CN108931138A - A kind of arc furnace cover preparation system - Google Patents

A kind of arc furnace cover preparation system Download PDF

Info

Publication number
CN108931138A
CN108931138A CN201811013441.XA CN201811013441A CN108931138A CN 108931138 A CN108931138 A CN 108931138A CN 201811013441 A CN201811013441 A CN 201811013441A CN 108931138 A CN108931138 A CN 108931138A
Authority
CN
China
Prior art keywords
arc furnace
furnace cover
agitating device
preparation system
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811013441.XA
Other languages
Chinese (zh)
Other versions
CN108931138B (en
Inventor
王习华
杨忠波
王习强
谭勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan One Electric Technology Co Ltd
Original Assignee
Sichuan One Electric Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan One Electric Technology Co Ltd filed Critical Sichuan One Electric Technology Co Ltd
Priority to CN201811013441.XA priority Critical patent/CN108931138B/en
Publication of CN108931138A publication Critical patent/CN108931138A/en
Application granted granted Critical
Publication of CN108931138B publication Critical patent/CN108931138B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D1/00Casings; Linings; Walls; Roofs
    • F27D1/18Door frames; Doors, lids, removable covers
    • F27D1/1808Removable covers
    • F27D1/1816Removable covers specially adapted for arc furnaces
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Abstract

The invention discloses a kind of arc furnace cover preparation systems, including the first agitating device, for being stirred the various components for preparing arc furnace cover in advance;Second agitating device carries out secondary agitation with moisture for will be stirred the various components for preparing arc furnace cover in advance according to the ratio and mixes;Automatic water supply system uses water for providing according to arc furnace cover preparation proportion for the second agitating device;Mobile platform is delivered in injection mold for carrying the second agitating device and automatic water supply system, and by the mixture that secondary agitation mixes is completed;Injection mold, for the mixture injection molding of secondary agitation mixing will to be completed;Baking system accelerates the evaporation of its moisture for toasting the arc furnace cover of injection molding.

Description

A kind of arc furnace cover preparation system
Technical field
The invention belongs to the technical fields of arc furnace cover, and in particular to a kind of arc furnace cover preparation system.
Background technique
With the rapid development of China's steel and iron industry, strengthening smelting new process is constantly used, and electric furnace is constantly to big in pot Type and ultra high powerization development, but bring is that resistance to material use condition is increasingly harsh therewith, and the bell service life reduces etc. year by year asks Topic.Arc furnace cover is a component of the utmost importance in electric furnace production process, and service life height significantly affects the operating rate of electric furnace And labor intensity, and certain influence is brought to steel quality and production safety.
And existing arc furnace cover preparation system cycle time is long, low efficiency, be not able to satisfy industrialized production rate and The requirement of quality.
Summary of the invention
It is an object of the invention to be directed to above-mentioned deficiency in the prior art, a kind of arc furnace cover preparation system is provided, To solve the problems, such as that the existing arc furnace cover manufacturing cycle time is long and prepares low-quality.
In order to achieve the above objectives, the technical solution adopted by the present invention is that:
A kind of arc furnace cover preparation system comprising:
First agitating device, for being stirred the various components for preparing arc furnace cover in advance;
Second agitating device is carried out for will be stirred the various components for preparing arc furnace cover in advance with moisture according to the ratio Secondary agitation mixing;
Automatic water supply system uses water for providing according to arc furnace cover preparation proportion for the second agitating device;
Mobile platform, for carrying the second agitating device and automatic water supply system, and the group that secondary agitation mixing will be completed Part mixture is delivered in injection mold;
Injection mold, for the mixture injection molding of secondary agitation mixing will to be completed;
Baking system accelerates the evaporation of its moisture for toasting the arc furnace cover of injection molding.
Preferably, the second agitating device and automatic water supply system are mounted on mobile platform;Automatic water supply system goes out Waterpipe is located at the top of the second agitating device;Agitating device bottom opening is simultaneously connected to conveyance conduit;
Mobile platform is set on two platform tracks by the four rolling of its bottom;It is set between two platform tracks There are several to prepare the injection mold of arc furnace cover;A pair of boom crane is installed above mobile platform;Pair of both arms crane One boom is installed, boom is equipped with the lifting rope with hook connection on beam orbit.
Preferably, automatic water replenishing system includes water tank;The first electromagnetism is respectively equipped on water tank water intake pipeline and outlet conduit Valve and second solenoid valve;It is embedded a control panel at the top of water tank, controller is integrated in control panel and is electrically connected with controller The water level detecting warning circuit connect;Water level detecting warning circuit includes a piece of four bilateral analog switch integrated circuit CD4066 core Piece;13 pins of CD4066 chip extend at the water level of water tank a quarter depth, and 5 pins extend to half depth At water level, 6 pins are extended at the water level of 3/4ths depth, and 12 pins are located at tank top position.
Preferably, the first solenoid valve and second solenoid valve are HOPE97 pulse electromagnetic valve, and are connected with controller signals It connects;Controller is STM32 single-chip microcontroller;STM32 single-chip microcontroller inputs between serial ports end and water level detecting warning circuit to be connected by conducting wire It connects.
Preferably, baking system includes several baking vessel being disposed adjacent;Each baking vessel and its lid are separately positioned, And each baking vessel's wall and lid include insulating layer and steelframe;Steelframe is embedded on six sides of insulating layer;Steelframe Staggered form is distributed in baking vessel's wall and lid, and the steelframe vertical section on the inside of baking vessel's wall is L-shaped, the concave side of L-type An infrared heating fluorescent tube is fixed in face.
Preferably, for cooperating the arc shaped hook of hook there are four being welded on the steelframe of lid upper surface.
Preferably, baking vessel's wall top is evenly distributed with several wall fans.
Preferably, insulating layer is insulating sponge.
Arc furnace cover preparation system provided by the invention, has the advantages that
The solid material for preparing arc furnace cover is carried out first time mixing by invention according to the proportion, and will complete first Mixture and water after secondary stirring carry out that second of stirring of completion is sufficiently stirred, and raw material can be sufficiently uniformly mixed by stirring twice, The quality for ensuring the arc furnace cover of later period injection molding, efficiently solves that the existing arc furnace cover quality of production is low to ask Topic.
Except this, secondary mixed raw material will be completed by mobile platform and is fed directly to the injection mold of arc furnace cover In, after completing injection molding, the arc furnace cover for completing injection molding is transported to baking vessel by both arms crane, is carried out The evaporation of the arc furnace cover moisture of moisture is accelerated in uniformly baking, accelerates arc furnace cover into flat rate.
The present invention is remarkably reinforced compared to traditional preparation system, the degree of automation, and efficiently solves existing electric arc furnaces The bell manufacturing cycle time is long and prepares low-quality problem.
Detailed description of the invention
Fig. 1 is the system block diagram of arc furnace cover preparation system.
Fig. 2 is the structure chart of arc furnace cover preparation system.
Fig. 3 is the structure chart of arc furnace cover preparation system baking vessel.
Fig. 4 is the arc furnace cover preparation system infrared heating fluorescent tube location drawing.
Fig. 5 is arc furnace cover preparation system cisten mechanism figure.
Fig. 6 is that warning circuit is detected in arc furnace cover preparation system Water in Water Tanks position.
Wherein, 1, mobile platform;2, the second agitating device;3, water tank;4, conveyance conduit;5, injection mold;6, platform rail Road;7, idler wheel;8, twin beams track;9, boom;10, lifting rope;11, it links up with;12, baking vessel;13, wall fan;14, infrared heat lamp Pipe;15, steelframe;16, lid;17, arc shaped hook;18, insulating layer;19, baking vessel's wall;31, control panel;32, the first LED Lamp;33, the second LED light;34, third LED light;35 the 4th LED light;36, the first solenoid valve;37, water inlet line;38, the second electricity Magnet valve;39, outlet conduit.
Specific embodiment
A specific embodiment of the invention is described below, in order to facilitate understanding by those skilled in the art this hair It is bright, it should be apparent that the present invention is not limited to the ranges of specific embodiment, for those skilled in the art, As long as various change is in the spirit and scope of the present invention that the attached claims limit and determine, these variations are aobvious and easy See, all are using the innovation and creation of present inventive concept in the column of protection.
With reference to Fig. 1, according to one embodiment of the application, the arc furnace cover preparation system of this programme, comprising:
First agitating device, for being stirred the various components for preparing arc furnace cover in advance;
Second agitating device 2, for will be stirred in advance the various components for preparing arc furnace cover and moisture according to the ratio into The mixing of row secondary agitation;
Automatic water supply system uses water for providing according to arc furnace cover preparation proportion for the second agitating device 2;
Mobile platform 1 for carrying the second agitating device 2 and automatic water supply system, and will complete what secondary agitation mixed Mixture is delivered in injection mold 5;
Injection mold 5, for the mixture injection molding of secondary agitation mixing will to be completed;
Baking system accelerates the evaporation of its moisture for toasting the arc furnace cover of injection molding.
Just each system and device are described in detail below:
First agitating device is HX-L2000 powder mixer, and shop personnel can be according to preparing each of arc furnace cover Kind component carries out the first time stirring of solid powder according to the proportion of each component.
Second agitating device 2 and automatic water supply system are mounted on mobile platform 1, the outlet conduit of automatic water supply system 39 are located at the top of the second agitating device 2, and agitating device bottom opening is simultaneously connected to conveyance conduit 4.
Second agitating device 2 be JW-350 blender, for will complete for the first time stirring after mixture with it is a certain amount of Water carries out second and stirs.The various combinations for preparing arc furnace cover are stirred twice, compared in conventional preparation techniques Successively stirring, stirring can be sufficiently mixed various components twice, and can stir evenly each component, for the quality of finished product With higher promotion.Second agitating device, 2 bottom opening is simultaneously connected to conveyance conduit 4, will complete the mixture of secondary agitation Conveying outward.
With reference to Fig. 5, automatic water replenishing system includes water tank 3;Is respectively equipped on 3 water inlet line 37 of water tank and outlet conduit 39 One solenoid valve 36 and second solenoid valve 38;The top of water tank 3 is embedded a control panel 31, is integrated with controller in control panel 31 With the water level detecting warning circuit being electrically connected with the controller;Water level detecting warning circuit includes that a piece of four bilateral analog switch is integrated Circuit CD4066 chip;13 pins of CD4066 chip extend at the water level of 3 a quarter depth of water tank, and 5 pins extend to At the water level of half depth, 6 pins are extended at the water level of 3/4ths depth, and 12 pins are located at 3 top position of water tank.
First solenoid valve 36 and second solenoid valve 38 are HOPE97 pulse electromagnetic valve, and are connect with controller signals; Controller is STM32 single-chip microcontroller;STM32 single-chip microcontroller is inputted between serial ports end and water level detecting warning circuit and is connected by conducting wire.
With reference to Fig. 6, the working principle of water tank 3 are as follows: when water tank 3 is anhydrous, due to the effect of 180K resistance, make four switches Control terminal be low level, switch disconnects, and LED do not shine.With the increase of water level, due to the conductive characteristic of water, so that IC 13 feet are high level, and S1 is connected, and LED1 is lighted;When water level gradually increases, LED successively shine indicated water level.When water is full, LED4 It shines, display water is full.T1 conducting simultaneously, B issue alarm, and water is prompted to expire.When not needing alarm, switch K is disconnected.
I.e. when the water level in water tank 3 is a quarter, S1 conducting, the 4th LED light 35 shines;
When the water level in water tank 3 is half, S2 conducting, third LED light 34 shines;
When the water level in water tank 3 is 3/4ths, S3 conducting, the second LED light 33 shines;
When the water in water tank 3 is full, S4 conducting, the first LED light 32 shines, while B issues alarm.
Water level information is sent to controller by water level detecting warning circuit simultaneously, and controller can control 37 He of water inlet line The inflow and outflow of outlet conduit 39.When the water level in water tank 3 is lower than half, i.e. the 4th LED light 35 shines, third When LED light 34 does not shine, the first solenoid valve 36 of control is opened into water inlet, until the second LED light 33 and the first LED light 32 shine When, the first solenoid valve 36 of control is closed.
With reference to Fig. 2, mobile platform 1 is set on two platform tracks 6 by the four rolling 7 of its bottom;It is flat positioned at two It is equipped with several between platform track 6 and prepares the injection mold 5 of arc furnace cover;A pair of boom crane is installed above mobile platform 1; One boom 9 is installed, boom 9 is equipped with the lifting rope 10 connecting with hook 11 on the twin beams track 8 of both arms crane.
Injection mold 5 can choose general arc furnace cover injection mold 5 and carry out injection molding.Positioned at two platforms Several injection molds 5 are installed, mobile platform 1 is moved to 5 top of injection mold, by conveyance conduit 4 by group between track 6 Part mixture is delivered in injection mold 5, and then completes the injection molding of arc furnace cover.
With reference to Fig. 3, baking system includes several baking vessel being disposed adjacent 12;Each baking vessel 12 divides with its lid 16 From setting, and each baking vessel's wall 19 and lid 16 include insulating layer 18 and steelframe 15;On six sides of insulating layer 18 It is embedded with steelframe 15;15 staggered form of steelframe is distributed in baking vessel's wall 19 and lid 16, positioned at 19 inside of baking vessel's wall 15 vertical section of steelframe is L-shaped, and the concave side of L-type fixes an infrared heating fluorescent tube 14.
It is welded with reference to Fig. 4, on the steelframe 15 of 16 upper surface of lid there are four the arc shaped hook 17 for being used to cooperate hook 11, it can By the cooperation of hook 11 and four arc shaped hooks 17, lid 16 is sling to and is moved to the top of baking vessel 12, by baking vessel 12 A confined space is formed, prevents heat is too fast to scatter and disappear.
19 top of baking vessel's wall is evenly distributed with several wall fans 13, when toasting arc furnace cover, can accelerate to toast Air flowing in room 12, avoids local temperature excessively high, influences final product quality.
Insulating layer 18 between steelframe 15 selects insulating sponge, primarily serves the effect of insulation pack heat, reduces thermal loss.
Just the working principle of arc furnace cover preparation system of the present invention is described in detail below:
The various solids or solid powder of arc furnace cover are put into the first agitating device according to the ratio, are carried out mixed for the first time Stirring is closed, and obtains the mixture stirred for the first time;
By first time, the mixture of stirring is transported in the second agitating device 2, and a certain amount of moisture is added by water tank 3, It carries out second to stir, and obtains second of stirring mixture;
Mobile platform 1 is moved to 5 top of injection mold, will pass through the transport of conveyance conduit 4 to note by stirring mixture for the second time In mould 5, vibration moulding obtains arc furnace cover;
Double girder crane is opened, the arc furnace cover of vibration moulding is transported to by baking vessel 12 by hook 11 and lifting rope 10 It is interior;
Lid 16 is transported to 12 top of baking vessel by rope and hook 11, opened red by double girder crane subjob again External heat fluorescent tube 14 and wall fan 13 carry out evenly drying to arc furnace cover.
The solid material for preparing arc furnace cover is carried out first time mixing by invention according to the proportion, and will complete first Mixture and water after secondary stirring carry out that second of stirring of completion is sufficiently stirred, and raw material can be sufficiently uniformly mixed by stirring twice, The quality for ensuring the arc furnace cover of later period injection molding, efficiently solves that the existing arc furnace cover quality of production is low to ask Topic.
Except this, secondary mixed raw material will be completed and pass through the injection mold 5 that mobile platform 1 is fed directly to arc furnace cover In, after completing injection molding, the arc furnace cover for completing injection molding is transported to baking vessel 12 by both arms crane, into Row uniformly baking, accelerates the evaporation of the arc furnace cover moisture of moisture, accelerates arc furnace cover into flat rate.
The present invention is remarkably reinforced compared to traditional preparation system, the degree of automation, and efficiently solves existing electric arc furnaces The bell manufacturing cycle time is long and prepares low-quality problem.
Although being described in detail in conjunction with specific embodiment of the attached drawing to invention, should not be construed as to this patent Protection scope restriction.In range described by claims, those skilled in the art are without creative work The various modifications and deformation made still belong to the protection scope of this patent.

Claims (8)

1. a kind of arc furnace cover preparation system characterized by comprising
First agitating device, for being stirred the various components for preparing arc furnace cover in advance;
Second agitating device is carried out according to the ratio for will be stirred the various components for preparing arc furnace cover in advance with moisture secondary It is stirred;
Automatic water supply system uses water for providing according to arc furnace cover preparation proportion for the second agitating device;
Mobile platform is mixed for carrying the second agitating device and automatic water supply system, and by the component that secondary agitation mixes is completed Object is closed to be delivered in injection mold;
Injection mold, for the mixture injection molding of secondary agitation mixing will to be completed;
Baking system accelerates the evaporation of its moisture for toasting the arc furnace cover of injection molding.
2. arc furnace cover preparation system according to claim 1, it is characterised in that: second agitating device and automatic Water system is mounted on mobile platform;The outlet conduit of the automatic water supply system is located at the top of the second agitating device; The agitating device bottom opening is simultaneously connected to conveyance conduit;
The mobile platform is set on two platform tracks by the four rolling of its bottom;Positioned at two platform tracks it Between be equipped with several prepare the injection mold of arc furnace cover;A pair of boom crane is installed above the mobile platform;It is described double One boom is installed, boom is equipped with the lifting rope with hook connection on the twin beams track of boom crane.
3. arc furnace cover preparation system according to claim 1, it is characterised in that: the automatic water replenishing system includes water Case;The first solenoid valve and second solenoid valve are respectively equipped on the water tank water intake pipeline and outlet conduit;The top of the water tank It is embedded a control panel, the water level detecting warning circuit that controller is integrated in control panel and is electrically connected with the controller;It is described Water level detecting warning circuit includes a piece of four bilateral analog switch integrated circuit CD4066 chip;Draw the 13 of the CD4066 chip Foot extends at the water level of water tank a quarter depth, and 5 pins extend at the water level of half depth, and 6 pins extend to At the water level of 3/4ths depth, 12 pins are located at tank top position.
4. arc furnace cover preparation system according to claim 3, it is characterised in that: first solenoid valve and the second electricity Magnet valve is HOPE97 pulse electromagnetic valve, and is connect with controller signals;The controller is STM32 single-chip microcontroller;It is described STM32 single-chip microcontroller is inputted between serial ports end and water level detecting warning circuit and is connected by conducting wire.
5. arc furnace cover preparation system according to claim 1, it is characterised in that: the baking system includes several The baking vessel being disposed adjacent;Each baking vessel and its lid are separately positioned, and each baking vessel's wall and lid include Insulating layer and steelframe;Steelframe is embedded on six sides of the insulating layer;The steelframe staggered form is distributed in baking vessel's wall Wall and lid, the steelframe vertical section on the inside of baking vessel's wall is L-shaped, and the concave side of L-type fixes an infrared heating Fluorescent tube.
6. arc furnace cover preparation system according to claim 5, it is characterised in that: on the steelframe of the lid upper surface There are four for cooperating the arc shaped hook of hook for welding.
7. arc furnace cover preparation system according to claim 5, it is characterised in that: baking vessel's wall top is uniform Several wall fans are distributed with.
8. arc furnace cover preparation system according to claim 5, it is characterised in that: the insulating layer is insulating sponge.
CN201811013441.XA 2018-08-31 2018-08-31 Electric arc furnace cover preparation system Active CN108931138B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811013441.XA CN108931138B (en) 2018-08-31 2018-08-31 Electric arc furnace cover preparation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811013441.XA CN108931138B (en) 2018-08-31 2018-08-31 Electric arc furnace cover preparation system

Publications (2)

Publication Number Publication Date
CN108931138A true CN108931138A (en) 2018-12-04
CN108931138B CN108931138B (en) 2023-12-01

Family

ID=64443203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811013441.XA Active CN108931138B (en) 2018-08-31 2018-08-31 Electric arc furnace cover preparation system

Country Status (1)

Country Link
CN (1) CN108931138B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2447749Y (en) * 2000-10-25 2001-09-12 尹晓刚 Water temp. and level indicator with alarm function for water tank
CN2539986Y (en) * 2002-02-06 2003-03-12 瞿天树 Electronic acousto-optical fully automatic water level controller
CN101619925A (en) * 2009-08-06 2010-01-06 铁岭龙鑫钛业新材料有限公司 Ferrotitanium dispersing arc furnace cover preparation method
CN102775158A (en) * 2012-07-09 2012-11-14 郑州东方安彩耐火材料有限公司 Ramming furnace cover of corundum electric arc furnace and production process of ramming furnace cover
CN103970158A (en) * 2014-05-17 2014-08-06 浙江工贸职业技术学院 Automatic liquid level control device
CN105546983A (en) * 2016-01-29 2016-05-04 云南天高镍业有限公司 Box alloy baking oven system with oven top capable of being opened
CN105777157A (en) * 2016-03-15 2016-07-20 北京利尔高温材料股份有限公司 Integral furnace cover for central region of roof of LF refining furnace and manufacturing method of integral furnace cover
CN206146189U (en) * 2016-09-13 2017-05-03 湖北恒嘉科技有限公司 Die heating furnace
CN107285752A (en) * 2017-07-19 2017-10-24 四川合电气科技有限公司 A kind of arc furnace cover and preparation method thereof
CN108414047A (en) * 2018-05-21 2018-08-17 无锡集安自动化科技有限公司 A kind of monitoring water level equipment for water tank
CN208720822U (en) * 2018-08-31 2019-04-09 四川合一电气科技有限公司 A kind of arc furnace cover preparation system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2447749Y (en) * 2000-10-25 2001-09-12 尹晓刚 Water temp. and level indicator with alarm function for water tank
CN2539986Y (en) * 2002-02-06 2003-03-12 瞿天树 Electronic acousto-optical fully automatic water level controller
CN101619925A (en) * 2009-08-06 2010-01-06 铁岭龙鑫钛业新材料有限公司 Ferrotitanium dispersing arc furnace cover preparation method
CN102775158A (en) * 2012-07-09 2012-11-14 郑州东方安彩耐火材料有限公司 Ramming furnace cover of corundum electric arc furnace and production process of ramming furnace cover
CN103970158A (en) * 2014-05-17 2014-08-06 浙江工贸职业技术学院 Automatic liquid level control device
CN105546983A (en) * 2016-01-29 2016-05-04 云南天高镍业有限公司 Box alloy baking oven system with oven top capable of being opened
CN105777157A (en) * 2016-03-15 2016-07-20 北京利尔高温材料股份有限公司 Integral furnace cover for central region of roof of LF refining furnace and manufacturing method of integral furnace cover
CN206146189U (en) * 2016-09-13 2017-05-03 湖北恒嘉科技有限公司 Die heating furnace
CN107285752A (en) * 2017-07-19 2017-10-24 四川合电气科技有限公司 A kind of arc furnace cover and preparation method thereof
CN108414047A (en) * 2018-05-21 2018-08-17 无锡集安自动化科技有限公司 A kind of monitoring water level equipment for water tank
CN208720822U (en) * 2018-08-31 2019-04-09 四川合一电气科技有限公司 A kind of arc furnace cover preparation system

Also Published As

Publication number Publication date
CN108931138B (en) 2023-12-01

Similar Documents

Publication Publication Date Title
CN208720822U (en) A kind of arc furnace cover preparation system
CN203181937U (en) Hand-made-imitated machine-made circular sheet jelly machine
CN209775071U (en) External wall panel production device
CN104525032A (en) Gas stirring tank easy to heat and stirring method
CN206501262U (en) A kind of automatic watering device of stirrer
CN203320097U (en) Production line of automatic hot galvanizing of small pieces
CN109235441B (en) Automatic circulating liquid temperature control process for mass concrete construction
CN208824888U (en) A kind of hairbrush processing automatic mixing glue pouring machine
CN108931138A (en) A kind of arc furnace cover preparation system
CN207175796U (en) High performance water reducing agent of polyocarboxy acid compositional apparatus
CN209271467U (en) A kind of enamel reaction still for chemical industry
CN208722075U (en) A kind of automatic control system preparing arc furnace cover
CN111589681A (en) Method and device for improving paint dipping effect of reinforcing mesh
CN102839070A (en) Automatic water proportioning device for fermented grains
CN109177266A (en) A kind of arc furnace cover production method
CN205517598U (en) Automobile -used urea solution apparatus for producing
CN208920838U (en) A kind of arc furnace cover baking system
CN206027490U (en) Efficient fabric dyestuff mixer
CN210426042U (en) Large-size push plate nitrogen atmosphere protection sintering furnace
CN108932002A (en) A kind of automatic control system preparing arc furnace cover
CN108060377A (en) A kind of novel hot galvanizing stove
CN207403021U (en) A kind of plastic mixer
CN202792897U (en) Water circulation heating and cooling device of vacuum drying oven
CN216558312U (en) A discharge apparatus for chromium corundum production smelting furnace
CN215798530U (en) Efficient high-purity quartz sand pickling equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant