CN108933437A - A kind of power supply capacity automatic analysis method of power distribution network - Google Patents
A kind of power supply capacity automatic analysis method of power distribution network Download PDFInfo
- Publication number
- CN108933437A CN108933437A CN201810608952.XA CN201810608952A CN108933437A CN 108933437 A CN108933437 A CN 108933437A CN 201810608952 A CN201810608952 A CN 201810608952A CN 108933437 A CN108933437 A CN 108933437A
- Authority
- CN
- China
- Prior art keywords
- region
- distribution line
- distribution
- power supply
- substation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
Abstract
The present invention provides a kind of power supply capacity automatic analysis method of power distribution network, includes the following steps:Basic data obtains:By establishing data-interface with major related system, related data information is obtained;Data Management Analysis:By distribution line looped network information process analysis, the communication relationship of substation or the powered distribution line of 10kV bus outside the distribution line and region that substation or 10kV bus are powered in region is established;Meanwhile turning whether will cause overload phenomenon after powering by looped network communication relationship analysis in conjunction with substation, 10kV bus and distribution line load data information analysis distribution line;In conjunction with 10kV distribution line number of users combination looped network communication relationship, analysis turns power supply number of users situation;The comprehensive displaying of data:After interface inputs website in relevant range and is arranged, system carries out data analysis processing, and result is presented to the user.
Description
Technical field
The present invention relates to power distribution network management method fields, divide automatically more particularly, to a kind of power supply capacity of power distribution network
Analysis method.
Background technique
By major network Power grid structure reason, often there is some region Nei Duozuo substation or 10kV bus need into
The limitation of row load is both needed to its supplied power to sub-load turn by distribution line outside region for the power supply reliability of user
His substation and 10kV bus are powered.When distribution scheduling person's execution turns power supply, need manually to check distribution line item by item
The distribution line communication relationship powered with substation outside region or 10kV bus, and also need to consider whether can make after turning power supply
The problems such as at opposite side substation or main transformer overload.The above traditional approach is difficult quickly to provide when power grid need to promptly be rationed the power supply
Distribution line turns power supply plan in region, causes load control system not in time, brings security risk to grid equipment operation.
Based on the above analysis, it is badly in need of that the condition of load control system can be needed in given region Nei Duozuo substation or 10kV bus
Under, it quickly generates the distribution line that substation or 10kV bus are powered in region and turns power supply plan, be that currently there is an urgent need to solve
A demand certainly.
Summary of the invention
The present invention provides a kind of power supply capacity to provide the power distribution network of support for power grid security reliability service and automatically analyzes
Method.
In order to reach above-mentioned technical effect, technical scheme is as follows:
A kind of regional distribution network power supply capacity automatic analysis method, includes the following steps:
S1:Basic data obtains:By establishing data-interface with major related system, related data information is obtained.Such as by with
Power grid Production MIS establishes data-interface, obtains power grid account basic data, the station as belonging to distribution line, change,
The information such as line relationship;By with power grid GIS(Geographic Information System, GIS)Establish number
According to interface, the communication relationship of distribution line, i.e. the looped network point information of distribution line are obtained;By being established with distribution automation system
Data-interface obtains the load data of distribution line, such as substation's load, distribution line information on load;By with marketing management
System establishes data-interface, obtains distribution line number of users information.
S2:Data Management Analysis:By distribution line looped network information process analysis, it is female to establish substation or 10kV in region
The distribution line that line is powered and the communication relationship of substation or the powered distribution line of 10kV bus outside region.Meanwhile in conjunction with
After substation, 10kV bus and distribution line load data information analysis distribution line turn power supply by looped network communication relationship analysis
Whether overload phenomenon will cause.In addition, analysis turns power supply user in conjunction with 10kV distribution line number of users combination looped network communication relationship
Situations such as number.
Distribution line load and number of users situation in bond area, according to accident event classification standard, in analyzed area such as
Have a power failure, the accident event grade by caused by.Meanwhile according to distribution line in region whether the information such as responsible consumer route,
The responsible consumer marketed will be will cause by having a power failure in analyzed area.In addition, distribution line turns to supply power to outside region in bond area
Substation belonging to distribution line and 10kV bus, whether distribution line will cause substation outside region after turning electricity in analyzed area
Or main transformer overload.
During Data Management Analysis, relevant field is defined as follows:
(1)Distribution line returns number in region:The distribution line that substation or 10V bus are powered in region;
(2)Distribution line can be got in touch in region returns number:There is the region distribution line number of looped network communication with distribution line outside region;
(3)It can not interconnector time number in region:Region distribution line number with distribution line outside region without looped network communication;
(4)It can turn distribution line in region entirely and return number:With distribution line outside region have looped network communication and turn electricity after will not
Cause the region distribution line number that distribution line overloads outside region;
(5)It can not turn distribution line in region entirely and return number:There is looped network communication with distribution line outside region but completely turn meeting after electricity
Cause the region distribution line number that distribution line overloads outside region;
(6)Number of users in region:Total number of users that the distribution line that substation or 10V bus are powered in region is powered;
(7)It can contact user number in region:There is total user of the region distribution line of looped network communication with distribution line outside region
Number;
(8)It can not contact user number in region:Total user of region distribution line with distribution line outside region without looped network communication
Number;
(9)Can convert amount entirely in region:With distribution line outside region have looped network communication and turn electricity after will not cause area
Total number of users of the region distribution line number of overseas distribution line overload;
(10)Can not convert amount entirely in region:There is looped network communication with distribution line outside region but area can be caused after completely turning electricity
Total number of users of the region distribution line of overseas distribution line overload;
(12)Region internal loading:The distribution line total load that substation or 10V bus are powered in region;
(12)Load can be got in touch in region:There is the total load of the region distribution line of looped network communication with distribution line outside region;
(13)Load can not be got in touch in region:The total load of region distribution line with distribution line outside region without looped network communication;
(14)It can turn load in region entirely:With distribution line outside region have looped network communication and turn electricity after will not cause region
The total load of the region distribution line number of outer distribution line overload;
(15)It can not turn load in region entirely:There is looped network communication with distribution line outside region but region can be caused after completely turning electricity
The total load of the region distribution line of outer distribution line overload.
S3:The comprehensive displaying of data:After interface inputs website in relevant range and is arranged, system carries out data and divides automatically
Analysis processing, and result is presented to the user.
By power grid account data, substation in the input area item of interface, 10kV bus are provided, while in order to cope with spy
Different occasion provides the input that can not be transferred to item and only be transferred to item.In some region, distribution turns in power supply capacity analytical plan,
Area attribute maintenance " can not be transferred to item " and " being only transferred to item " can only at most select one, i.e.,:It can not select " to be only transferred to
" or " item can not be transferred to ", it is unable to simultaneous selection this two.It is defined respectively as:
(1)Area item:Certain region needs to produce the part of load;
(2)Only it is transferred to item:The load of above-mentioned zone item can only be produced to the region of the part;
(3)Item can not be transferred to:The load of above-mentioned zone item cannot be produced to the region of the part.
During data are shown, the displaying of sub-module data is carried out.Mainly there are following several big modules:
(1)Region website input module:Carry out region mean terms, the substation that item can not be transferred to and be only transferred to item or 10kV bus
Input;
(2)Power supply capacity analysis module:The distribution line that every substation, 10kV bus are powered in detailed display area returns
Situations such as number, number of users and load;
(3)Distribution turns power supply prediction scheme module:It lists the distribution line that every Hui Kezhuan is supplied power to outside region in region and turns power supply plan;
(4)Master network equipment loading condition:Distribution line in region is listed to turn to supply power to the power transformation that distribution line outside region is powered
It stands or the loading condition of 10kV bus.
Compared with prior art, the beneficial effect of technical solution of the present invention is:
(1)Regional distribution network power supply capacity automatically analyzes, and is distribution scheduling person when that need to carry out emergency load control, provides
Distribution line turns quickly generating automatically for power supply prediction scheme, has ensured the timely control of load, has ensured power network safety operation,
Improve power supply reliability;
(2)Regional distribution network power supply capacity automatically analyzes, distribution scheduling person pass through quickly generate automatically turn power supply prediction scheme into
Row power supply user's quickly turns electricity, and avoiding apparatus overload leads to the permanent power failure phenomenon of user, improves the satisfaction of user;
(3)By automatically analyzing for regional distribution network power supply capacity, weak link existing for electric network composition can be disclosed automatically, for electricity
Network planning is drawn, construction provides operation data support.
Detailed description of the invention
Fig. 1 is a kind of flow chart of regional distribution network power supply capacity automatic analysis method of the present invention.
Specific embodiment
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;
In order to better illustrate this embodiment, the certain components of attached drawing have omission, zoom in or out, and do not represent the ruler of actual product
It is very little;
To those skilled in the art, the omitting of some known structures and their instructions in the attached drawings are understandable.
The following further describes the technical solution of the present invention with reference to the accompanying drawings and examples.
Embodiment 1
A kind of regional distribution network power supply capacity automatic analysis method principle of the present invention is:It is connect by establishing data with major system
Mouthful, obtain the data such as distribution network line account, distribution looped network communication data, grid equipment load and distribution line number of users.Root
Distribution outside the distribution line powered according to substation in distribution line looped network data information analyzed area or 10kV bus and region
The communication relationship of route, and whether analysis will cause overload after turning power supply situations such as combination load, while according to distribution line institute
Supply load and number of users situation automatically analyze in region decompression will caused by electric power accident event class situations such as.In addition,
Establish that system interface automatically enters in region substation or 10kV bus website and other require website, and automatically from distribution line
The power supply capacity for returning power distribution network in number, distribution line number of users, distribution line load etc. analyzed area, ultimately produces region
Distribution line turns power supply prediction scheme, and turning to power to execute for distribution scheduling execution regional distribution network provides support, realizes the fast of turn power supply
Speed executes.
Referring to Fig. 1, it is as follows to use a kind of regional distribution network power supply capacity automatic analysis method specific implementation process:
Substation or 10kV bus website input 1 in the region S1:Region domestic demand is implemented to turn substation or the 10kV bus of power supply
Area item, while further including can not be transferred to item and be only transferred to a substation or 10kV bus under special applications scene.
Power grid account basic data obtains 2:By establishing data-interface with power grid Production MIS, power grid is obtained
Account basic data, the information such as the station as belonging to distribution line, change, line relationship.
Distribution looped network account data obtains 3:By with power grid GIS(Geographic Information
System, GIS)Data-interface is established, the communication relationship of distribution line, i.e. the looped network point information of distribution line are obtained.
Grid equipment load data obtains 4:By establishing data-interface with distribution automation system, distribution line is obtained
Load data, such as substation's load, distribution line information on load.
Distribution line number of users obtains 5:By establishing data-interface with marketing management system, distribution line number of users is obtained
Information.
Distribution line returns number power supply capacity analysis 6:According to substation in region or the powered distribution line of 10kV bus with
The looped network communication information of distribution line outside region, in analyzed area distribution line return number, can get in touch in region distribution line return number,
In region can not interconnector return number, distribution line can be turned in region entirely return number, distribution line can not be turned entirely in region return number.
Distribution line number of users power supply capacity analysis 7:According to substation in region or the powered distribution line of 10kV bus
With the looped network communication information of distribution line outside region, number of users in analyzed area, in region can contact user number, can not in region
Can convert entirely in contact user number, region amount, can not convert in region amount entirely.
Distribution line load power supply capacity analysis 8:According to substation in region or the powered distribution line of 10kV bus with
The looped network communication information of distribution line outside region, can get in touch in analyzed area internal loading, region load, can not get in touch in region it is negative
It can turn load in lotus, region entirely, load can not be turned entirely in region.
Master network equipment loading condition analysis 9:Distribution line has the area of contact with distribution line outside region in analyzed area
Substation belonging to overseas distribution line and major network route.Meanwhile by obtaining substation and major network line load phase outside region
Data are closed, substation is analyzed and whether major network route turns to overload after powering, provide support to turn power supply analysis.
Responsible consumer influences situation analysis 10:The distribution line account powered by region distribution transforming power station or 10kV bus
Information analyzes its responsible consumer powered.
Distribution line turns power supply scheme forming 11 in region:The distribution powered according to substation in region or 10kV bus
The communication relationship information of distribution line outside route and region, and the information such as distribution line load and number of users are combined, it automatically generates
Distribution line turns power supply prediction scheme, executes distribution line load control system in region for distribution scheduling and executes a turn power supply and provide support,
Realize that the effective of load quickly implements control.
Region supplying power allocation capability analysis, which is summarized, summarizes 12:Data are analyzed according to power distribution network power supply capacity in region, automatically
Formation zone supplying power allocation capability analysis, which is summarized, to be summarized, and main contents include:Distribution line returns number, distribution line number of users, matches
The power supply capacities of the dimensions such as net line load is analyzed, region decompression will caused by electric power accident event class, region decompression shadow
The contents such as loud responsible consumer.
The same or similar label correspond to the same or similar components;
Described in attached drawing positional relationship for only for illustration, should not be understood as the limitation to this patent;Obviously, originally
The above embodiment is merely an example for clearly illustrating the present invention for invention, and is not to embodiments of the present invention
Restriction.For those of ordinary skill in the art, other not similar shapes can also be made on the basis of the above description
The variation or variation of formula.There is no necessity and possibility to exhaust all the enbodiments.It is all in the spirit and principles in the present invention
Within made any modifications, equivalent replacements, and improvements etc., should all be included in the scope of protection of the claims of the present invention.
The same or similar label correspond to the same or similar components;
Described in attached drawing positional relationship for only for illustration, should not be understood as the limitation to this patent;
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be to this hair
The restriction of bright embodiment.For those of ordinary skill in the art, it can also do on the basis of the above description
Other various forms of variations or variation out.There is no necessity and possibility to exhaust all the enbodiments.It is all in the present invention
Spirit and principle within made any modifications, equivalent replacements, and improvements etc., should be included in the guarantor of the claims in the present invention
Within the scope of shield.
Claims (6)
1. a kind of power supply capacity automatic analysis method of power distribution network, which is characterized in that include the following steps:
S1:Basic data obtains:By establishing data-interface with major related system, related data information is obtained;
S2:Data Management Analysis:By distribution line looped network information process analysis, substation or 10kV bus institute in region are established
The communication relationship of substation or the powered distribution line of 10kV bus outside the distribution line of power supply and region;Meanwhile in conjunction with power transformation
Stand, 10kV bus and distribution line load data information analysis distribution line by looped network communication relationship analysis turn power supply after whether
It will cause overload phenomenon;In conjunction with 10kV distribution line number of users combination looped network communication relationship, analysis turns power supply number of users situation;
S3:The comprehensive displaying of data:After interface inputs website in relevant range and is arranged, system is carried out at data analysis
Reason, and result is presented to the user.
2. the power supply capacity automatic analysis method of power distribution network according to claim 1, which is characterized in that the step S2 is also
Including:Distribution line load and number of users situation in bond area are stopped in analyzed area according to accident event classification standard
Electricity, the accident event grade by caused by;Meanwhile according to distribution line in region whether the information such as responsible consumer route, analysis area
The responsible consumer marketed will be will cause by having a power failure in domain;Distribution line turns to supply power to outside region belonging to distribution line in bond area
Substation and 10kV bus, whether distribution line will cause substation or main transformer overload outside region after turning electricity in analyzed area.
3. the power supply capacity automatic analysis method of power distribution network according to claim 1, which is characterized in that in the region
It is the distribution line number that substation or 10V bus are powered in region that distribution line, which returns number,;Distribution can be got in touch in the region
It is the region distribution line number for having looped network communication with distribution line outside region that route, which returns number,;It can not interconnection in the region
It is the region distribution line number with distribution line outside region without looped network communication that number is returned on road;It can turn distribution line in the region entirely
Returning number is to have looped network communication with distribution line outside region and will not cause the area that distribution line overloads outside region after turning electricity
Domain distribution line number;Can not turn entirely in the region distribution line return number be with distribution line outside region with looped network communication but
It can cause the region distribution line number that distribution line overloads outside region after completely turning electricity;Number of users is in region in the region
Total number of users that the distribution line that substation or 10V bus are powered is powered;In the region can contact user number be with
Distribution line has total number of users of the region distribution line of looped network communication outside region;It can not contact user number in the region
It is total number of users of the region distribution line with distribution line outside region without looped network communication;Can convert amount entirely in the region
It is that there is looped network communication with distribution line outside region and the region that distribution line overloads outside region will not be caused to match after turning electricity
Total number of users of cable number;The amount that can not convert entirely in the region be with distribution line outside region have looped network communication but
It can cause the total number of users for the region distribution line that distribution line overloads outside region after completely turning electric;The region internal loading is
The distribution line total load that substation or 10V bus are powered in region;Can be got in touch in the region load be with outside region
Distribution line has the total load of the region distribution line of looped network communication;Can not be got in touch in the region load be with outside region
The total load of region distribution line of the distribution line without looped network communication;Can turn load in the region entirely is and distribution outside region
It is that route has a looped network communication and turn the region distribution line number that distribution line region outside will not be caused to overload after electricity total bears
Lotus;Can not turn load in the region entirely is to have looped network communication with distribution line outside region but can cause area after completely turning electricity
The total load of the region distribution line of overseas distribution line overload.
4. the power supply capacity automatic analysis method of power distribution network according to claim 3, which is characterized in that in the step S3
By power grid account data, substation in the input area item of interface, 10kV bus are provided, while in order to cope with special occasions,
Offer can not be transferred to item and only be transferred to the input of item;In some region, distribution turns in power supply capacity analytical plan, and region belongs to
Property maintenance " item can not be transferred to " and " being only transferred to item " can only at most select one, i.e.,:Can not select " being only transferred to item " or
" can not be transferred to item " is unable to simultaneous selection this two.
5. the power supply capacity automatic analysis method of power distribution network according to claim 4, which is characterized in that the area item
It is the part that certain region needs to produce load;It is described to be only transferred to the load that item is above-mentioned zone item and produce to the part
Region;It is described to be transferred to the load that item is above-mentioned zone item and cannot produce to the region of the part.
6. the power supply capacity automatic analysis method of power distribution network according to claim 5, which is characterized in that shown in data
In the process, the displaying of sub-module data is carried out, mainly there are following several big modules:
Region website input module:It is defeated to carry out region mean terms, the substation that item can not be transferred to and be only transferred to item or 10kV bus
Enter;
Power supply capacity analysis module:The distribution line that every substation, 10kV bus are powered in detailed display area returns number, uses
Amount and load condition;
Distribution turns power supply prediction scheme module:It lists the distribution line that every Hui Kezhuan is supplied power to outside region in region and turns power supply plan;
Master network equipment loading condition:List distribution line in region turn to supply power to substation that distribution line outside region is powered or
The loading condition of 10kV bus.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810608952.XA CN108933437B (en) | 2018-06-13 | 2018-06-13 | Automatic analysis method for power supply capacity of power distribution network |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810608952.XA CN108933437B (en) | 2018-06-13 | 2018-06-13 | Automatic analysis method for power supply capacity of power distribution network |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108933437A true CN108933437A (en) | 2018-12-04 |
CN108933437B CN108933437B (en) | 2021-07-16 |
Family
ID=64446547
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810608952.XA Active CN108933437B (en) | 2018-06-13 | 2018-06-13 | Automatic analysis method for power supply capacity of power distribution network |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108933437B (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109948191A (en) * | 2019-02-22 | 2019-06-28 | 广东电网有限责任公司 | Volume method and system is repaired in a kind of rolling of one prediction scheme of a bus |
CN110310053A (en) * | 2019-08-28 | 2019-10-08 | 广东电网有限责任公司佛山供电局 | A kind of automation of distribution line can turn power supply capacity statistical method and system |
CN110517163A (en) * | 2019-07-31 | 2019-11-29 | 广东电网有限责任公司 | A kind of distribution network feeder group analyzing method |
CN110610327A (en) * | 2019-10-09 | 2019-12-24 | 广东电网有限责任公司 | Intelligent analysis method for power supply capacity of distribution network considering temporary load transfer |
CN110957724A (en) * | 2019-12-16 | 2020-04-03 | 深圳供电局有限公司 | Method for evaluating operation mode and grid structure of power distribution network |
CN111342455A (en) * | 2020-03-17 | 2020-06-26 | 云南电网有限责任公司迪庆供电局 | Method for switching 10kV line ring network into power supply |
CN112087001A (en) * | 2020-09-28 | 2020-12-15 | 国家电网有限公司 | County clean energy supply system capable of converting energy supply |
CN112258149A (en) * | 2020-10-14 | 2021-01-22 | 广东电网有限责任公司 | Method, device, equipment and storage medium for determining circuit switchable power supply rate |
CN113258683A (en) * | 2021-07-01 | 2021-08-13 | 广东电网有限责任公司佛山供电局 | Distribution network ring network point change analysis method and system |
CN116154778A (en) * | 2023-04-19 | 2023-05-23 | 广东电网有限责任公司佛山供电局 | Automatic analysis method, device and equipment for first-segment looped network of power distribution network |
CN116505525A (en) * | 2023-06-29 | 2023-07-28 | 北京国科恒通科技股份有限公司 | Load switching method and device for power grid line and computer storage medium |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103746374A (en) * | 2014-01-14 | 2014-04-23 | 国家电网公司 | Closed loop control method comprising multi-microgrid power distribution network |
CN105868869A (en) * | 2016-05-10 | 2016-08-17 | 华南理工大学 | Dynamic distribution automation terminal layout optimization planning method taking reliability and economic cost of power supply into account |
CN106208393A (en) * | 2016-09-21 | 2016-12-07 | 北京三清互联科技有限公司 | A kind of distribution network automated monitoring method and system |
CN107103415A (en) * | 2017-04-17 | 2017-08-29 | 中国南方电网有限责任公司 | Power distribution network resource allocation method and system |
CN107346886A (en) * | 2016-12-06 | 2017-11-14 | 广东电网有限责任公司云浮供电局 | Distribution network load turns to supply method and system |
JP2018007364A (en) * | 2016-06-29 | 2018-01-11 | 積水化学工業株式会社 | Power management device and program |
CN107681780A (en) * | 2017-09-07 | 2018-02-09 | 广东电网有限责任公司佛山供电局 | A kind of power network section monitors and turns to supply tactful intelligent generating system and method |
CN107844880A (en) * | 2017-07-17 | 2018-03-27 | 中国南方电网有限责任公司 | A kind of electric network fault grade automatic identifying method based on multisource data fusion |
CN108061841A (en) * | 2017-11-13 | 2018-05-22 | 广东电网有限责任公司惠州供电局 | A kind of method of electric network fault event class automatic identification |
-
2018
- 2018-06-13 CN CN201810608952.XA patent/CN108933437B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103746374A (en) * | 2014-01-14 | 2014-04-23 | 国家电网公司 | Closed loop control method comprising multi-microgrid power distribution network |
CN105868869A (en) * | 2016-05-10 | 2016-08-17 | 华南理工大学 | Dynamic distribution automation terminal layout optimization planning method taking reliability and economic cost of power supply into account |
JP2018007364A (en) * | 2016-06-29 | 2018-01-11 | 積水化学工業株式会社 | Power management device and program |
CN106208393A (en) * | 2016-09-21 | 2016-12-07 | 北京三清互联科技有限公司 | A kind of distribution network automated monitoring method and system |
CN107346886A (en) * | 2016-12-06 | 2017-11-14 | 广东电网有限责任公司云浮供电局 | Distribution network load turns to supply method and system |
CN107103415A (en) * | 2017-04-17 | 2017-08-29 | 中国南方电网有限责任公司 | Power distribution network resource allocation method and system |
CN107844880A (en) * | 2017-07-17 | 2018-03-27 | 中国南方电网有限责任公司 | A kind of electric network fault grade automatic identifying method based on multisource data fusion |
CN107681780A (en) * | 2017-09-07 | 2018-02-09 | 广东电网有限责任公司佛山供电局 | A kind of power network section monitors and turns to supply tactful intelligent generating system and method |
CN108061841A (en) * | 2017-11-13 | 2018-05-22 | 广东电网有限责任公司惠州供电局 | A kind of method of electric network fault event class automatic identification |
Non-Patent Citations (1)
Title |
---|
陈东新: "配电自动化终端布点优化的动态规划研究", 《电力系统保护与控制》 * |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109948191A (en) * | 2019-02-22 | 2019-06-28 | 广东电网有限责任公司 | Volume method and system is repaired in a kind of rolling of one prediction scheme of a bus |
CN110517163A (en) * | 2019-07-31 | 2019-11-29 | 广东电网有限责任公司 | A kind of distribution network feeder group analyzing method |
CN110310053A (en) * | 2019-08-28 | 2019-10-08 | 广东电网有限责任公司佛山供电局 | A kind of automation of distribution line can turn power supply capacity statistical method and system |
CN110610327A (en) * | 2019-10-09 | 2019-12-24 | 广东电网有限责任公司 | Intelligent analysis method for power supply capacity of distribution network considering temporary load transfer |
CN110957724A (en) * | 2019-12-16 | 2020-04-03 | 深圳供电局有限公司 | Method for evaluating operation mode and grid structure of power distribution network |
CN110957724B (en) * | 2019-12-16 | 2023-10-24 | 深圳供电局有限公司 | Power distribution network operation mode and grid structure evaluation method |
CN111342455B (en) * | 2020-03-17 | 2023-07-28 | 云南电网有限责任公司迪庆供电局 | Method for converting 10kV line ring network into power supply |
CN111342455A (en) * | 2020-03-17 | 2020-06-26 | 云南电网有限责任公司迪庆供电局 | Method for switching 10kV line ring network into power supply |
CN112087001A (en) * | 2020-09-28 | 2020-12-15 | 国家电网有限公司 | County clean energy supply system capable of converting energy supply |
CN112087001B (en) * | 2020-09-28 | 2024-05-07 | 国家电网有限公司 | County clean energy supply system capable of converting energy supply |
CN112258149A (en) * | 2020-10-14 | 2021-01-22 | 广东电网有限责任公司 | Method, device, equipment and storage medium for determining circuit switchable power supply rate |
CN112258149B (en) * | 2020-10-14 | 2023-05-30 | 广东电网有限责任公司 | Method, device, equipment and storage medium for determining line rotatable power supply rate |
CN113258683A (en) * | 2021-07-01 | 2021-08-13 | 广东电网有限责任公司佛山供电局 | Distribution network ring network point change analysis method and system |
CN113258683B (en) * | 2021-07-01 | 2021-09-14 | 广东电网有限责任公司佛山供电局 | Distribution network ring network point change analysis method and system |
CN116154778B (en) * | 2023-04-19 | 2023-07-04 | 广东电网有限责任公司佛山供电局 | Automatic analysis method, device and equipment for first-segment looped network of power distribution network |
CN116154778A (en) * | 2023-04-19 | 2023-05-23 | 广东电网有限责任公司佛山供电局 | Automatic analysis method, device and equipment for first-segment looped network of power distribution network |
CN116505525A (en) * | 2023-06-29 | 2023-07-28 | 北京国科恒通科技股份有限公司 | Load switching method and device for power grid line and computer storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN108933437B (en) | 2021-07-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108933437A (en) | A kind of power supply capacity automatic analysis method of power distribution network | |
Yuan et al. | Smart grids in China | |
CN108808675B (en) | Automatic generation method for power supply conversion scheme of voltage-loss distribution network of transformer substation | |
Hussain et al. | Communication modeling of solar home system and smart meter in smart grids | |
Dada | Towards understanding the benefits and challenges of Smart/Micro-Grid for electricity supply system in Nigeria | |
CN103366051B (en) | Primary equipment and the method and system of secondary device modeling | |
CN107730093B (en) | System and method for power grid accident re-routing path | |
Dicorato et al. | An integrated DC microgrid solution for electric vehicle fleet management | |
CN103559160B (en) | The construction method of semantic information interactive interface based on the intelligent distribution system of SG-CIM standard | |
CN103065270A (en) | Visual monitoring system of power grid breakdown first-aid repair | |
CN103675600A (en) | A power distribution network fault diagnosis system based on topology knowledge and a method | |
CN103986227A (en) | Electric power distribution network operation monitoring method and system based on GIS platform | |
CN105678651A (en) | Power grid big data quality standardization-based power grid information management system and method | |
CN105117532A (en) | Modeling method for intelligent substation secondary equipment interval information model | |
CN104835078B (en) | Consider that the trend of prepared auto restart action determines method in static security analysis system | |
CN104535892B (en) | A kind of fault detection method and equipment | |
Yuan | Rural electrification goes local: recent innovations in renewable generation, energy efficiency, and grid modernization | |
CN111585352B (en) | Power monitoring system, equipment and readable storage medium based on PMS2.0 system | |
CN102044021A (en) | Management method for power grid risk assessment | |
CN103942240B (en) | A kind of building method of intelligent substation integrated data Information application platform | |
Jinming et al. | Application prospect of edge computing in smart distribution | |
CN104537571B (en) | A kind of information in power dispatching center graphical representation method based on GIS | |
CN112286915A (en) | Data interaction method for power communication dispatching command platform and third-party platform | |
Recalde et al. | A review of operation methods and simulation requirements for future smart distribution grids | |
Karnouskos et al. | Prosumer interactions for efficient energy management in smartgrid neighborhoods |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |