CN108961895A - A kind of network comprehensive lining engineering simulator and its construction method - Google Patents

A kind of network comprehensive lining engineering simulator and its construction method Download PDF

Info

Publication number
CN108961895A
CN108961895A CN201810567823.0A CN201810567823A CN108961895A CN 108961895 A CN108961895 A CN 108961895A CN 201810567823 A CN201810567823 A CN 201810567823A CN 108961895 A CN108961895 A CN 108961895A
Authority
CN
China
Prior art keywords
subsystem
fixedly connected
unit
indicating mechanism
subsystem unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810567823.0A
Other languages
Chinese (zh)
Inventor
陈占铨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Ruijie Information Technology Co Ltd
Original Assignee
Fujian Ruijie Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Ruijie Information Technology Co Ltd filed Critical Fujian Ruijie Information Technology Co Ltd
Priority to CN201810567823.0A priority Critical patent/CN108961895A/en
Publication of CN108961895A publication Critical patent/CN108961895A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to network comprehensive lining technical fields, and disclose a kind of network comprehensive lining engineering simulator, including bottom plate, bracket is fixedly connected at the top of the bottom plate, the back side of the bracket is fixedly connected with resin plate, the front of the resin plate is fixedly connected sequentially has Management room subsystem unit from left to right, closet subsystem unit and vertical subsystem element, work space subsystem unit is fixedly connected on the left of the closet subsystem unit, the bottom of the work space subsystem unit and be located at resin plate front be fixedly connected with building subsystem element, the top of the building subsystem element and be located at resin plate front be fixedly connected with horizontal subsystem unit.The network comprehensive lining engineering simulator and its construction method, small in size, light-weight, foldable, carrying easy to remove have been obviously improved reasonability, safety and the stability of the system of network comprehensive lining engineering, and explanation effect is good.

Description

A kind of network comprehensive lining engineering simulator and its construction method
Technical field
The present invention relates to network comprehensive lining technical field, specially a kind of network comprehensive lining engineering simulator and Its construction method.
Background technique
Comprehensive wiring is with modular theory, with the laying of stelliform connection topology configuration organizing cables, to realize specific region The analogue transmission of the various digital informations such as data, video image and the voice of range designs, scientific and technical progress, effectively The development for having pushed comprehensive wiring, fast development and the industrialization for having better adapted to new period Urbanization in China are logical The demand for believing development, is new era important wire laying mode, the main feature of comprehensive wiring include: it is open, comprehensive with it is simultaneous Capacitive, stability, flexibility and economy etc., wherein opening is primarily referred to as comprehensive wiring system and can support all communication Agreement, and mesh all has opening to relevant device, the interchanger relevant device of computer;It is comprehensive to refer to synthesis with compatible Transmission medium, adapter unlike signal can be integrated into a wiring system by wiring system, unified hardware configuration and Specification realizes the signal transmission between not homologous ray to the maximum extent;The subsystem of stability mainly comprehensive wiring system It is mutually isolated, other subsystems will not be had an impact individual subsystem breaks down, while hub-and-spoke configuration is answered With sequencing, modularization and the summary for improving comprehensive wiring system work, convenient managing and maintaining for later period;Flexibility Refer to the standardized modular designs of comprehensive wiring system, realizes any connection of information point and terminal device, it is preferably full The different actual demand of foot, for example, simple apparatus connecting can complete the change of device location, reduction number of devices with And the structure of adjustment system, in addition the transmission channel in system is general and all supports transmission terminal;What economy was said is Comprehensive wiring system largely reduces the replacement or again of equipment because of its opening and compatibility with height It is laid with the cost input of cable.
Existing network comprehensive lining engineering simulator all has the advantages that real-time simulated operation, but existing network Generic cabling engineering mostly uses metal material to be fabricated greatly with simulator, bulky, is placed in laboratory and not only accounts for With much room, and there is no indicating mechanism, each working cell is mixed in together, and it is low that teacher explains quality, and it is low that student practices quality, Teacher is when carrying out the explanation of correlated curriculum, when needing to use network comprehensive lining engineering simulator, due to network Generic cabling engineering is inconvenient to move with simulator massiveness, can only attend class in laboratory, thereby result in inconvenience, Low efficiency is explained, so propose a kind of network comprehensive lining engineering simulator and its construction method.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of network comprehensive lining engineering simulator and its construction parties Method has the good advantage of explanation effect, solves existing network comprehensive lining engineering with simulator and mostly use metal material greatly Matter is fabricated, bulky, is placed in laboratory and is not only taken up much room, and does not have indicating mechanism, each working cell Mixed in together, teacher explains that quality is low, and student practices that quality is low, and teacher needs to use when carrying out the explanation of correlated curriculum When network comprehensive lining engineering simulator, since network comprehensive lining engineering is inconvenient with simulator massiveness It is mobile, the problem of can only attending class in laboratory, thereby result in inconvenience, explain low efficiency.
(2) technical solution
To realize the good purpose of above-mentioned explanation effect, the invention provides the following technical scheme: a kind of network comprehensive lining engineering is used Simulator, including bottom plate are fixedly connected with bracket at the top of the bottom plate, and the back side of the bracket is fixedly connected with resin Plate, the resin plate front be fixedly connected sequentially from left to right have Management room subsystem unit, closet subsystem unit and Vertical subsystem element is fixedly connected with work space subsystem unit, the work on the left of the closet subsystem unit The bottom of area's subsystem element and be located at resin plate front be fixedly connected with building subsystem element, the building subsystem Unite unit top and be located at resin plate front be fixedly connected with horizontal subsystem unit, the building subsystem element Front is fixedly connected with building subsystem element indicating mechanism, is fixedly connected with pipe at the top of the Management room subsystem unit Li Jian subsystem element indicating mechanism is fixedly connected with closet subsystem unit at the top of the closet subsystem unit and refers to Show mechanism, vertical subsystem element indicating mechanism, the horizontal subsystem are fixedly connected on the left of the vertical subsystem element The bottom of system unit is fixedly connected with horizontal subsystem unit indicating mechanism, and the top of the work space subsystem unit is fixed to be connected It is connected to work space subsystem unit indicating mechanism, hinge is fixedly connected at left and right sides of the resin plate, the hinge Side far from bracket is fixedly connected with side plate, and the inside of the side plate and resin plate offers multiple through-holes, the side plate Top movable be connected with inserted link, the back side of the resin plate is fixedly connected with fixed block, and the internal activity of the fixed block connects It is connected to locking bar.
Preferably, the quantity of the hinge is six, and six hinges symmetrically and evenly arrange, and the diameter of the through-hole is five Millimeter, and multiple through-holes symmetrically and evenly arrange.
Preferably, the cross section of the inserted link is L-shaped, and inserted link is contacted close to one end of fixed block with fixed block, described Resin plate is transparent panel.
Another technical problem to be solved by the present invention is that providing a kind of network comprehensive lining engineering simulator and its applying Work method, comprising the following steps:
1) side plate is unfolded by hinge, inserted link is fixed on fixed block by locking bar, and then comprehensive and systematic analysis is routed with research Integrated engineering, construction early period structure chart, finishing work plans and the customer network demand for services etc. to building where wiring installation The contents such as specific time and the cost budgeting that data is collected, analyzes and studies, sufficiently grasps and understands cable wiring manufacture;
2) engineering material selection and layout are carried out after making a concrete analysis of integrated engineering, the demand according to different construction mechanisms to network with And the cost and each factor such as function of generic cabling engineering, cable and plug-in unit are reasonably selected, it is smooth in order to construction in later period It carries out, the wiring material of different stage influences also not identical, selection on the transmission of network system data information during cable wiring manufacture The material of identical series;
3) construction and installation are started by through-hole, subsystem element and closet subsystem unit between first installation management are then installed Continue to pacify after vertical subsystem element, work space subsystem unit, building subsystem element, horizontal subsystem unit, debugging Fill building subsystem element indicating mechanism, Management room subsystem unit indicating mechanism, closet subsystem unit indicating mechanism, Vertical subsystem element indicating mechanism, horizontal subsystem unit indicating mechanism and work space subsystem unit indicating mechanism;
4) reinforce supervision of construction, reinforce the supervision to cable wiring manufacture scene, it is convenient to be found present in work progress in time Problem is simultaneously solved, carry out summary feedback various aspects requirement and opinion work, cable wiring manufacture strictly connect according to construct into It spends table to carry out, checks the condition of construction of each link in time, it is ensured that wiring installation smoothly completes;
5) construction site after cleaning completion, clears up in time and summarizes surplus material after wiring installation completion, carry out construction site Cleaning, that in addition carries out the engineering reports such as commencement report, engineering drawing and test report writes work.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of network comprehensive lining engineering simulator and its construction method, tools It is standby following the utility model has the advantages that
1, the network comprehensive lining engineering simulator and its construction method, are fixed resin plate by the bracket on bottom plate Come, side plate is unfolded through loose-leaf, inserted link is fixed on fixed block by locking bar, can carry out network comprehensive lining work by through-hole Journey, small in size, light-weight, foldable, carrying easy to remove, explanation effect are good.
2, the network comprehensive lining engineering simulator and its construction method, pass through Management room subsystem unit, equipment Between subsystem element, vertical subsystem element, work space subsystem unit, building subsystem element and horizontal subsystem unit Network comprehensive lining is carried out, by thering is the building subsystem element indicating mechanism of different color, Management room subsystem unit to refer to Show mechanism, closet subsystem unit indicating mechanism, vertical subsystem element indicating mechanism, horizontal subsystem unit indicating mechanism Indicating mechanism is distinguish identification with work space subsystem unit, light bar or lampion is controlled by indicating mechanism, with intelligence The workspace of building, equipment room, the different color part of floor different zones unit are corresponding, keep student intuitive clear, quick Grasp network and communication, intelligent construction in different units distribution and content, be obviously improved network comprehensive lining engineering Reasonability, safety and the stability of system, explanation effect are good.
Detailed description of the invention
Fig. 1 is a kind of network comprehensive lining engineering simulator and its construction method front view proposed by the present invention;
Fig. 2 is a kind of network comprehensive lining engineering simulator and its construction method side view proposed by the present invention;
Fig. 3 is a kind of part in the portion A in network comprehensive lining engineering simulator and its construction method Fig. 2 proposed by the present invention Enlarged drawing.
In figure: 1 bottom plate, 2 brackets, 3 resin plates, 4 Management room subsystem units, 5 closet subsystem units, 6 vertical sons System unit, 7 work space subsystem units, 8 building subsystem elements, 9 horizontal subsystem units, 10 building subsystem lists First indicating mechanism, 11 Management room subsystem unit indicating mechanisms, 12 closet subsystem unit indicating mechanisms, 13 vertical subsystems Unit indicating mechanism, 14 horizontal subsystem unit indicating mechanisms, 15 work space subsystem unit indicating mechanisms, 16 hinges, 17 sides Plate, 18 through-holes, 19 inserted links, 20 fixed blocks, 21 locking bars.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical solution in the embodiment of the present invention is clearly and completely retouched It states, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the present invention In embodiment, every other implementation obtained by those of ordinary skill in the art without making creative efforts Example, shall fall within the protection scope of the present invention.
Fig. 1-3, a kind of network comprehensive lining engineering simulator, including bottom plate 1, the top of bottom plate 1 is please referred to fix It is connected with bracket 2, the back side of bracket 2 is fixedly connected with resin plate 3, and the front of resin plate 3 is fixedly connected sequentially has from left to right Management room subsystem unit 4, closet subsystem unit 5 and vertical subsystem element 6, the left side of closet subsystem unit 5 It is fixedly connected with work space subsystem unit 7, the fixed company in the bottom of work space subsystem unit 7 and the front for being located at resin plate 3 It is connected to building subsystem element 8, the top of the building subsystem element 8 and front for being located at resin plate 3 is fixedly connected with water Flat subsystem element 9, the front of building subsystem element 8 are fixedly connected with building subsystem element indicating mechanism 10, pipe The top of subsystem element 4 is fixedly connected with Management room subsystem unit indicating mechanism 11 between reason, closet subsystem unit 5 Top is fixedly connected with closet subsystem unit indicating mechanism 12, and the left side of vertical subsystem element 6 is fixedly connected with vertically Subsystem element indicating mechanism 13, the bottom of horizontal subsystem unit 9 are fixedly connected with horizontal subsystem unit indicating mechanism 14, The top of work space subsystem unit 7 is fixedly connected with work space subsystem unit indicating mechanism 15, the left and right sides of resin plate 3 It is fixedly connected to hinge 16, the side of the separate bracket 2 of hinge 16 is fixedly connected with side plate 17, side plate 17 and resin plate 3 Inside offers multiple through-holes 18, and the quantity of hinge 16 is six, and six hinges 16 symmetrically and evenly arrange, through-hole 18 it is straight Diameter is five millimeters, and multiple through-holes 18 symmetrically and evenly arrange, and the top movable of side plate 17 is connected with inserted link 19, the back of resin plate 3 Face is fixedly connected with fixed block 20, and the cross section of inserted link 19 is L-shaped, and the one end and fixed block 20 of inserted link 19 close to fixed block 20 Contact, resin plate 3 are transparent panel, and the internal activity of fixed block 20 is connected with locking bar 21, by the bracket 2 on bottom plate 1 by resin Plate 3 is fixed up, and side plate 17 is unfolded through loose-leaf 16, and inserted link 19 is fixed on fixed block 20 by locking bar 21, is by through-hole 18 Network comprehensive lining engineering can be carried out, small in size, light-weight, foldable, carrying easy to remove, explanation effect is good, passes through management Between subsystem element 4, closet subsystem unit 5, vertical subsystem element 6, work space subsystem unit 7, building subsystem System unit 8 and horizontal subsystem unit 9 carry out network comprehensive lining, by there is the instruction of the building subsystem element of different color Mechanism 10, Management room subsystem unit indicating mechanism 11, closet subsystem unit indicating mechanism 12, vertical subsystem element refer to Show that mechanism 13, horizontal subsystem unit indicating mechanism 14 and work space subsystem unit indicating mechanism 15 are distinguish identification, leads to Indicating mechanism's control light bar or lampion is crossed, not with the workspace of intelligent construction object, equipment room, floor different zones unit It is corresponding with color part, make in intuitive clear, quick the grasps network of student and communication, intelligent construction different units be distributed and Content, has been obviously improved reasonability, safety and the stability of the system of network comprehensive lining engineering, and explanation effect is good.
A kind of network comprehensive lining engineering simulator and its construction method, which comprises the following steps:
1) side plate 17 is unfolded by hinge 16, inserted link 19 is fixed on fixed block 20 by locking bar 21, then comprehensive and systematic analysis With the integrated engineering of research wiring, construction early period structure chart, finishing work plans and the customer network to building where wiring installation The data such as demand for services are collected, analyze and study, sufficiently grasp and understand specific time and the cost budgeting of cable wiring manufacture Etc. contents;
2) engineering material selection and layout are carried out after making a concrete analysis of integrated engineering, the demand according to different construction mechanisms to network with And the cost and each factor such as function of generic cabling engineering, cable and plug-in unit are reasonably selected, it is smooth in order to construction in later period It carries out, the wiring material of different stage influences also not identical, selection on the transmission of network system data information during cable wiring manufacture The material of identical series;
3) construction and installation are started by through-hole 18, subsystem element 4 and closet subsystem unit 5 between first installation management, then Vertical subsystem element 6, work space subsystem unit 7, building subsystem element 8, horizontal subsystem unit 9, debugging are installed After continue install building subsystem element indicating mechanism 10, Management room subsystem unit indicating mechanism 11, closet subsystem Unit indicating mechanism 12, vertical subsystem element indicating mechanism 13, horizontal subsystem unit indicating mechanism 14 and workspace subsystem Unite unit indicating mechanism 15;
4) reinforce supervision of construction, reinforce the supervision to cable wiring manufacture scene, it is convenient to be found present in work progress in time Problem is simultaneously solved, carry out summary feedback various aspects requirement and opinion work, cable wiring manufacture strictly connect according to construct into It spends table to carry out, checks the condition of construction of each link in time, it is ensured that wiring installation smoothly completes;
5) construction site after cleaning completion, clears up in time and summarizes surplus material after wiring installation completion, carry out construction site Cleaning, that in addition carries out the engineering reports such as commencement report, engineering drawing and test report writes work.
In conclusion the network comprehensive lining engineering simulator and its construction method, pass through the bracket 2 on bottom plate 1 Resin plate 3 is fixed up, side plate 17 is unfolded through loose-leaf 16, inserted link 19 is fixed on fixed block 20 by locking bar 21, by logical Hole 18 can carry out network comprehensive lining engineering, small in size, light-weight, foldable, carrying easy to remove, and explanation effect is good, lead to Cross Management room subsystem unit 4, closet subsystem unit 5, vertical subsystem element 6, work space subsystem unit 7, building Object subsystem element 8 and horizontal subsystem unit 9 carry out network comprehensive lining, by there is the building subsystem list of different color First indicating mechanism 10, Management room subsystem unit indicating mechanism 11, closet subsystem unit indicating mechanism 12, vertical subsystem Unit indicating mechanism 13, horizontal subsystem unit indicating mechanism 14 and work space subsystem unit indicating mechanism 15 are distinguish knowledge Not, light bar or lampion are controlled by indicating mechanism, with the workspace of intelligent construction object, equipment room, floor different zones list The different color part of member is corresponding, makes different units in intuitive clear, the quick grasp network of student and communication, intelligent construction Distribution and content have been obviously improved reasonability, safety and the stability of the system of network comprehensive lining engineering, explain effect It is good.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (4)

1. a kind of network comprehensive lining engineering simulator, including bottom plate (1), which is characterized in that the top of the bottom plate (1) Be fixedly connected with bracket (2), the back side of the bracket (2) is fixedly connected with resin plate (3), the resin plate (3) front from Left-to-right, which is fixedly connected sequentially, Management room subsystem unit (4), closet subsystem unit (5) and vertical subsystem element (6), it is fixedly connected with work space subsystem unit (7) on the left of the closet subsystem unit (5), the workspace subsystem Unite unit (7) bottom and be located at resin plate (3) front be fixedly connected with building subsystem element (8), the building The top of subsystem element (8) and be located at resin plate (3) front be fixedly connected with horizontal subsystem unit (9), the building The front of object subsystem element (8) is fixedly connected with building subsystem element indicating mechanism (10), the Management room subsystem Management room subsystem unit indicating mechanism (11) is fixedly connected at the top of unit (4), the closet subsystem unit (5) Top is fixedly connected with closet subsystem unit indicating mechanism (12), and the left side of the vertical subsystem element (6) is fixed to be connected It is connected to vertical subsystem element indicating mechanism (13), the bottom of the horizontal subsystem unit (9) is fixedly connected with horizontal subsystem It unites unit indicating mechanism (14), is fixedly connected with work space subsystem unit at the top of the work space subsystem unit (7) and refers to Show mechanism (15), is fixedly connected to hinge (16) at left and right sides of the resin plate (3), the separate bracket of the hinge (16) (2) side is fixedly connected with side plate (17), and the inside of the side plate (17) and resin plate (3) offers multiple through-holes (18), the top movable of the side plate (17) is connected with inserted link (19), and the back side of the resin plate (3) is fixedly connected with fixed block (20), the internal activity of the fixed block (20) is connected with locking bar (21).
2. a kind of network comprehensive lining engineering simulator according to claim 1, which is characterized in that the hinge (16) quantity is six, and six hinges (16) symmetrically and evenly arrange, and the diameter of the through-hole (18) is five millimeters, and multiple Through-hole (18) symmetrically and evenly arranges.
3. a kind of network comprehensive lining engineering simulator according to claim 1, which is characterized in that the inserted link (19) cross section is L-shaped, and inserted link (19) is contacted close to the one end of fixed block (20) with fixed block (20), the resin plate It (3) is transparent panel.
4. a kind of network comprehensive lining engineering simulator and its construction method, which comprises the following steps:
1) by hinge (16) expansion side plate (17), inserted link (19) is fixed on fixed block (20) by locking bar (21), then comprehensively The integrated engineering of the analysis of system and research wiring, construction early period to the structure chart of building where wiring installation, finishing work plans with And the data such as customer network demand for services are collected, analyze and study, sufficiently grasp and understand specific time of cable wiring manufacture With the contents such as cost budgeting;
2) engineering material selection and layout are carried out after making a concrete analysis of integrated engineering, the demand according to different construction mechanisms to network with And the cost and each factor such as function of generic cabling engineering, cable and plug-in unit are reasonably selected, it is smooth in order to construction in later period It carries out, the wiring material of different stage influences also not identical, selection on the transmission of network system data information during cable wiring manufacture The material of identical series;
3) start construction and installation by through-hole (18), subsystem element (4) and closet subsystem unit between first installation management (5), vertical subsystem element (6), work space subsystem unit (7), building subsystem element (8), horizontal son are then installed Continue that building subsystem element indicating mechanism (10), Management room subsystem unit instruction machine are installed after system unit (9), debugging Structure (11), closet subsystem unit indicating mechanism (12), vertical subsystem element indicating mechanism (13), horizontal subsystem unit Indicating mechanism (14) and work space subsystem unit indicating mechanism (15);
4) reinforce supervision of construction, reinforce the supervision to cable wiring manufacture scene, it is convenient to be found present in work progress in time Problem is simultaneously solved, carry out summary feedback various aspects requirement and opinion work, cable wiring manufacture strictly connect according to construct into It spends table to carry out, checks the condition of construction of each link in time, it is ensured that wiring installation smoothly completes;
5) construction site after cleaning completion, clears up in time and summarizes surplus material after wiring installation completion, carry out construction site Cleaning, that in addition carries out the engineering reports such as commencement report, engineering drawing and test report writes work.
CN201810567823.0A 2018-06-05 2018-06-05 A kind of network comprehensive lining engineering simulator and its construction method Pending CN108961895A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810567823.0A CN108961895A (en) 2018-06-05 2018-06-05 A kind of network comprehensive lining engineering simulator and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810567823.0A CN108961895A (en) 2018-06-05 2018-06-05 A kind of network comprehensive lining engineering simulator and its construction method

Publications (1)

Publication Number Publication Date
CN108961895A true CN108961895A (en) 2018-12-07

Family

ID=64493182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810567823.0A Pending CN108961895A (en) 2018-06-05 2018-06-05 A kind of network comprehensive lining engineering simulator and its construction method

Country Status (1)

Country Link
CN (1) CN108961895A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112086009A (en) * 2020-09-09 2020-12-15 王远志 Intelligent information equipment for engineering cost consultation
CN112510614A (en) * 2020-11-16 2021-03-16 青海巨时信息科技有限公司 Wiring unit for network comprehensive wiring
CN113593349A (en) * 2021-08-17 2021-11-02 河北机电职业技术学院 Simulation experiment platform for network comprehensive wiring

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030028676A1 (en) * 2001-06-28 2003-02-06 Pangrac David M. Field technician virtual trainer
CN201066547Y (en) * 2007-07-17 2008-05-28 西安开元电子实业有限公司 Demonstration device for network integrated cabling system
CN103708133A (en) * 2013-12-19 2014-04-09 柳州铁道职业技术学院 Novel sliding and folding container
CN204680257U (en) * 2015-06-03 2015-09-30 广州番禺职业技术学院 A kind of multifunctional network comprehensive wiring experiment teaching aid
CN107547233A (en) * 2016-06-29 2018-01-05 黑龙江省康格尔科技有限公司 A kind of computer network comprehensive wiring construction method
CN206921364U (en) * 2017-04-13 2018-01-23 江苏华亿信息工程有限公司 A kind of demonstration device for network integrated cabling system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030028676A1 (en) * 2001-06-28 2003-02-06 Pangrac David M. Field technician virtual trainer
CN201066547Y (en) * 2007-07-17 2008-05-28 西安开元电子实业有限公司 Demonstration device for network integrated cabling system
CN103708133A (en) * 2013-12-19 2014-04-09 柳州铁道职业技术学院 Novel sliding and folding container
CN204680257U (en) * 2015-06-03 2015-09-30 广州番禺职业技术学院 A kind of multifunctional network comprehensive wiring experiment teaching aid
CN107547233A (en) * 2016-06-29 2018-01-05 黑龙江省康格尔科技有限公司 A kind of computer network comprehensive wiring construction method
CN206921364U (en) * 2017-04-13 2018-01-23 江苏华亿信息工程有限公司 A kind of demonstration device for network integrated cabling system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112086009A (en) * 2020-09-09 2020-12-15 王远志 Intelligent information equipment for engineering cost consultation
CN112510614A (en) * 2020-11-16 2021-03-16 青海巨时信息科技有限公司 Wiring unit for network comprehensive wiring
CN113593349A (en) * 2021-08-17 2021-11-02 河北机电职业技术学院 Simulation experiment platform for network comprehensive wiring

Similar Documents

Publication Publication Date Title
CN108961895A (en) A kind of network comprehensive lining engineering simulator and its construction method
CN103532744A (en) Information-communication integrated supporting platform of intelligent power grid
CN212011604U (en) Data center bus duct power supply and distribution system
CN203167158U (en) Set top box remote testing system
CN201673299U (en) Optical fiber distribution device with intelligent optical fiber management and identification functions
CN107948008A (en) A kind of modeling method for low-voltage network monitoring system
CN110276516A (en) Distribution monitoring analysis and repairing command methods based on power grid GIS
CN104933495A (en) Work task assessment system on Android-based mobile terminal
CN101614849B (en) Fiber core alignment plate
CN204335235U (en) A kind of Joint construction and sharing type base station integrated machine cabinet
CN100461230C (en) Full interactive microscope teaching system
CN103116330A (en) Lobby-commanding controlling method
CN204732805U (en) A kind of network layout system, crane span structure and can electrical power wiring assembly be loaded and unloaded
CN107547233A (en) A kind of computer network comprehensive wiring construction method
CN206921364U (en) A kind of demonstration device for network integrated cabling system
CN201315112Y (en) Integrated wiring training operation platform
CN110880060A (en) Intelligent comprehensive wiring system for building
CN108631236A (en) A kind of vertical trunking of network layout
CN210605143U (en) Intelligent comprehensive wiring system for building
CN104537090B (en) User profile standardized data treating method and apparatus
CN110867107B (en) AI-based multidisciplinary teaching resource comprehensive management system and management method
CN201251877Y (en) Simulation experiment platform of building comprehensive wiring system and simulation method thereof.
CN108832999A (en) A kind of computer network comprehensive wiring
CN201673298U (en) Optical fiber distributing device with intelligent optical fiber managing function
CN203134234U (en) Simulation real-training device for chemical reaction process control

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181207

WD01 Invention patent application deemed withdrawn after publication