CN108939508B - Teenager fitness user data management system and method - Google Patents

Teenager fitness user data management system and method Download PDF

Info

Publication number
CN108939508B
CN108939508B CN201810708174.1A CN201810708174A CN108939508B CN 108939508 B CN108939508 B CN 108939508B CN 201810708174 A CN201810708174 A CN 201810708174A CN 108939508 B CN108939508 B CN 108939508B
Authority
CN
China
Prior art keywords
fitness
user
plan
cloud server
completion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810708174.1A
Other languages
Chinese (zh)
Other versions
CN108939508A (en
Inventor
计东亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoding Tongzhilan Education Technology Co ltd
Original Assignee
Shaoxing Dongwei Sports Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Dongwei Sports Technology Co Ltd filed Critical Shaoxing Dongwei Sports Technology Co Ltd
Priority to CN201810708174.1A priority Critical patent/CN108939508B/en
Publication of CN108939508A publication Critical patent/CN108939508A/en
Application granted granted Critical
Publication of CN108939508B publication Critical patent/CN108939508B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B71/00Games or sports accessories not covered in groups A63B1/00 - A63B69/00
    • A63B71/06Indicating or scoring devices for games or players, or for other sports activities
    • A63B71/0619Displays, user interfaces and indicating devices, specially adapted for sport equipment, e.g. display mounted on treadmills
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B71/00Games or sports accessories not covered in groups A63B1/00 - A63B69/00
    • A63B71/06Indicating or scoring devices for games or players, or for other sports activities
    • A63B2071/0691Maps, e.g. yardage maps or electronic maps
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B2220/00Measuring of physical parameters relating to sporting activity
    • A63B2220/30Speed
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B2225/00Miscellaneous features of sport apparatus, devices or equipment
    • A63B2225/50Wireless data transmission, e.g. by radio transmitters or telemetry

Landscapes

  • Engineering & Computer Science (AREA)
  • Human Computer Interaction (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Physical Education & Sports Medicine (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a teenager fitness user data management system and a method, wherein the teenager fitness user data management system comprises a fitness user terminal, an administrator terminal, a plurality of fitness equipment, a database and a cloud server, the cloud server provides fitness data management platform services, each fitness equipment is provided with a Bluetooth communication module and a speed sensor, the Bluetooth communication module is used for collecting a user ID of the fitness user terminal when communicating with the fitness user terminal, the user ID of the fitness user terminal is sent to the cloud server, the speed sensor is arranged on a movable part of the fitness equipment, and the collected speed data are sent to the cloud server; the database stores the identification ID of each fitness equipment and the type of each fitness equipment. The invention automatically collects the fitness data of teenagers, automatically judges the execution condition of the fitness plan according to the fitness plan, generates the tree-shaped graph, more intuitively and intensively displays the fitness exercise states of a plurality of teenagers, and realizes more effective and quicker supervision and management.

Description

Teenager fitness user data management system and method
Technical Field
The invention relates to the technical field of data processing, in particular to a system and a method for managing teenager fitness user data.
Background
With the continuous development of society and the continuous acceleration of life rhythm, people pay more and more attention to body building. Especially for teenagers, the teenagers are in a body-growing stage and face increasing learning pressure, and the physical fitness and the stress relief are also required to be enhanced through the body-building way. However, the mental development of teenagers is not as good as that of adults, and it may be difficult to achieve the intended goal without effective supervision of the fitness training of the teenagers. Therefore, today there are often unified coaches or sports teachers to focus on supervising and instructing a part of teenagers on their usual exercise conditions. The existing supervision mode is usually a mode of juvenile report or on-site supervision by an administrator, the efficiency is low, and a more effective and quicker body building data sharing and management mode cannot be realized.
Disclosure of Invention
The invention provides a teenager fitness user data management system and a method, which aim to overcome the defects in the prior art, automatically acquire fitness data of teenagers, automatically judge the execution condition of a fitness plan according to the fitness plan, generate a tree diagram, more intuitively and intensively show the fitness exercise states of a plurality of teenagers, and realize more effective and faster supervision and management.
In order to achieve the above object, the present invention has the following configurations:
the teenager fitness user data management system comprises a fitness user terminal, an administrator terminal, a plurality of fitness equipment, a database and a cloud server, wherein the cloud server provides fitness data management platform services, each fitness equipment is provided with a Bluetooth communication module and a speed sensor, the Bluetooth communication module collects a user ID of the fitness user terminal when communicating with the fitness user terminal and sends the user ID of the fitness user terminal to the cloud server, and the speed sensor is arranged on a movable part of the fitness equipment and sends collected speed data to the cloud server; the database stores the identification ID of each fitness equipment and the type of each fitness equipment;
the cloud server is used for executing the following steps:
the cloud server acquires a fitness plan and a user ID corresponding to the fitness plan from the administrator terminal, wherein the fitness plan comprises a fitness plan execution time, a target duration of at least one fitness project and a fitness equipment type;
when the cloud server receives the user ID sent by the fitness equipment, the user ID is adopted to log in a fitness data management platform, an unfinished fitness plan corresponding to the user ID is obtained, and the unfinished fitness plan is pushed to a fitness user terminal;
the cloud server acquires speed data sent by a speed sensor of the fitness equipment in real time, and the fitness time of the fitness user at this time is counted according to the speed data;
the cloud server judges the type of the fitness equipment, determines a corresponding fitness item according to the type of the fitness equipment, and adds the fitness time length of the fitness user to the fitness time length of the fitness item;
when the execution time of the fitness plan is finished, the cloud server counts the fitness plan completion state of each user ID;
the cloud server counts the number of users completing the whole fitness plan in the fitness plan execution time, generates a total plan completion node, and adds a user number value for completing the whole fitness plan at the total plan completion node;
the cloud server counts the number of users completing each fitness project in the fitness plan execution time, respectively generates fitness project completion nodes corresponding to each fitness project one by one, each fitness project completion node is a child node of the total plan completion node, and the number of users completing the fitness project is added at each fitness project completion node;
the cloud server generates a fitness plan completion result tree graph, the tree graph comprises a total plan completion node and all the fitness project completion nodes, the total plan completion node displays the number of users completing the whole fitness plan, and all the fitness project completion nodes display the number of users completing the fitness project;
the cloud server calculates the percentage of the number of users at each node to the total number of users corresponding to the fitness plan, green labeling is adopted for nodes with the calculated percentage being more than 60% in the dendrogram, and red labeling is adopted for nodes with the calculated percentage being less than 40% in the dendrogram;
the cloud server adds links to each node in the dendrogram, the total plan completion node is linked to a total plan completion user list, the total plan completion user list comprises user IDs for completing the whole fitness plan, each fitness item node is linked to a corresponding fitness item completion user list, and the fitness item completion user list comprises a user list for completing the corresponding fitness items;
and the cloud server pushes the dendrogram to a manager terminal issuing the fitness plan.
Optionally, the cloud server may count the fitness plan completion status of each user ID, including the following steps:
for each user ID, the cloud server judges whether the fitness duration of a fitness project corresponding to the user ID is greater than or equal to the target duration of the fitness project, if so, the cloud server judges that the user ID completes the fitness project, otherwise, the cloud server judges that the user ID does not complete the fitness project;
for each user ID, the cloud server judges whether the user ID completes all fitness items in the fitness plan, if so, the cloud server judges that the user ID completes the fitness plan, and otherwise, the cloud server judges that the user ID does not complete the fitness plan.
Optionally, when the execution time of the fitness plan is finished, after the cloud server counts the fitness plan completion states of the user IDs, the cloud server further performs the following steps:
the cloud server generates a fitness plan completion list, wherein the fitness plan completion list comprises user IDs of all fitness users and the number of fitness items completed by all the fitness users;
the cloud server adds links to the user IDs of all the fitness users in the fitness plan completion list, and the user IDs of all the fitness users in the fitness plan completion list are linked to the fitness plan completion graph of the user;
the fitness plan completion graph of each fitness user comprises a plurality of fitness item completion nodes, and the percentage of the fitness duration of the user in the fitness item to the target duration is displayed at each fitness item completion node;
the cloud server adds a labeling color to the fitness project completion nodes, when the percentage of the fitness project completion nodes is more than 80%, the fitness project completion nodes are labeled green, when the percentage of the fitness project completion nodes is between 60% and 80%, the fitness project completion nodes are labeled yellow, and when the percentage of the fitness project completion nodes is less than 60%, the fitness project completion nodes are labeled red;
and the cloud server pushes the fitness plan completion list to a manager terminal issuing the fitness plan.
Optionally, after the cloud server pushes the dendrogram to a manager terminal issuing the fitness plan, the cloud server further executes the following steps:
the cloud server receives a fitness plan delay notice and a fitness plan delay list sent by the administrator terminal;
the cloud server determines a user ID for executing the fitness plan delay according to the fitness plan delay list;
the cloud server inquires uncompleted fitness items and corresponding lack time corresponding to the user ID of each user executing the fitness plan delay, and takes the uncompleted fitness items as the delayed fitness items of the user;
the cloud server sends the body-building plan delay notice, the unfinished body-building items and the corresponding lack time to the corresponding body-building user terminal executing the body-building plan delay;
and when the cloud server receives the user ID and the speed data sent by the fitness equipment corresponding to the delayed fitness item, accumulating and calculating the fitness time of the user corresponding to the delayed fitness item.
Optionally, after the cloud server pushes the dendrogram to a manager terminal issuing the fitness plan, the cloud server further executes the following steps:
the cloud server receives a body-building plan resetting notice and a body-building plan resetting list sent by the administrator terminal;
the cloud server determines a user ID for executing the body-building plan reset according to the body-building plan reset list;
and the cloud server inquires user IDs for executing the body-building plan resetting, and clears the body-building time of all body-building projects under the body-building plan corresponding to the user IDs.
The embodiment of the invention also provides a teenager fitness user data management method, which adopts the teenager fitness user data management system and comprises the following steps:
the cloud server acquires a fitness plan and a user ID corresponding to the fitness plan from the administrator terminal, wherein the fitness plan comprises a fitness plan execution time, a target duration of at least one fitness project and a fitness equipment type;
the Bluetooth communication module of the fitness equipment receives a connection request of a fitness user terminal, acquires a user ID of the fitness user terminal and sends the user ID of the fitness user terminal to the cloud server;
when the cloud server receives the user ID sent by the fitness equipment, the user ID is adopted to log in a fitness data management platform, an unfinished fitness plan corresponding to the user ID is obtained, and the unfinished fitness plan is pushed to a fitness user terminal;
the cloud server acquires speed data sent by a speed sensor of the fitness equipment in real time, and the fitness time of the fitness user at this time is counted according to the speed data;
the cloud server judges the type of the fitness equipment, determines a corresponding fitness item according to the type of the fitness equipment, and adds the fitness time length of the fitness user to the fitness time length of the fitness item;
when the execution time of the fitness plan is finished, the cloud server counts the fitness plan completion state of each user ID;
the cloud server counts the number of users completing the whole fitness plan in the fitness plan execution time, generates a total plan completion node, and adds a user number value for completing the whole fitness plan at the total plan completion node;
the cloud server counts the number of users completing each fitness project in the fitness plan execution time, respectively generates fitness project completion nodes corresponding to each fitness project one by one, each fitness project completion node is a child node of the total plan completion node, and the number of users completing the fitness project is added at each fitness project completion node;
the cloud server generates a fitness plan completion result tree graph, the tree graph comprises a total plan completion node and all the fitness project completion nodes, the total plan completion node displays the number of users completing the whole fitness plan, and all the fitness project completion nodes display the number of users completing the fitness project;
the cloud server calculates the percentage of the number of users at each node to the total number of users corresponding to the fitness plan, green labeling is adopted for nodes with the calculated percentage being more than 60% in the dendrogram, and red labeling is adopted for nodes with the calculated percentage being less than 40% in the dendrogram;
the cloud server adds links to each node in the dendrogram, the total plan completion node is linked to a total plan completion user list, the total plan completion user list comprises user IDs for completing the whole fitness plan, each fitness item node is linked to a corresponding fitness item completion user list, and the fitness item completion user list comprises a user list for completing the corresponding fitness items;
and the cloud server pushes the dendrogram to a manager terminal issuing the fitness plan.
Optionally, the cloud server may count the fitness plan completion status of each user ID, including the following steps:
for each user ID, the cloud server judges whether the fitness duration of a fitness project corresponding to the user ID is greater than or equal to the target duration of the fitness project, if so, the cloud server judges that the user ID completes the fitness project, otherwise, the cloud server judges that the user ID does not complete the fitness project;
for each user ID, the cloud server judges whether the user ID completes all fitness items in the fitness plan, if so, the cloud server judges that the user ID completes the fitness plan, and otherwise, the cloud server judges that the user ID does not complete the fitness plan.
Optionally, when the execution time of the fitness plan is finished, after the cloud server counts the fitness plan completion states of the user IDs, the method further includes the following steps:
the cloud server generates a fitness plan completion list, wherein the fitness plan completion list comprises user IDs of all fitness users and the number of fitness items completed by all the fitness users;
the cloud server adds links to the user IDs of all the fitness users in the fitness plan completion list, and the user IDs of all the fitness users in the fitness plan completion list are linked to the fitness plan completion graph of the user;
the fitness plan completion graph of each fitness user comprises a plurality of fitness item completion nodes, and the percentage of the fitness duration of the user in the fitness item to the target duration is displayed at each fitness item completion node;
the cloud server adds a labeling color to the fitness project completion nodes, when the percentage of the fitness project completion nodes is more than 80%, the fitness project completion nodes are labeled green, when the percentage of the fitness project completion nodes is between 60% and 80%, the fitness project completion nodes are labeled yellow, and when the percentage of the fitness project completion nodes is less than 60%, the fitness project completion nodes are labeled red;
and the cloud server pushes the fitness plan completion list to a manager terminal issuing the fitness plan.
By adopting the adolescent fitness user data management system and the adolescent fitness user data management method, the beneficial effects are as follows:
(1) the fitness data of the teenagers are automatically collected, the execution condition of the fitness plan is automatically judged according to the fitness plan, a tree-shaped graph is generated, the fitness exercise states of a plurality of teenagers are displayed more visually and intensively, more effective and faster supervision and management are realized, a manager can more visually see the completion condition of the fitness plan of each teenager, the fitness plan can be further reset or delayed according to the completion states of different fitness projects of the teenagers, and the management mode is more flexible and diversified;
(2) the body-building data of each body-building user can be only pushed to the terminal of the administrator who issues the body-building plan, if different administrators issue different body-building plans for the same body-building user, the body-building user can also choose to accept one body-building plan or accept a plurality of body-building plans, if the body-building user chooses to accept a plurality of body-building plans, the body-building data aiming at different body-building plans can be respectively sent to the administrator terminal corresponding to the body-building plans, all the body-building data of the body-building user cannot be sent to the terminal of one of the administrators, the body-building data cannot be sent to an unrelated administrator terminal, and the privacy and the safety of the body-building user data are guaranteed.
Drawings
Fig. 1 is a schematic structural diagram of a data management system for a teenager fitness user according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a tree diagram generated by the cloud server according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of a fitness plan completion list generated by the cloud server according to an embodiment of the present invention;
fig. 4 is a flowchart of a data management method for a teenager fitness user according to an embodiment of the present invention.
Detailed Description
In order to more clearly describe the technical contents of the present invention, the following further description is given in conjunction with specific embodiments.
In order to solve the technical problems in the prior art, the invention provides a teenager fitness user data management system, which comprises a fitness user terminal, a manager terminal, a plurality of fitness equipment, a database and a cloud server as shown in fig. 1, wherein the cloud server provides fitness data management platform services, each fitness equipment is provided with a bluetooth communication module and a speed sensor, the bluetooth communication module collects a user ID of the fitness user terminal when communicating with the fitness user terminal and sends the user ID of the fitness user terminal to the cloud server, and the speed sensor is arranged on a movable part of the fitness equipment and sends collected speed data to the cloud server; the database stores the identification ID of each fitness equipment and the type of each fitness equipment;
the cloud server is used for executing the following steps:
the cloud server acquires a fitness plan and a user ID corresponding to the fitness plan from the administrator terminal, wherein the fitness plan comprises a fitness plan execution time, a target duration of at least one fitness project and a fitness equipment type;
when the cloud server receives the user ID sent by the fitness equipment, the user ID is adopted to log in a fitness data management platform, an unfinished fitness plan corresponding to the user ID is obtained, and the unfinished fitness plan is pushed to a fitness user terminal;
the cloud server acquires speed data sent by a speed sensor of the fitness equipment in real time, and the fitness time of the fitness user at this time is counted according to the speed data; specifically, when the speed data is greater than a preset threshold value, the user is considered to be in motion, when the speed data is less than the preset threshold value, the user is considered not to be in motion, when the accumulated time when the user is not in motion exceeds 15min, the user can automatically log out, and if the user wants to continue accumulating the time, the user needs to log in again;
the cloud server judges the type of the fitness equipment, determines a corresponding fitness item according to the type of the fitness equipment, and adds the fitness time length of the fitness user to the fitness time length of the fitness item;
when the execution time of the fitness plan is finished, the cloud server counts the fitness plan completion state of each user ID;
the cloud server counts the number of users completing the whole fitness plan in the fitness plan execution time, generates a total plan completion node, and adds a user number value for completing the whole fitness plan at the total plan completion node;
the cloud server counts the number of users completing each fitness project in the fitness plan execution time, respectively generates fitness project completion nodes corresponding to each fitness project one by one, each fitness project completion node is a child node of the total plan completion node, and the number of users completing the fitness project is added at each fitness project completion node;
the cloud server generates a fitness plan completion result tree graph, the tree graph comprises a total plan completion node and all the fitness project completion nodes, the total plan completion node displays the number of users completing the whole fitness plan, and all the fitness project completion nodes display the number of users completing the fitness project;
the cloud server calculates the percentage of the number of users at each node to the total number of users corresponding to the fitness plan, green labeling is adopted for nodes with the calculated percentage being more than 60% in the dendrogram, and red labeling is adopted for nodes with the calculated percentage being less than 40% in the dendrogram; the form of the tree diagram can be seen in fig. 2, wherein the nodes with dotted filling ground color are the nodes with percentage more than 60%;
the cloud server adds links to each node in the dendrogram, the total plan completion node is linked to a total plan completion user list, the total plan completion user list comprises user IDs for completing the whole fitness plan, each fitness item node is linked to a corresponding fitness item completion user list, and the fitness item completion user list comprises a user list for completing the corresponding fitness items;
and the cloud server pushes the dendrogram to a manager terminal issuing the fitness plan.
When the administrator terminal receives the dendrogram, the dendrogram is displayed to the administrator for viewing, and when the administrator clicks the link of each node, the user list corresponding to each node can be viewed, so that the method is very visual and concise.
In this embodiment, the cloud server calculates the fitness plan completion status of each user ID, including the following steps:
for each user ID, the cloud server judges whether the fitness duration of a fitness project corresponding to the user ID is greater than or equal to the target duration of the fitness project, if so, the cloud server judges that the user ID completes the fitness project, otherwise, the cloud server judges that the user ID does not complete the fitness project;
for each user ID, the cloud server judges whether the user ID completes all fitness items in the fitness plan, if so, the cloud server judges that the user ID completes the fitness plan, and otherwise, the cloud server judges that the user ID does not complete the fitness plan.
Further, in this embodiment, after the cloud server counts the exercise plan completion status of each user ID when the exercise plan execution time ends, the cloud server further performs the following steps:
the cloud server generates a fitness plan completion list, wherein the fitness plan completion list comprises user IDs of all fitness users and the number of fitness items completed by all the fitness users; the exercise plan completion list may be as shown in fig. 3, and include various information corresponding to the user ID, where the information in the exercise plan completion list is not limited to the information category listed in fig. 3, and information data of other categories may also be used;
the cloud server adds links to the user IDs of all the fitness users in the fitness plan completion list, and the user IDs of all the fitness users in the fitness plan completion list are linked to the fitness plan completion graph of the user;
the fitness plan completion graph of each fitness user comprises a plurality of fitness item completion nodes, and the percentage of the fitness duration of the user in the fitness item to the target duration is displayed at each fitness item completion node;
the cloud server adds a labeling color to the fitness project completion nodes, when the percentage of the fitness project completion nodes is more than 80%, the fitness project completion nodes are labeled green, when the percentage of the fitness project completion nodes is between 60% and 80%, the fitness project completion nodes are labeled yellow, and when the percentage of the fitness project completion nodes is less than 60%, the fitness project completion nodes are labeled red;
the cloud server pushes the fitness plan completion list to an administrator terminal issuing the fitness plan, and the administrator can further click each user ID to check the completion state of each user after checking the fitness plan completion list, so that the fitness plan completion list is more targeted.
In this embodiment, after the cloud server pushes the dendrogram to the administrator terminal that issues the fitness plan, the following steps are further performed:
the cloud server receives a fitness plan delay notice and a fitness plan delay list sent by the administrator terminal;
the cloud server determines a user ID for executing the fitness plan delay according to the fitness plan delay list;
the cloud server inquires uncompleted fitness items and corresponding lack time corresponding to the user ID of each user executing the fitness plan delay, and takes the uncompleted fitness items as the delayed fitness items of the user;
the cloud server sends the body-building plan delay notice, the unfinished body-building items and the corresponding lack time to the corresponding body-building user terminal executing the body-building plan delay;
and when the cloud server receives the user ID and the speed data sent by the fitness equipment corresponding to the delayed fitness item, accumulating and calculating the fitness time of the user corresponding to the delayed fitness item.
That is, the delay is simply a delay for some exercise program that is not completed, and the time for that exercise program can be accumulated.
Further, in this embodiment, after the cloud server pushes the dendrogram to the administrator terminal that issues the fitness plan, the following steps are further performed:
the cloud server receives a body-building plan resetting notice and a body-building plan resetting list sent by the administrator terminal;
the cloud server determines a user ID for executing the body-building plan reset according to the body-building plan reset list;
and the cloud server inquires user IDs for executing the body-building plan resetting, and clears the body-building time of all body-building projects under the body-building plan corresponding to the user IDs.
I.e., reset is reset for the entire exercise program, as opposed to delay, and all previous times are cleared and recalculated.
As shown in fig. 4, an embodiment of the present invention further provides a data management method for a teenager fitness user, where the data management method for a teenager fitness user is adopted, and the method includes the following steps:
the cloud server acquires a fitness plan and a user ID corresponding to the fitness plan from the administrator terminal, wherein the fitness plan comprises a fitness plan execution time, a target duration of at least one fitness project and a fitness equipment type;
the Bluetooth communication module of the fitness equipment receives a connection request of a fitness user terminal, acquires a user ID of the fitness user terminal and sends the user ID of the fitness user terminal to the cloud server;
when the cloud server receives the user ID sent by the fitness equipment, the user ID is adopted to log in a fitness data management platform, an unfinished fitness plan corresponding to the user ID is obtained, and the unfinished fitness plan is pushed to a fitness user terminal;
the cloud server acquires speed data sent by a speed sensor of the fitness equipment in real time, and the fitness time of the fitness user at this time is counted according to the speed data;
the cloud server judges the type of the fitness equipment, determines a corresponding fitness item according to the type of the fitness equipment, and adds the fitness time length of the fitness user to the fitness time length of the fitness item;
when the execution time of the fitness plan is finished, the cloud server counts the fitness plan completion state of each user ID;
the cloud server counts the number of users completing the whole fitness plan in the fitness plan execution time, generates a total plan completion node, and adds a user number value for completing the whole fitness plan at the total plan completion node;
the cloud server counts the number of users completing each fitness project in the fitness plan execution time, respectively generates fitness project completion nodes corresponding to each fitness project one by one, each fitness project completion node is a child node of the total plan completion node, and the number of users completing the fitness project is added at each fitness project completion node;
the cloud server generates a fitness plan completion result tree graph, the tree graph comprises a total plan completion node and all the fitness project completion nodes, the total plan completion node displays the number of users completing the whole fitness plan, and all the fitness project completion nodes display the number of users completing the fitness project;
the cloud server calculates the percentage of the number of users at each node to the total number of users corresponding to the fitness plan, green labeling is adopted for nodes with the calculated percentage being more than 60% in the dendrogram, and red labeling is adopted for nodes with the calculated percentage being less than 40% in the dendrogram;
the cloud server adds links to each node in the dendrogram, the total plan completion node is linked to a total plan completion user list, the total plan completion user list comprises user IDs for completing the whole fitness plan, each fitness item node is linked to a corresponding fitness item completion user list, and the fitness item completion user list comprises a user list for completing the corresponding fitness items;
and the cloud server pushes the dendrogram to a manager terminal issuing the fitness plan.
In this embodiment, the cloud server calculates the fitness plan completion status of each user ID, including the following steps:
for each user ID, the cloud server judges whether the fitness duration of a fitness project corresponding to the user ID is greater than or equal to the target duration of the fitness project, if so, the cloud server judges that the user ID completes the fitness project, otherwise, the cloud server judges that the user ID does not complete the fitness project;
for each user ID, the cloud server judges whether the user ID completes all fitness items in the fitness plan, if so, the cloud server judges that the user ID completes the fitness plan, and otherwise, the cloud server judges that the user ID does not complete the fitness plan.
In this embodiment, after the cloud server counts the exercise plan completion status of each user ID when the exercise plan execution time ends, the method further includes the following steps:
the cloud server generates a fitness plan completion list, wherein the fitness plan completion list comprises user IDs of all fitness users and the number of fitness items completed by all the fitness users;
the cloud server adds links to the user IDs of all the fitness users in the fitness plan completion list, and the user IDs of all the fitness users in the fitness plan completion list are linked to the fitness plan completion graph of the user;
the fitness plan completion graph of each fitness user comprises a plurality of fitness item completion nodes, and the percentage of the fitness duration of the user in the fitness item to the target duration is displayed at each fitness item completion node;
the cloud server adds a labeling color to the fitness project completion nodes, when the percentage of the fitness project completion nodes is more than 80%, the fitness project completion nodes are labeled green, when the percentage of the fitness project completion nodes is between 60% and 80%, the fitness project completion nodes are labeled yellow, and when the percentage of the fitness project completion nodes is less than 60%, the fitness project completion nodes are labeled red;
and the cloud server pushes the fitness plan completion list to a manager terminal issuing the fitness plan.
Compared with the prior art, the adolescent fitness user data management system and the adolescent fitness user data management method have the following beneficial effects:
(1) the fitness data of the teenagers are automatically collected, the execution condition of the fitness plan is automatically judged according to the fitness plan, a tree-shaped graph is generated, the fitness exercise states of a plurality of teenagers are displayed more visually and intensively, more effective and faster supervision and management are realized, a manager can more visually see the completion condition of the fitness plan of each teenager, the fitness plan can be further reset or delayed according to the completion states of different fitness projects of the teenagers, and the management mode is more flexible and diversified;
(2) the body-building data of each body-building user can be only pushed to the terminal of the administrator who issues the body-building plan, if different administrators issue different body-building plans for the same body-building user, the body-building user can also choose to accept one body-building plan or accept a plurality of body-building plans, if the body-building user chooses to accept a plurality of body-building plans, the body-building data aiming at different body-building plans can be respectively sent to the administrator terminal corresponding to the body-building plans, all the body-building data of the body-building user cannot be sent to the terminal of one of the administrators, the body-building data cannot be sent to an unrelated administrator terminal, and the privacy and the safety of the body-building user data are guaranteed.
In this specification, the invention has been described with reference to specific embodiments thereof. It will, however, be evident that various modifications and changes may be made thereto without departing from the broader spirit and scope of the invention. The specification and drawings are, accordingly, to be regarded in an illustrative rather than a restrictive sense.

Claims (8)

1. A teenager fitness user data management system is characterized by comprising a fitness user terminal, a manager terminal, a plurality of fitness equipment, a database and a cloud server, wherein the cloud server provides fitness data management platform services, each fitness equipment is provided with a Bluetooth communication module and a speed sensor, the Bluetooth communication module is used for collecting a user ID of the fitness user terminal when communicating with the fitness user terminal and sending the user ID of the fitness user terminal to the cloud server, and the speed sensor is arranged on a movable part of the fitness equipment and sends collected speed data to the cloud server; the database stores the identification ID of each fitness equipment and the type of each fitness equipment;
the cloud server is used for executing the following steps:
the cloud server acquires a fitness plan and a user ID corresponding to the fitness plan from the administrator terminal, wherein the fitness plan comprises a fitness plan execution time, a target duration of at least one fitness project and a fitness equipment type;
when the cloud server receives the user ID sent by the fitness equipment, the user ID is adopted to log in a fitness data management platform, an unfinished fitness plan corresponding to the user ID is obtained, and the unfinished fitness plan is pushed to a fitness user terminal;
the cloud server acquires speed data sent by a speed sensor of the fitness equipment in real time, the fitness time of the fitness user is counted according to the speed data, when the speed data is larger than a preset threshold value, the user is considered to be in the middle of exercise, and when the speed data is smaller than the preset threshold value, the user is not in the middle of exercise;
the cloud server judges the type of the fitness equipment, determines a corresponding fitness item according to the type of the fitness equipment, and adds the fitness time length of the fitness user to the fitness time length of the fitness item;
when the execution time of the fitness plan is finished, the cloud server counts the fitness plan completion state of each user ID;
the cloud server counts the number of users completing the whole fitness plan in the fitness plan execution time, generates a total plan completion node, and adds a user number value for completing the whole fitness plan at the total plan completion node;
the cloud server counts the number of users completing each fitness project in the fitness plan execution time, respectively generates fitness project completion nodes corresponding to each fitness project one by one, each fitness project completion node is a child node of the total plan completion node, and the number of users completing the fitness project is added at each fitness project completion node;
the cloud server generates a fitness plan completion result tree graph, the tree graph comprises a total plan completion node and all the fitness project completion nodes, the total plan completion node displays the number of users completing the whole fitness plan, and all the fitness project completion nodes display the number of users completing the fitness project;
the cloud server calculates the percentage of the number of users at each node to the total number of users corresponding to the fitness plan, green labeling is adopted for nodes with the calculated percentage being more than 60% in the dendrogram, and red labeling is adopted for nodes with the calculated percentage being less than 40% in the dendrogram;
the cloud server adds links to each node in the dendrogram, the total plan completion node is linked to a total plan completion user list, the total plan completion user list comprises user IDs for completing the whole fitness plan, each fitness item node is linked to a corresponding fitness item completion user list, and the fitness item completion user list comprises a user list for completing the corresponding fitness items;
and the cloud server pushes the dendrogram to a manager terminal issuing the fitness plan.
2. The system as claimed in claim 1, wherein the cloud server counts the exercise plan completion status of each user ID, comprising the steps of:
for each user ID, the cloud server judges whether the fitness duration of a fitness project corresponding to the user ID is greater than or equal to the target duration of the fitness project, if so, the cloud server judges that the user ID completes the fitness project, otherwise, the cloud server judges that the user ID does not complete the fitness project;
for each user ID, the cloud server judges whether the user ID completes all fitness items in the fitness plan, if so, the cloud server judges that the user ID completes the fitness plan, and otherwise, the cloud server judges that the user ID does not complete the fitness plan.
3. The system as claimed in claim 1, wherein after the cloud server counts the exercise plan completion status of each user ID at the end of the exercise plan execution time, the cloud server further performs the following steps:
the cloud server generates a fitness plan completion list, wherein the fitness plan completion list comprises user IDs of all fitness users and the number of fitness items completed by all the fitness users;
the cloud server adds links to the user IDs of all the fitness users in the fitness plan completion list, and the user IDs of all the fitness users in the fitness plan completion list are linked to the fitness plan completion graph of the user;
the fitness plan completion graph of each fitness user comprises a plurality of fitness item completion nodes, and the percentage of the fitness duration of the user in the fitness item to the target duration is displayed at each fitness item completion node;
the cloud server adds a labeling color to the fitness project completion nodes, when the percentage of the fitness project completion nodes is more than 80%, the fitness project completion nodes are labeled green, when the percentage of the fitness project completion nodes is between 60% and 80%, the fitness project completion nodes are labeled yellow, and when the percentage of the fitness project completion nodes is less than 60%, the fitness project completion nodes are labeled red;
and the cloud server pushes the fitness plan completion list to a manager terminal issuing the fitness plan.
4. The system as claimed in claim 1, wherein after the cloud server pushes the dendrogram to the administrator terminal issuing the fitness plan, the cloud server further performs the following steps:
the cloud server receives a fitness plan delay notice and a fitness plan delay list sent by the administrator terminal;
the cloud server determines a user ID for executing the fitness plan delay according to the fitness plan delay list;
the cloud server inquires uncompleted fitness items and corresponding lack time corresponding to the user ID of each user executing the fitness plan delay, and takes the uncompleted fitness items as the delayed fitness items of the user;
the cloud server sends the body-building plan delay notice, the unfinished body-building items and the corresponding lack time to the corresponding body-building user terminal executing the body-building plan delay;
and when the cloud server receives the user ID and the speed data sent by the fitness equipment corresponding to the delayed fitness item, accumulating and calculating the fitness time of the user corresponding to the delayed fitness item.
5. The system as claimed in claim 1, wherein after the cloud server pushes the dendrogram to the administrator terminal issuing the fitness plan, the cloud server further performs the following steps:
the cloud server receives a body-building plan resetting notice and a body-building plan resetting list sent by the administrator terminal;
the cloud server determines a user ID for executing the body-building plan reset according to the body-building plan reset list;
and the cloud server inquires user IDs for executing the body-building plan resetting, and clears the body-building time of all body-building projects under the body-building plan corresponding to the user IDs.
6. A teenager's fitness user data management method, using the teenager's fitness user data management system of any one of claims 1 to 5, the method comprising the steps of:
the cloud server acquires a fitness plan and a user ID corresponding to the fitness plan from the administrator terminal, wherein the fitness plan comprises a fitness plan execution time, a target duration of at least one fitness project and a fitness equipment type;
the Bluetooth communication module of the fitness equipment receives a connection request of a fitness user terminal, acquires a user ID of the fitness user terminal and sends the user ID of the fitness user terminal to the cloud server;
when the cloud server receives the user ID sent by the fitness equipment, the user ID is adopted to log in a fitness data management platform, an unfinished fitness plan corresponding to the user ID is obtained, and the unfinished fitness plan is pushed to a fitness user terminal;
the cloud server acquires speed data sent by a speed sensor of the fitness equipment in real time, and the fitness time of the fitness user at this time is counted according to the speed data;
the cloud server judges the type of the fitness equipment, determines a corresponding fitness item according to the type of the fitness equipment, and adds the fitness time length of the fitness user to the fitness time length of the fitness item;
when the execution time of the fitness plan is finished, the cloud server counts the fitness plan completion state of each user ID;
the cloud server counts the number of users completing the whole fitness plan in the fitness plan execution time, generates a total plan completion node, and adds a user number value for completing the whole fitness plan at the total plan completion node;
the cloud server counts the number of users completing each fitness project in the fitness plan execution time, respectively generates fitness project completion nodes corresponding to each fitness project one by one, each fitness project completion node is a child node of the total plan completion node, and the number of users completing the fitness project is added at each fitness project completion node;
the cloud server generates a fitness plan completion result tree graph, the tree graph comprises a total plan completion node and all the fitness project completion nodes, the total plan completion node displays the number of users completing the whole fitness plan, and all the fitness project completion nodes display the number of users completing the fitness project;
the cloud server calculates the percentage of the number of users at each node to the total number of users corresponding to the fitness plan, green labeling is adopted for nodes with the calculated percentage being more than 60% in the dendrogram, and red labeling is adopted for nodes with the calculated percentage being less than 40% in the dendrogram;
the cloud server adds links to each node in the dendrogram, the total plan completion node is linked to a total plan completion user list, the total plan completion user list comprises user IDs for completing the whole fitness plan, each fitness item node is linked to a corresponding fitness item completion user list, and the fitness item completion user list comprises a user list for completing the corresponding fitness items;
and the cloud server pushes the dendrogram to a manager terminal issuing the fitness plan.
7. The teenager fitness user data management method of claim 6, wherein the cloud server counts fitness plan completion status of each user ID, comprising the steps of:
for each user ID, the cloud server judges whether the fitness duration of a fitness project corresponding to the user ID is greater than or equal to the target duration of the fitness project, if so, the cloud server judges that the user ID completes the fitness project, otherwise, the cloud server judges that the user ID does not complete the fitness project;
for each user ID, the cloud server judges whether the user ID completes all fitness items in the fitness plan, if so, the cloud server judges that the user ID completes the fitness plan, and otherwise, the cloud server judges that the user ID does not complete the fitness plan.
8. The method as claimed in claim 6, wherein after the cloud server counts the exercise program completion status of each user ID when the exercise program execution time is over, the method further comprises the following steps:
the cloud server generates a fitness plan completion list, wherein the fitness plan completion list comprises user IDs of all fitness users and the number of fitness items completed by all the fitness users;
the cloud server adds links to the user IDs of all the fitness users in the fitness plan completion list, and the user IDs of all the fitness users in the fitness plan completion list are linked to the fitness plan completion graph of the user;
the fitness plan completion graph of each fitness user comprises a plurality of fitness item completion nodes, and the percentage of the fitness duration of the user in the fitness item to the target duration is displayed at each fitness item completion node;
the cloud server adds a labeling color to the fitness project completion nodes, when the percentage of the fitness project completion nodes is more than 80%, the fitness project completion nodes are labeled green, when the percentage of the fitness project completion nodes is between 60% and 80%, the fitness project completion nodes are labeled yellow, and when the percentage of the fitness project completion nodes is less than 60%, the fitness project completion nodes are labeled red;
and the cloud server pushes the fitness plan completion list to a manager terminal issuing the fitness plan.
CN201810708174.1A 2018-07-02 2018-07-02 Teenager fitness user data management system and method Active CN108939508B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810708174.1A CN108939508B (en) 2018-07-02 2018-07-02 Teenager fitness user data management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810708174.1A CN108939508B (en) 2018-07-02 2018-07-02 Teenager fitness user data management system and method

Publications (2)

Publication Number Publication Date
CN108939508A CN108939508A (en) 2018-12-07
CN108939508B true CN108939508B (en) 2020-07-28

Family

ID=64484921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810708174.1A Active CN108939508B (en) 2018-07-02 2018-07-02 Teenager fitness user data management system and method

Country Status (1)

Country Link
CN (1) CN108939508B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110102026B (en) * 2019-05-13 2020-11-13 绍兴文理学院 System and method for intelligently customizing slimming plan based on Internet of things
CN114042296A (en) * 2021-09-22 2022-02-15 广州医科大学附属第一医院(广州呼吸中心) Intelligent training system for rehabilitation of lung surgery patient

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8200323B2 (en) * 2009-05-18 2012-06-12 Adidas Ag Program products, methods, and systems for providing fitness monitoring services
CN104601726A (en) * 2015-02-04 2015-05-06 唐山呼呼网络科技有限公司 Cloud analysis intelligent fitness system based on fitness acquirer and implementing method
CN205283606U (en) * 2015-10-31 2016-06-01 厦门钢宇工业有限公司 Healthy management system of cloud intelligence
US20170263147A1 (en) * 2016-03-08 2017-09-14 Your Trainer Inc. Systems and methods of dynamically creating a personalized workout video
WO2017214926A1 (en) * 2016-06-16 2017-12-21 深圳市屹石科技股份有限公司 Execution device and method for fitness program visualization
CN107770220A (en) * 2016-08-19 2018-03-06 杰铠思科技(上海)有限公司 Gymnasium management system
CN106530055A (en) * 2016-11-11 2017-03-22 厦门钢宇工业有限公司 Body-building method and body-building system
CN106693307B (en) * 2017-01-24 2019-08-09 深圳翎云思创网络科技有限公司 A kind of information interaction system and method for fitness equipment
CN107609191B (en) * 2017-10-11 2020-05-12 安徽一网网络科技有限公司 Incentive type multi-user intelligent fitness management system and using method thereof

Also Published As

Publication number Publication date
CN108939508A (en) 2018-12-07

Similar Documents

Publication Publication Date Title
EP3933811A1 (en) Dynamically adapting cybersecurity training templates based on measuring user-specific phishing/fraud susceptibility
CN104424433B (en) A kind of anti-cheat method and related system of application program
US10695678B2 (en) Computer-implemented methods and systems enabling fan participation in calling plays at sporting and other events
CN108939508B (en) Teenager fitness user data management system and method
CN101501672B (en) Determine powerful/welcome participant in communication network
US20120323623A1 (en) System and method for assigning an incident ticket to an assignee
CN113467847A (en) Service data processing method and device
CN109224453A (en) Game monitoring and managing method, system and computer equipment, computer readable storage medium
CN104158677B (en) A kind of safety state analysis alarm method
US20220075797A1 (en) Systems and Methods for Enabling Situational Awareness for Events Via Data Visualization
CN102571406A (en) Data service node quality analysis method and device and data service short plate analysis system
US20220355696A1 (en) Electric vehicle charging station reliability assessment method and device
CN108133306A (en) Performance appraisal method, server and performance appraisal system
CN108154379A (en) The dissemination method and device of media information
CN102231888A (en) Monitoring method and device
CN110738451A (en) Monitoring method and device for courier cross-region behavior, storage medium and electronic equipment
CN107133892A (en) The real-time estimating method and system of a kind of network Piano lesson
CN107403258A (en) Performance acquisition methods and system
CN107609792A (en) Worker based on big data algorithm assesses labor service resource allocation method and system
CN110942698B (en) Simulation real operation control platform for distribution network uninterrupted operation
CN110414693A (en) A kind of multimedia teaching facility information management system
CN112017749B (en) Intelligent runway system for residential communities
CN116887340A (en) Real-time pushing system for short message status report
US9844726B2 (en) Games analytics
CN108962402B (en) User motion data transmission system and method for personal education training

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200701

Address after: Room 519-1, building 3, Lantian Shixin square, Keqiao street, Keqiao District, Shaoxing City, Zhejiang Province

Applicant after: Shaoxing Dongwei Sports Technology Co., Ltd

Address before: 201419 107, room 1, 518 Haixing Road, Fengxian District Bay Town, Shanghai.

Applicant before: SHANGHAI DONGWEI SPORTS TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210601

Address after: 071000 room 906, 9 / F, building 1, 289 Xingye Road, Baoding City, Hebei Province

Patentee after: Baoding Longwu Information Technology Service Co.,Ltd.

Address before: 312030 room 519-1, building 3, Lantian Shixin Plaza, Keqiao street, Keqiao District, Shaoxing City, Zhejiang Province

Patentee before: Shaoxing Dongwei Sports Technology Co., Ltd

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210721

Address after: 071000 No. 68, southwest Han village, Xiantai Township, high tech Zone, Baoding City, Hebei Province

Patentee after: Baoding tongzhilan Education Technology Co.,Ltd.

Address before: 071000 room 906, 9 / F, building 1, 289 Xingye Road, Baoding City, Hebei Province

Patentee before: Baoding Longwu Information Technology Service Co.,Ltd.