7 top of casing after the completion of S3, continued multiple S3 is repeated, is cleaned out until by the mud in casing 7.
The above is only exemplary embodiments of the invention, protection scope and is not intended to limit the present invention, of the invention Protection scope is determined by the attached claims.

Claims (10)

1. a kind of device for removing cast-in-situ bored pile casing inner wall mud, characterized in that including hanging cylinder (1), the cylinder (1) of hanging Bottom wall rotation is provided with hollow shaft (12), and the top of shaft (12) is connected with water inlet pipe (121), solid on the shaft (12) Surely it is provided with the sparge pipe (13) being connected to shaft (12), the sparge pipe (13) is provided with close to one end of casing (7) inner wall Spray head (131) is fixedly and coaxially connected the connecting shaft (2) extended downwardly on the shaft (12), is arranged on the connecting shaft (2) There is captation, the bottom end of the connecting shaft (2) is provided with the scraper assembly (5) for striking off the mud on casing (7) inner wall, It is described to hang the driving source being provided in cylinder (1) for drive shaft (12) rotation.
2. the device according to claim 1 for removing cast-in-situ bored pile casing inner wall mud, characterized in that described to strike off group Part (5) includes fixed plate (51), movable plate (52) and pressure spring (53), and the fixed plate (51) is fixedly installed on connecting shaft (2) And extend to the inner wall of casing (7), sliding slot (511), the activity are offered along length direction in the fixed plate (51) Plate (52) is slideably positioned in sliding slot (511), and sliding slot (511) is square groove, and movable plate (52) is side compatible with square groove To prevent movable plate (52) from rotating relative to fixed plate (51), the pressure spring (53) is set in sliding slot (511) and is used for shape plate Movable plate (52) and casing (7) inner wall are driven to push against.
3. the device according to claim 2 for removing cast-in-situ bored pile casing inner wall mud, characterized in that the fixed plate (51) and on movable plate (52) it is provided with the anti-delinking part (6) for preventing movable plate (52) to be detached from fixed plate (51).
4. the device according to claim 3 for removing cast-in-situ bored pile casing inner wall mud, characterized in that the anti-delinking part It (6) include being fixedly installed on the flange (61) of one end that movable plate (52) protrudes into sliding slot (511), and be fixedly installed on fixation Plate (51) is close to movable plate (52) one end for abutting with flange (61) to prevent movable plate (52) to be detached from enclosing for sliding slot (511) Side (62).
5. the device according to claim 4 for removing cast-in-situ bored pile casing inner wall mud, characterized in that the movable plate (52) it is provided with scraper plate (521) close to one end of casing (7) inner wall, the scraper plate (521) is biased to movable plate (52) direction of rotation It is obliquely installed.
6. the device according to claim 5 for removing cast-in-situ bored pile casing inner wall mud, characterized in that the dress that catchments It sets including weather board (31) and hollow Water collecting tube (32), the Water collecting tube (32), which rotates coaxially, to be sheathed on connecting shaft (2), collection Water drum (32) includes top plate (321) and bottom plate (322), is fixedly installed on the connecting shaft (2) and supports with the bottom wall of top plate (321) The adapting table (21) connect, at least two layers of water-guiding hole (323) group is offered on Water collecting tube (32), and every layer of water-guiding hole (323) group is wrapped The multiple water-guiding holes (323) being circumferentially uniformly arranged along Water collecting tube (32) are included, are provided at each water-guiding hole (323) for by water The weather board (31) in Water collecting tube (32) is imported, the projection of weather board (31) in the horizontal plane overlaps, weather board (31) edge The two sides of water (flow) direction are provided with water fender (311).
7. the device according to claim 6 for removing cast-in-situ bored pile casing inner wall mud, characterized in that the weather board (31) it is articulated on Water collecting tube (32) and one end passes through water-guiding hole (323) and protrudes into Water collecting tube (32), weather board (31) dips down Tiltedly setting, the outer wall of the Water collecting tube (32) be fixedly installed for drive weather board (31) far from Water collecting tube (32) side with The elastic component that casing (7) inner wall is adjacent to.
8. the device according to claim 7 for removing cast-in-situ bored pile casing inner wall mud, characterized in that the connecting shaft (2) it is offered on overflow hole (22), and the height of overflow hole (22) is not higher than undermost water-guiding hole (323), the connecting shaft It (2) is hollow structure to the bottom end of connecting shaft (2) at overflow hole (22), the bottom end rotation of connecting shaft (2) is provided with connection ring (23), the water-collecting bag (4) being connected to connecting shaft (2) is fixedly installed on the connection ring (23).
9. the device according to claim 8 for removing cast-in-situ bored pile casing inner wall mud, characterized in that the Water collecting tube (32) bottom wall tilts down setting.
10. a kind of application method for the device for removing cast-in-situ bored pile casing inner wall mud, characterized in that the following steps are included:
The device: being placed in the tube port position of the casing (7) of mud for clearance by S1, is in scraper assembly (5) in casing (7);
S2: starting driving source, driving source drive shaft (12) and connecting shaft (2) rotation, connecting shaft (2) to drive scraper assembly (5) work is to strike off the mud on casing (7) inner wall, and then slowly cylinder (1) is hung in lower section, so that device declines;
S3: after sparge pipe (13) enter in casing (7), the water filling into water inlet pipe (121) keeps driving source to work on, after Cylinder (1) is hung in continuous slowly decentralization, until sparge pipe (13) drops to casing (7) bottom;
S4: closing driving source, is simultaneously stopped to water inlet pipe (121) Nei Jiashui, cylinder (1), withdrawing device are hung in promotion.
CN201811064726.6A 2018-09-12 2018-09-12 Device for removing slurry on inner wall of cast-in-situ bored pile casing and using method thereof Active CN108978664B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811064726.6A CN108978664B (en) 2018-09-12 2018-09-12 Device for removing slurry on inner wall of cast-in-situ bored pile casing and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811064726.6A CN108978664B (en) 2018-09-12 2018-09-12 Device for removing slurry on inner wall of cast-in-situ bored pile casing and using method thereof

Publications (2)

Publication Number Publication Date
CN108978664A true CN108978664A (en) 2018-12-11
CN108978664B CN108978664B (en) 2020-09-08

Family

ID=64545145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811064726.6A Active CN108978664B (en) 2018-09-12 2018-09-12 Device for removing slurry on inner wall of cast-in-situ bored pile casing and using method thereof

Country Status (1)

Country Link
CN (1) CN108978664B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112170329A (en) * 2020-08-29 2021-01-05 深圳鹏城岩土科技有限公司 Foundation pit support bored pile construction equipment and method thereof
CN115012399A (en) * 2022-05-26 2022-09-06 中国石油工程建设有限公司 Hole wall processing device for improving hole forming quality of cast-in-situ bored pile
CN115156206A (en) * 2022-06-22 2022-10-11 盐城永业基础工程有限公司 Environment-friendly high stability pipe pile mould inner wall Yu Jiangqing reason equipment
CN115404866A (en) * 2022-08-25 2022-11-29 中建八局(厦门)建设有限公司 Dig bored concrete pile construction soon and clear up structure with adhesion dregs

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5735356A (en) * 1996-06-06 1998-04-07 Boulard; Victor Well boring method and apparatus
CN205551017U (en) * 2016-03-18 2016-09-07 石家庄德润环保科技有限公司 Rotation type self - cleaning device
CN107178145A (en) * 2017-07-03 2017-09-19 温州龙强市政工程有限公司 A kind of municipal sewage system dredger
CN207396443U (en) * 2017-11-07 2018-05-22 广西壮族自治区林业科学研究院 One kind is automatically determined with collecting stem flow device
CN207469250U (en) * 2017-11-23 2018-06-08 北京颐和工程监理有限责任公司 Remove the device of cast-in-situ bored pile pillar inner wall mud

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5735356A (en) * 1996-06-06 1998-04-07 Boulard; Victor Well boring method and apparatus
CN205551017U (en) * 2016-03-18 2016-09-07 石家庄德润环保科技有限公司 Rotation type self - cleaning device
CN107178145A (en) * 2017-07-03 2017-09-19 温州龙强市政工程有限公司 A kind of municipal sewage system dredger
CN207396443U (en) * 2017-11-07 2018-05-22 广西壮族自治区林业科学研究院 One kind is automatically determined with collecting stem flow device
CN207469250U (en) * 2017-11-23 2018-06-08 北京颐和工程监理有限责任公司 Remove the device of cast-in-situ bored pile pillar inner wall mud

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112170329A (en) * 2020-08-29 2021-01-05 深圳鹏城岩土科技有限公司 Foundation pit support bored pile construction equipment and method thereof
CN115012399A (en) * 2022-05-26 2022-09-06 中国石油工程建设有限公司 Hole wall processing device for improving hole forming quality of cast-in-situ bored pile
CN115012399B (en) * 2022-05-26 2023-07-25 中国石油工程建设有限公司 Hole wall processing device for improving hole quality of bored pile
CN115156206A (en) * 2022-06-22 2022-10-11 盐城永业基础工程有限公司 Environment-friendly high stability pipe pile mould inner wall Yu Jiangqing reason equipment
CN115156206B (en) * 2022-06-22 2023-10-20 盐城永业基础工程有限公司 Environment-friendly high-stability pipe pile die inner wall residual paddle cleaning equipment
CN115404866A (en) * 2022-08-25 2022-11-29 中建八局(厦门)建设有限公司 Dig bored concrete pile construction soon and clear up structure with adhesion dregs

Also Published As

Publication number Publication date
CN108978664B (en) 2020-09-08

Similar Documents

Publication Publication Date Title
CN108978664A (en) Remove the device and its application method of cast-in-situ bored pile casing inner wall mud
JP2007126846A (en) Reinforcing cage, construction method for cast-in-place concrete pile, and cast-in-place concrete pile
KR100370714B1 (en) Reinforcing Construction Method of Foundation for Pier and It's Reinforced Structure Thereof
CN109183803A (en) A kind of deep basal pit adverse construction method device and construction method
CN108505644A (en) CL compound concrete shear wall construction methods
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN113695333A (en) Hopper belt cleaning device
CN113338942A (en) Drilling device for large-diameter rock-socketed pile full-sleeve full-slewing drilling machine
CN114250776A (en) Anti-collapse rotary digging pile construction device and construction method thereof
CN113699981A (en) Construction method for preventing necking of rotary-digging cast-in-place pile in high-fill field
CN216275687U (en) Dredging device for cast-in-situ bored pile
CN112177081A (en) Scouring device with anti-subsidence structure arranged on river channel sludge and implementation method thereof
CN106759296A (en) Drainable irregular-section bamboo joint pipe pile and root planting type construction method thereof
CN206956791U (en) A kind of new-old concrete interface waterproof sealing structure
CN209128999U (en) A kind of deep basal pit adverse construction method device
CN214925679U (en) Hydraulic engineering concrete mixing equipment
CN104404953B (en) Cast-in-place concrete pile bubble is eliminated and is built device
JP2003049424A (en) Construction method of composite pile, diameter enlarging device and inter-pile cutting device
CN209227572U (en) A kind of TRD cement-earth underground continuous wall suspension device
CN110485422B (en) Pile pulling construction method of pile pulling device
CN115709135B (en) Water channel surface repair coating equipment and coating method thereof
CN104612159B (en) The cast-in-place concrete pile with agitator builds device
CN110700239B (en) Method for reinforcing foundation by adopting tree root piles
CN215801573U (en) Grouting equipment for post grouting for drilling and grouting construction
CN114775642B (en) Construction method for foundation pit of pipe gallery channel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: Room 802, railway building, Wenzhou Avenue, Lucheng District, Wenzhou City, Zhejiang Province

Patentee after: ZHEJIANG SANKAI ENGINEERING MANAGEMENT Co.,Ltd.

Address before: 325000 railway building in Wenzhou, Zhejiang Province, 17A

Patentee before: ZHEJIANG SANKAI ENGINEERING MANAGEMENT Co.,Ltd.

CP02 Change in the address of a patent holder