CN108960646A - A kind of smart grid acquisition terminal monitoring method and system - Google Patents
A kind of smart grid acquisition terminal monitoring method and system Download PDFInfo
- Publication number
- CN108960646A CN108960646A CN201810754517.8A CN201810754517A CN108960646A CN 108960646 A CN108960646 A CN 108960646A CN 201810754517 A CN201810754517 A CN 201810754517A CN 108960646 A CN108960646 A CN 108960646A
- Authority
- CN
- China
- Prior art keywords
- acquisition terminal
- unit
- tested
- smart grid
- carry out
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06398—Performance of employee with respect to a job function
Abstract
The invention proposes a kind of smart grid acquisition terminal monitoring method and systems, by counting conformity testing quantity, the workload of retest number, irregularity number of operations and staff, testing staff can be constrained and detect behavior, it avoids repeating operation, guarantee the reliable and stable of tested acquisition terminal, it improves efficiency, reduces the cost;By comparing string information; judge whether it is to have surveyed acquisition terminal; the repetitive operation of testing staff is automatically reminded to; the carry out acousto-optic hint of necessary repetitive operation; need higher level or related personnel's password authorization that could further test; it avoids repeating operation, qualified products is protected by secondary damage, not guarantee the reliable of product.
Description
Technical field
The present invention relates to power grid acquisition terminal product testing field more particularly to a kind of smart grid acquisition terminal detection sides
Method and system.
Background technique
Automatization testing technique has obtained application extensively and profoundly in power grid, and smart grid end product is also deep
Enter to cover all trades and professions, the residential area of electricity consumption, or even closely bound up with everyone.Existing automatic test device and side
Method can detect the various functions of acquisition terminal, parameter etc. of dispatching from the factory can even be arranged, but effectively cannot distinguish and supervise detection
The faulty operation of operator and the repeated labor of personnel need special messenger to exercise supervision management so that the reliability of terminal and
Testing efficiency is low, and terminal is at high cost.Therefore, it is badly in need of a kind of reduction personnel faulty operation number and duplication of labour amount, automatic at present
The monitoring system and method for statistical work amount and tester's ability to work.
Summary of the invention
In view of this, the invention proposes a kind of reduction personnel faulty operation numbers and duplication of labour amount, programming count work
The smart grid acquisition terminal monitoring method and system of work amount and tester's ability to work.
The technical scheme of the present invention is realized as follows: the present invention provides a kind of smart grid acquisition terminal monitoring sides
Method, comprising the following steps:
Log in monitoring system;
Tested acquisition terminal string information is read, string information is compared with acquisition terminal database has been surveyed, it will be right
The number of ratio is denoted as N;If comparing result is inconsistent, detected automatically;If comparing result is consistent, judge whether that weight must be carried out
Renaturation test;
If not needing to carry out retest, the number for not needing to carry out retest is denoted as M, by tested acquisition terminal
Information storage removes the note of the tested acquisition terminal in acquisition terminal database to be measured to having surveyed in acquisition terminal database
Record;If reperformance test must be carried out, judge whether to authorize;
If not needing to authorize, the number for not needing authorization is denoted as H, the storage of the information of tested acquisition terminal is adopted to having surveyed
Collect in terminal database, and removes the record of the tested acquisition terminal in acquisition terminal database to be measured;If desired it authorizes, inputs
Password is detected automatically;
Automatically detection carries out qualified judgement, and carries out qualification and unqualified quantity statistics automatically, will carry out certainly after authorization
There is underproof acquisition terminal quantity in the tested acquisition terminal of dynamic detection and be denoted as S, the result detected automatically is sent to number
It is managed according to library.
On the basis of above technical scheme, it is preferred that by do not need carry out retest number M with do not need to authorize
The sum of number H be denoted as the total quantity of retest.
On the basis of above technical scheme, it is preferred that will be in the tested acquisition terminal that detected automatically after authorization
The process for underproof acquisition terminal occur is denoted as faulty operation, i.e. the quantity of faulty operation is M.
On the basis of above technical scheme, it is preferred that automatic detection specifically includes: one by one to tested power grid acquisition terminal
Functional test is carried out, system will carry out qualified and unqualified quantity statistics automatically, and green light is reminded;Underproof tested acquisition is eventually
The record at end will be removed, and repair.
On the basis of above technical scheme, it is preferred that the result detected automatically includes: the name of testing staff, every
The detection time of tested acquisition terminal, terminal program version, communication module version, conformity testing quantity, retest number, no
Close rule number of operations.
The present invention provides a kind of smart grid acquisition terminals to monitor system, including sequentially connected login unit, string number
Comparison unit, the first judging unit, second judgment unit, Password Input unit, automatic detection unit and storage unit, Yi Jiqing
Except unit, the first counting unit, the second counting unit and third counting unit;
String comparison unit is also electrically connected with the first counting unit and automatic detection unit respectively;
Clearing cell is electrically connected with the first judging unit, second judgment unit and the second counting unit respectively;
Third counting unit and automatic detection unit are electrically connected, the first counting unit, the second counting unit and third meter
Counting unit is electrically connected with storage unit
On the basis of above technical scheme, it is preferred that string comparison unit includes: measured data unit interconnected
Measured data unit;
Measured data unit is electrically connected with automatic detection unit, the first judging unit and the first counting unit respectively.
Of the invention has the advantages that compared with the existing technology
(1) pass through the work of statistics conformity testing quantity, retest number, irregularity number of operations and staff
Amount can be constrained testing staff and detect behavior, avoid repeating operation, guarantees the reliable and stable of tested acquisition terminal, improves efficiency
It reduces the cost;
(2) by comparison string information, judge whether it is to have surveyed acquisition terminal, the repetitive operation of testing staff is mentioned automatically
It wakes up, it is necessary to which the carry out acousto-optic hint of repetitive operation needs higher level or related personnel's password authorization that could further test, avoids repeating
Operation protects qualified products by secondary damage, not guarantee the reliability of product.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is a kind of flow chart of smart grid acquisition terminal monitoring method of the present invention;
Fig. 2 is the structure chart that a kind of smart grid acquisition terminal of the present invention monitors system.
Specific embodiment
Below in conjunction with the attached drawing in embodiment of the present invention, the technical solution in embodiment of the present invention is carried out clear
Chu is fully described by, it is clear that described embodiment is only some embodiments of the invention, rather than whole realities
Apply mode.Based on the embodiment in the present invention, those of ordinary skill in the art institute without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
As shown in Figure 1, in conjunction with Fig. 2, a kind of smart grid acquisition terminal monitoring method of the invention comprising following step
It is rapid:
S101, input username and password log in monitoring system;
S102, tested acquisition terminal string information is read, string information is compared with acquisition terminal database has been surveyed,
The number of comparison is denoted as N;If comparing result is inconsistent, detected automatically;If comparing result is consistent, system will pop up " this
Mistake after tested before acquisition terminal, if need to detect again? " prompting frame;
S103, if you do not need to or because testing staff's maloperation caused by, testing staff click " cancellation ", will not need into
The number of row retest is denoted as M, by the storage of the information of tested acquisition terminal to having surveyed in acquisition terminal database, and remove to
Survey the record of the tested acquisition terminal in acquisition terminal database.
If system, which needs to upgrade again, to be detected again, testing staff because being maintenance or customer demand variation
It clicks " determination ", dialog box will pop up input cryptographic interface, while smart grid acquisition terminal monitoring system can trigger acoustic control report
Alarm device is authorized with the higher level or related personnel of light and sound prompting testing staff.
After S104, the higher level of testing staff or related personnel are connected to authorization alarm, this time whether operation needs to authorize for judgement,
If need to really authorize, the higher level of testing staff or related personnel input licencing key, can carry out to tested acquisition terminal from
Dynamic detection;If being not required to authorization, the higher level of testing staff or related personnel click " cancellation ", and system will not need authorization automatically
Number is denoted as H, by the storage of the information of tested acquisition terminal to having surveyed in acquisition terminal database, and removes acquisition terminal number to be measured
According to the record of the tested acquisition terminal in library;
S105, automatic detection carry out qualified judgement, carry out functional test and qualified statistics one by one to tested acquisition terminal, if
System judges that tested acquisition terminal will carry out qualified quantity statistics as qualification automatically, and green light is reminded;It is adopted if system judgement is tested
Collect terminal be it is unqualified, unqualified quantity statistics will be carried out automatically, and red light is reminded, and the information storage of tested acquisition terminal is arrived
It has surveyed in acquisition terminal database, and has removed the record of the tested acquisition terminal in acquisition terminal database to be measured, wherein if
S is denoted as by there is underproof acquisition terminal quantity in the tested acquisition terminal detected automatically after authorization;
It will test detection time, terminal program version, the communication module version, qualification of personnel, every tested electric network terminal
Test quantity, retest number, irregularity number of operations are counted, and these information are stored to database and carry out pipe
Reason.
A kind of smart grid acquisition terminal monitoring method of the present invention is to the detection method of the working efficiency of staff: when
It work total amount is N, and repetitive operation number is the number M and number H for not needing authorization for not needing to carry out retest
Number of operations with, irregularity is underproof acquisition end will occur in the tested acquisition terminal detected after authorization automatically
Quantity S is held, the ratio of work total amount is accounted for according to repetitive operation number to determine whether staff's working is conscientious, according to irregularity
Number of operations accounts for the working efficiency of the ratio-dependent staff of work total amount.
As shown in Fig. 2, a kind of smart grid acquisition terminal of the invention monitors system in conjunction with Fig. 1 comprising log in single
Member, measured data unit, measured data unit, the first judging unit, second judgment unit, Password Input unit, automatic detection
Unit, storage unit, clearing cell, the first counting unit, the second counting unit and third counting unit;
Measured data is compared with measured data, judges whether to be the data detected by string comparison unit,
It avoids repeating to detect.String unit includes: the measured data unit being electrically connected with each other and measured data unit, measured data list
Member stores the information of acquisition terminal to be measured, and measured data unit stores the acquisition terminal information detected;Measured data list
Member is electrically connected with login unit, the first judging unit, automatic detection unit and the first counting unit respectively.
First judging unit and second judgment unit judge whether to repeat to detect, play the role of prompting repeatedly.The
One judging unit is electrically connected with clearing cell and second judgment unit respectively, second judgment unit respectively with Password Input unit
Clearing cell is electrically connected.
Clearing cell, if tested acquisition terminal is the acquisition terminal detected, staff's not repetitive operation or
Person does not need to authorize, then removes the acquisition terminal from measured data unit, and unloading is in measured data unit.It removes single
Member is electrically connected with the first judging unit, second judgment unit and the second counting unit respectively.
Automatic detection unit, the automatic essential information for detecting tested acquisition terminal, including testing staff, every tested power grid
The detection time of terminal, terminal program version, communication module version, conformity testing quantity, retest number, irregularity operation
Number;Automatic detection unit electrically connects with measured data unit, Password Input unit, storage unit and third counting unit respectively
It connects.
First counting unit, the second counting unit and third counting unit, respectively to work total amount, repetitive operation number and
Irregularity number of operations counts, convenient for the ability to work of censorship personnel.First counting unit and measured data unit are electrical
Connection, the second counting unit and clearing cell are electrically connected, and third counting unit and automatic detection unit are electrically connected.
Storage unit, the data of storage automatic detection unit detection.Storage unit and automatic detection unit are electrically connected.
The foregoing is merely better embodiments of the invention, are not intended to limit the invention, all of the invention
Within spirit and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (7)
1. a kind of smart grid acquisition terminal monitoring method, it is characterised in that: the following steps are included:
S101, monitoring system is logged in;
S102, tested acquisition terminal string information is read, string information is compared with acquisition terminal database has been surveyed, it will be right
The number of ratio is denoted as N;If comparing result is inconsistent, detected automatically;If comparing result is consistent, judge whether that weight must be carried out
Renaturation test;
If S103, not needing to carry out retest, the number for not needing to carry out retest is denoted as M, by tested acquisition terminal
Information storage to having surveyed in acquisition terminal database, and remove the note of the tested acquisition terminal in acquisition terminal database to be measured
Record;If reperformance test must be carried out, judge whether to authorize;
If S104, not needing to authorize, the number for not needing authorization is denoted as H, by the storage of the information of tested acquisition terminal to having surveyed
In acquisition terminal database, and remove the record of the tested acquisition terminal in acquisition terminal database to be measured;If desired it authorizes, it is defeated
Enter password, is detected automatically;
S105, automatically detection carry out qualified judgement, and carry out qualification and unqualified quantity statistics automatically, will carry out certainly after authorization
There is underproof acquisition terminal quantity in the tested acquisition terminal of dynamic detection and be denoted as S, the result detected automatically is sent to number
It is managed according to library.
2. a kind of smart grid acquisition terminal monitoring method as described in claim 1, it is characterised in that: by the S103 and
The sum of the number M and the number H for not needing authorization for not needing to carry out retest in S104 is denoted as the total quantity of retest.
3. a kind of smart grid acquisition terminal monitoring method as described in claim 1, it is characterised in that: it will be authorized in S105
The process for occurring underproof acquisition terminal in the tested acquisition terminal detected automatically afterwards is denoted as faulty operation, i.e. mistake behaviour
The quantity of work is M.
4. a kind of smart grid acquisition terminal monitoring method as described in claim 1, it is characterised in that: automatic in the S105
Detection specifically includes: carrying out functional test one by one to tested power grid acquisition terminal, system will carry out qualified and number of non-compliances automatically
Amount statistics, and green light is reminded;The record of underproof tested acquisition terminal will be removed, and repair.
5. a kind of smart grid acquisition terminal monitoring method as described in claim 1, it is characterised in that: the result detected automatically
It include: detection time, terminal program version, the communication module version, qualification of the name of testing staff, every tested acquisition terminal
Test quantity, retest number, irregularity number of operations.
6. a kind of smart grid acquisition terminal monitors system, it is characterised in that: including sequentially connected login unit, string number comparison
Unit, the first judging unit, second judgment unit, Password Input unit, automatic detection unit and storage unit, and remove single
Member, the first counting unit, the second counting unit and third counting unit;
The string comparison unit is also electrically connected with the first counting unit and automatic detection unit respectively;
The clearing cell is electrically connected with the first judging unit, second judgment unit and the second counting unit respectively;
The third counting unit and automatic detection unit are electrically connected, the first counting unit, the second counting unit and third meter
Counting unit is electrically connected with storage unit.
7. a kind of smart grid acquisition terminal monitoring method as claimed in claim 6, it is characterised in that: the string number comparison is single
Member includes: measured data unit interconnected and measured data unit;
The measured data unit is electrically connected with automatic detection unit, the first judging unit and the first counting unit respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810754517.8A CN108960646B (en) | 2018-07-11 | 2018-07-11 | Smart power grid acquisition terminal monitoring method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810754517.8A CN108960646B (en) | 2018-07-11 | 2018-07-11 | Smart power grid acquisition terminal monitoring method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108960646A true CN108960646A (en) | 2018-12-07 |
CN108960646B CN108960646B (en) | 2021-06-08 |
Family
ID=64483600
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810754517.8A Active CN108960646B (en) | 2018-07-11 | 2018-07-11 | Smart power grid acquisition terminal monitoring method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108960646B (en) |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090070163A1 (en) * | 2007-09-11 | 2009-03-12 | Robert Lee Angell | Method and apparatus for automatically generating labor standards from video data |
CN102540133A (en) * | 2011-12-26 | 2012-07-04 | 北京煜邦电力技术有限公司 | Automatic detecting system and method for intelligent grid data collecting terminal |
CN103426069A (en) * | 2013-09-03 | 2013-12-04 | 佛山市明睿达科技有限公司 | Public customs declaration comprehensive service platform on basis of Internet information technique |
CN103679392A (en) * | 2013-12-26 | 2014-03-26 | 拉卡拉支付有限公司 | Task scheduling processing method and system |
US20140122188A1 (en) * | 2011-10-17 | 2014-05-01 | CrowdFlower, Inc. | Predicting future performance of multiple workers on crowdsourcing tasks and selecting repeated crowdsourcing workers |
CN105242999A (en) * | 2015-09-22 | 2016-01-13 | 深圳怡化电脑股份有限公司 | Method and apparatus for testing financial self-service equipment |
CN106296038A (en) * | 2016-08-26 | 2017-01-04 | 隆鑫通用动力股份有限公司 | Test assignment triggering method |
CN106415418A (en) * | 2014-01-22 | 2017-02-15 | 富士机械制造株式会社 | Production system |
US20170185941A1 (en) * | 2015-12-29 | 2017-06-29 | Crowd Computing Systems, Inc. | Task-level Answer Confidence Estimation for Worker Assessment |
CN107392494A (en) * | 2017-08-03 | 2017-11-24 | 成都牵牛草信息技术有限公司 | The method for supervising review operation, Authorized operation and list operation |
CN107818390A (en) * | 2016-09-12 | 2018-03-20 | 方正国际软件(北京)有限公司 | A kind of check requirements generation method and device |
US20180157938A1 (en) * | 2016-12-07 | 2018-06-07 | Samsung Electronics Co., Ltd. | Target detection method and apparatus |
-
2018
- 2018-07-11 CN CN201810754517.8A patent/CN108960646B/en active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090070163A1 (en) * | 2007-09-11 | 2009-03-12 | Robert Lee Angell | Method and apparatus for automatically generating labor standards from video data |
US20140122188A1 (en) * | 2011-10-17 | 2014-05-01 | CrowdFlower, Inc. | Predicting future performance of multiple workers on crowdsourcing tasks and selecting repeated crowdsourcing workers |
CN102540133A (en) * | 2011-12-26 | 2012-07-04 | 北京煜邦电力技术有限公司 | Automatic detecting system and method for intelligent grid data collecting terminal |
CN103426069A (en) * | 2013-09-03 | 2013-12-04 | 佛山市明睿达科技有限公司 | Public customs declaration comprehensive service platform on basis of Internet information technique |
CN103679392A (en) * | 2013-12-26 | 2014-03-26 | 拉卡拉支付有限公司 | Task scheduling processing method and system |
CN106415418A (en) * | 2014-01-22 | 2017-02-15 | 富士机械制造株式会社 | Production system |
CN105242999A (en) * | 2015-09-22 | 2016-01-13 | 深圳怡化电脑股份有限公司 | Method and apparatus for testing financial self-service equipment |
US20170185941A1 (en) * | 2015-12-29 | 2017-06-29 | Crowd Computing Systems, Inc. | Task-level Answer Confidence Estimation for Worker Assessment |
CN106296038A (en) * | 2016-08-26 | 2017-01-04 | 隆鑫通用动力股份有限公司 | Test assignment triggering method |
CN107818390A (en) * | 2016-09-12 | 2018-03-20 | 方正国际软件(北京)有限公司 | A kind of check requirements generation method and device |
US20180157938A1 (en) * | 2016-12-07 | 2018-06-07 | Samsung Electronics Co., Ltd. | Target detection method and apparatus |
CN107392494A (en) * | 2017-08-03 | 2017-11-24 | 成都牵牛草信息技术有限公司 | The method for supervising review operation, Authorized operation and list operation |
Non-Patent Citations (2)
Title |
---|
无: "自动化技术、计算机技术", 《中国无线电电子学文摘》 * |
李红青 等: "配电网新型一二次融合成套设备测试方法研究", 《湖南电力》 * |
Also Published As
Publication number | Publication date |
---|---|
CN108960646B (en) | 2021-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106340968B (en) | Integrated support system and method for power distribution network management and control | |
CN102156245B (en) | A kind of mine high-voltage cable on-line fault diagnosis and method for early warning | |
CN103568863B (en) | The Real-Time Monitoring diagnostic system of cell management system of electric automobile and diagnostic method | |
CN104360208A (en) | Acquisition failure analyzing and processing method of electricity utilization information acquisition operating and maintaining system | |
CN110568838B (en) | Vehicle quiescent current acquisition method and system, electronic device and storage medium | |
CN108051745A (en) | Test system, method and the computer readable storage medium of BMS | |
CN109583711A (en) | A kind of security risk assessment whole process management system | |
CN103389397B (en) | Anti-cheating system for photovoltaic power generation | |
CN111812536A (en) | Rapid evaluation method for retired power battery residual value | |
CN110703009A (en) | Abnormal analysis and processing method for line loss rate of transformer area | |
CN106848452B (en) | A kind of power battery fault display method and power battery fault display device | |
CN106201804A (en) | The device of a kind of measuring and calculation mainboard, method and system | |
CN108233323A (en) | A kind of current leakage detection system | |
CN112987696A (en) | Regional power distribution network equipment management platform and operation method thereof | |
CN114383652A (en) | Method, system and device for identifying potential fault online risk of power distribution network | |
CN105761167A (en) | Method for evaluating health status of transformer station secondary equipment | |
CN107612927B (en) | Safety detection method for power dispatching automation system | |
CN107241241B (en) | A kind of Network records analytical equipment performance test methods | |
CN109615273A (en) | A kind of electric car electrically-charging equipment method for evaluating state and system | |
CN107479007A (en) | A kind of power supply module test system and method | |
CN111123009A (en) | Intelligent substation avalanche testing method and system based on SCD file and terminal equipment | |
CN202421448U (en) | Relay detecting device for nuclear power stations | |
CN202903956U (en) | GIS partial discharge on-line monitoring system | |
CN103997126A (en) | Fault diagnosis grading method and system based on on-off state | |
CN108960646A (en) | A kind of smart grid acquisition terminal monitoring method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |