CN108951341A CN201810712051.5A CN201810712051A CN108951341A CN 108951341 A CN108951341 A CN 108951341A CN 201810712051 A CN201810712051 A CN 201810712051A CN 108951341 A CN108951341 A CN 108951341A
Authority
CN
China
Prior art keywords
brick
ontology
row
planting
collecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810712051.5A
Other languages
Chinese (zh)
Other versions
CN108951341B (en
Inventor
杨玉杰
杨惠芬
曾波
李晓三
李阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing City Green Environmental Protection Science And Technology Ltd Co
Beijing Jingrun Landscaping Engineering Co Ltd
Original Assignee
Beijing City Green Environmental Protection Science And Technology Ltd Co
Beijing Jingrun Landscaping Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing City Green Environmental Protection Science And Technology Ltd Co, Beijing Jingrun Landscaping Engineering Co Ltd filed Critical Beijing City Green Environmental Protection Science And Technology Ltd Co
Priority to CN201810712051.5A priority Critical patent/CN108951341B/en
Publication of CN108951341A publication Critical patent/CN108951341A/en
Application granted granted Critical
Publication of CN108951341B publication Critical patent/CN108951341B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/005Individual couplings or spacer elements for joining the prefabricated units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • E01C9/004Pavings specially adapted for allowing vegetation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of concrete breaking aggregate ecological pavement bricks, belong to landscape engineering field field, its key points of the technical solution are that: including the permeable shaped brick ontology made of concrete breaking aggregate, brick ontology upper surface is provided with Non-slip material, brick body interior is additionally provided with the water-storing device for collecting the water fallen on brick ontology, and the water-storing device is connected with row's silt component that the mud flowed in collecting-tank with water is discharged.The invention also discloses a kind of green belt containing concrete breaking aggregate ecological pavement brick, including several brick body units on the ground are arranged, brick body unit includes grass-planting brick and the concrete breaking aggregate ecological pavement brick that grass-planting brick periphery is arranged in, and several pavement bricks are to be formed by connecting by interlock head and the tail;The upper surface of grass-planting brick and the side of pavement brick form the planting groove of planting plants.It is an advantage of the invention that preventing having ponding on pavement brick.

Description

Concrete breaking aggregate ecological pavement brick and its application in afforestation
Technical field
The present invention relates to landscape engineering fields, and in particular to a kind of concrete breaking aggregate ecological pavement brick and its in gardens Application in greening.
Background technique
With the development of China's modernization construction, the quickening of urbanization process, large-scale new town construction and old city change Making leads to the increasing of building castoff, and resulting building waste is also more and more, but for the place of building waste Reason is few, and utilization rate is also extremely low.Some solid refuses such as concrete, masonry etc. are not easily decomposed, be by the long duration Can natural decomposition fall, even if being used to fill out hole or laying also due to volume is excessive and can not dissolve, not only land occupation resource is also Be unfavorable for environmental greening, thus now for some construction materials such as concrete, masonry carry out concrete it is broken after again using having Critically important meaning.
Chinese patent if Authorization Notice No. is CN202945521U discloses a kind of building solid castoff aggregate system The permeable pavement brick of work, the pavement brick include the surface layer set gradually from upper surface to bottom surface, the matrix manufactured with recycled aggregate Layer, matrix enhancement layer, are internally provided with metal mesh in matrix enhancement layer;The recycled aggregate is by the coagulation in building waste The particle that soil, mortar, stone or brick and tile etc. are process.
Above-mentioned pavement brick also has certain intensity while having water penetration, still using building waste as aggregate This pavement brick is entity brick, is used in application process as just pavement brick, but because makes road without water storage mechanism It is not easy to permeate when having ponding on face brick, is easy ponding, is easy to slip when pedestrian passes by and is easy to splash in pedestrian With.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of concrete breaking aggregate ecological pavement brick and Its application in afforestation, its advantage is that: prevent having ponding on pavement brick.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of concrete breaking aggregate ecological pavement brick, including the permeable shaped brick ontology made of concrete breaking aggregate, brick ontology upper surface It is provided with Non-slip material, brick body interior is additionally provided with the water-storing device for collecting the water fallen on brick ontology, and water-storing device includes The catch basin of brick ontology upper surface is set and the collecting-tank of brick body interior is set, passes through company between catch basin and collecting-tank Through-hole perforation connection;
The Non-slip material includes the antislip cog for being symmetricly set on catch basin two sides, and antislip cog runs through along its width direction to be opened up There are several diversion trenches, diversion trench one end and catch basin perforation connect;
The collecting-tank is connected with row's silt component that the mud flowed in collecting-tank with water is discharged.
Through the above technical solutions, water flows into collecting-tank along catch basin, right when having water to fall on brick ontology Rainwater is stored.Antislip cog can prevent pedestrian from slipping on road surface, and diversion trench can will fall in the rain on brick ontology Water is dredged to catch basin, and then flows into collecting-tank, prevents having ponding on brick ontology, and row's silt component will flow in collecting-tank with water Mud discharge.
The present invention is further arranged to: row's silt component includes the row's silt plate connecting with brick ontology and driving row's silt plate around level The rotating member that axis rotates on vertical side, rotating member are connect with brick ontology, and are arranged between silt plate and brick ontology around described in formation Collecting-tank;
Brick ontology opens up fluted far from catch basin one end, and row's silt plate is between the inner wall of groove and the lower end surface with brick ontology Between formed supply and discharge silt plate rotation space;
The rotating member includes the fixing axle being fixed in the two side walls that collecting-tank is parallel to each other and is socketed in fixing axle Torsional spring, row's silt plate pass through a pair of of otic placode and are rotatablely connected with fixing axle, and otic placode and fixing axle are rotatablely connected, and are fixed and connected with row's silt plate It connects, and one end of torsional spring and row's silt plate are affixed, the other end and brick ontology are affixed.
Through the above technical solutions, arranging the lighter weight of silt plate, torsional spring limitation row's silt plate when the mud on row's silt plate is less It rotates down;When arranging the accumulation of sludge on silt plate to a certain extent, because gravity row's silt plate rotates down, it will arrange Mud discharge on silt plate, when row's silt plate loses mud gravity, torsional spring restores deformation and row's silt plate is driven to be rotated up return.
The present invention is further arranged to: the baffle that limitation row's silt plate is rotated up is additionally provided on the brick ontology, it is described Baffle is in above row's silt plate.
Through the above technical solutions, baffle limitation row silt plate row continues to be rotated up after becoming silted up, so that row's silt plate and brick ontology Between have certain gap, prevent water from gap flow out.
The present invention is further arranged to: elastic component is additionally provided on the brick ontology, row's silt plate is in elastic component and baffle Between.
Through the above technical solutions, so set, that silt plate will be arranged when the mud weight on row's silt plate has not been reached yet When rotating down, elastic component can will row's silt plate support it is more secured, and because of elastic component with certain elasticity, So that row silt plate by row silt plate above mud weight under the action of, can still rotate down, meanwhile, when quality compared with Effect of the light row's silt plate by torsional spring, can also be rotated up, and not influence the movement for arranging silt plate, until row's silt plate is supported with baffle It connects, baffle limitation row's silt plate continues up rotation.
The present invention is further arranged to: size on the elastic component vertical direction along close to the direction of row's silt plate gradually Reduce.
Through the above technical solutions, so set, to arrange the more easily rotation in the vertical direction of silt plate.
The present invention is further arranged to: reinforcing rib is additionally provided between the two side walls of the groove, reinforcing rib is in brick The lower end surface of ontology.
Through the above technical solutions, the intensity of brick ontology can be enhanced in the setting of reinforcing rib, and then improve the whole of pavement brick Body intensity and load-carrying ability, meanwhile, reinforcing rib is in the lower end surface of brick ontology, so that having between row's silt plate and reinforcing rib certain Space length, row's silt process of the row's of will not influence silt plate.
A kind of green belt containing concrete breaking aggregate ecological pavement brick, including several brick body units on the ground are arranged, Brick body unit includes grass-planting brick and the concrete breaking aggregate ecological pavement brick that grass-planting brick periphery is arranged in, and several pavement bricks are logical Interlock head and the tail are crossed to be formed by connecting;
The size of grass-planting brick in the vertical direction is less than the size of pavement brick, and the upper surface of grass-planting brick and the side of pavement brick are formed The planting groove of planting plants, the grass-planting brick runs through along its vertical direction uplink offers several deflector holes;
Perforation is provided with drainage hole between planting groove and the collecting-tank of pavement brick, and drainage hole is in the upper end of collecting-tank.
Through the above technical solutions, ponding is from catchmenting when the height of the ponding in collecting-tank is more than the height of drainage hole Pond enters planting groove by drainage hole and is absorbed by plants.So set, the water on pavement brick is poured into collecting-tank, and then flow to kind It plants slot and moisture supply is carried out to plant, increase the utilization rate of water.The water section for entering planting groove from collecting-tank is not absorbed by plants When entered in the ground below grass-planting brick by deflector hole, prevent the dilutional hyponatremia in planting groove from causing drought and waterlogging.
The present invention is further arranged to: the interlock includes first grafting affixed towards grass-planting brick side with brick ontology Part offers the first mounting groove for the insertion of the first plug connector on the adjacent bricks ontology mutually spliced with the brick ontology.
Through the above technical solutions, grass-planting brick is placed on the ground, the first mounting groove then will be equipped with when use Brick ontology closely grass-planting brick place, by another piece of brick ontology the first plug connector and the first mounting groove grafting, so circulation, Several pavement bricks are carried out to be spliced to form brick body unit.
The present invention is further arranged to: first plug connector is along the thickness direction of brick ontology through setting, the first peace Tankage is arranged along the thickness direction of brick ontology, and the slot bottom size of the first mounting groove is less than the size of notch.
Through the above technical solutions, in use, by one of brick ontology in the vertical direction with adjacent brick ontology into Row grafting, so that the first plug connector is inserted into the first mounting groove, the slot bottom size of the first mounting groove is less than the size of notch, so that will After two neighboring brick ontology is spliced, the more fastening that even brick ontology can connect will not be mutually de- in the horizontal direction From simple to operate.
The present invention is further arranged to: the size of first plug connector is less than on brick ontology upper surface and collecting-tank The distance between end face, the interlock further include the limit to being limited after the first plug connector and the installation of the first mounting groove Part, the limiting slot for locating part insertion is offered on brick ontology, and limiting slot connects with each other with collecting-tank;
Locating part is less than the size of the other end far from the size of brick ontology one end in the horizontal direction, and when locating part is in limit When in slot, locating part upper surface and brick ontology upper end surface are in same plane.
Through the above technical solutions, then passing through limit in use, the first plug connector and the first mounting groove are mutually inserted First plug connector is connect by part with brick ontology, is limited to the first plug connector, and the first plug connector and brick ontology is prevented to be detached from.Limit Position slot connects with each other with collecting-tank, and locating part is less than the other end far from the size of brick ontology one end in the horizontal direction Size, so that collecting-tank, while locating part can be flowed into along limiting slot when the gap for having water to flow into locating part and brick ontology It will not also fall into collecting-tank.
In conclusion the invention has the following advantages:
1, the water on pavement brick can be collected by the setting of water-storing device, prevent having ponding on pavement brick;
2, the cooperation of pavement brick and grass-planting brick can flow into the water on pavement brick in planting groove, carry out to the plant in planting groove Moisture supply, increases the utilization rate of water;
3, the setting for arranging silt component can carry out discharge cleaning for the mud in collecting-tank is entered to water.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that catch basin is embodied in embodiment 1;
Fig. 2 is the structural schematic diagram that pavement brick is embodied in embodiment 1;
Fig. 3 is the structural schematic diagram that row's silt component is embodied in embodiment 1;
Fig. 4 is the structural schematic diagram that rotating member is embodied in embodiment 1;
Fig. 5 is the structural schematic diagram that brick body unit is embodied in embodiment 2;
Fig. 6 is the structural schematic diagram for embodying grass planting in embodiment 2 and turning;
Fig. 7 is the structural schematic diagram that the first plug connector is embodied in embodiment 2;
Fig. 8 is the structural schematic diagram that locating part is embodied in embodiment 2.
Appended drawing reference: 1, brick ontology;11, reinforcing rib;12, drainage hole;13, the first mounting groove;2, Non-slip material;21, anti-skidding Fin;211, diversion trench;3, water-storing device;31, catch basin;32, collecting-tank;4, silt component is arranged;41, silt plate is arranged;42, it rotates Part;421, fixing axle;422, torsional spring;423, otic placode;43, baffle;44, elastic component;5, brick body unit;51, grass-planting brick;52, it plants Plant slot;6, interlock;61, the first plug connector;62, locating part;63, limiting slot.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.The wherein identical appended drawing reference of identical components It indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "upper", "lower", " bottom surface " and " top surface " refers to that the direction in attached drawing, word "inner" and "outside" are referred respectively to towards or away from geometric center of specific component Direction.
Embodiment 1: a kind of concrete breaking aggregate ecological pavement brick, as shown in Figure 1, including permeable made of concrete breaking aggregate Shaped brick ontology 1,1 upper surface of brick ontology are provided with Non-slip material 2, water-storing device 3 are additionally provided with inside brick ontology 1.In conjunction with Fig. 2, store 3 row's of being connected with silt component 4 of water installations, water-storing device 3 are arranged for the rainwater fallen on brick ontology 1 or irrigation water to be collected The mud flowed in water-storing device 3 with water is discharged silt component 4.
As shown in Figure 1, water-storing device 3 includes that the catch basin 31 of 1 upper surface of brick ontology is arranged in and is arranged in brick ontology 1 The collecting-tank 32 in portion, catch basin 31 are annularly arranged and are gradually reduced along its size of path rhone in the vertical direction, tie Fig. 2 is closed, the minimum point of catch basin 31 and the perforation of collecting-tank 32 connect, so that falling in rainwater on brick ontology 1 or irrigation water can be with It is flowed into collecting-tank 32 along catch basin 31, rainwater is stored.
As shown in Figure 1, Non-slip material 2 includes the antislip cog 21 for being symmetricly set on 31 two sides of catch basin, 21 edge of antislip cog Its width direction is connected through several diversion trenches 211,211 one end of diversion trench and the perforation of catch basin 31 is offered.So set, anti- Sliding fin 21 can prevent pedestrian from slipping on road surface, and diversion trench 211 can dredge the rainwater fallen on brick ontology 1 to collection Sink 31, and then flow into collecting-tank 32.The length of diversion trench 211 in the vertical direction along close to catch basin 31 direction gradually Reduce, so that the ponding on brick ontology 1 more readily flows into catch basin 31.
As shown in figure 3, row's silt component 4 includes the row's silt plate 41 connecting with brick ontology 1 and driving row's silt plate 41 around trunnion axis The rotating member 42 rotated in the vertical direction, rotating member 42 and brick ontology 1 connect and surround shape between row's silt plate 41 and brick ontology 1 At above-mentioned collecting-tank 32.Brick ontology 1 opened up far from 31 one end of catch basin it is fluted, row silt plate 41 be between the inner wall of groove and There is a certain distance with the lower end surface of brick ontology 1.In conjunction with Fig. 4, rotating member 42 includes being fixed in two that groove is parallel to each other Fixing axle 421 on side wall and the torsional spring 422 being socketed in fixing axle 421, arrange silt plate 41 and pass through a pair of of otic placode 423 and fixing axle 421 rotation connections, otic placode 423 and fixing axle 421 are rotatablely connected, and are fixedly connected with row's silt plate 41, and 422 one end of torsional spring and row Silt plate 41 is affixed, and the other end and brick ontology 1 are affixed.When arranging, the mud on silt plate 41 is less, arranges the lighter weight of silt plate 41, torsional spring 422 limitation row's silt plates 41 rotate down;When arranging the accumulation of sludge on silt plate 41 to a certain extent, because gravity is arranged Silt plate 41 rotates down, and will arrange the mud on silt plate 41 and is discharged, and when row's silt plate 41 loses mud gravity, torsional spring 422 restores Deformation drives row's silt plate 41 to be rotated up return.
As shown in figure 3, being additionally provided with the baffle 43 that limitation row's silt plate 41 continues up rotation on brick ontology 1, it is equipped with gear Elastic component 44 is also connected on the side wall of plate 43, the size on 44 vertical direction of elastic component along close to row silt plate 41 direction by It is decrescence small.It in conjunction with Fig. 2, arranges silt plate 41 and is between elastic component 44 and baffle 43, so set, making when the silt on row's silt plate 41 Mud weight have not been reached yet will row's silt plate 41 when rotate down, elastic component 44 can will row's support of silt plate 41 ground it is more firm Gu and because elastic component 44 has certain elasticity, so that row's silt plate 41 is in the weight by the mud above row's silt plate 41 Under the action of, it can still rotate down, meanwhile, it, can also be to when effect of row's silt plate 41 by torsional spring 422 of lighter weight Upper rotation, do not influence arrange silt plate 41 movement, until row silt plate 41 is abutted with baffle 43, baffle 43 limit arrange silt plate 41 continue to Upper rotation.Size on 44 vertical direction of elastic component is gradually reduced along close to the direction of row's silt plate 41, so that row's silt plate 41 is more It is easy rotation.
As shown in Fig. 2, being additionally provided with reinforcing rib 11 between the two side walls of groove, reinforcing rib 11 is in brick ontology 1 Lower end surface.The intensity of brick ontology 1 can be enhanced in the setting of reinforcing rib 11, and then improves the integral strength and load energy of pavement brick Power, meanwhile, reinforcing rib 11 is in the lower end surface of brick ontology 1 so that row silt plate 41 and reinforcing rib 11 between have certain space away from From row's silt process of the row's of will not influence silt plate 41.
The course of work: when having water to fall on brick ontology 1, water flows into collecting-tank 32 along catch basin 31, to rain Water is stored.Enter the also mud of collecting-tank 32 with water, mud is fallen on row's silt plate 41, the silt on row's silt plate 41 When mud is accumulated to a certain extent, because gravity row's silt plate 41 rotates down, the mud on silt plate 41 will be arranged and be discharged, when Row's silt plate 41 loses mud gravity, and torsional spring 422 restores deformation and row's silt plate 41 is driven to be rotated up return.
Embodiment 2: a kind of green belt containing concrete breaking aggregate ecological pavement brick, as shown in figure 5, its with embodiment 1 not Be with place: including several brick body units 5 on the ground are arranged, brick body unit 5 includes grass-planting brick 51 and is arranged in grass planting Concrete breaking aggregate ecological pavement brick described in the embodiment 1 on 51 periphery of brick, the size of grass-planting brick 51 in the vertical direction are less than The size of pavement brick, so that the upper surface of grass-planting brick 51 and the side of pavement brick form the planting groove 52 of planting plants.In conjunction with figure 6, perforation is provided with drainage hole 12 between planting groove 52 and the collecting-tank 32 of pavement brick, and drainage hole 12 is in the upper of collecting-tank 32 End.When the height of the ponding in collecting-tank 32 be more than drainage hole 12 height when, ponding from collecting-tank 32 by drainage hole 12 into Enter planting groove 52 to be absorbed by plants.Grass-planting brick 51 runs through along its vertical direction uplink offers several deflector holes 511, from collecting-tank Enter the ground below grass-planting brick 51 when 32 water sections for entering planting groove 52 are not absorbed by plants by deflector hole 511 In, prevent the dilutional hyponatremia in planting groove 52 from causing drought and waterlogging.
As shown in fig. 7, several pavement bricks are to be formed by connecting by 6 head and the tail of interlock, and grass-planting brick 51 is in pavement brick head In the cavity formed after tail connection.Interlock 6 includes first plug connector 61 affixed towards 51 side of grass-planting brick with brick ontology 1, It is corresponding, the first mounting groove for the insertion of the first plug connector 61 is offered on the adjacent bricks ontology 1 spliced with 1 phase of brick ontology 13.When use, grass-planting brick 51 is placed on the ground, then will be equipped with the closely grass planting of brick ontology 1 of the first mounting groove 13 Brick 51 is placed, and 13 grafting of the first plug connector 61 and the first mounting groove on another piece of brick ontology 1 so recycles, if by main line Face brick carries out being spliced to form brick body unit 5, simple to operate.
As shown in fig. 7, the first plug connector 61 is along the thickness direction of brick ontology 1 through setting, corresponding, the first installation Slot 13 is arranged also along the thickness direction of brick ontology 1, and the slot bottom size of the first mounting groove 13 is less than the size of notch.It uses When, one of brick ontology 1 is subjected to grafting with adjacent brick ontology 1 in the vertical direction, so that the first plug connector 61 is inserted into First mounting groove 13, the slot bottom size of the first mounting groove 13 is less than the size of notch, so that two neighboring brick ontology 1 is spelled After connecing, the more fastening that even brick ontology 1 can connect will not be mutually disengaged in the horizontal direction.
It is not limited to above scheme, as shown in figure 8, the both ends of the first plug connector 61 and brick ontology 1 have a certain distance, phase Accordingly, the first mounting groove 13 and brick ontology 1 also have a certain distance, and interlock 6 further includes to the first plug connector 61 and the The locating part 62 limited after the installation of one mounting groove 13 is correspondingly offered on brick ontology 1 for the insertion of locating part 62 Limiting slot 63, limiting slot 63 connect with each other with collecting-tank 32.Locating part 62 far from 1 one end of brick ontology in the horizontal direction Size is less than the size of the other end, and when locating part 62 is in limiting slot 63,62 upper surface of locating part and 1 upper end of brick ontology Face is in same plane.In use, the first plug connector 61 and the first mounting groove 13 are mutually inserted, then passing through locating part 62 will First plug connector 61 is connect with brick ontology 1, is limited to the first plug connector 61, prevents the first plug connector 61 and brick ontology 1 de- From.Limiting slot 63 connects with each other with collecting-tank 32, and size of the locating part 62 far from 1 one end of brick ontology in the horizontal direction Less than the size of the other end, so that can be flowed into along limiting slot 63 when the gap for thering is water to flow into locating part 62 and brick ontology 1 Collecting-tank 32, while locating part 62 will not also be fallen into collecting-tank 32.
The course of work: when use, grass-planting brick 51 being placed on the ground, and then will be equipped with the brick of the first mounting groove 13 Ontology 1 closely place by grass-planting brick 51, by 13 grafting of the first plug connector 61 and the first mounting groove on another piece of brick ontology 1, so Several pavement bricks are carried out head and the tail connection and form brick body unit 5 by circulation.When rain is fallen on pavement brick, pavement brick catchments When the height of ponding in pond 32 is more than the height of drainage hole 12, ponding enters planting groove 52 by drainage hole 12 from collecting-tank 32 It is absorbed by plants.Entered in the ground below grass-planting brick 51 when not being absorbed by plants by deflector hole 511.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (10)

1. a kind of concrete breaking aggregate ecological pavement brick, it is characterized in that: including the permeable shaped brick ontology made of concrete breaking aggregate (1), brick ontology (1) upper surface is provided with Non-slip material (2), and the water on brick ontology (1) will be fallen in by being additionally provided with inside brick ontology (1) The water-storing device (3) of collection, water-storing device (3) include setting in the catch basin (31) of brick ontology (1) upper surface and are arranged in brick The internal collecting-tank (32) of ontology (1), is penetrated through by intercommunicating pore between catch basin (31) and collecting-tank (32) and is connected;
The Non-slip material (2) includes the antislip cog (21) for being symmetricly set on catch basin (31) two sides, and antislip cog (21) is along it Through offering several diversion trenches (211), diversion trench (211) one end and catch basin (31) perforation connect width direction;
The collecting-tank (32) is connected with row's silt component (4) that the mud flowed in collecting-tank (32) with water is discharged.
2. a kind of concrete breaking aggregate ecological pavement brick according to claim 1, it is characterized in that: row silt component (4) include with The rotating member (42) that row's silt plate (41) of brick ontology (1) connection and driving row silt plate (41) rotate on vertical side around trunnion axis, Rotating member (42) is connect with brick ontology (1), and is arranged to surround between silt plate (41) and brick ontology (1) and formed the collecting-tank (32);
Brick ontology (1) opens up fluted far from catch basin (31) one end, and row silt plate (41) is between the inner wall of groove and and brick The space of supply and discharge silt plate (41) rotation is formed between the lower end surface of ontology (1);
The rotating member (42) includes the fixing axle (421) being fixed in the two side walls that collecting-tank (32) is parallel to each other and socket Torsional spring (422) on fixing axle (421), row silt plate (41) passes through a pair of of otic placode (423) and fixing axle (421) are rotatablely connected, Otic placode (423) and fixing axle (421) are rotatablely connected, and are fixedly connected with row silt plate (41), and torsional spring (422) one end and row's silt plate (41) affixed, the other end and brick ontology (1) are affixed.
3. a kind of concrete breaking aggregate ecological pavement brick according to claim 2, it is characterized in that: on the brick ontology (1) also The baffle (43) that restricted row's silt plate (41) is rotated up is set, and the baffle (43) is in above row's silt plate (41).
4. a kind of concrete breaking aggregate ecological pavement brick according to claim 3, it is characterized in that: on the brick ontology (1) also It is provided with elastic component (44), row silt plate (41) is between elastic component (44) and baffle (43).
5. a kind of concrete breaking aggregate ecological pavement brick according to claim 4, it is characterized in that: the elastic component (44) is vertical Size on direction is gradually reduced along close to the direction of row silt plate (41).
6. a kind of concrete breaking aggregate ecological pavement brick according to claim 2, it is characterized in that: the two side walls of the groove Between be additionally provided with reinforcing rib (11), reinforcing rib (11) is in the lower end surface of brick ontology (1).
7. a kind of green belt containing concrete breaking aggregate ecological pavement brick, if it is characterized in that: including the hacking of setting on the ground Body unit (5), brick body unit (5) include any institute of claim 1-6 of grass-planting brick (51) and setting on grass-planting brick (51) periphery Concrete breaking aggregate ecological pavement brick is stated, several pavement bricks are to be formed by connecting from beginning to end by interlock (6);
The size of grass-planting brick (51) in the vertical direction is less than the size of pavement brick, the upper surface of grass-planting brick (51) and pavement brick Side forms the planting groove (52) of planting plants, and the grass-planting brick (51) is run through along its vertical direction uplink offers several water conservancy diversion Hole;
Perforation is provided with drainage hole (12) between planting groove (52) and the collecting-tank (32) of pavement brick, and drainage hole (12), which is in, to catchment The upper end in pond (32).
8. a kind of green belt containing concrete breaking aggregate ecological pavement brick according to claim 7, it is characterized in that: described mutual Latch fitting (6) includes first plug connector (61) affixed towards grass-planting brick (51) side with brick ontology (1), with brick ontology (1) phase The first mounting groove (13) for the first plug connector (61) insertion is offered on the adjacent bricks ontology (1) of splicing.
9. a kind of green belt containing concrete breaking aggregate ecological pavement brick according to claim 8, it is characterized in that: described One plug connector (61) along brick ontology (1) thickness direction through setting, the first mounting groove (13) along brick ontology (1) thickness Direction setting, and the slot bottom size of the first mounting groove (13) is less than the size of notch.
10. a kind of green belt containing concrete breaking aggregate ecological pavement brick according to claim 8, it is characterized in that: described The size of first plug connector (61) is less than the distance between brick ontology (1) upper surface and collecting-tank (32) upper surface, described Interlock (6) further includes to the locating part (62) limited after the first plug connector (61) and the first mounting groove (13) installation, brick The limiting slot (63) for locating part (62) insertion, limiting slot (63) and collecting-tank (32) company of being mutually communicated are offered on ontology (1) It connects;
Locating part (62) is less than the size of the other end far from the size of brick ontology (1) one end in the horizontal direction, and works as locating part (62) when interior in limiting slot (63), locating part (62) upper surface and brick ontology (1) upper end surface are in same plane.
CN201810712051.5A 2018-06-29 2018-06-29 Concrete broken aggregate ecological pavement brick and application thereof in landscaping Active CN108951341B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810712051.5A CN108951341B (en) 2018-06-29 2018-06-29 Concrete broken aggregate ecological pavement brick and application thereof in landscaping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810712051.5A CN108951341B (en) 2018-06-29 2018-06-29 Concrete broken aggregate ecological pavement brick and application thereof in landscaping

Publications (2)

Publication Number Publication Date
CN108951341A true CN108951341A (en) 2018-12-07
CN108951341B CN108951341B (en) 2020-07-24

Family

ID=64484931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810712051.5A Active CN108951341B (en) 2018-06-29 2018-06-29 Concrete broken aggregate ecological pavement brick and application thereof in landscaping

Country Status (1)

Country Link
CN (1) CN108951341B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111188239A (en) * 2020-01-14 2020-05-22 蒋俊连 Water storage and temperature adjustment floor tile for sponge city

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206486757U (en) * 2017-02-20 2017-09-12 深圳市柯沐生态科技产业有限公司 A kind of water-permeable brick for sponge city
CN207484211U (en) * 2017-09-20 2018-06-12 温州恒福新型建材有限公司 A kind of ashlar brick
CN207484206U (en) * 2017-11-24 2018-06-12 深圳市交运工程集团有限公司 A kind of road surface water-permeable brick and porous pavement

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206486757U (en) * 2017-02-20 2017-09-12 深圳市柯沐生态科技产业有限公司 A kind of water-permeable brick for sponge city
CN207484211U (en) * 2017-09-20 2018-06-12 温州恒福新型建材有限公司 A kind of ashlar brick
CN207484206U (en) * 2017-11-24 2018-06-12 深圳市交运工程集团有限公司 A kind of road surface water-permeable brick and porous pavement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111188239A (en) * 2020-01-14 2020-05-22 蒋俊连 Water storage and temperature adjustment floor tile for sponge city

Also Published As

Publication number Publication date
CN108951341B (en) 2020-07-24

Similar Documents

Publication Publication Date Title
CN206571217U (en) Outdoor Parking position system based on sponge the idea of the city
CN208701842U (en) Greenery patches buffer strip system
CN204626612U (en) A kind of modular assembly type gutter
CN205604000U (en) Novel permeable pavement brick
EP4071307A1 (en) Farmland irrigation and drainage system
CN204530960U (en) A kind of modular assembly type environmental protection gutter
CN108951341A (en) Concrete breaking aggregate ecological pavement brick and its application in afforestation
CN216474335U (en) A foundation structure for installing night light ceramic tile that permeates water
CN207727658U (en) A kind of processing system with rainwater-collecting, storage and reverse osmosis
CN217439127U (en) A sponge type side ditch structure for urban road
CN206368311U (en) A kind of ecological road of sponge city water collecting and purifying
CN109487900A (en) A kind of the shock resistance drain filtering system of domestic and construction method of concave herbaceous field
CN212925656U (en) Road surface structure with rainwater collection function
CN108179677A (en) Sponge urban water-through pavement
CN213740396U (en) Natural permeable quarrying paving structure for sponge city
CN114568236A (en) High-standard paddy field system built by sand-based microbead technology
CN108222237A (en) A kind of water purification water storage device
CN209144964U (en) A kind of efficient rainwater isolation collection device
CN208578059U (en) A kind of barricade slope protection integration earthen structure
CN207727715U (en) Sponge Comprehensive Utilization System of Urban Rainwater
CN206360052U (en) Heat-extraction system is received in a kind of sponge type rain penetration
CN205636875U (en) Rainwater incremental system
CN210975848U (en) Slope greening system suitable for expressway
CN205368929U (en) Disposable high carrier ring protects grass planting mould
CN204150016U (en) Novel washing recessing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant