CN108951552A - A kind of non-pressure tunnel access path with blow vent - Google Patents
A kind of non-pressure tunnel access path with blow vent Download PDFInfo
- Publication number
- CN108951552A CN108951552A CN201810828259.3A CN201810828259A CN108951552A CN 108951552 A CN108951552 A CN 108951552A CN 201810828259 A CN201810828259 A CN 201810828259A CN 108951552 A CN108951552 A CN 108951552A
- Authority
- CN
- China
- Prior art keywords
- section
- blow vent
- pressure tunnel
- tunnel
- access path
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B5/00—Artificial water canals, e.g. irrigation canals
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B5/00—Artificial water canals, e.g. irrigation canals
- E02B5/08—Details, e.g. gates, screens
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B9/00—Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
- E02B9/02—Water-ways
- E02B9/04—Free-flow canals or flumes; Intakes
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
- Ventilation (AREA)
Abstract
The invention discloses a kind of non-pressure tunnel access path with blow vent, access path section, blow vent section are set gradually in working tunnel end, blow vent section intersects with non-pressure tunnel section, access path section uses square shape bearing structure, hollow bearing structure top, which is provided with channel, to be made to communicate between working tunnel and blow vent section, is provided with air grid steel mesh on a passage.The non-pressure tunnel section includes non-pressure tunnel non-standard segment and non-pressure tunnel standard paragraphs, using the straight hole section of half gateway opening, half rectangular cross section, the straight hole section of half gateway opening, half rectangular cross section is connected with non-pressure tunnel standard paragraphs using half of formula transition for non-pressure tunnel non-standard segment and blow vent section intersection.The present invention had both met the requirement that long range non-pressure tunnel is overhauled into hole, but also with long range non-pressure tunnel aeration condition;Structure arrangement is economical and practical, improves the degree of safety and service efficiency of non-pressure tunnel operation.
Description
Technical field
The present invention relates to a kind of non-pressure tunnel access path arrangement and structure types, more particularly to one kind to apply with compared with big cross section
Combination, the non-pressure tunnel access path with blow vent are faced in work branch hole forever.
Background technique
Non-pressure tunnel be usually used in diversion irrigation, urban water supply, navigation, excessively wood and water channeling type hydraulic and hydroelectric engineering in.Low water
Head disappears and falls the small water delivery situation of depth, generally uses non-pressure tunnel.Water level frequent fluctuation during non-pressure tunnel is run, gas in hole
Body contraction or expansion therewith, to guarantee the safety of non-pressure tunnel structure and the needs of non-pressure tunnel operation, the non-pressure tunnel water surface with
On need to have good aeration condition.Non-pressure tunnel flow rate of water flow is typically small, and dirt is easy to deposit in hole, and especially conveying contains mud
When husky water flow, after non-pressure tunnel generates siltation, water delivery section is reduced, and is had an adverse effect to aeration condition and operation, because
This divulges information and more protrudes the problems such as maintenance in the non-pressure tunnel of long range.
Summary of the invention
The technical problem to be solved by the invention is to provide a kind of with strong applicability, structures to arrange economical and practical band logical
The non-pressure tunnel access path of port.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is that: it is a kind of with blow vent non-pressure tunnel inspection
Channel is repaired, sets gradually access path section, blow vent section in working tunnel end, blow vent section intersects with non-pressure tunnel section, inspection
Channel section is repaired using square shape bearing structure, hollow bearing structure top be provided with channel make working tunnel and blow vent section it
Between communicate, be provided with air grid steel mesh on a passage.
The non-pressure tunnel section includes non-pressure tunnel non-standard segment and non-pressure tunnel standard paragraphs, non-pressure tunnel non-standard segment with
Straight hole section of the blow vent section intersection using half gateway opening, half rectangular cross section, the straight hole Duan Yuwu pressure of half gateway opening, half rectangular cross section
Tunnel standard paragraphs are connected using half of formula transition.
The acute angle that the straight hole section intersects vertically or intersects with blow vent section is not less than 65 degree.
Straight hole the section floor elevation, blow vent section floor elevation, access path section floor elevation are ladder-like gradually to rise
High.
The profile height of the working tunnel is higher than the profile height of non-pressure tunnel, and straight hole section combines place with blow vent section
Dark deep beam is set.
The channel is arch cavity, and air grid steel mesh surrounding build-in is in the concrete in channel.
The beneficial effects of the present invention are: the requirement for meeting the ventilation of long range non-pressure tunnel and being overhauled into hole;With construction branch
Combination is faced in hole forever, and structure arrangement is economical and practical;Improve the degree of safety and service efficiency of non-pressure tunnel operation.
Detailed description of the invention
Fig. 1 is the floor map of the non-pressure tunnel access path of the invention with blow vent;
Fig. 2 is A-A sectional view in Fig. 1;
Fig. 3 is B-B sectional view in Fig. 1;
Fig. 4 is C-C sectional view in Fig. 1;
Fig. 5 is perspective view of the invention;
In figure: 1--- non-pressure tunnel non-standard segment;2--- access path section;3--- blow vent section;4--- working tunnel;
The straight hole section of 5---;6--- non-pressure tunnel standard paragraphs;7--- air grid steel mesh;The dark deep beam of 8---;9--- blow vent section bottom plate;
10--- access path section bottom plate;Direction shown in arrow is non-pressure tunnel water (flow) direction;Water level symbol indicates that non-pressure tunnel designs water
Position.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and detailed description:
As shown in Fig. 1~5, the non-pressure tunnel access path of the invention with blow vent, which is characterized in that in working tunnel
4 ends set gradually access path section 2, blow vent section 3, and blow vent section 3 intersects with non-pressure tunnel section, and access path section 2 uses
Square shape bearing structure, hollow bearing structure top, which is provided with channel, to be made to communicate between working tunnel 4 and blow vent section 3,
Air grid steel mesh 7 is provided on channel.
The non-pressure tunnel section includes non-pressure tunnel non-standard segment 1 and non-pressure tunnel standard paragraphs 6, non-pressure tunnel non-standard segment
1 uses the straight hole section 5 of half gateway opening, half rectangular cross section, the straight hole section 5 of half gateway opening, half rectangular cross section with 3 intersection of blow vent section
Connected with non-pressure tunnel standard paragraphs 6 using half of formula transition.
The acute angle that the straight hole section 5 intersects vertically or intersects with blow vent section 3 is not less than 65 degree.
Straight hole section 5 floor elevations, 9 elevation of blow vent section bottom plate, 10 elevation of access path section bottom plate, be it is ladder-like by
It is gradually raised.
The profile height of the working tunnel 4 is higher than the profile height of non-pressure tunnel, straight hole section 5 and 3 phase knot of blow vent section
Dark deep beam 8 is set at conjunction.
The channel is arch cavity, and 7 surrounding build-in of air grid steel mesh is in the concrete in channel.
Non-pressure tunnel non-standard segment of the present invention and working tunnel intersect vertically or wide-angle oblique, and intersection uses half city
The straight hole section of half rectangular cross section of door opening, and required according to traffic in side wall hole-opening, non-pressure tunnel non-standard segment and non-pressure tunnel
Standard paragraphs are connected using the transition that one side of something side becomes gateway opening;Access path section is divided according to the arrangement and force request of maintenance door
Certain thickness structural concrete is not done in the upper and lower, left and right of door, forms square shape bearing structure;Blow vent section is located at construction
Between branch hole end, access path section and non-pressure tunnel non-standard segment, the well formula ventilation device that blow vent section uses top open,
Not only the requirement of non-pressure tunnel charge, exhaust had been met, but also can avoid non-pressure tunnel water flow and overflow.
Present invention accomplishes requirements long range non-pressure tunnel ventilation and overhauled into hole;Face combination forever with working tunnel, ties
Structure arrangement is economical and practical;Improve the degree of safety and service efficiency of non-pressure tunnel operation.
It is described in detail combined with specific embodiments below:
Certain large-scale diversion pump station engineering, about 5km between the upstream and downstream hole of drain cavern, conveying water flow containing silt in hole is
Main and SEA LEVEL VARIATION is frequent.The working tunnel of drain cavern leads to the 1# access tunnel of underground pump station.Working tunnel connects with drain cavern
Place, floor elevation is close, and profile height is larger.Drain cavern arranges the nothing of the invention with blow vent in its working tunnel end
Press tunnel for overhaul channel design.Drain cavern and blow vent section intersection are the straight hole section of half gateway opening, half rectangular cross section, straight hole section
It is 86.44 ° with acute angle folded by blow vent section, straight hole section section dead size is 2.8mx3.5m, lining thickness 0.4m, floor elevation
825.434m, water level elevation 827.864m, length 10m.Working tunnel is gateway opening type section, section dead size
4.5mx5.07m.Blow vent segment length 2.5m, floor elevation 825.890m;Access path segment length 2m, floor elevation 826.046m.It is logical
Port section cross section dead size is 2.5mx2.8m.Arch cavity lays steel mesh together between access path section and working tunnel
8 array pitch 150mm of Ф, surrounding build-in is in concrete.Straight hole section and the blow vent section of half gateway opening of drain cavern, half rectangular cross section
Place is combined, dark deep beam, section 0.4mx1.0m, to reinforce hole portion structure bearing capacity are set.
Embodiment described above is merely to illustrate technical idea and feature of the invention, in the art its object is to make
Technical staff it will be appreciated that the contents of the present invention and implement accordingly, patent model of the invention only cannot be limited with the present embodiment
It encloses, i.e., same changes or modifications made by all disclosed spirit are still fallen in the scope of the patents of the invention.
Claims (6)
1. a kind of non-pressure tunnel access path with blow vent, which is characterized in that set gradually maintenance in working tunnel (4) end
Channel section (2), blow vent section (3), blow vent section (3) intersect with non-pressure tunnel section, and access path section (2) is carried using square shape
Structure, hollow bearing structure top, which is provided with channel, to be made to communicate between working tunnel (4) and blow vent section (3), on a passage
It is provided with air grid steel mesh (7).
2. the non-pressure tunnel access path with blow vent according to claim 1, which is characterized in that the non-pressure tunnel section packet
Non-pressure tunnel non-standard segment (1) and non-pressure tunnel standard paragraphs (6) are included, non-pressure tunnel non-standard segment (1) intersects with blow vent section (3)
Straight hole section (5) of the place using half gateway opening, half rectangular cross section, the straight hole section (5) and non-pressure tunnel mark of half gateway opening, half rectangular cross section
Quasi- section (6) is connected using half of formula transition.
3. the non-pressure tunnel access path with blow vent according to claim 2, which is characterized in that the straight hole section (5) with
The acute angle that blow vent section (3) intersects vertically or intersects is not less than 65 degree.
4. the non-pressure tunnel access path with blow vent according to claim 2, which is characterized in that described straight hole section (5) bottom
Plate elevation, blow vent section bottom plate (9) elevation, access path section bottom plate (10) elevation, it is ladder-like to gradually rise.
5. the non-pressure tunnel access path with blow vent according to claim 2, which is characterized in that the working tunnel (4)
Profile height be higher than the profile height of non-pressure tunnel, straight hole section (5) is the same as the dark deep beam (8) of blow vent section (3) place of combining setting.
6. the non-pressure tunnel access path with blow vent according to claim 2, which is characterized in that the channel is that arch is empty
Chamber, air grid steel mesh (7) surrounding build-in is in the concrete in channel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810828259.3A CN108951552B (en) | 2018-07-25 | 2018-07-25 | Pressureless tunnel overhauling channel with air vents |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810828259.3A CN108951552B (en) | 2018-07-25 | 2018-07-25 | Pressureless tunnel overhauling channel with air vents |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108951552A true CN108951552A (en) | 2018-12-07 |
CN108951552B CN108951552B (en) | 2023-10-20 |
Family
ID=64463968
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810828259.3A Active CN108951552B (en) | 2018-07-25 | 2018-07-25 | Pressureless tunnel overhauling channel with air vents |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108951552B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110185117A (en) * | 2019-05-05 | 2019-08-30 | 上海市城市建设设计研究总院(集团)有限公司 | It is crossed node using the main hole of sewage water-conveyance tunnel of tool car inspection and branch hole |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3015151A1 (en) * | 1980-04-19 | 1981-11-05 | Bochumer Eisenhütte Heintzmann GmbH & Co, 4630 Bochum | Mine gallery junction arched support - has branch galleries segment arches fastened to stiffening beam between intersections |
US6413015B1 (en) * | 2001-01-08 | 2002-07-02 | Keith Poirier | Beaver controlling culvert attachment |
CN104018474A (en) * | 2014-06-23 | 2014-09-03 | 黄河勘测规划设计有限公司 | Method for reconstructing construction adit into maintenance adit by virtue of back-filling |
CN205035779U (en) * | 2015-09-29 | 2016-02-17 | 浙江省水利水电勘测设计院 | Construction branch tunnel suitable for pressure regulating of water delivery tunnel and maintenance traffic |
CN208733572U (en) * | 2018-07-25 | 2019-04-12 | 中国电建集团北京勘测设计研究院有限公司 | A kind of non-pressure tunnel access path with blow vent |
-
2018
- 2018-07-25 CN CN201810828259.3A patent/CN108951552B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3015151A1 (en) * | 1980-04-19 | 1981-11-05 | Bochumer Eisenhütte Heintzmann GmbH & Co, 4630 Bochum | Mine gallery junction arched support - has branch galleries segment arches fastened to stiffening beam between intersections |
US6413015B1 (en) * | 2001-01-08 | 2002-07-02 | Keith Poirier | Beaver controlling culvert attachment |
CN104018474A (en) * | 2014-06-23 | 2014-09-03 | 黄河勘测规划设计有限公司 | Method for reconstructing construction adit into maintenance adit by virtue of back-filling |
CN205035779U (en) * | 2015-09-29 | 2016-02-17 | 浙江省水利水电勘测设计院 | Construction branch tunnel suitable for pressure regulating of water delivery tunnel and maintenance traffic |
CN208733572U (en) * | 2018-07-25 | 2019-04-12 | 中国电建集团北京勘测设计研究院有限公司 | A kind of non-pressure tunnel access path with blow vent |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110185117A (en) * | 2019-05-05 | 2019-08-30 | 上海市城市建设设计研究总院(集团)有限公司 | It is crossed node using the main hole of sewage water-conveyance tunnel of tool car inspection and branch hole |
CN110185117B (en) * | 2019-05-05 | 2024-03-12 | 上海市城市建设设计研究总院(集团)有限公司 | Main hole and branch hole intersection node of sewage water delivery tunnel adopting inspection vehicle for inspection |
Also Published As
Publication number | Publication date |
---|---|
CN108951552B (en) | 2023-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103541345B (en) | Aqueous vapor separate vacuum preloading and device | |
CN102877420A (en) | Construction method of large tube well fixed point precipitation, sealing bottom free concrete and steel sheet pile cofferdam deepwater bearing platform | |
CN109267549A (en) | Diversion tunnel structure | |
CN208733572U (en) | A kind of non-pressure tunnel access path with blow vent | |
CN103225283B (en) | The syndeton of barrage foundation diaphragm wall and gate dam building | |
CN108951552A (en) | A kind of non-pressure tunnel access path with blow vent | |
CN110499740A (en) | The safe method for blocking of diversion tunnel under a kind of hydroelectric project high water head unfavorable geological condition | |
CN109944236A (en) | Root pile actively follows track delamination pour slurry system and construction method | |
CN204252119U (en) | The special-shaped supporting pile structure of X | |
CN104120696B (en) | Environment-friendly type slope sticking type trashrack structure and construction method thereof | |
CN103526732A (en) | Dam drainage structure | |
CN204212168U (en) | Dam water retaining structure for jointly building dam by utilizing karst cave | |
CN207363699U (en) | A kind of device for improving downdraft mode paste body filling mining methods Tight filling rate | |
CN212772252U (en) | Gallery inlet plugging body structure using transverse traffic galleries to replace diversion bottom holes | |
CN110185051A (en) | Deep narrow excavation water discharge method | |
CN204825820U (en) | Pressure regulating well structure using traffic hole as upper chamber | |
CN107268547A (en) | Karst funnel reservoir and its flood releasing structure and construction method | |
CN103758081A (en) | Floating self-adjustment water-stopping dam | |
CN203741782U (en) | Multi-section face plate structure of high concrete faced rockfill dam | |
CN103758099B (en) | A kind of bottom edge aerification system of water delivery valve of high lift lock | |
CN107366259A (en) | Embankment structure is only starched in a kind of concrete dam and its surface grouting | |
CN209277087U (en) | Diversion works head stores clear erosion and deposition regulating reservoir | |
CN109826301A (en) | A kind of prefabricated assembled folded plate moldeed depth tunnel draining shaft structure | |
CN209603090U (en) | High-efficient multistage overflow corridor system | |
CN204174587U (en) | Flood discharge structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |