CN108958149A - A kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system - Google Patents

A kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system Download PDF

Info

Publication number
CN108958149A
CN108958149A CN201810945607.5A CN201810945607A CN108958149A CN 108958149 A CN108958149 A CN 108958149A CN 201810945607 A CN201810945607 A CN 201810945607A CN 108958149 A CN108958149 A CN 108958149A
Authority
CN
China
Prior art keywords
monitoring
monitoring system
gantry crane
wind
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810945607.5A
Other languages
Chinese (zh)
Inventor
聂郭飞扬
沈毅祥
高钰敏
张艳波
曹志勇
谢邦天
李永红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MICRO TECHNOLOGY Co Ltd
Original Assignee
MICRO TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MICRO TECHNOLOGY Co Ltd filed Critical MICRO TECHNOLOGY Co Ltd
Priority to CN201810945607.5A priority Critical patent/CN108958149A/en
Publication of CN108958149A publication Critical patent/CN108958149A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/048Monitoring; Safety
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B19/00Alarms responsive to two or more different undesired or abnormal conditions, e.g. burglary and fire, abnormal temperature and abnormal rate of flow
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention proposes a kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system, including monitor terminal, for receiving monitoring host computer signal, handles signal data, issues point inspection demand according to manager works, equipment is made to return to key state;Monitoring host computer, independently of operation safety monitoring system outside, for receive monitor terminal instruction with wake-up master, independent read sensing data and by data back to management server;Signal acquisition terminal, including video signal collection device parallel with one another, door machine main power source power supply state sensor, intrusion-detection sensor, air monitoring sensor, wind-proof iron wedge sensors in place and rail clamping device sensors in place and redundancy access port;Power supply system is powered for entire monitoring system;Signal acquisition terminal, monitoring host computer and monitor terminal successively use signal communication to connect.The present invention meets requirement of the modernization production safety management to safety monitoring equipment, saves manpower, improves efficiency, saves the time, guarantee safe production.

Description

A kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system
Technical field
The present invention relates to security monitoring field more particularly to a kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring systems.
Background technique
Transformation Plan of Gantry Crane is the important equipment of water conservancy projects, is widely used in reservoir, the massive water projects such as power station, peace Full monitoring is a very important job.One work characteristics of Transformation Plan of Gantry Crane is that break time is long, because of water project operation Time response, Transformation Plan of Gantry Crane may shut down for a long time after having executed a task, at even 2 months or longer 1 month Between without task, be in shutdown status.Equipment can not exist automatically in fully powered-off state, existing equipment under shutdown status Down period feeds back status of equipment, even with telesecurity monitoring system, it is still necessary to which the personnel of arranging work go to set Standby to obtain status of equipment in open state, this process is not only that power transmission of operating a switch sends someone more to have in management by switch One requirements of process is walked, and switching on and shutting down cannot be checked at any time.It is even more impossible to react due to accident occur during equipment downtime it is certain Change and leads to accident.
Currently without the stop safe monitoring system that suitable Transformation Plan of Gantry Crane uses, be one of System of Safe Production Management not The region of the equipment that is automated covering, solution in the industry is using human inspection at present.Major defect is labor intensive, by One investigation polling rate is slow, meets emergency-response not in time, happen suddenly bad weather when, such as once there is rail clamping device or anti- It will be major safety risks in the case that wind iron wedge is not in place.
Similar technology has monitoring remote video and Transformation Plan of Gantry Crane operation safety monitoring system.
Video security monitoring, effect are mainly reflected in video information, can not obtain equipment operation information.
The available facility information of operation safety monitoring system, but its operating condition be door machine power, and start after. Long-distance management system can only also receive the whether online information of equipment, close whether later state meets always peace for equipment Full specification has no help.And current safety monitoring system is unable to Remote Wake Up, even if powering to door machine, still needs on driver Vehicle, which carries out starting, could be transmitted to parameter on backstage.
Such as wind-proof iron wedge, it shuts down wind-proof iron wedge is inserted into designated position as required for a long time, once because Various accidents in place, encounter 7 grades or more strong wind, it is possible to coaster major accident occur not when having an effect.Cause This, need safety monitoring system can setting in emergency circumstances, actively start warning message to manager.In emergency situations Under, manager wants the key message that can be quickly obtained all devices.
Summary of the invention
The purpose of the invention is to overcome the deficiencies of the prior art and provide a kind of uninterrupted Transformation Plan of Gantry Crane telesecurity Monitoring system, meets informationization, and automation requires increasing modernization production safety management to want safety monitoring equipment It asks, fills up the no-man's-land of hydropower industry Transformation Plan of Gantry Crane safety monitoring system, save manpower, improve efficiency, save the time, ensure Safety in production.
The present invention is achieved through the following technical solutions:
A kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system, including
Monitor terminal handles signal data, issues point inspection need according to manager works for receiving monitoring host computer signal It asks, equipment is made to return to key state;
Monitoring host computer, independently of operation safety monitoring system outside, for receive monitor terminal instruction with wake-up master, independence It reads the sensing data installed in door machine and sensing data is passed back into management server;
Signal acquisition terminal, including video signal collection device parallel with one another, door machine main power source power supply state sensor, invasion Detection sensor, air monitoring sensor, wind-proof iron wedge sensors in place and rail clamping device sensors in place and redundancy access port;
Power supply system is powered for entire monitoring system, the connection line being additionally provided between monitored device;
Signal acquisition terminal, monitoring host computer and monitor terminal successively use signal communication to connect.
Preferably, the monitoring host computer includes that processor, power supply module, on-off model input module and network connect Mouthful.
Preferably, the door machine main power source power supply state sensor and intrusion-detection sensor monitoring mode be not between It is disconnected.
Preferably, the wind-proof iron wedge sensors in place and rail clamping device sensors in place monitoring mode be periodic monitoring or Monitoring on demand.
Preferably, the power supply system includes that the photovoltaic generating system of setting and dam crest and photovoltaic generating system cooperate Wind power generating set, the battery group and programmable controller for electricity storage used, the setting of wind speed measurement sensor In wind power generating set;Programmable controller is used for control system charge/discharge, monitors photovoltaic power generation and wind-power electricity generation power, According to wind-power electricity generation power output switching value as windbreak early warning signal.
Of the invention is advantageous in that compared with the existing technology:
1, be angle from safety management, provide the shutdown of door machine host, for being electrically cut off in the case where, it is uninterrupted to supervise The method for controlling door mechanism system necessity state, has the characteristics of low-power consumption.To reach this purpose, this system host is used with lower section Formula saves electric power: 1) cancelling analog quantity monitoring, only (may be regarded as the switch frequently switched on to necessary status switch amount and pulse form Amount) sensor progress data acquisition;2) using can awakening technology, be that monitoring host computer keeps suspend mode under no task status, save Electric power.
2, video detection, during undertaking shutdown, door machine sensitizing range two kinds of exclusive detections that this system includes: 1) are invaded (predominantly driver's cabin, a small number of demands are the other positions of user's concern, can adjust installation number and position according to actual needs) Unauthorized personnel's intrusion detection, prevents accident;2) main power source is for electro-detection, and during preventing shutdown, host, which is surprisingly powered, to be drawn Send out safety accident.
3, monitoring host computer can complete monitor and alarm task, and can when no task suspend mode with energy saving, Reduce cost of electricity-generating.During shutdown, the prerequisite three kinds of wake-up modes of safety monitoring system, network remote is waken up, alarm signal Number wake up, timing wake-up.
4, it does strong wind early warning using wind-driven generator to detect, current wind-driven generator full power power generating wind is generally 6 Between~7 grades, require 7 grades of strong wind of warning line very close with door machine radix saposhnikoviae, using programmable electricity generating controller to wind-power electricity generation The generated output of machine is detected, and generated output is more than that the i.e. triggering strong wind state of warning line wakes up monitoring host computer, then leads to It crosses the collected more accurate data of anemobiagraph and is transmitted to rear prompting gale warning.Benefit is without uninterruptedly to anemobiagraph It powers to monitor wind speed, saves system energy, further save the cost of electricity-generating of system.
Detailed description of the invention
Fig. 1 is a kind of composition schematic diagram of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system in the embodiment of the present invention.
Fig. 2 is a kind of structure of monitoring host computer in uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system in the embodiment of the present invention At schematic diagram.
Fig. 3 is a kind of structure of power supply system in uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system in the embodiment of the present invention At schematic diagram.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
As shown in Figure 1, the present invention is the safety to solve to design the security monitoring demand during Transformation Plan of Gantry Crane shutdown Monitoring system mainly includes following part:
Programmable monitoring host computer has low-power consumption, remotely calls out independently of the unique host outside operation safety monitoring system It wakes up and sensor alarm wakes up, the functions such as timing wake-up receive remote command wake-up master for key sensor data back To remote side administration equipment, the sensing data installed in door machine can be independently read;Electric power is saved in suspend mode when no demand, for administrator Member checks at any time, includes consisting of part: 1) processor;2) power supply module;3) on-off model input module;4) network connects Mouthful.
For Monitoring Design Scheme by the cooperation long-term with vast actual use unit, exchange and practical safety accident case are total Knot is specifically provided with following signal acquisition terminal comprising five basic detections of stop safe monitoring and certain scalability:
Door machine main power source power supply state sensor, effect be monitoring door machine whether the case where not being connected to dispatch command meaning Outer power supply may cause surprisingly, and monitoring mode is uninterrupted;
Intrusion-detection sensor, using with intrusion detection, the camera of alarm signal output function detects that range enters It invades alarm signal wake-up master i.e., management server can be sent by alarm by host, alarm and vision signal are sent To specified manager terminal;
Vision signal uses universal camera shooting head, is directly accessed network, monitoring mode is uninterrupted;
Air monitoring, it is again uninterrupted that anemobiagraph (can share with other systems) reaches i.e. power saving in conjunction with wind generator system Monitoring effect;
Wind-proof iron wedge sensors in place (can share), periodic detection or press backstage demand;
Rail clamping device sensors in place (can share), periodic detection or press backstage demand;
Certain redundancy access port is additionally provided with for adding the status signal that other managers wish to know.
As shown in Fig. 2, power supply system is used for the company being additionally provided between monitored device to the power supply of entire monitoring system Link, temporary power when for wake-up device;It comprises the following structure:
1) photovoltaic power generation plate, using the enormousness of Transformation Plan of Gantry Crane, for dam crest without hiding without gear, light condition is convenient, and light is arranged Photovoltaic generating system;
2) small-sized wind power generator group cooperates small-size wind power-generating according to the more rich feature of rivers water surface wind resource Unit is formed complementary with photovoltaic power generation;
3) programmable controller, charge control, control system charge and discharge monitor photovoltaic power generation and wind-power electricity generation power, root According to the exportable switching value of wind-power electricity generation power as windbreak early warning signal;
4) large-capacity battery group is stored for electric power.
Monitor terminal includes monitoring software and management server: receiving monitoring host computer alarm, video data is handled, according to pipe Reason personnel, which operate, issues point inspection demand, returns to key state, can also decide whether alarm and video being sent to management according to setting Person's personal data terminal (mobile phone, other office computers etc.).
By above each section, when Transformation Plan of Gantry Crane is shut down according to safety requirement must be in place information can pass at any time The safe condition of administrative staff, monitoring include but is not limited to: rail clamping device state, wind-proof iron wedge state, cab door switch state, The on off operating mode of main power source during shutdown, personnel activity's state in drivers' cab, door machine stop place and strong wind alarming are in host Power-off still can be transmitted during shutting down and give remote side administration personnel.
Described is only presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within principle.

Claims (6)

1. a kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system, including
Monitor terminal, for receiving monitoring host computer signal, processing signal data issues a point inspection demand according to manager works, Equipment is set to return to key state;
Monitoring host computer, independently of operation safety monitoring system outside, for receive monitor terminal instruction with wake-up master, independent read Sensing data is simultaneously passed back to management server by the sensing data installed in door machine;
Signal acquisition terminal, including video signal collection device parallel with one another, door machine main power source power supply state sensor, intrusion detection Sensor, air monitoring sensor, wind-proof iron wedge sensors in place and rail clamping device sensors in place and redundancy access port;
Power supply system is powered for entire monitoring system, the connection line being additionally provided between monitored device;
Signal acquisition terminal, monitoring host computer and monitor terminal successively use signal communication to connect.
2. a kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system as described in claim 1, which is characterized in that the monitoring Host includes processor, power supply module, on-off model input module and network interface.
3. a kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system as described in claim 1, which is characterized in that the door machine Main power source power supply state sensor and intrusion-detection sensor monitoring mode are uninterrupted.
4. a kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system as described in claim 1, which is characterized in that the radix saposhnikoviae Iron wedge sensors in place and rail clamping device sensors in place monitoring mode are periodic monitoring or monitoring on demand.
5. a kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system as described in claim 1, which is characterized in that the power supply System includes being arranged with the photovoltaic generating system of dam crest, the wind power generating set being used cooperatively with photovoltaic generating system, for electricity The battery group and programmable controller, wind speed measurement sensor of power storage are set in wind power generating set;Programmable control Device processed is used for control system charge/discharge, photovoltaic power generation and wind-power electricity generation power is monitored, according to wind-power electricity generation power output switching value As windbreak early warning signal.
6. a kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system as described in claim 1, which is characterized in that the monitoring Terminal can be with manager's personal terminal data interchange.
CN201810945607.5A 2018-08-20 2018-08-20 A kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system Pending CN108958149A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810945607.5A CN108958149A (en) 2018-08-20 2018-08-20 A kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810945607.5A CN108958149A (en) 2018-08-20 2018-08-20 A kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system

Publications (1)

Publication Number Publication Date
CN108958149A true CN108958149A (en) 2018-12-07

Family

ID=64470773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810945607.5A Pending CN108958149A (en) 2018-08-20 2018-08-20 A kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system

Country Status (1)

Country Link
CN (1) CN108958149A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101051222A (en) * 2007-05-10 2007-10-10 武汉立方科技有限公司 Low power wireless gate controller
CN102572387A (en) * 2011-07-27 2012-07-11 河海大学 Wireless-network-based water gate security monitoring system
CN102917202A (en) * 2011-08-04 2013-02-06 苏州微体电子科技有限公司 Sluice safety monitoring system based on wireless network
KR101339918B1 (en) * 2013-04-05 2014-01-03 에스엠소프트웨어 (주) Integration management system able to predicting and deciding time of salt-gathering
CN105484211A (en) * 2016-01-13 2016-04-13 宜昌市创星电子技术发展有限公司 Safety monitoring and management system for gantry crane
CN206100314U (en) * 2016-10-17 2017-04-12 杨小平 Computer and video remote monitoring system for water conservancy and hydropower hub gate
CN206752424U (en) * 2017-04-21 2017-12-15 衢州智博工业自动化科技有限公司 A kind of water conservancy gate remote monitoring hydraulic test system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101051222A (en) * 2007-05-10 2007-10-10 武汉立方科技有限公司 Low power wireless gate controller
CN102572387A (en) * 2011-07-27 2012-07-11 河海大学 Wireless-network-based water gate security monitoring system
CN102917202A (en) * 2011-08-04 2013-02-06 苏州微体电子科技有限公司 Sluice safety monitoring system based on wireless network
KR101339918B1 (en) * 2013-04-05 2014-01-03 에스엠소프트웨어 (주) Integration management system able to predicting and deciding time of salt-gathering
CN105484211A (en) * 2016-01-13 2016-04-13 宜昌市创星电子技术发展有限公司 Safety monitoring and management system for gantry crane
CN206100314U (en) * 2016-10-17 2017-04-12 杨小平 Computer and video remote monitoring system for water conservancy and hydropower hub gate
CN206752424U (en) * 2017-04-21 2017-12-15 衢州智博工业自动化科技有限公司 A kind of water conservancy gate remote monitoring hydraulic test system

Similar Documents

Publication Publication Date Title
CN201174049Y (en) Remote intelligent management apparatus for digging machine
CN201181322Y (en) Electric network fault remote intelligent monitoring device
CN101841187B (en) Power management power supply system for electronic electric energy meter
CN201276024Y (en) Auxiliary control unit of power distributed motor train unit
CN207311151U (en) A kind of vehicle monitoring system
CN209676004U (en) A kind of the wireless monitor detector and system of electric line safe operation
CN218767870U (en) Mobile operation monitoring system based on edge calculation
CN108495286A (en) A kind of system for realizing seamless railway rail status monitoring master control set low-power consumption
CN206665915U (en) A kind of elevator operation monitoring system
CN104065727A (en) Network wake-up method of vehicle-borne terminal and vehicle-borne terminal
CN203573191U (en) PLC control system taking fuel cell as base station communication power supply
CN201498990U (en) Source-side power-saving network control system
CN201127087Y (en) Transmission line anti-damage intelligent prewarning wireless video monitoring system
CN209248304U (en) A kind of SCM Based substation's remote intelligent monitoring system
CN206471441U (en) The low-power consumption BMS that a kind of band communication wakes up
CN102593947B (en) A kind of EMUs tackle the have a power failure processing system with lightning fault and method
CN108958149A (en) A kind of uninterrupted Transformation Plan of Gantry Crane telesecurity monitoring system
CN106685076A (en) Low voltage power failure alarm management system and chopping signal acquisition equipment
CN217442600U (en) Remote transmission's multi-parameter bridge monitor
CN201438309U (en) Fingerprint verification equipment with sensing and fingerprint-acquiring functions
CN211773905U (en) Low-power consumption simple and easy general type cable well lid monitoring devices
CN203165237U (en) Solar energy electronic display stop
CN210442674U (en) Automatic early warning device of thermal power plant
CN201118853Y (en) A device for providing video monitoring device with uninterrupted power
CN102445936B (en) Method for carrying out remote management on batteries

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207