CN108233323A - A kind of current leakage detection system - Google Patents
A kind of current leakage detection system Download PDFInfo
- Publication number
- CN108233323A CN108233323A CN201810121746.6A CN201810121746A CN108233323A CN 108233323 A CN108233323 A CN 108233323A CN 201810121746 A CN201810121746 A CN 201810121746A CN 108233323 A CN108233323 A CN 108233323A
- Authority
- CN
- China
- Prior art keywords
- detection
- leakage
- data
- terminal
- electrical leakage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H1/00—Details of emergency protective circuit arrangements
- H02H1/0007—Details of emergency protective circuit arrangements concerning the detecting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H1/00—Details of emergency protective circuit arrangements
- H02H1/0061—Details of emergency protective circuit arrangements concerning transmission of signals
- H02H1/0084—Details of emergency protective circuit arrangements concerning transmission of signals by means of pilot wires or a telephone network; watching of these wires
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H1/00—Details of emergency protective circuit arrangements
- H02H1/0092—Details of emergency protective circuit arrangements concerning the data processing means, e.g. expert systems, neural networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
Landscapes
- Engineering & Computer Science (AREA)
- Artificial Intelligence (AREA)
- Evolutionary Computation (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of current leakage detection systems, log in identity management module and log in identity validation to detection of electrical leakage terminal;Management module is set to be used for detection of electrical leakage terminal parameter copy reading;Test and management module is used for the administrative staff of different stage to electric leakage census operations arrangement and the upload of dependence test data;Locking unlock management module, which reaches the standard grade to data detection of electrical leakage terminal, meets the intelligent locking management of barring condition;Abnormal pushing module pushes the various abnormal works of data detection of electrical leakage terminal, and data management module is used to acquire the various data of detection of electrical leakage terminal and be preserved;Check that statistical module can be with the current online various data of detection of electrical leakage terminal of real time inspection according to different rights, the current leakage detection system and application method, solve the problems, such as that arriving each household one by one using electric leakage pincers in the past investigates, save a large amount of human and material resources, it improves work efficiency, and it is preferable to investigate effect.
Description
Technical field
The present invention relates to network communication technology field more particularly to a kind of current leakage detection systems.
Background technology
In rural area low-voltage power supply and distribution system, widely used TT earthing modes.According to national relevant regulations and standard, TT is used
Earthed system taiwan area must install three-level residual current action protector (being first class of protection under taiwan area transformer, abbreviation total security).
Since rural area low-voltage customer awareness of safety is poor, final stage protection (family guarantor) popularity rate is not high, and in China developed regions, popularity rate is not
To 70%, it is more low that popularity rate is protected by central and west regions man;The environment of rural power grids power supply simultaneously is complicated, severe, is frequently present of low-voltage line
Road drain conditions, the superposition of several respects factor lead to taiwan area total security Frequent trip.
Frequently tripping brings rural power grids frequently to have a power failure, since power supply department has moon tripping operation index, to ensure
Improper frequency of power cut is reduced, artificial dismounting total security aftercurrent action protecting function occurs, at this time rural power grids taiwan area earth leakage protective
First class of protection is actually not implemented, the practical operational percentage of rural power grids taiwan area total security is less than 40% according to incompletely statistics so that rural power grids
For example there are serious security risks for casualties and fire for safety utilization of electric power.
It reaches the standard grade and puts into operation for taiwan area total security, it is necessary to solve rural power grids resident electric leakage and supply line's electrical leakage problems.Rural power grids are low
Supply line is pressed generally using overhead line, can more intuitively to pinpoint the problems;Rural Low-Voltage Power Network user electric leakage be divided into it is lasting electric leakage with
Interval is leaked electricity, when work about electric power personnel are using common electric leakage pincers investigation, since rural power grids are few using electrical equipment resident's daytime,
It cannot effectively find drain conditions.Necessary condition is become to the drain conditions detection of Rural Low-Voltage Power Network user for a period of time at this time, is made
This problem can be efficiently solved with detection of electrical leakage terminal.
Since rural area taiwan area number of users is more, detection user, which is leaked electricity, needs multiple detection of electrical leakage terminals to work at the same time, agriculture
Village user dispersibility causes rural power grids taiwan area electric leakage investigation workload larger, how to manage detection of electrical leakage terminal at this time, reach high
Effect, accurately, easily leak electricity investigating is very important.
Invention content
For overcome the deficiencies in the prior art, the purpose of the present invention is to provide a kind of convenient, efficient, accurate electric leakage inspections
Examining system, the invention can be solved since rural subscribers' quantity is more, rural power grids taiwan area electric leakage investigation workload caused by large dispersion
The problem of.
The purpose of the present invention adopts the following technical scheme that realization:
Current leakage detection system, including logging in identity management module, setting management module, test and management module, data analysis
Management module, abnormal pushing module, data management module, checks statistical module at locking unlock management module;
The login identity management module logs in identity validation for detection of electrical leakage terminal and detection of electrical leakage terminal attaching is drawn
Divide, mobile phone or PDA user log in identity validation and its ownership place division, user network login system identity validation and its ownership place
It divides;
The setting management module is used for the copy reading of detection of electrical leakage terminal parameter and sets new parameter as required;To it
The change of state is so that equipment is in different working conditions:Factory state, ownership place division, reprocess state, scrap state,
Operating personnel's priority assignation;
The test and management module provides electric leakage census operations arrangement and dependence test for the administrative staff of different stage
The upload of material;
The data analysis management module is acquired by the electric leakage feature model library pre-established according to detection of electrical leakage terminal
Electric leakage indicatrix with electric leakage feature model library analyse and compare and form preliminary electric leakage type diagnostic foundation, and issue mobile phone
Or PDA staff is leaked electricity user's processing scheme or suggestion, while collects mobile phone or PDA staff's in-situ processing electric leakage user
The actual conditions of Shi Faxian are improved and update electric leakage feature model library;Test report is generated after test;
The locking unlock management module meets the intelligent locking of barring condition for reaching the standard grade to data detection of electrical leakage terminal
Management and locking abnormity prompt, processing management, meet data detection of electrical leakage terminal the management of intelligent unlocking condition and unlock abnormal
It reminds, processing management;
The exception pushing module is used to push the various abnormal works of data detection of electrical leakage terminal, including low battery, leads to
News are abnormal, user's serious drain situation;
The data management module is used to acquire the various data of detection of electrical leakage terminal and be preserved;Acquisition preserves current
Data are determined whether there are historical data automatically, to judge whether detection of electrical leakage terminal whether there is Internet Use, and are given
Sort out storage;Or the setting according to setting management module, automatic distinguishing detection of electrical leakage terminal attaching ground information make the ownership place
Classified with the related data of detection of electrical leakage terminal and preserved;And the device number according to detection of electrical leakage terminal of reaching the standard grade judges the equipment state
It is factory's debugging before normal use or manufacture and reprocesses debugging;
It is described check statistical module according to different rights can with the current online various data of detection of electrical leakage terminal of real time inspection,
Or call detection of electrical leakage terminal historical test data;Or check that the working efficiency of detection of electrical leakage personnel is being currently used in statistics;
Or check real-time electric leakage curve there are drain conditions user, provide foundation for investigation electric leakage.
Further, the current leakage detection system further includes no network operational module:No network area can be pre-set
Information is tested, the phenomenon that preventing that data can not be uploaded in no network state, is moved to after detection of electrical leakage terminal test
There is network area, it is automatic to carry out data upload;Simultaneously detection of electrical leakage terminal in no network state when, the mobile phone of tester or
PDA during detection of electrical leakage terminal close to, by the test data of bluetooth or infrared automatic acquisition detection of electrical leakage terminal and monitoring, working as hand
Machine or PDA enter is uploaded to platform without network module by test data automatically when having network area.
Further, the current leakage detection system further includes interface administration module, and the current leakage detection system is believed with other
The data exchange of platform is ceased, including power department marketing, production platform, the docking of taiwan area total security management platform, realizes test job
The automatically generating of job order, automatic shared, taiwan area electric leakage information sharing, the situation feedback extension of electric leakage investigation of taiwan area user information
Using.
Further, the current leakage detection system can be accessed with PDA or mobile phone application end, including accessing legitimacy to it
Verification;Receive the upload that legal access user of service applies end data;It issues legal incoming end correlation electric leakage investigation information, answering
It is checked with end.
Compared with prior art, the beneficial effects of the present invention are:
(1) it is calculated with more 90 family of rural power grids taiwan area, conventional method:A user, which is often tested, using electric leakage pincers takes around 10
Minute, current instant drain conditions can only be tested at this time, need the electric leakage pincers variation of operating personnel's hig diligence, and a taiwan area needs
15 hours/people, test result can not represent the true drain conditions of user, and test result has no value for use substantially;It is using this
System and one detection of electrical leakage terminal loading equipments, reclaimer user take around 3 minutes, a taiwan area need 4.5 hours/
People, for user for a period of time, for example the drain conditions of 24 hours, basic to reflect the practical drain conditions of user, efficiency for test result
It is nearly 4 times using common electric leakage pincers.
(2) current leakage detection system utilizes the network information technology, realizes height when detection of electrical leakage terminal is tested at the scene
Effect;Electric leakage data validity collected to detection of electrical leakage terminal is done automatic screening, is excluded.So that Rural Low-Voltage Power Network taiwan area electric leakage row
Look into it is accurate, convenient, efficient, to promoted rural power grids taiwan area total security reliability service provide strong support.
(3) current leakage detection system realizes the Life Cycle Management of detection of electrical leakage terminal, from product export, sale, fortune
Go, reprocess, scrap or lose can Whole Course Management in the present system, management level that is convenient, improving detection of electrical leakage.
(4) current leakage detection system may be such that rural power grids taiwan area electric leakage investigation is possibly realized, and solve previous using electric leakage pincers
Each household investigation is arrived one by one, a large amount of human and material resources is saved, improves work efficiency, and it is preferable to investigate effect.
The present invention is described in further detail with reference to the accompanying drawings and detailed description.
Description of the drawings
Fig. 1 is the principle modules schematic diagram of current leakage detection system of the present invention;
Fig. 2 is the test schematic diagram of current leakage detection system of the present invention.
Specific embodiment
In the following, with reference to attached drawing and specific embodiment, the present invention is described further, it should be noted that not
Under the premise of conflicting, new implementation can be formed between various embodiments described below or between each technical characteristic in any combination
Example.
Current leakage detection system as shown in Figs. 1-2, including logging in identity management module, setting management module, test and management
Module, locking unlock management module, abnormal pushing module, data management module, checks statistics mould at data analysis management module
Block;
Log in identity management module:Divided for detection of electrical leakage terminal login identity validation and detection of electrical leakage terminal attaching,
Mobile phone or PDA user log in identity validation and its ownership place divides, user network login system identity validation and its ownership place are drawn
Point;
Management module is set:For setting to the copy reading of detection of electrical leakage terminal parameter and as required new parameter;To its shape
The change of state is so that equipment is in different working conditions:Factory state, ownership place division, reprocess state, scrap state, behaviour
Make personnel's priority assignation;The Life Cycle Management of detection of electrical leakage terminal is realized, from product export, sale, runs, reprocess, report
It is useless or lose can Whole Course Management in the present system, management level that is convenient, improving detection of electrical leakage.
Test and management module:For different stage administrative staff to electric leakage census operations arrangement and dependence test data
It uploads;
Data analysis management module:By the electric leakage feature model library pre-established, according to the acquisition of detection of electrical leakage terminal
Electric leakage indicatrix, which with electric leakage feature model library analyse and compare, forms preliminary electric leakage type diagnostic foundation, and issue mobile phone or
PDA staff is leaked electricity user's processing scheme or suggestion, while when collecting mobile phone or PDA staff's in-situ processing electric leakage user
It was found that actual conditions, improve and update electric leakage feature model library;Test report is generated after test;Realize detection of electrical leakage
It is efficient when terminal is tested at the scene;Electric leakage data validity collected to detection of electrical leakage terminal is done automatic screening, is excluded.Make
It is accurate, convenient, efficient to obtain Rural Low-Voltage Power Network taiwan area electric leakage investigation, effectively branch is provided to the reliability service for promoting rural power grids taiwan area total security
Support.
Locking unlock management module:Meet the intelligent locking management of barring condition for reaching the standard grade to data detection of electrical leakage terminal
And locking abnormity prompt, processing management, data detection of electrical leakage terminal is met the management of intelligent unlocking condition and unlocking abnormity prompt,
Processing management;
Abnormal pushing module:It is different including low battery, communication for being pushed to the various abnormal works of data detection of electrical leakage terminal
Often, user's serious drain situation;
Data management module:For acquiring the various data of detection of electrical leakage terminal and being preserved;Acquisition preserves current number
According to or determine whether automatically there are historical data, to judge whether detection of electrical leakage terminal whether there is Internet Use, and returned
Class is stored;Or the setting according to setting management module, automatic distinguishing detection of electrical leakage terminal attaching ground information use the ownership place
The related data classification of detection of electrical leakage terminal preserves;And the device number according to detection of electrical leakage terminal of reaching the standard grade judges that the equipment state is
In normal use still dispatch from the factory before factory's debugging and reprocess debugging;
Check statistical module:According to different rights can with real time inspection currently the various data of online detection of electrical leakage terminal or
Call detection of electrical leakage terminal historical test data;Or check that the working efficiency of detection of electrical leakage personnel is being currently used in statistics;Or
It checks the real-time electric leakage curve there are drain conditions user, foundation is provided for investigation electric leakage.
As preferred embodiment, current leakage detection system further includes no network operational module, prevents in no network state
Shi Wufa uploads the phenomenon that data, the test information of no network area can be pre-set, after detection of electrical leakage terminal test
Network area has been moved to, it is automatic to carry out data upload;When detection of electrical leakage terminal is in no network state, the mobile phone of tester
Or PDA close to during detection of electrical leakage terminal by the test data of bluetooth or infrared automatic acquisition detection of electrical leakage terminal and monitoring, when
Mobile phone or PDA enter is uploaded to platform without network module by test data automatically when having network area.
As preferred embodiment, current leakage detection system further includes interface administration module, and current leakage detection system is the same as other
The data exchange of information platform including power department marketing, production platform, the docking of taiwan area total security management platform, realizes test work
Make the automatically generating of job order, automatic shared, the taiwan area electric leakage information sharing of taiwan area user information, electric leakage investigation situation feedback are prolonged
Stretch application.
As preferred embodiment, current leakage detection system can be accessed with PDA or mobile phone application end, including accessing conjunction to it
The verification of method;Receive the upload that legal access user of service applies end data;Issue legal incoming end correlation electric leakage investigation letter
Breath is checked in application end.
The current leakage detection system compares traditional detection mode, is calculated with more 90 family of rural power grids taiwan area, is often surveyed using electric leakage pincers
One user of examination takes around 10 minutes, can only test current instant drain conditions at this time, and operating personnel's hig diligence is needed to leak
Electricity pincers variation, a taiwan area need 15 hours/people, and test result can not represent the true drain conditions of user, test result base
Originally it has no value for use;Using this system and detection of electrical leakage terminal loading equipments, one user of reclaimer takes around 3 minutes,
One taiwan area needs 4.5 hours/people, and test result for user for a period of time, use by for example drain conditions of 24 hours, basic reflection
The practical drain conditions in family, efficiency are nearly 4 times using common electric leakage pincers.The current leakage detection system may be such that rural power grids taiwan area electric leakage row
It looks into and is possibly realized, solve previous clamped using electric leakage and arrive each household investigation one by one, save a large amount of human and material resources, improve work
Make efficiency, and it is preferable to investigate effect.
The above embodiment is only the preferred embodiment of the present invention, it is impossible to the scope of protection of the invention is limited with this,
The variation and replacement for any unsubstantiality that those skilled in the art is done on the basis of the present invention belong to institute of the present invention
Claimed range.
Claims (4)
1. a kind of current leakage detection system, which is characterized in that including:
Identity management module is logged in, identity validation and the division of detection of electrical leakage terminal attaching, mobile phone are logged in for detection of electrical leakage terminal
Or PDA user logs in identity validation and its ownership place divides, user network login system identity validation and its ownership place divide;
Management module is set, for setting to the copy reading of detection of electrical leakage terminal parameter and as required relevant parameter;
Test and management module, for different stage administrative staff to electric leakage census operations arrangement and dependence test data
It passes;
Data analysis management module, by the electric leakage feature model library pre-established, the electric leakage according to the acquisition of detection of electrical leakage terminal
Indicatrix is analysed and compared with electric leakage feature model library;
Locking unlock management module, meets the intelligent locking management of barring condition and closes for reaching the standard grade to data detection of electrical leakage terminal
Abnormity prompt, processing management are locked, meets data detection of electrical leakage terminal the management of intelligent unlocking condition and unlocking abnormity prompt, processing
Management;
Abnormal pushing module, for being pushed to the various abnormal works of data detection of electrical leakage terminal, abnormal work includes low battery, leads to
News are abnormal, user's serious drain situation;
Data management module, for acquiring the various data of detection of electrical leakage terminal and being preserved;
It checks statistical module, the various data of current online detection of electrical leakage terminal are checked according to different rights or calls detection of electrical leakage
Terminal historical test data;Or check that the working efficiency of detection of electrical leakage personnel is being currently used in statistics;Or it checks in the presence of electric leakage
The real-time electric leakage curve of situation user, foundation is provided for investigation electric leakage.
2. current leakage detection system as described in claim 1, it is characterised in that:The current leakage detection system further includes no network work
Make module:The test information of no network area can be pre-set, the phenomenon that preventing that data can not be uploaded in no network state.
3. current leakage detection system as described in claim 1, it is characterised in that:The current leakage detection system further includes interface management
Module, the current leakage detection system with other information platform data exchange, other information platform include following one or more:
Power department marketing, production platform, taiwan area total security management platform.
4. current leakage detection system as described in claim 1, it is characterised in that:The current leakage detection system should with PDA or mobile phone
With terminating into the verification including accessing legitimacy to it;Receive the upload that legal access user of service applies end data;Issue conjunction
Method incoming end correlation electric leakage investigation information is checked in application end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810121746.6A CN108233323A (en) | 2018-02-07 | 2018-02-07 | A kind of current leakage detection system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810121746.6A CN108233323A (en) | 2018-02-07 | 2018-02-07 | A kind of current leakage detection system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108233323A true CN108233323A (en) | 2018-06-29 |
Family
ID=62671120
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810121746.6A Pending CN108233323A (en) | 2018-02-07 | 2018-02-07 | A kind of current leakage detection system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108233323A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109212301A (en) * | 2018-08-16 | 2019-01-15 | 杭州华春科技有限公司 | A kind of current leakage detection system of no local communication network |
CN109448516A (en) * | 2018-11-19 | 2019-03-08 | 杭州华春科技有限公司 | A kind of electric leakage investigation simulation teching device, control method and storage medium |
CN109541375A (en) * | 2018-12-20 | 2019-03-29 | 杭州华春科技有限公司 | A kind of earth detector for concentrated gas meter box |
CN111308386A (en) * | 2019-12-11 | 2020-06-19 | 国网北京市电力公司 | Electric leakage detection system and detection method |
CN112104072A (en) * | 2020-08-04 | 2020-12-18 | 杭州华春科技有限公司 | Leakage monitoring switch |
CN113419193A (en) * | 2021-07-30 | 2021-09-21 | 重庆电子工程职业学院 | Electric leakage monitoring system |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104833893A (en) * | 2015-04-14 | 2015-08-12 | 国网浙江杭州市萧山区供电公司 | Electric leakage detecting terminal, system, and method |
-
2018
- 2018-02-07 CN CN201810121746.6A patent/CN108233323A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104833893A (en) * | 2015-04-14 | 2015-08-12 | 国网浙江杭州市萧山区供电公司 | Electric leakage detecting terminal, system, and method |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109212301A (en) * | 2018-08-16 | 2019-01-15 | 杭州华春科技有限公司 | A kind of current leakage detection system of no local communication network |
CN109448516A (en) * | 2018-11-19 | 2019-03-08 | 杭州华春科技有限公司 | A kind of electric leakage investigation simulation teching device, control method and storage medium |
CN109541375A (en) * | 2018-12-20 | 2019-03-29 | 杭州华春科技有限公司 | A kind of earth detector for concentrated gas meter box |
CN111308386A (en) * | 2019-12-11 | 2020-06-19 | 国网北京市电力公司 | Electric leakage detection system and detection method |
CN112104072A (en) * | 2020-08-04 | 2020-12-18 | 杭州华春科技有限公司 | Leakage monitoring switch |
CN112104072B (en) * | 2020-08-04 | 2023-06-13 | 杭州华春科技有限公司 | Leakage monitoring switch |
CN113419193A (en) * | 2021-07-30 | 2021-09-21 | 重庆电子工程职业学院 | Electric leakage monitoring system |
CN113419193B (en) * | 2021-07-30 | 2023-09-26 | 重庆电子工程职业学院 | Leakage monitoring system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108233323A (en) | A kind of current leakage detection system | |
CN104635198B (en) | Remote monitoring and diagnosing method for electric energy metering device with timely fault finding function | |
CN104678348B (en) | Remote monitoring and diagnosing method for electric energy metering device with high efficiency | |
CN109034400A (en) | A kind of substation's exception metric data predicting platform system | |
CN109298379A (en) | A kind of recognition methods of the intelligent electric meter site error exception based on data monitoring | |
CN113452141A (en) | Closed integrated control system based on thing allies oneself with data | |
CN106597225A (en) | Distribution network on-line state monitoring system and on-line monitoring method thereof | |
CN114383652A (en) | Method, system and device for identifying potential fault online risk of power distribution network | |
CN110703009A (en) | Abnormal analysis and processing method for line loss rate of transformer area | |
CN113591393A (en) | Fault diagnosis method, device, equipment and storage medium of intelligent substation | |
CN110571925A (en) | Method for analyzing power quality by using data of power distribution network monitoring terminal | |
CN116980285B (en) | Data processing-based intelligent detection response method, system and medium for resident operation and maintenance | |
CN104714206B (en) | Remote monitoring and diagnosing method for electric energy metering device capable of finding faults timely | |
CN116566043A (en) | Power distribution terminal monitoring system and monitoring method | |
CN105938153A (en) | System for monitoring abnormal state of CT secondary loop and electricity stealing prevention method | |
CN118228172A (en) | Anti-electricity-stealing monitoring and recognition system based on model analysis | |
CN114839462A (en) | Intelligent anti-electricity-stealing monitoring method and system | |
CN104656050B (en) | Manpower-saving remote monitoring and diagnosing method for electric energy metering device | |
CN112557745A (en) | Power superposition comparison system and method for line loss monitoring | |
CN107229499B (en) | Master station simulation system and detection method for detecting fault terminal of power acquisition system | |
CN104614700B (en) | Remote monitoring and diagnosing method for electric energy metering device with good real-time performance | |
CN109239529B (en) | System and method for preventing hidden danger of power line and warning information | |
CN110750500A (en) | Method and system for checking CCD (Charge coupled device) file and SCD (substation configuration description) file of intelligent substation | |
CN105811580B (en) | A kind of stealing prosecution system and method | |
CN104656051B (en) | Remote monitoring and diagnosing method for electric energy metering device with good real-time performance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |