CN108960619A - A kind of continuous casting and rolling journey bloom production complete period information management system - Google Patents
A kind of continuous casting and rolling journey bloom production complete period information management system Download PDFInfo
- Publication number
- CN108960619A CN108960619A CN201810701852.1A CN201810701852A CN108960619A CN 108960619 A CN108960619 A CN 108960619A CN 201810701852 A CN201810701852 A CN 201810701852A CN 108960619 A CN108960619 A CN 108960619A
- Authority
- CN
- China
- Prior art keywords
- steel billet
- processed
- event
- information
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Control Of Metal Rolling (AREA)
Abstract
The invention discloses a kind of continuous casting and rolling journey bloom production complete period information management system, including automated system, steel billet information management system, industries process control system, creation data processing systems;The automated system for extracting the raw steel base information of steel billet to be processed from the steel billet information management system, and is transferred to the creation data processing system;The automated system is also used to read the current manufacturing parameter that the steel billet to be processed generates in production technology from the industries process control system, and the current manufacturing parameter is transferred to the creation data processing system;The creation data processing system, for the raw steel base information based on the steel billet to be processed, it is handled with the current manufacturing parameter, obtain the current steel billet information of the steel billet to be processed, and the current steel billet information of the steel billet to be processed is transferred to the steel billet information management system, it is updated with replacing the raw steel base information of the steel billet to be processed.
Description
Technical field
This application involves hot rolling technology technical field more particularly to a kind of continuous casting and rolling journey bloom production complete period message tubes
Reason system.
Background technique
Compared to traditional hot continuous rolling process, continuously casting and continuously rolling technology is by continuous casting, heating and the big process organic combination of tandem rolling three to one
In producing line, with low investment, land occupation is less, low energy consumption, lumber recovery is high, operating cost is low, and can produce biography by Endless Rolling Technology
Thin material, the very thin material that system hot continuous rolling process can not produce, realize " with the hot Dai Leng " of part description.But since producing line is whole
It closes, information of steel billet during continuous casting and rolling is among continuous variation, such as the specification of steel billet, length, temperature, weight
Deng.
And the specification of steel billet, length, temperature, weight information constantly change, for the pipe of steel billet whole life cycle
Reason is difficult to real-time tracing, if the data information in Production Scheduling System is not accurate enough, will lead to of material flow and information flow
With inconsistent, subsequent management and technique are influenced, it is often necessary to remove manual amendment's every terms of information, improve labour cost, reduce
Therefore how production efficiency, manages the actual information of steel billet and real-time update becomes technical problem urgently to be solved.
Summary of the invention
Invention provides a kind of continuous casting and rolling journey bloom production complete period information management systems, with solution or part
The matching for solving material flow and information flow is inconsistent thus the technical issues of reducing production efficiency.
In order to solve the above technical problems, the present invention provides a kind of continuous casting and rolling journey bloom production complete period information management systems
System, comprising: automated system, steel billet information management system, industries process control system, creation data processing system;
Wherein,
The automated system, the raw steel base for extracting steel billet to be processed from the steel billet information management system are believed
Breath, and it is transferred to the creation data processing system;
The automated system is also used to read the steel billet to be processed from the industries process control system and is producing
The current manufacturing parameter generated in technique, and the current manufacturing parameter is transferred to the creation data processing system;
The creation data processing system for the raw steel base information based on the steel billet to be processed and described works as previous existence
It produces parameter to be handled, obtains the current steel billet information of the steel billet to be processed, and by the current steel billet of the steel billet to be processed
Information is transferred to the steel billet information management system, is updated with replacing the raw steel base information of the steel billet to be processed.
Preferably, the automated system is also used to obtain the raw steel base letter of the steel billet to be processed from reading system
Breath, and the raw steel base information of the steel billet to be processed is transferred to the steel billet information management system and is stored;Wherein, the reading
System can be read and save the raw steel base information of the steel billet to be processed.
Preferably, the automated system, specifically includes:
Read module reads what the steel billet to be processed generated in production technology from the industries process control system
Current production procedure event;
Determining module, for determining the event category of the corresponding current production procedure event of the steel billet to be processed;
Module is obtained, for being based on the event category, the event class is obtained from the industries process control system
Not corresponding adjustment parameter;
Transmission module, for the corresponding adjustment parameter of the event category to be transferred to the creation data processing system.
Preferably, the event category includes at least: direct output event, technique adjustment event, production consumption event.
Preferably, when the event category is the direct output event,
The determining module is also used to determine the event class of the corresponding current production procedure event of the steel billet to be processed
It Wei not the direct output event;
The acquisition module obtains institute for being based on the direct output event from the industries process control system
State the first practical steel billet information of steel billet to be processed;
The transmission module, for the described first practical steel billet information to be transferred to the creation data processing system.
Preferably, the creation data processing system, for the described first practical steel billet information to be transferred to the steel billet
Information management system is updated with replacing the raw steel base information of the steel billet to be processed.
Preferably, when the event category is the technique adjustment event,
The determining module is also used to determine the event class of the corresponding current production procedure event of the steel billet to be processed
It Wei not the technique adjustment event;
The acquisition module obtains institute for being based on the technique adjustment event from the industries process control system
State the adjustment amount of steel billet to be processed;
The transmission module, for the adjustment amount of the steel billet to be processed to be transferred to the creation data processing system.
Preferably, the creation data processing system, for the adjustment amount using the steel billet to be processed to described wait locate
The raw steel base information of reason steel billet is adjusted, and obtains the second practical steel billet information of the steel billet to be processed, and by described second
Practical steel billet information is transferred to steel billet information management system, is updated with replacing the raw steel base information of the steel billet to be processed.
Preferably, when the event category is the production consumption event,
The determining module is also used to determine the event class of the corresponding current production procedure event of the steel billet to be processed
It Wei not the production consumption event;
The acquisition module obtains institute for being based on the technique adjustment event from the industries process control system
State the consumption of steel billet to be processed;
The transmission module, for the consumption of the steel billet to be processed to be transferred to the creation data processing system.
Preferably, the creation data processing system, for the consumption using the steel billet to be processed to described wait locate
The raw steel base information of reason steel billet is calculated, and obtains the practical steel billet information of third of the steel billet to be processed, and by the third
Practical steel billet information is transferred to steel billet information management system, is updated with replacing the raw steel base information of the steel billet to be processed.
One or more technical solution through the invention, the invention has the advantages that advantage:
The invention discloses a kind of continuous casting and rolling journey bloom production complete period information management systems, comprising: automated system,
Steel billet information management system, industries process control system, creation data processing system.Wherein, the automated system, for from
The raw steel base information of steel billet to be processed is extracted in the steel billet information management system, and is transferred to the creation data processing system
System.In addition, can also be read from the industries process control system steel billet to be processed generated in production technology it is current
Manufacturing parameter, and the current manufacturing parameter is transferred to the creation data processing system.And the creation data processing system
The raw steel base information then based on the steel billet to be processed of uniting and the current manufacturing parameter are handled, and are obtained described to be processed
The current steel billet information of steel billet.Since current manufacturing parameter is utilized, that is, the parameter in actual production process is to raw steel base
Information is handled, so current steel billet information can be obtained.The actual information of namely current steel billet, then will be described to be processed
The current steel billet information of steel billet is transferred to the steel billet information management system, to replace the raw steel base information of the steel billet to be processed
It is updated.Thereby, it is possible to guarantee that the steel billet information of steel billet information management system storage is exactly actual steel billet information, can solve
Certainly material flow and information flow match inconsistent problem, and then will not influence subsequent management and technique, can be improved production
Efficiency.
Detailed description of the invention
Fig. 1 is a kind of schematic diagram of continuous casting and rolling journey bloom production complete period information management system in the embodiment of the present invention.
Specific embodiment
In order to make the application the technical staff in the technical field be more clearly understood that the application, with reference to the accompanying drawing,
Technical scheme is described in detail by specific embodiment.
In embodiments of the present invention, a kind of continuous casting and rolling journey bloom production complete period information management system is disclosed, referring to
Fig. 1, comprising: automated system 11, steel billet information management system 12, industries process control system 13, creation data processing system
14。
This four systems cooperates, and the steel billet information that can guarantee that steel billet information management system 12 stores is exactly actual
Steel billet information, be able to solve material flow and information flow matches inconsistent problem, and then will not influence subsequent management and work
Skill can be improved production efficiency.
Specific description is looked at below.
The automated system 11, for extracting the raw steel of steel billet to be processed from the steel billet information management system 12
Base information, and it is transferred to the creation data processing system 14.
Specifically, automated system 11, for obtaining the raw steel base information of the steel billet to be processed from reading system,
And the raw steel base information of the steel billet to be processed is transferred to the steel billet information management system 12 and is stored.
Steel billet of the invention can be the steel billet of any specification.
Wherein, the reading system can be read and save the raw steel base information of the steel billet to be processed, further, be
After determining steel billet to be processed, the reading system can then obtain the raw steel base information of steel billet to be processed.
Automated system 11 can then read the raw steel base letter of the steel billet to be processed before production process from reading system
Breath is stored in steel billet information management system 12, as spare.Further, in the raw steel for needing to extract steel billet to be processed
After base information, then incoming creation data processing system 14 can be extracted from steel billet information management system 12 and is handled.
And in the production of steel billet to be processed, the automated system 11 is also used to from the industries process control system
The current manufacturing parameter that the steel billet to be processed generates in production technology is read in 13, and the current manufacturing parameter is transmitted
To the creation data processing system 14.
In the specific implementation process, the automated system 11, specifically includes:
Read module reads the steel billet to be processed from the industries process control system 13 and generates in production technology
Current production procedure event.
Determining module, for determining the event category of the corresponding current production procedure event of the steel billet to be processed.
Module is obtained, for being based on the event category, obtains the event from the industries process control system 13
The corresponding adjustment parameter of classification.Different event categories can generate different adjustment parameters.So for obtaining the specific of module
Effect, can be different according to the difference of adjustment parameter.
Transmission module, for the corresponding adjustment parameter of the event category to be transferred to the creation data processing system
14。
The creation data processing system 14, for raw steel base information based on the steel billet to be processed and described current
Manufacturing parameter is handled, and obtains the current steel billet information of the steel billet to be processed, and by the current steel of the steel billet to be processed
Base information is transferred to the steel billet information management system 12, is updated with replacing the raw steel base information of the steel billet to be processed.
The effect of creation data processing system 14 is the raw steel base information for the steel billet to be processed and described works as previous existence
It produces parameter and carries out calculation processing, obtain the practical steel billet information of steel billet to be processed, steel billet information management system 12 is then written.By
This, then can guarantee that information flow is consistent with the parameter actually flowed.
In the present embodiment, production procedure event is included at least there are many classification: direct output event, technique adjustment event,
Production consumption event.So being directed to different production procedure events, creation data processing system 14 has different treatment processes.
And for automated system 11, after obtaining production procedure event, corresponding adjustment parameter is transferred to creation data
Processing system 14.Specifically please refer to following implementation process.
When the event category is the direct output event,
The determining module is also used to determine the event class of the corresponding current production procedure event of the steel billet to be processed
It Wei not the direct output event;
The acquisition module is obtained from the industries process control system 13 for being based on the direct output event
The practical steel billet information of the first of the steel billet to be processed;
The transmission module, for the described first practical steel billet information to be transferred to the creation data processing system 14.
The creation data processing system 14, for the described first practical steel billet information to be transferred to the steel billet message tube
Reason system 12 is updated with replacing the raw steel base information of the steel billet to be processed.
Specifically, if bloom production event is " direct output event ", automated system 11 can be directly read at this time
The practical steel billet information of the first of steel billet is passed to creation data processing system 14, by creation data processing system 14 and raw steel base information
Comparison is made, update and steel billet information management system 12 is written.
As a kind of optional embodiment, when the event category is the technique adjustment event,
The determining module is also used to determine the event class of the corresponding current production procedure event of the steel billet to be processed
It Wei not the technique adjustment event;
The acquisition module is obtained from the industries process control system 13 for being based on the technique adjustment event
The adjustment amount of the steel billet to be processed;
The transmission module, for the adjustment amount of the steel billet to be processed to be transferred to the creation data processing system
14。
The creation data processing system 14, for the adjustment amount using the steel billet to be processed to the steel billet to be processed
Raw steel base information be adjusted, obtain the second practical steel billet information of the steel billet to be processed, and by the described second practical steel
Base information is transferred to steel billet information management system 12, is updated with replacing the raw steel base information of the steel billet to be processed.
Specifically, if bloom production flow events are " technique adjustment event ", automated system 11 was from producing
Adjustment amount, such as specification, weight, length are read in process control system 13, then are read out raw steel base information and be conveyed into production together
Process Control System 13.New slab information is calculated by industries process control system 13, updates and steel billet information management is written
System 12.
As a kind of optional embodiment, when the event category is the production consumption event,
The determining module is also used to determine the event class of the corresponding current production procedure event of the steel billet to be processed
It Wei not the production consumption event;
The acquisition module is obtained from the industries process control system 13 for being based on the technique adjustment event
The consumption of the steel billet to be processed;
The transmission module, for the consumption of the steel billet to be processed to be transferred to the creation data processing system
14。
The creation data processing system 14, for the consumption using the steel billet to be processed to the steel billet to be processed
Raw steel base information calculated, obtain the practical steel billet information of third of the steel billet to be processed, and by the practical steel of the third
Base information is transferred to steel billet information management system 12, is updated with replacing the raw steel base information of the steel billet to be processed.
Specifically, if bloom production flow events to be processed are " production consumption ", production process system judges it
Whether there is production consumption, if any consumption, reads the steel billet information in the steel billet information management system 12 having been written into first, then read
Consumption caused by due to cutting or roll, is transmitted to creation data processing system 14, by creation data processing system 14 together
New slab information and lumber recovery (the namely practical steel billet information of third) are calculated, production management system and more is ultimately written
Newly.
As a kind of optional embodiment, current steel billet information is being transferred to steel billet information management system 12, with replacement
After the raw steel base information of the steel billet to be processed is updated, input update date can be also corresponded to check.
Further, creation data processing system 14, can also core after the current steel billet information for obtaining steel billet to be processed
Whether the current steel billet information of steel billet to be processed is accurate in fact.
During verification, pre-determined target steel billet information is obtained first.Target steel billet information is steel to be processed
Conditional information to be achieved is needed after base processing.Then the current steel billet information of steel billet to be processed and target steel billet information are carried out
Comparison, if error is in preset range, means that the accurate of current steel billet information.Otherwise, generation error report is transferred to certainly
Dynamicization system 11 and production management system.
As a kind of optional embodiment, a kind of current steel that also there is mode of the embodiment of the present invention to verify steel billet to be processed
Base information it is whether accurate.
Specifically, creation data processing system 14 can be calculated according to the raw steel base information and adjustment parameter of steel billet to be processed
A reference information out;Then the current steel billet information and reference information of steel billet to be processed are compared, if error is in pre-
If in range, meaning that the accurate of current steel billet information.Otherwise, generation error report is transferred to automated system 11, and production
Management system.
It is the implementation process of the embodiment of the present invention above, is cooperated by aforementioned four system, can guarantees steel billet
The steel billet information of information management system storage is exactly actual steel billet information, and the matching for being able to solve material flow and information flow is different
The problem of cause, and then will not influence subsequent management and technique, it can be improved production efficiency.
Although the preferred embodiment of the application has been described, but one of ordinary skilled in the art once knows substantially
Creative concept, then additional changes and modifications may be made to these embodiments.It is wrapped so the following claims are intended to be interpreted as
It includes preferred embodiment and falls into all change and modification of the application range.
Obviously, those skilled in the art can carry out various modification and variations without departing from the essence of the application to the application
Mind and range.In this way, if these modifications and variations of the application belong to the range of the claim of this application and its equivalent technologies
Within, then the application is also intended to include these modifications and variations.
Claims (10)
1. a kind of continuous casting and rolling journey bloom production complete period information management system characterized by comprising automated system, steel
Base information management system, industries process control system, creation data processing system;
Wherein,
The automated system, for extracting the raw steel base information of steel billet to be processed from the steel billet information management system,
And it is transferred to the creation data processing system;
The automated system is also used to read the steel billet to be processed from the industries process control system in production technology
The current manufacturing parameter of middle generation, and the current manufacturing parameter is transferred to the creation data processing system;
The creation data processing system, for raw steel base information and the current production ginseng based on the steel billet to be processed
Number is handled, and obtains the current steel billet information of the steel billet to be processed, and by the current steel billet information of the steel billet to be processed
It is transferred to the steel billet information management system, is updated with replacing the raw steel base information of the steel billet to be processed.
2. a kind of continuous casting and rolling journey bloom production complete period information management system as described in claim 1, which is characterized in that institute
Automated system is stated, is also used to obtain the raw steel base information of the steel billet to be processed from reading system, and will be described to be processed
The raw steel base information of steel billet is transferred to the steel billet information management system storage;Wherein, the reading system can be read and save
The raw steel base information of the steel billet to be processed.
3. a kind of continuous casting and rolling journey bloom production complete period information management system as described in claim 1, which is characterized in that institute
Automated system is stated, is specifically included:
Read module, read from the industries process control system steel billet to be processed generated in production technology it is current
Production procedure event;
Determining module, for determining the event category of the corresponding current production procedure event of the steel billet to be processed;
Module is obtained, for being based on the event category, the event category pair is obtained from the industries process control system
The adjustment parameter answered;
Transmission module, for the corresponding adjustment parameter of the event category to be transferred to the creation data processing system.
4. a kind of continuous casting and rolling journey bloom production complete period information management system as claimed in claim 3, which is characterized in that institute
It states event category to include at least: direct output event, technique adjustment event, production consumption event.
5. a kind of continuous casting and rolling journey bloom production complete period information management system as claimed in claim 4, which is characterized in that when
When the event category is the direct output event,
The determining module is also used to determine that the event category of the corresponding current production procedure event of the steel billet to be processed is
The direct output event;
The acquisition module, for being based on the direct output event, obtained from the industries process control system it is described to
Handle the first practical steel billet information of steel billet;
The transmission module, for the described first practical steel billet information to be transferred to the creation data processing system.
6. a kind of continuous casting and rolling journey bloom production complete period information management system as claimed in claim 5, which is characterized in that institute
Creation data processing system is stated, for the described first practical steel billet information to be transferred to the steel billet information management system, to replace
The raw steel base information for changing the steel billet to be processed is updated.
7. a kind of continuous casting and rolling journey bloom production complete period information management system as claimed in claim 4, which is characterized in that when
When the event category is the technique adjustment event,
The determining module is also used to determine that the event category of the corresponding current production procedure event of the steel billet to be processed is
The technique adjustment event;
The acquisition module, for being based on the technique adjustment event, obtained from the industries process control system it is described to
Handle the adjustment amount of steel billet;
The transmission module, for the adjustment amount of the steel billet to be processed to be transferred to the creation data processing system.
8. a kind of continuous casting and rolling journey bloom production complete period information management system as claimed in claim 7, which is characterized in that
The creation data processing system, for the adjustment amount using the steel billet to be processed to the raw steel of the steel billet to be processed
Base information is adjusted, and obtains the second practical steel billet information of the steel billet to be processed, and by the described second practical steel billet information
It is transferred to steel billet information management system, is updated with replacing the raw steel base information of the steel billet to be processed.
9. a kind of continuous casting and rolling journey bloom production complete period information management system as claimed in claim 4, which is characterized in that
When the event category is the production consumption event,
The determining module is also used to determine that the event category of the corresponding current production procedure event of the steel billet to be processed is
The production consumption event;
The acquisition module, for being based on the technique adjustment event, obtained from the industries process control system it is described to
Handle the consumption of steel billet;
The transmission module, for the consumption of the steel billet to be processed to be transferred to the creation data processing system.
10. a kind of continuous casting and rolling journey bloom production complete period information management system as claimed in claim 9, which is characterized in that
The creation data processing system, for the consumption using the steel billet to be processed to the raw steel of the steel billet to be processed
Base information is calculated, and obtains the practical steel billet information of third of the steel billet to be processed, and by the practical steel billet information of the third
It is transferred to steel billet information management system, is updated with replacing the raw steel base information of the steel billet to be processed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810701852.1A CN108960619A (en) | 2018-06-30 | 2018-06-30 | A kind of continuous casting and rolling journey bloom production complete period information management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810701852.1A CN108960619A (en) | 2018-06-30 | 2018-06-30 | A kind of continuous casting and rolling journey bloom production complete period information management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108960619A true CN108960619A (en) | 2018-12-07 |
Family
ID=64484288
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810701852.1A Pending CN108960619A (en) | 2018-06-30 | 2018-06-30 | A kind of continuous casting and rolling journey bloom production complete period information management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108960619A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109978368A (en) * | 2019-03-22 | 2019-07-05 | 刘童童 | A kind of continuous casting and rolling journey bloom production complete period information management system |
CN110633908A (en) * | 2019-09-18 | 2019-12-31 | 工业云制造(四川)创新中心有限公司 | Product production full-period control method, system, storage medium and terminal |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102495900A (en) * | 2011-12-15 | 2012-06-13 | 武汉钢铁(集团)公司 | Slab production data processing method |
CN107042234A (en) * | 2017-03-15 | 2017-08-15 | 中冶华天工程技术有限公司 | The intelligent production line and production method gathered based on bar whole process big data |
-
2018
- 2018-06-30 CN CN201810701852.1A patent/CN108960619A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102495900A (en) * | 2011-12-15 | 2012-06-13 | 武汉钢铁(集团)公司 | Slab production data processing method |
CN107042234A (en) * | 2017-03-15 | 2017-08-15 | 中冶华天工程技术有限公司 | The intelligent production line and production method gathered based on bar whole process big data |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109978368A (en) * | 2019-03-22 | 2019-07-05 | 刘童童 | A kind of continuous casting and rolling journey bloom production complete period information management system |
CN109978368B (en) * | 2019-03-22 | 2021-07-27 | 浙江隆泰钢业有限公司 | Continuous casting and rolling process billet production full-period information management system |
CN110633908A (en) * | 2019-09-18 | 2019-12-31 | 工业云制造(四川)创新中心有限公司 | Product production full-period control method, system, storage medium and terminal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108960619A (en) | A kind of continuous casting and rolling journey bloom production complete period information management system | |
CN106773682B (en) | The glass furnace bottom of pond temperature intelligent forecast Control Algorithm being dynamically determined based on time lag | |
WO2012126177A3 (en) | Method and apparatus for reading data from database | |
WO2004074954A3 (en) | Apparatus and method for open network-based data acquisition using xml | |
EA201190228A1 (en) | METHOD OF ESTABLISHING A SUPPORT SYSTEM FOR DECISION-MAKING FOR THE PROCESS | |
CN103632214A (en) | Maintenance and spare part supply combined optimization method for use in absence of inventory degradation data | |
JP2010097506A (en) | Schedule preparation system, schedule preparation method and schedule preparation program | |
CN108921232B (en) | Hot-rolled strip steel cooling historical data clustering and similarity measuring method | |
CN103778486A (en) | Power distribution network load predication method | |
CN107239548B (en) | Report processing method based on SQL Server and HIVE | |
CN114817178A (en) | Industrial Internet data storage method, system, storage medium and electronic equipment | |
CN111325487A (en) | Intelligent scheduling optimization method and system for flow production workshop | |
CN110751418A (en) | Load section coal-fired boiler coal blending and burning scheme generation method and system | |
CN104252470A (en) | Recommendation method and recommendation system of hot word | |
CN109726237A (en) | A kind of association complementing method for multichannel real-time streaming data | |
CN109680613B (en) | Simply supported variable structure continuous bridge construction monitoring method | |
CN106269894B (en) | A kind of control method of continuous casting predetermined slab plan automatically | |
CN104102849B (en) | Method for calculating downtime of hot continuous rolling production process | |
CN104690197A (en) | Forging method for improving flaw detection quality of roll neck blank of cold roll | |
CN107506403B (en) | Gridding information system and data synchronous changing method | |
Huang et al. | Single machine scheduling with consideration of preventive maintenance and machine health | |
CN107016510A (en) | One kind research and development intermediate item life cycle management system | |
CN106596905B (en) | Glass metal quality intelligent forecasting procedure based on Multiscale Fusion ANFIS | |
CN110722001A (en) | Method for improving product quality by using hot rolling codes in hot continuous rolling | |
CN117852839B (en) | Production efficiency regulation and control method, equipment and medium for medical glass bottle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181207 |