CN108961895A - A kind of network comprehensive lining engineering simulator and its construction method - Google Patents
A kind of network comprehensive lining engineering simulator and its construction method Download PDFInfo
- Publication number
- CN108961895A CN108961895A CN201810567823.0A CN201810567823A CN108961895A CN 108961895 A CN108961895 A CN 108961895A CN 201810567823 A CN201810567823 A CN 201810567823A CN 108961895 A CN108961895 A CN 108961895A
- Authority
- CN
- China
- Prior art keywords
- subsystem
- fixedly connected
- unit
- indicating mechanism
- subsystem unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B9/00—Simulators for teaching or training purposes
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to network comprehensive lining technical fields, and disclose a kind of network comprehensive lining engineering simulator, including bottom plate, bracket is fixedly connected at the top of the bottom plate, the back side of the bracket is fixedly connected with resin plate, the front of the resin plate is fixedly connected sequentially has Management room subsystem unit from left to right, closet subsystem unit and vertical subsystem element, work space subsystem unit is fixedly connected on the left of the closet subsystem unit, the bottom of the work space subsystem unit and be located at resin plate front be fixedly connected with building subsystem element, the top of the building subsystem element and be located at resin plate front be fixedly connected with horizontal subsystem unit.The network comprehensive lining engineering simulator and its construction method, small in size, light-weight, foldable, carrying easy to remove have been obviously improved reasonability, safety and the stability of the system of network comprehensive lining engineering, and explanation effect is good.
Description
Technical field
The present invention relates to network comprehensive lining technical field, specially a kind of network comprehensive lining engineering simulator and
Its construction method.
Background technique
Comprehensive wiring is with modular theory, with the laying of stelliform connection topology configuration organizing cables, to realize specific region
The analogue transmission of the various digital informations such as data, video image and the voice of range designs, scientific and technical progress, effectively
The development for having pushed comprehensive wiring, fast development and the industrialization for having better adapted to new period Urbanization in China are logical
The demand for believing development, is new era important wire laying mode, the main feature of comprehensive wiring include: it is open, comprehensive with it is simultaneous
Capacitive, stability, flexibility and economy etc., wherein opening is primarily referred to as comprehensive wiring system and can support all communication
Agreement, and mesh all has opening to relevant device, the interchanger relevant device of computer;It is comprehensive to refer to synthesis with compatible
Transmission medium, adapter unlike signal can be integrated into a wiring system by wiring system, unified hardware configuration and
Specification realizes the signal transmission between not homologous ray to the maximum extent;The subsystem of stability mainly comprehensive wiring system
It is mutually isolated, other subsystems will not be had an impact individual subsystem breaks down, while hub-and-spoke configuration is answered
With sequencing, modularization and the summary for improving comprehensive wiring system work, convenient managing and maintaining for later period;Flexibility
Refer to the standardized modular designs of comprehensive wiring system, realizes any connection of information point and terminal device, it is preferably full
The different actual demand of foot, for example, simple apparatus connecting can complete the change of device location, reduction number of devices with
And the structure of adjustment system, in addition the transmission channel in system is general and all supports transmission terminal;What economy was said is
Comprehensive wiring system largely reduces the replacement or again of equipment because of its opening and compatibility with height
It is laid with the cost input of cable.
Existing network comprehensive lining engineering simulator all has the advantages that real-time simulated operation, but existing network
Generic cabling engineering mostly uses metal material to be fabricated greatly with simulator, bulky, is placed in laboratory and not only accounts for
With much room, and there is no indicating mechanism, each working cell is mixed in together, and it is low that teacher explains quality, and it is low that student practices quality,
Teacher is when carrying out the explanation of correlated curriculum, when needing to use network comprehensive lining engineering simulator, due to network
Generic cabling engineering is inconvenient to move with simulator massiveness, can only attend class in laboratory, thereby result in inconvenience,
Low efficiency is explained, so propose a kind of network comprehensive lining engineering simulator and its construction method.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of network comprehensive lining engineering simulator and its construction parties
Method has the good advantage of explanation effect, solves existing network comprehensive lining engineering with simulator and mostly use metal material greatly
Matter is fabricated, bulky, is placed in laboratory and is not only taken up much room, and does not have indicating mechanism, each working cell
Mixed in together, teacher explains that quality is low, and student practices that quality is low, and teacher needs to use when carrying out the explanation of correlated curriculum
When network comprehensive lining engineering simulator, since network comprehensive lining engineering is inconvenient with simulator massiveness
It is mobile, the problem of can only attending class in laboratory, thereby result in inconvenience, explain low efficiency.
(2) technical solution
To realize the good purpose of above-mentioned explanation effect, the invention provides the following technical scheme: a kind of network comprehensive lining engineering is used
Simulator, including bottom plate are fixedly connected with bracket at the top of the bottom plate, and the back side of the bracket is fixedly connected with resin
Plate, the resin plate front be fixedly connected sequentially from left to right have Management room subsystem unit, closet subsystem unit and
Vertical subsystem element is fixedly connected with work space subsystem unit, the work on the left of the closet subsystem unit
The bottom of area's subsystem element and be located at resin plate front be fixedly connected with building subsystem element, the building subsystem
Unite unit top and be located at resin plate front be fixedly connected with horizontal subsystem unit, the building subsystem element
Front is fixedly connected with building subsystem element indicating mechanism, is fixedly connected with pipe at the top of the Management room subsystem unit
Li Jian subsystem element indicating mechanism is fixedly connected with closet subsystem unit at the top of the closet subsystem unit and refers to
Show mechanism, vertical subsystem element indicating mechanism, the horizontal subsystem are fixedly connected on the left of the vertical subsystem element
The bottom of system unit is fixedly connected with horizontal subsystem unit indicating mechanism, and the top of the work space subsystem unit is fixed to be connected
It is connected to work space subsystem unit indicating mechanism, hinge is fixedly connected at left and right sides of the resin plate, the hinge
Side far from bracket is fixedly connected with side plate, and the inside of the side plate and resin plate offers multiple through-holes, the side plate
Top movable be connected with inserted link, the back side of the resin plate is fixedly connected with fixed block, and the internal activity of the fixed block connects
It is connected to locking bar.
Preferably, the quantity of the hinge is six, and six hinges symmetrically and evenly arrange, and the diameter of the through-hole is five
Millimeter, and multiple through-holes symmetrically and evenly arrange.
Preferably, the cross section of the inserted link is L-shaped, and inserted link is contacted close to one end of fixed block with fixed block, described
Resin plate is transparent panel.
Another technical problem to be solved by the present invention is that providing a kind of network comprehensive lining engineering simulator and its applying
Work method, comprising the following steps:
1) side plate is unfolded by hinge, inserted link is fixed on fixed block by locking bar, and then comprehensive and systematic analysis is routed with research
Integrated engineering, construction early period structure chart, finishing work plans and the customer network demand for services etc. to building where wiring installation
The contents such as specific time and the cost budgeting that data is collected, analyzes and studies, sufficiently grasps and understands cable wiring manufacture;
2) engineering material selection and layout are carried out after making a concrete analysis of integrated engineering, the demand according to different construction mechanisms to network with
And the cost and each factor such as function of generic cabling engineering, cable and plug-in unit are reasonably selected, it is smooth in order to construction in later period
It carries out, the wiring material of different stage influences also not identical, selection on the transmission of network system data information during cable wiring manufacture
The material of identical series;
3) construction and installation are started by through-hole, subsystem element and closet subsystem unit between first installation management are then installed
Continue to pacify after vertical subsystem element, work space subsystem unit, building subsystem element, horizontal subsystem unit, debugging
Fill building subsystem element indicating mechanism, Management room subsystem unit indicating mechanism, closet subsystem unit indicating mechanism,
Vertical subsystem element indicating mechanism, horizontal subsystem unit indicating mechanism and work space subsystem unit indicating mechanism;
4) reinforce supervision of construction, reinforce the supervision to cable wiring manufacture scene, it is convenient to be found present in work progress in time
Problem is simultaneously solved, carry out summary feedback various aspects requirement and opinion work, cable wiring manufacture strictly connect according to construct into
It spends table to carry out, checks the condition of construction of each link in time, it is ensured that wiring installation smoothly completes;
5) construction site after cleaning completion, clears up in time and summarizes surplus material after wiring installation completion, carry out construction site
Cleaning, that in addition carries out the engineering reports such as commencement report, engineering drawing and test report writes work.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of network comprehensive lining engineering simulator and its construction method, tools
It is standby following the utility model has the advantages that
1, the network comprehensive lining engineering simulator and its construction method, are fixed resin plate by the bracket on bottom plate
Come, side plate is unfolded through loose-leaf, inserted link is fixed on fixed block by locking bar, can carry out network comprehensive lining work by through-hole
Journey, small in size, light-weight, foldable, carrying easy to remove, explanation effect are good.
2, the network comprehensive lining engineering simulator and its construction method, pass through Management room subsystem unit, equipment
Between subsystem element, vertical subsystem element, work space subsystem unit, building subsystem element and horizontal subsystem unit
Network comprehensive lining is carried out, by thering is the building subsystem element indicating mechanism of different color, Management room subsystem unit to refer to
Show mechanism, closet subsystem unit indicating mechanism, vertical subsystem element indicating mechanism, horizontal subsystem unit indicating mechanism
Indicating mechanism is distinguish identification with work space subsystem unit, light bar or lampion is controlled by indicating mechanism, with intelligence
The workspace of building, equipment room, the different color part of floor different zones unit are corresponding, keep student intuitive clear, quick
Grasp network and communication, intelligent construction in different units distribution and content, be obviously improved network comprehensive lining engineering
Reasonability, safety and the stability of system, explanation effect are good.
Detailed description of the invention
Fig. 1 is a kind of network comprehensive lining engineering simulator and its construction method front view proposed by the present invention;
Fig. 2 is a kind of network comprehensive lining engineering simulator and its construction method side view proposed by the present invention;
Fig. 3 is a kind of part in the portion A in network comprehensive lining engineering simulator and its construction method Fig. 2 proposed by the present invention
Enlarged drawing.
In figure: 1 bottom plate, 2 brackets, 3 resin plates, 4 Management room subsystem units, 5 closet subsystem units, 6 vertical sons
System unit, 7 work space subsystem units, 8 building subsystem elements, 9 horizontal subsystem units, 10 building subsystem lists
First indicating mechanism, 11 Management room subsystem unit indicating mechanisms, 12 closet subsystem unit indicating mechanisms, 13 vertical subsystems
Unit indicating mechanism, 14 horizontal subsystem unit indicating mechanisms, 15 work space subsystem unit indicating mechanisms, 16 hinges, 17 sides
Plate, 18 through-holes, 19 inserted links, 20 fixed blocks, 21 locking bars.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical solution in the embodiment of the present invention is clearly and completely retouched
It states, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the present invention
In embodiment, every other implementation obtained by those of ordinary skill in the art without making creative efforts
Example, shall fall within the protection scope of the present invention.
Fig. 1-3, a kind of network comprehensive lining engineering simulator, including bottom plate 1, the top of bottom plate 1 is please referred to fix
It is connected with bracket 2, the back side of bracket 2 is fixedly connected with resin plate 3, and the front of resin plate 3 is fixedly connected sequentially has from left to right
Management room subsystem unit 4, closet subsystem unit 5 and vertical subsystem element 6, the left side of closet subsystem unit 5
It is fixedly connected with work space subsystem unit 7, the fixed company in the bottom of work space subsystem unit 7 and the front for being located at resin plate 3
It is connected to building subsystem element 8, the top of the building subsystem element 8 and front for being located at resin plate 3 is fixedly connected with water
Flat subsystem element 9, the front of building subsystem element 8 are fixedly connected with building subsystem element indicating mechanism 10, pipe
The top of subsystem element 4 is fixedly connected with Management room subsystem unit indicating mechanism 11 between reason, closet subsystem unit 5
Top is fixedly connected with closet subsystem unit indicating mechanism 12, and the left side of vertical subsystem element 6 is fixedly connected with vertically
Subsystem element indicating mechanism 13, the bottom of horizontal subsystem unit 9 are fixedly connected with horizontal subsystem unit indicating mechanism 14,
The top of work space subsystem unit 7 is fixedly connected with work space subsystem unit indicating mechanism 15, the left and right sides of resin plate 3
It is fixedly connected to hinge 16, the side of the separate bracket 2 of hinge 16 is fixedly connected with side plate 17, side plate 17 and resin plate 3
Inside offers multiple through-holes 18, and the quantity of hinge 16 is six, and six hinges 16 symmetrically and evenly arrange, through-hole 18 it is straight
Diameter is five millimeters, and multiple through-holes 18 symmetrically and evenly arrange, and the top movable of side plate 17 is connected with inserted link 19, the back of resin plate 3
Face is fixedly connected with fixed block 20, and the cross section of inserted link 19 is L-shaped, and the one end and fixed block 20 of inserted link 19 close to fixed block 20
Contact, resin plate 3 are transparent panel, and the internal activity of fixed block 20 is connected with locking bar 21, by the bracket 2 on bottom plate 1 by resin
Plate 3 is fixed up, and side plate 17 is unfolded through loose-leaf 16, and inserted link 19 is fixed on fixed block 20 by locking bar 21, is by through-hole 18
Network comprehensive lining engineering can be carried out, small in size, light-weight, foldable, carrying easy to remove, explanation effect is good, passes through management
Between subsystem element 4, closet subsystem unit 5, vertical subsystem element 6, work space subsystem unit 7, building subsystem
System unit 8 and horizontal subsystem unit 9 carry out network comprehensive lining, by there is the instruction of the building subsystem element of different color
Mechanism 10, Management room subsystem unit indicating mechanism 11, closet subsystem unit indicating mechanism 12, vertical subsystem element refer to
Show that mechanism 13, horizontal subsystem unit indicating mechanism 14 and work space subsystem unit indicating mechanism 15 are distinguish identification, leads to
Indicating mechanism's control light bar or lampion is crossed, not with the workspace of intelligent construction object, equipment room, floor different zones unit
It is corresponding with color part, make in intuitive clear, quick the grasps network of student and communication, intelligent construction different units be distributed and
Content, has been obviously improved reasonability, safety and the stability of the system of network comprehensive lining engineering, and explanation effect is good.
A kind of network comprehensive lining engineering simulator and its construction method, which comprises the following steps:
1) side plate 17 is unfolded by hinge 16, inserted link 19 is fixed on fixed block 20 by locking bar 21, then comprehensive and systematic analysis
With the integrated engineering of research wiring, construction early period structure chart, finishing work plans and the customer network to building where wiring installation
The data such as demand for services are collected, analyze and study, sufficiently grasp and understand specific time and the cost budgeting of cable wiring manufacture
Etc. contents;
2) engineering material selection and layout are carried out after making a concrete analysis of integrated engineering, the demand according to different construction mechanisms to network with
And the cost and each factor such as function of generic cabling engineering, cable and plug-in unit are reasonably selected, it is smooth in order to construction in later period
It carries out, the wiring material of different stage influences also not identical, selection on the transmission of network system data information during cable wiring manufacture
The material of identical series;
3) construction and installation are started by through-hole 18, subsystem element 4 and closet subsystem unit 5 between first installation management, then
Vertical subsystem element 6, work space subsystem unit 7, building subsystem element 8, horizontal subsystem unit 9, debugging are installed
After continue install building subsystem element indicating mechanism 10, Management room subsystem unit indicating mechanism 11, closet subsystem
Unit indicating mechanism 12, vertical subsystem element indicating mechanism 13, horizontal subsystem unit indicating mechanism 14 and workspace subsystem
Unite unit indicating mechanism 15;
4) reinforce supervision of construction, reinforce the supervision to cable wiring manufacture scene, it is convenient to be found present in work progress in time
Problem is simultaneously solved, carry out summary feedback various aspects requirement and opinion work, cable wiring manufacture strictly connect according to construct into
It spends table to carry out, checks the condition of construction of each link in time, it is ensured that wiring installation smoothly completes;
5) construction site after cleaning completion, clears up in time and summarizes surplus material after wiring installation completion, carry out construction site
Cleaning, that in addition carries out the engineering reports such as commencement report, engineering drawing and test report writes work.
In conclusion the network comprehensive lining engineering simulator and its construction method, pass through the bracket 2 on bottom plate 1
Resin plate 3 is fixed up, side plate 17 is unfolded through loose-leaf 16, inserted link 19 is fixed on fixed block 20 by locking bar 21, by logical
Hole 18 can carry out network comprehensive lining engineering, small in size, light-weight, foldable, carrying easy to remove, and explanation effect is good, lead to
Cross Management room subsystem unit 4, closet subsystem unit 5, vertical subsystem element 6, work space subsystem unit 7, building
Object subsystem element 8 and horizontal subsystem unit 9 carry out network comprehensive lining, by there is the building subsystem list of different color
First indicating mechanism 10, Management room subsystem unit indicating mechanism 11, closet subsystem unit indicating mechanism 12, vertical subsystem
Unit indicating mechanism 13, horizontal subsystem unit indicating mechanism 14 and work space subsystem unit indicating mechanism 15 are distinguish knowledge
Not, light bar or lampion are controlled by indicating mechanism, with the workspace of intelligent construction object, equipment room, floor different zones list
The different color part of member is corresponding, makes different units in intuitive clear, the quick grasp network of student and communication, intelligent construction
Distribution and content have been obviously improved reasonability, safety and the stability of the system of network comprehensive lining engineering, explain effect
It is good.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (4)
1. a kind of network comprehensive lining engineering simulator, including bottom plate (1), which is characterized in that the top of the bottom plate (1)
Be fixedly connected with bracket (2), the back side of the bracket (2) is fixedly connected with resin plate (3), the resin plate (3) front from
Left-to-right, which is fixedly connected sequentially, Management room subsystem unit (4), closet subsystem unit (5) and vertical subsystem element
(6), it is fixedly connected with work space subsystem unit (7) on the left of the closet subsystem unit (5), the workspace subsystem
Unite unit (7) bottom and be located at resin plate (3) front be fixedly connected with building subsystem element (8), the building
The top of subsystem element (8) and be located at resin plate (3) front be fixedly connected with horizontal subsystem unit (9), the building
The front of object subsystem element (8) is fixedly connected with building subsystem element indicating mechanism (10), the Management room subsystem
Management room subsystem unit indicating mechanism (11) is fixedly connected at the top of unit (4), the closet subsystem unit (5)
Top is fixedly connected with closet subsystem unit indicating mechanism (12), and the left side of the vertical subsystem element (6) is fixed to be connected
It is connected to vertical subsystem element indicating mechanism (13), the bottom of the horizontal subsystem unit (9) is fixedly connected with horizontal subsystem
It unites unit indicating mechanism (14), is fixedly connected with work space subsystem unit at the top of the work space subsystem unit (7) and refers to
Show mechanism (15), is fixedly connected to hinge (16) at left and right sides of the resin plate (3), the separate bracket of the hinge (16)
(2) side is fixedly connected with side plate (17), and the inside of the side plate (17) and resin plate (3) offers multiple through-holes
(18), the top movable of the side plate (17) is connected with inserted link (19), and the back side of the resin plate (3) is fixedly connected with fixed block
(20), the internal activity of the fixed block (20) is connected with locking bar (21).
2. a kind of network comprehensive lining engineering simulator according to claim 1, which is characterized in that the hinge
(16) quantity is six, and six hinges (16) symmetrically and evenly arrange, and the diameter of the through-hole (18) is five millimeters, and multiple
Through-hole (18) symmetrically and evenly arranges.
3. a kind of network comprehensive lining engineering simulator according to claim 1, which is characterized in that the inserted link
(19) cross section is L-shaped, and inserted link (19) is contacted close to the one end of fixed block (20) with fixed block (20), the resin plate
It (3) is transparent panel.
4. a kind of network comprehensive lining engineering simulator and its construction method, which comprises the following steps:
1) by hinge (16) expansion side plate (17), inserted link (19) is fixed on fixed block (20) by locking bar (21), then comprehensively
The integrated engineering of the analysis of system and research wiring, construction early period to the structure chart of building where wiring installation, finishing work plans with
And the data such as customer network demand for services are collected, analyze and study, sufficiently grasp and understand specific time of cable wiring manufacture
With the contents such as cost budgeting;
2) engineering material selection and layout are carried out after making a concrete analysis of integrated engineering, the demand according to different construction mechanisms to network with
And the cost and each factor such as function of generic cabling engineering, cable and plug-in unit are reasonably selected, it is smooth in order to construction in later period
It carries out, the wiring material of different stage influences also not identical, selection on the transmission of network system data information during cable wiring manufacture
The material of identical series;
3) start construction and installation by through-hole (18), subsystem element (4) and closet subsystem unit between first installation management
(5), vertical subsystem element (6), work space subsystem unit (7), building subsystem element (8), horizontal son are then installed
Continue that building subsystem element indicating mechanism (10), Management room subsystem unit instruction machine are installed after system unit (9), debugging
Structure (11), closet subsystem unit indicating mechanism (12), vertical subsystem element indicating mechanism (13), horizontal subsystem unit
Indicating mechanism (14) and work space subsystem unit indicating mechanism (15);
4) reinforce supervision of construction, reinforce the supervision to cable wiring manufacture scene, it is convenient to be found present in work progress in time
Problem is simultaneously solved, carry out summary feedback various aspects requirement and opinion work, cable wiring manufacture strictly connect according to construct into
It spends table to carry out, checks the condition of construction of each link in time, it is ensured that wiring installation smoothly completes;
5) construction site after cleaning completion, clears up in time and summarizes surplus material after wiring installation completion, carry out construction site
Cleaning, that in addition carries out the engineering reports such as commencement report, engineering drawing and test report writes work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810567823.0A CN108961895A (en) | 2018-06-05 | 2018-06-05 | A kind of network comprehensive lining engineering simulator and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810567823.0A CN108961895A (en) | 2018-06-05 | 2018-06-05 | A kind of network comprehensive lining engineering simulator and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108961895A true CN108961895A (en) | 2018-12-07 |
Family
ID=64493182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810567823.0A Pending CN108961895A (en) | 2018-06-05 | 2018-06-05 | A kind of network comprehensive lining engineering simulator and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108961895A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112086009A (en) * | 2020-09-09 | 2020-12-15 | 王远志 | Intelligent information equipment for engineering cost consultation |
CN112510614A (en) * | 2020-11-16 | 2021-03-16 | 青海巨时信息科技有限公司 | Wiring unit for network comprehensive wiring |
CN113593349A (en) * | 2021-08-17 | 2021-11-02 | 河北机电职业技术学院 | Simulation experiment platform for network comprehensive wiring |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030028676A1 (en) * | 2001-06-28 | 2003-02-06 | Pangrac David M. | Field technician virtual trainer |
CN201066547Y (en) * | 2007-07-17 | 2008-05-28 | 西安开元电子实业有限公司 | Demonstration device for network integrated cabling system |
CN103708133A (en) * | 2013-12-19 | 2014-04-09 | 柳州铁道职业技术学院 | Novel sliding and folding container |
CN204680257U (en) * | 2015-06-03 | 2015-09-30 | 广州番禺职业技术学院 | A kind of multifunctional network comprehensive wiring experiment teaching aid |
CN107547233A (en) * | 2016-06-29 | 2018-01-05 | 黑龙江省康格尔科技有限公司 | A kind of computer network comprehensive wiring construction method |
CN206921364U (en) * | 2017-04-13 | 2018-01-23 | 江苏华亿信息工程有限公司 | A kind of demonstration device for network integrated cabling system |
-
2018
- 2018-06-05 CN CN201810567823.0A patent/CN108961895A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030028676A1 (en) * | 2001-06-28 | 2003-02-06 | Pangrac David M. | Field technician virtual trainer |
CN201066547Y (en) * | 2007-07-17 | 2008-05-28 | 西安开元电子实业有限公司 | Demonstration device for network integrated cabling system |
CN103708133A (en) * | 2013-12-19 | 2014-04-09 | 柳州铁道职业技术学院 | Novel sliding and folding container |
CN204680257U (en) * | 2015-06-03 | 2015-09-30 | 广州番禺职业技术学院 | A kind of multifunctional network comprehensive wiring experiment teaching aid |
CN107547233A (en) * | 2016-06-29 | 2018-01-05 | 黑龙江省康格尔科技有限公司 | A kind of computer network comprehensive wiring construction method |
CN206921364U (en) * | 2017-04-13 | 2018-01-23 | 江苏华亿信息工程有限公司 | A kind of demonstration device for network integrated cabling system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112086009A (en) * | 2020-09-09 | 2020-12-15 | 王远志 | Intelligent information equipment for engineering cost consultation |
CN112510614A (en) * | 2020-11-16 | 2021-03-16 | 青海巨时信息科技有限公司 | Wiring unit for network comprehensive wiring |
CN113593349A (en) * | 2021-08-17 | 2021-11-02 | 河北机电职业技术学院 | Simulation experiment platform for network comprehensive wiring |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108961895A (en) | A kind of network comprehensive lining engineering simulator and its construction method | |
CN103532744A (en) | Information-communication integrated supporting platform of intelligent power grid | |
CN212011604U (en) | Data center bus duct power supply and distribution system | |
CN203167158U (en) | Set top box remote testing system | |
CN201673299U (en) | Optical fiber distribution device with intelligent optical fiber management and identification functions | |
CN107948008A (en) | A kind of modeling method for low-voltage network monitoring system | |
CN110276516A (en) | Distribution monitoring analysis and repairing command methods based on power grid GIS | |
CN104933495A (en) | Work task assessment system on Android-based mobile terminal | |
CN101614849B (en) | Fiber core alignment plate | |
CN204335235U (en) | A kind of Joint construction and sharing type base station integrated machine cabinet | |
CN100461230C (en) | Full interactive microscope teaching system | |
CN103116330A (en) | Lobby-commanding controlling method | |
CN204732805U (en) | A kind of network layout system, crane span structure and can electrical power wiring assembly be loaded and unloaded | |
CN107547233A (en) | A kind of computer network comprehensive wiring construction method | |
CN206921364U (en) | A kind of demonstration device for network integrated cabling system | |
CN201315112Y (en) | Integrated wiring training operation platform | |
CN110880060A (en) | Intelligent comprehensive wiring system for building | |
CN108631236A (en) | A kind of vertical trunking of network layout | |
CN210605143U (en) | Intelligent comprehensive wiring system for building | |
CN104537090B (en) | User profile standardized data treating method and apparatus | |
CN110867107B (en) | AI-based multidisciplinary teaching resource comprehensive management system and management method | |
CN201251877Y (en) | Simulation experiment platform of building comprehensive wiring system and simulation method thereof. | |
CN108832999A (en) | A kind of computer network comprehensive wiring | |
CN201673298U (en) | Optical fiber distributing device with intelligent optical fiber managing function | |
CN203134234U (en) | Simulation real-training device for chemical reaction process control |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181207 |
|
WD01 | Invention patent application deemed withdrawn after publication |