CN108957232A - A kind of distribution net work earthing fault detection processing and its operating method - Google Patents

A kind of distribution net work earthing fault detection processing and its operating method Download PDF

Info

Publication number
CN108957232A
CN108957232A CN201810790354.9A CN201810790354A CN108957232A CN 108957232 A CN108957232 A CN 108957232A CN 201810790354 A CN201810790354 A CN 201810790354A CN 108957232 A CN108957232 A CN 108957232A
Authority
CN
China
Prior art keywords
electrically connected
output end
transmitting terminal
control cabinet
gps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810790354.9A
Other languages
Chinese (zh)
Inventor
马浩程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Xinrong Fang Technology Co Ltd
Original Assignee
Hangzhou Xinrong Fang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Xinrong Fang Technology Co Ltd filed Critical Hangzhou Xinrong Fang Technology Co Ltd
Priority to CN201810790354.9A priority Critical patent/CN108957232A/en
Publication of CN108957232A publication Critical patent/CN108957232A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H1/00Details of emergency protective circuit arrangements
    • H02H1/0061Details of emergency protective circuit arrangements concerning transmission of signals
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Locating Faults (AREA)

Abstract

The present invention relates to power distribution network technical field of safety protection equipment, and disclose a kind of distribution net work earthing fault detection processing and its operating method, including detection case and failure induction system, the bottom surface of the detection box cavity is fixedly installed with control cabinet, the left and right sides of the control cabinet pass through cable respectively and are electrically connected with electric pressure converter and current converter, the another side of the current converter and electric pressure converter is electrically connected with support plate, and the other end of the support plate extends to the outside of detection case and is fixedly installed with GPS signal transmitting terminal.The distribution net work earthing fault detection processing and its operating method, it is cooperated by setting GPS and GPS signal transmitting terminal, it ensure that the stabilization of information transmitting, it avoids one-phase earthing failure in electric distribution network position and is located under complex environment and be difficult to the problem of passing fault message, it ensure that the stabilization of information transmission significantly, subsequent maintenance is facilitated, the practicability of this method is significantly increased.

Description

A kind of distribution net work earthing fault detection processing and its operating method
Technical field
The present invention relates to power distribution network technical field of safety protection equipment, specially a kind of distribution net work earthing fault detection processing And its operating method.
Background technique
Power distribution network, which refers to from power transmission network or regional power plant, receives electric energy, distribute or is pressed on the spot by distribution facility voltage by Grade distributes to the power network of all types of user, is by overhead transmission line, cable, shaft tower, distribution transformer, disconnecting switch, reactive compensation The compositions such as device and some affiliated facilities, the network of important distribution electric energy effect is played in power network.
With being continuously increased for power distribution network cable run, once power distribution network single-phase earthing breaks down, due to power distribution network point Cloth is extensive, and the either determination of abort situation or subsequent detection is all very difficult, at present to singlephase earth fault fault point Localization method be broadly divided into two classes, active localization method and passive type localization method, active Fault Locating Method be Signal specific is injected to system after line failure, failure point is determined by the distribution of detection institute's Injection Signal in systems Set, passive type Fault Locating Method be then using the feature of voltage and current signal produced by failure itself, Design Orientation algorithm, It determines position of failure point, either active localization method or passive type localization method, is directly transmitted using signal, face To the power distribution network environment in complicated geographical location, it is frequently present of the problem of lacking signal, it is extremely difficult to guarantee that fault-signal accurately transmits It goes out, the failure for causing power distribution network single-phase earthing to occur is difficult to quickly be found and repaired, therefore needs to design a kind of efficient Distribution net work earthing fault detection and its operating method.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of distribution net work earthing fault detection processing and its operating method, tools The advantages that standby detection fast and stable and failed transmission signal efficiently and accurately, solves either active localization method or passive Formula localization method is directly transmitted using signal, and the power distribution network environment in face of complicated geographical location is frequently present of shortage signal The problem of, it is extremely difficult to guarantee that fault-signal accurately transfers out, the failure for causing power distribution network single-phase earthing to occur is difficult to quick It was found that and repair the problem of.
(2) technical solution
To realize above-mentioned detection fast and stable and failed transmission signal efficiently and accurately purpose, the invention provides the following technical scheme: A kind of distribution net work earthing fault detection processing and its operating method, including detection case and failure induction system, in the detection case The bottom surface of chamber is fixedly installed with control cabinet, and the left and right sides of the control cabinet pass through cable respectively and are electrically connected with voltage turn The another side of parallel operation and current converter, the current converter and electric pressure converter is electrically connected with support plate, described The other end of support plate extends to the outside of detection case and is fixedly installed with GPS signal transmitting terminal, the top electricity of the control cabinet Property is connected with stabiliser bar, and the both ends of the stabiliser bar are electrically connected with conducting wire, and the conducting wire extends to the outside of detection case, institute The first resistor silk of stabiliser bar being externally wrapped on the left of control cabinet is stated, being externally wrapped with for the stabiliser bar is located at control Second resistance silk on the right side of case.
The output end signal of the failure induction system is connected with satellite failure signal data receiving unit, the satellite event The output end of barrier signal data receiving unit is electrically connected with satellite data transmitting terminal, the output end of the satellite data transmitting terminal Signal is connected with ground power grid maintenance system receiving end, and the output end of the ground power grid maintenance system receiving end is electrically connected with The output end signal of ground power grid maintenance system transmitting terminal, the ground power grid maintenance system transmitting terminal is connected with communication apparatus.
Preferably, the communication apparatus includes central processing unit, and the output end and input terminal of the central processing unit are electric Property be connected with speech communication unit, image information receiving end and text information receiving end, the output end electricity of the central processing unit Property is connected with data display screen.
Preferably, the failure induction system includes control cabinet, and the output end of the control cabinet electrically has current converter And electric pressure converter, the current converter, the output end of the control switch are electrically connected with a GPS, a GPS Output end and the input terminal of GPS signal transmitting terminal be electrically connected, the output end of the electric pressure converter opens with another control The input terminal of pass is electrically connected, and the output end of another control switch and the input terminal of another GPS are electrically connected, another The output end of a GPS and another described GPS signal transmitting terminal are electrically connected, the output end of the GPS signal transmitting terminal It is electrically connected with satellite failure signal data receiving unit.
Preferably, the front of the control cabinet is fixedly installed with observing apparatus, and the bottom of the control cabinet is fixedly installed with Positioned at the pedestal of detection case inner chamber bottom surface.
Preferably, operating method is as follows, comprising the following steps:
Step 1: two stabiliser bars to be mounted on to any two sides of power distribution network earthing position first, then it will test case and be embedded in and match Near power grid earthing position;
Step 2: when power distribution network earthing position damages, according to the variation of connecting position of wires electric current, so that first resistor silk Shift voltage appearance more becomes, so that control cabinet receives the data that stabiliser bar transmits, to influence current converter according to variation Or electric pressure converter, then its internal control switch is opened by current converter or electric pressure converter, so that GPS transmitting letter Number, then fault location information is transferred to by satellite failure signal data receiving unit by GPS signal transmitting terminal;
Step 3: according to the received data information of satellite failure signal data receiving unit, satellite data transmitting terminal is by fault bit Confidence breath is transferred to ground power grid maintenance system receiving end, allows ground power grid maintenance system transmitting terminal by fault bit confidence Breath passes to communication apparatus;
Step 4: maintenance personal according on communication apparatus on data display screen pass through speech communication unit, image information receiving end With the received information in text information receiving end, breakdown maintenance place is rushed to, processing is repaired to the failure at power distribution network ground connection.
Preferably, the model MQACH-A of the central processing unit, the ground power grid maintenance system receiving end receives letter Breath passes through warning lamp figure operating personnel.
Preferably, the inside of the current converter and electric pressure converter is equipped with Separation control device, and Separation control Device and the input terminal of control switch are electrically connected.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of distribution net work earthing fault detection processing and its operating method, have with It is lower the utility model has the advantages that
1, the distribution net work earthing fault detection processing and its operating method are guaranteed by setting first resistor silk and second resistance silk The stabilization of control cabinet builtin voltage, so that deviation, the electric current inside control cabinet once occurs in the current or voltage of device contact Change with voltage, so that the control switch inside electric pressure converter and support plate perceives rapidly fault message, greatly increases The efficiency for having added the detection failure of the device, avoid detection process slowly causes one-phase earthing failure in electric distribution network to damage the time Powerup issue that is too long and influencing full wafer power distribution network, increases the safety of the device.
2, the distribution net work earthing fault detection processing and its operating method, it is mutual by setting GPS and GPS signal transmitting terminal Cooperation ensure that the stabilization of information transmitting, avoids one-phase earthing failure in electric distribution network position and is located under complex environment that be difficult to will be former The problem of barrier information passes, ensure that the stabilization of information transmission significantly, facilitates subsequent maintenance, significantly increase this The practicability of method.
3, the distribution net work earthing fault detection processing and its operating method are received by speech communication unit, image information End and text information receiving end, are transferred to rapidly data display screen for fault message, greatly facilitate maintenance personal by leading to The place for interrogating device-aware one-phase earthing failure in electric distribution network increases the efficiency of maintenance personal's maintenance, reduces because of power distribution network Singlephase earth fault bring economic loss.
Detailed description of the invention
Fig. 1 is distribution net work earthing fault detection processing system block diagram of the present invention;
Fig. 2 is failure induction system block diagram of the present invention;
Fig. 3 is communication apparatus internal structure block diagram of the present invention;
Fig. 4 is schematic structural view of the invention.
In figure: 1, detection case;2, control cabinet;3, stabiliser bar;4, first resistor silk;5, second resistance silk;6, conducting wire;7, electric Cable;8, current converter;9, electric pressure converter;10, support plate;11, GPS signal transmitting terminal;12, failure induction system;13, Pedestal;14, satellite data transmitting terminal;15, ground power grid maintenance system receiving end;16, ground power grid maintenance system transmitting terminal; 17, communication apparatus;18, control switch;19,GPS;20, satellite failure signal data receiving unit;21, central processing unit;22, Data display screen;23, speech communication unit;24, image information receiving end;25, text information receiving end.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1-4, a kind of distribution net work earthing fault detection processing and its operating method, including detection case 1 and failure Induction system 12, the bottom surface of 1 inner cavity of detection case are fixedly installed with control cabinet 2, and the left and right sides of control cabinet 2 pass through cable respectively Line 7 is electrically connected with electric pressure converter 9 and current converter 8, and the another side of current converter 8 and electric pressure converter 9 is electric Property is connected with support plate 10, and the other end of support plate 10 extends to the outside of detection case 1 and is fixedly installed with GPS signal transmitting terminal 11, the top of control cabinet 2 is electrically connected with stabiliser bar 3, and the both ends of stabiliser bar 3 are electrically connected with conducting wire 6, and conducting wire 6 extends to The outside of detection case 1, stabiliser bar 3 are externally wrapped with the first resistor silk 4 positioned at 2 left side of control cabinet, and the outside of stabiliser bar 3 twines It is wound with the second resistance silk 5 for being located at 2 right side of control cabinet.
The output end signal of failure induction system 12 is connected with satellite failure signal data receiving unit 20, failure induction system System 12 includes control cabinet 2, and the front of control cabinet 2 is fixedly installed with observing apparatus, and the bottom of control cabinet 2, which is fixedly installed with, is located at inspection The pedestal 13 of 1 inner chamber bottom surface of measuring tank, the output end of control cabinet 2 electrically have current converter 8 and electric pressure converter 9, electric current conversion Device 8, the output end of control switch 18 are electrically connected with a GPS19, the output end and GPS signal transmitting terminal 11 of a GPS19 Input terminal be electrically connected, the input terminal of the output end of electric pressure converter 9 and another control switch 18 is electrically connected, another The input terminal of the output end of control switch 18 and another GPS19 are electrically connected, the output end of another GPS19 and another GPS signal transmitting terminal 11 is electrically connected, and the output end of GPS signal transmitting terminal 11 is electrically connected with the reception of satellite failure signal data The output end of unit 20, satellite failure signal data receiving unit 20 is electrically connected with satellite data transmitting terminal 14, satellite data The output end signal of transmitting terminal 14 is connected with ground power grid maintenance system receiving end 15, ground power grid maintenance system receiving end 15 Output end is electrically connected with ground power grid maintenance system transmitting terminal 16, the output end signal of ground power grid maintenance system transmitting terminal 16 It is connected with communication apparatus 17, communication apparatus 17 includes central processing unit 21, the model MQA52CH/A of central processing unit 21, ground Face power grid maintenance system receiving end 15 receives information by warning lamp figure operating personnel, the output end of central processing unit 21 with it is defeated Enter end and is electrically connected with speech communication unit 23, image information receiving end 24 and text information receiving end 25, central processing unit 21 output end is electrically connected with data display screen 22.
Operating method is as follows, comprising the following steps:
Step 1: two stabiliser bars 3 to be mounted on to any two sides of power distribution network earthing position first, then it will test case 1 and be embedded in Near power distribution network earthing position;
Step 2: when power distribution network earthing position damages, according to the variation of 6 junction electric current of conducting wire, so that first resistor Silk 4 shift voltages appearance more becomes, so that control cabinet 2 receives the data that stabiliser bar 3 transmits, turns to influence electric current according to variation The inside of parallel operation 8 or electric pressure converter 9, current converter 8 and electric pressure converter 9 is equipped with Separation control device, and is spaced control Device processed and the input terminal of control switch 18 are electrically connected, then open its inside by current converter 8 or electric pressure converter 9 Fault location information so that GPS19 emits signal, then is transferred to satellite event by GPS signal transmitting terminal 11 by control switch 18 Hinder signal data receiving unit 20;
Step 3: satellite data transmitting terminal 14 will be former according to the received data information of satellite failure signal data receiving unit 20 Barrier location information is transferred to ground power grid maintenance system receiving end 15, allows ground power grid maintenance system transmitting terminal 16 will be former Barrier location information passes to communication apparatus 17;
Step 4: maintenance personal according on communication apparatus 17 on data display screen 22 pass through speech communication unit 23, image information The received information in receiving end 24 and text information receiving end 25, rushes to breakdown maintenance place, to the failure at power distribution network ground connection into Row maintenance process.
In conclusion the distribution net work earthing fault detection processing and its operating method, at the distribution net work earthing fault detection Reason and its operating method guarantee the stabilization of 2 builtin voltage of control cabinet by setting first resistor silk 4 and second resistance silk 5, so that Once there is deviation in the current or voltage of device contact, and the electric current and voltage inside control cabinet 2 change, so that voltage turns Control switch 18 inside parallel operation 9 and support plate 10 perceives rapidly fault message, significantly increases the detection failure of the device Efficiency, avoid detection process slowly causes one-phase earthing failure in electric distribution network damage overlong time and influence full wafer power distribution network Powerup issue, increase the safety of the device;It is cooperated, be ensure that by setting GPS19 and GPS signal transmitting terminal 11 The stabilization of information transmitting, avoids one-phase earthing failure in electric distribution network position and is located under complex environment and be difficult to pass out fault message The problem of going ensure that the stabilization of information transmission significantly, facilitate subsequent maintenance, significantly increase the practical of this method Property;By speech communication unit 23, image information receiving end 24 and text information receiving end 25, fault message is transferred to rapidly Data display screen 22 greatly facilitates the place that maintenance personal perceives one-phase earthing failure in electric distribution network by communication apparatus 17, The efficiency for increasing maintenance personal's maintenance reduces because of one-phase earthing failure in electric distribution network bring economic loss;Solves nothing It by being active localization method or passive type localization method, is directly transmitted using signal, the more complicated geographical locations in face Power distribution network environment is frequently present of the problem of lacking signal, it is extremely difficult to guarantee that fault-signal accurately transfers out, lead to power distribution network list The failure that mutually ground connection occurs is difficult to the problem of quickly being found and repaired.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of distribution net work earthing fault detection processing, including detection case (1) and failure induction system (12), it is characterised in that: The bottom surface of detection case (1) inner cavity is fixedly installed with control cabinet (2), and the left and right sides of the control cabinet (2) pass through respectively Cable (7) is electrically connected with electric pressure converter (9) and current converter (8), the current converter (8) and electric pressure converter (9) another side is electrically connected with support plate (10), and the other end of the support plate (10) extends to the outer of detection case (1) Portion is simultaneously fixedly installed with GPS signal transmitting terminal (11), is electrically connected with stabiliser bar (3) at the top of the control cabinet (2), described steady The both ends of fixed pole (3) are electrically connected with conducting wire (6), and the conducting wire (6) extends to the outside of detection case (1), the stabiliser bar (3) the first resistor silk (4) being externally wrapped on the left of control cabinet (2), being externally wrapped with for stabiliser bar (3) are located at Second resistance silk (5) on the right side of control cabinet (2).
2. the output end signal of the failure induction system (12) is connected with satellite failure signal data receiving unit (20), described The output end of satellite failure signal data receiving unit (20) is electrically connected with satellite data transmitting terminal (14), the satellite data The output end signal of transmitting terminal (14) is connected with ground power grid maintenance system receiving end (15), and the ground power grid maintenance system connects The output end of receiving end (15) is electrically connected with ground power grid maintenance system transmitting terminal (16), the ground power grid maintenance system transmitting The output end signal at end (16) is connected with communication apparatus (17).
3. a kind of distribution net work earthing fault detection processing according to claim 1, it is characterised in that: the communication apparatus It (17) include central processing unit (21), the output end and input terminal of the central processing unit (21) are electrically connected with speech communication Unit (23), image information receiving end (24) and text information receiving end (25), the output end electricity of the central processing unit (21) Property is connected with data display screen (22).
4. a kind of distribution net work earthing fault detection processing according to claim 1, it is characterised in that: failure induction system System (12) includes control cabinet (2), and the output end of the control cabinet (2) electrically has current converter (8) and electric pressure converter (9), The output end of the current converter (8), the control switch (18) is electrically connected with a GPS(19), a GPS (19) output end and the input terminal of GPS signal transmitting terminal (11) are electrically connected, the output end of the electric pressure converter (9) and another The input terminal of one control switch (18) is electrically connected, the output end and another GPS of another control switch (18) (19) input terminal is electrically connected, another described GPS(19) output end and another described GPS signal transmitting terminal (11) electricity Property connection, the output end of the GPS signal transmitting terminal (11) is electrically connected with satellite failure signal data receiving unit (20).
5. a kind of distribution net work earthing fault detection processing according to claim 1, it is characterised in that: the control cabinet (2) Front be fixedly installed with observing apparatus, the bottom of the control cabinet (2) is fixedly installed with positioned at detection case (1) inner chamber bottom surface Pedestal (13).
6. according to claim 1 to a kind of operating method of distribution net work earthing fault detection processing described in 4, it is characterised in that: It sequentially includes the following steps:
Step 1: two stabiliser bars (3) are mounted on any two sides of power distribution network earthing position first, then it will test case (1) in advance It is embedded near power distribution network earthing position;
Step 2: when power distribution network earthing position damages, according to the variation of conducting wire (6) junction electric current, so that the first electricity Resistance silk (4) shift voltage appearance more becomes, so that control cabinet (2) receives the data that stabiliser bar (3) transmits, thus according to variation shadow Current converter (8) or electric pressure converter (9) are rung, then its inside is opened by current converter (8) or electric pressure converter (9) Control switch (18), so that GPS(19) transmitting signal, then be transferred to fault location information by GPS signal transmitting terminal (11) Satellite failure signal data receiving unit (20);
Step 3: according to satellite failure signal data receiving unit (20) received data information, satellite data transmitting terminal (14) Fault location information is transferred to ground power grid maintenance system receiving end (15), so that ground power grid maintenance system transmitting terminal (16) Fault location information can be passed to communication apparatus (17);
Step 4: maintenance personal according on communication apparatus (17) on data display screen (22) by speech communication unit (23), figure As information receiving end (24) and text information receiving end (25) received information, breakdown maintenance place is rushed to, power distribution network is grounded The failure at place repairs processing.
7. a kind of operating method of distribution net work earthing fault detection processing according to claim 5, it is characterised in that: described The model MQA52CH-A of central processing unit (21), the ground power grid maintenance system receiving end (15) receive information and pass through police Show lamp body type operating personnel.
8. a kind of operating method of distribution net work earthing fault detection processing according to claim 5, it is characterised in that: described The inside of current converter (8) and electric pressure converter (9) is equipped with Separation control device, and Separation control device and control switch (18) input terminal is electrically connected.
CN201810790354.9A 2018-07-18 2018-07-18 A kind of distribution net work earthing fault detection processing and its operating method Pending CN108957232A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810790354.9A CN108957232A (en) 2018-07-18 2018-07-18 A kind of distribution net work earthing fault detection processing and its operating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810790354.9A CN108957232A (en) 2018-07-18 2018-07-18 A kind of distribution net work earthing fault detection processing and its operating method

Publications (1)

Publication Number Publication Date
CN108957232A true CN108957232A (en) 2018-12-07

Family

ID=64495829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810790354.9A Pending CN108957232A (en) 2018-07-18 2018-07-18 A kind of distribution net work earthing fault detection processing and its operating method

Country Status (1)

Country Link
CN (1) CN108957232A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110783896A (en) * 2019-09-25 2020-02-11 昆明理工大学 Distribution network single-phase grounding protection method based on weak fault active and passive joint detection
CN115291046A (en) * 2022-09-30 2022-11-04 南京鼎研电力科技有限公司 Power grid power distribution abnormity identification method based on power grid operation big data

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200976031Y (en) * 2006-11-27 2007-11-14 中国华北电力集团公司天津市电力公司 Power ground network online test device
CN101839958A (en) * 2010-04-28 2010-09-22 华北电力大学 Electrified locating device for single-phase earth fault of electric distribution network
JP2010271104A (en) * 2009-05-20 2010-12-02 Hitachi Ltd Ground-fault position locating method and ground-fault position locating system for realizing the method
CN102332707A (en) * 2011-06-08 2012-01-25 高政 Earth fault signal measuring method and protective device for ungrounded system
CN103278733A (en) * 2013-05-30 2013-09-04 孟津县电业公司 Cable ground connection remote monitoring method and remote monitoring system
JP2014055908A (en) * 2012-09-14 2014-03-27 Hitachi Ltd Method and device for specifying ground-fault position of power cable
CN204649892U (en) * 2015-05-14 2015-09-16 国家电网公司 There is the Design of DC System Grounding Fault Detection instrument of GPS positioning function
CN205539227U (en) * 2016-01-14 2016-08-31 南京理工大学 Monitoring system in mountain area urine power station
CN106054027A (en) * 2016-07-30 2016-10-26 孙文兵 Distribution network grounding fault location system
CN106597211A (en) * 2016-10-26 2017-04-26 国网浙江兰溪市供电公司 Grounding fault locating system of overhead line
CN107037256A (en) * 2017-03-31 2017-08-11 中广核核电运营有限公司 Ground detection device
CN107069965A (en) * 2017-04-17 2017-08-18 李亮棠 Power distribution network step voltage electric leakage alarm device and power supply area under one's jurisdiction power distribution network electric leakage monitoring system
CN206684260U (en) * 2017-05-10 2017-11-28 刘杰 A kind of novel power distribution network fault detection apparatus

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200976031Y (en) * 2006-11-27 2007-11-14 中国华北电力集团公司天津市电力公司 Power ground network online test device
JP2010271104A (en) * 2009-05-20 2010-12-02 Hitachi Ltd Ground-fault position locating method and ground-fault position locating system for realizing the method
CN101839958A (en) * 2010-04-28 2010-09-22 华北电力大学 Electrified locating device for single-phase earth fault of electric distribution network
CN102332707A (en) * 2011-06-08 2012-01-25 高政 Earth fault signal measuring method and protective device for ungrounded system
JP2014055908A (en) * 2012-09-14 2014-03-27 Hitachi Ltd Method and device for specifying ground-fault position of power cable
CN103278733A (en) * 2013-05-30 2013-09-04 孟津县电业公司 Cable ground connection remote monitoring method and remote monitoring system
CN204649892U (en) * 2015-05-14 2015-09-16 国家电网公司 There is the Design of DC System Grounding Fault Detection instrument of GPS positioning function
CN205539227U (en) * 2016-01-14 2016-08-31 南京理工大学 Monitoring system in mountain area urine power station
CN106054027A (en) * 2016-07-30 2016-10-26 孙文兵 Distribution network grounding fault location system
CN106597211A (en) * 2016-10-26 2017-04-26 国网浙江兰溪市供电公司 Grounding fault locating system of overhead line
CN107037256A (en) * 2017-03-31 2017-08-11 中广核核电运营有限公司 Ground detection device
CN107069965A (en) * 2017-04-17 2017-08-18 李亮棠 Power distribution network step voltage electric leakage alarm device and power supply area under one's jurisdiction power distribution network electric leakage monitoring system
CN206684260U (en) * 2017-05-10 2017-11-28 刘杰 A kind of novel power distribution network fault detection apparatus

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周永勇: "配电网故障诊断、定位及恢复方法研究", 《中国博士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110783896A (en) * 2019-09-25 2020-02-11 昆明理工大学 Distribution network single-phase grounding protection method based on weak fault active and passive joint detection
CN115291046A (en) * 2022-09-30 2022-11-04 南京鼎研电力科技有限公司 Power grid power distribution abnormity identification method based on power grid operation big data

Similar Documents

Publication Publication Date Title
EP2985613B1 (en) Method and system for detecting and locating single-phase ground fault on low current grounded power-distribution network
CN106291245A (en) A kind of distribution network failure actively generates and sends repaiies method and apparatus
CN102135587A (en) Fault monitoring method and system of power line
CN104678260A (en) System and method for single-phase grounding line selection of small current grounding system
CN108132425A (en) Power grid distribution line failure on-line monitoring method and system
CN102891533B (en) A kind of 800kV intelligent breaker
US20110285399A1 (en) Device, system and method for monitoring lines of grounding electrodes
CN103390887A (en) Method for isolating faults of power distribution system with micro-grid
CN110579693A (en) High GIS partial discharge online monitoring device and method based on wireless transmission
CN109884454A (en) The intelligent pole-mounted circuit breaker of one or two fusions of one kind and cable monitoring system
CN203688655U (en) Online monitoring system for monitoring distribution of DC (direct current) in AC (alternating current) network
CN108957232A (en) A kind of distribution net work earthing fault detection processing and its operating method
CN103487725B (en) A kind of overhead distribution earth fault indicating device based on zero-sequence component method
CN208297613U (en) Grounding measurement device and grounding wire detection system
IT201900018818A1 (en) High voltage overhead electrical transmission line equipped with maneuvering unit
Viacheslav et al. Integration of New Single-Phase-to-Ground Faults Detection Devices into Existing SmartGrid Systems
CN104124680A (en) Arc harmonic elimination, line selection and overvoltage protection device
US12051889B2 (en) Tower, particularly for a high-voltage overhead electric transmission line, equipped with switchgear unit and related protection, command and control system
CN108459207A (en) Grounding measurement device and grounding wire detection system
Tremblay et al. Using voltage sag measurements for advanced fault location and condition-based maintenance
CN105510768B (en) A kind of trouble shoot method of service conductor ground connection
CN111638425A (en) High-voltage cable fault positioning device
CN207396742U (en) A kind of gas-insulated switchgear GIS device Big Dipper safety monitoring system
CN212514848U (en) High-voltage cable fault positioning device
CN203587736U (en) Overhead distributing line ground fault indicating device based on zero-sequence component method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207