CN108917872A - Stainless steel water watch shell blank and processing method, stainless steel water watch shell and water meter - Google Patents

Stainless steel water watch shell blank and processing method, stainless steel water watch shell and water meter Download PDF

Info

Publication number
CN108917872A
CN108917872A CN201810812381.1A CN201810812381A CN108917872A CN 108917872 A CN108917872 A CN 108917872A CN 201810812381 A CN201810812381 A CN 201810812381A CN 108917872 A CN108917872 A CN 108917872A
Authority
CN
China
Prior art keywords
shell
inner ring
stainless steel
master slice
public affairs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810812381.1A
Other languages
Chinese (zh)
Other versions
CN108917872B (en
Inventor
朱春冬
王裕丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Youlipu Measurement Technology Co Ltd
Original Assignee
Zhejiang Youlipu Measurement Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Youlipu Measurement Technology Co Ltd filed Critical Zhejiang Youlipu Measurement Technology Co Ltd
Priority to CN201810812381.1A priority Critical patent/CN108917872B/en
Publication of CN108917872A publication Critical patent/CN108917872A/en
Priority to KR1020190017025A priority patent/KR102268254B1/en
Application granted granted Critical
Publication of CN108917872B publication Critical patent/CN108917872B/en
Priority to JP2019132405A priority patent/JP6736732B2/en
Priority to PCT/CN2019/097166 priority patent/WO2020020112A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P13/00Making metal objects by operations essentially involving machining but not covered by a single other subclass
    • B23P13/04Making metal objects by operations essentially involving machining but not covered by a single other subclass involving slicing of profiled material
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F15/00Details of, or accessories for, apparatus of groups G01F1/00 - G01F13/00 insofar as such details or appliances are not adapted to particular types of such apparatus
    • G01F15/14Casings, e.g. of special material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D22/00Shaping without cutting, by stamping, spinning, or deep-drawing
    • B21D22/20Deep-drawing
    • B21D22/205Hydro-mechanical deep-drawing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F1/00Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow
    • G01F1/05Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow by using mechanical effects

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Physics & Mathematics (AREA)
  • Measuring Volume Flow (AREA)
  • Domestic Plumbing Installations (AREA)

Abstract

The invention discloses stainless steel water watch shell blank and processing methods, stainless steel water watch shell and water meter, the processing method include component dismantling, punch forming, cutting, component processing, assembling and furnace weldering and etc., the bright spot of this method is for blank to be processed to be decomposed into the components such as shell public affairs piece, shell master slice and inner ring, shell public affairs piece and master slice are configured as in the symmetrical mirror-image structure in face, the inner-cavity structure of water meter case is formd after the two cooperation, and the accommodating space for the setting of water meter machine core is equipped in cavity;Plane where matching relationship between inner ring and shell public affairs piece and master slice is configured such that the fixation hole of inner ring and plane where shell mouth are parallel or substantially parallel;Reusing stainless steel is that material carries out hydraulic cold-punching molding, finally assembles and welding obtains shell blank.The present invention is made of safer stainless steel material, and process energy consumption is lower, also more friendly to environment, also utilizes again after recovery processing, significantly reduces overall cost.

Description

Stainless steel water watch shell blank and processing method, stainless steel water watch shell and water meter
Technical field
The invention belongs to water meter technical fields, and in particular to a kind of stainless steel water watch shell blank and processing method, and The stainless steel water watch shell as made from the processing method and the water meter with the stainless steel water watch shell.
Background technique
Water meter is the instrument for measuring water flow, is the integrated flow measurement of water mostly, is generally divided into volumetric water meter and speed Degree formula.The internal structure of two quasi-tradition water meter of water meter can be divided into shell, sleeve, inner core three-major-items outside in, and shell is the pig iron It casts, water passes through the lower annular space of shell after coming out from water inlet, be called " lower ring casing " here, empty in this annular Between the upper surface of there is " upper ring casing " and water outlet to communicate.The bottom of sleeve has with foraminate filter screen, filters out the sundries in water. Cartridges sides have two rows circular hole, and the position in hole is just opposite with the ring casing up and down of shell, it is clear that and lower row is inlet opening, on Row is apopore.Inner core is divided into upper, middle and lower-ranking, from windowpane it is seen that upper layer, only pointer and dial.In fact most , there is a plastic wheel in crucially lower layer here, takes turns on side that there are many plastic blades, is called " impeller ".The location of impeller It is just formed by rotating flow in casing lower layer hole, the blade in water impact wheel week, generates torque, rotate impeller. Faucet is opened bigger, and water flow is more anxious, and impeller just turns faster.This kind of water meter is simple inexpensive by it, can be in wet environment borough chief The advantages of phase is employed without maintenance, and does not have to power supply, and power failure nor affects on work still can long term service, therefore, still It is current mainstream water meter product.
For the water meter of the type, shell often uses iron or copper to cast and obtain blank, then passes through numerical control again After cutting and surface treatment, and final shell finished product is obtained, becomes available water meter after portion's installing machine core in the inner. For the water meter of the type, GB/T 778.1-2007 closes the measurement Chilled Drinking Water water meter and hot water water of water flow in full packages road Table part 1:The technical characteristic for all types of water meters is defined in specification, wherein for each type of each model water meter Water meter bore and overall size have detailed regulation, so that the water meter of different manufacturers can be general.
In existing production technology, shell is mostly to cast to obtain blank, this aspect after using iron or copper weld pool Can there are problems that following several respects:Firstly, since shell structure and casting process are limited, the most thin thickness of general shell It needs to reach 5-8cm, this production that will lead to shell needs to consume a large amount of iron or copper, and can also lead due to its thickness Shell and water meter is caused to all have biggish weight, this is unfavorable for production, transport and installation.Secondly, casting method needs first to To liquid, the energy consumption that this will lead to its production is high, consumes many energy and generates a large amount of greenhouse gases, this is right for iron or copper weld pool It is also disagreeableness for environment.Again, since water meter needs are in contact with water source for a long time, and iron and copper both substances Self property determine its with can occur after water Long Term Contact chemically react and influencing water quality, this for water meter use and Service life is unfavorable.Finally, being considered based on water safety, rules and regulations need replacing water meter after a period of use, tradition Irony and copper water meter, need disassemble after shell slightly handle after as source of iron and copper source return smelting furnace re-start Casting, this regeneration method is not only at high cost, also unfriendly to environment.
Therefore, a kind of manufacture craft of safer, production and processing the lower new water meter shell of cost of material is needed, And the Chinese patent that publication No. is CN103542907A discloses a kind of environment-friendly high-precision stainless steel water meter and its preparation side Method, publication No. are that the Chinese patent of CN105181060A discloses stainless steel water meter and its preparation side of a kind of high-intensitive high life Method, disclose in this two pieces patent document be by stainless material raw material water meter processing method, but it mainly passes through Laser Welding The mode connect is attached each component, and equipment cost is sufficiently expensive, also higher so as to cause its production cost, is unfavorable for big Technical scale metaplasia produces;Also, the performance parameter and product stability of its finished product housing do not reach reasonable commercialization water yet It is flat.
Summary of the invention
That the purpose of the present invention is to provide a kind of tooling costs is controllable, processing technology is easy to control, structural behaviour and good The stainless steel water watch shell blank and processing method and the stainless steel as made from the processing method of product rate height and material safety Water meter case and water meter with the stainless steel water watch shell.
In order to achieve the above object, scheme of the present invention is:
A kind of processing method of stainless steel water watch shell blank comprising following steps:
The step of component is disassembled:Stainless steel water watch shell blank is decomposed into shell public affairs piece, shell master slice and inner ring, it is described Shell public affairs piece and shell master slice are configured as foring the inner cavity knot of water meter case after the two cooperation in the symmetrical mirror-image structure in face Structure, inner cavity include cavity, intake tunnel and exhalant canal, and intake tunnel and exhalant canal are connected respectively to form water with cavity Channel;Inner ring separates the cavity into bottom and top, and bottom is connected with intake tunnel and top is connected with exhalant canal, water Stream can enter cavity bottom through intake tunnel, then again by after entering at the top of cavity after inner ring to exhalant canal.In cavity Equipped with the accommodating space being arranged for water meter machine core, top is equipped with shell mouth.The inner ring and the male piece of shell and shell are female Plane where matching relationship between piece is configured such that the fixation hole of inner ring and plane where shell mouth are parallel or substantially parallel.
The step of punch forming:Shell stainless steel materials are taken, are placed on mold, the hydraulic cold by the way of primary or gradation Punching or drawing and forming, so that the molding structure of shell public affairs piece and shell master slice meets setting structure requirement.
The step of cutting:Stamping forming shell public affairs piece and shell master slice are placed on cutter, along plane of symmetry direction into Row cutting, will form generate extra rim charge excision, and make cut after section be it is smooth so that male piece and mother Piece has biggish contact area in favor of subsequent welding processing.
The step of component processing:Inner ring stainless steel materials are taken, are placed on interior ring mould, the liquid by the way of primary or gradation Cold-punching molding is pressed, so that the molding structure of inner ring meets design requirement;Certainly, for inner ring, it is also possible to using numerical control cutting Mode be process.More preferably, the inner ring stainless steel materials thickness is configured as being greater than its setting thickness (i.e. final water Inner ring thickness in watch shell finished product), so that finally obtained shell blank is more than needed with certain thickness, so as to The slight deviations of the subsequent numerical control cutting of fixation position during to(for) inner ring are modified.
The step of assembling:The inner ring obtained after processing is matched with setting position in shell public affairs piece and shell master slice, i.e., will Inner ring is matched in the inner ring fixing groove in public piece and master slice, after fixed to joint progress spot welding, by the whole work after assembling Part is placed in girth welding machine, is carried out boxing to joint and is fixed.
The step of furnace welds:Stainless steel metal glue is coated in the joint for the workpiece that boxing fixes, is subsequently placed in furnace welding machine Interior progress furnace weldering, so that blank is obtained, it is consistent with the water meter case blank structure that casting obtains.
Preferably, the cutting of shell public affairs piece and shell master slice is along its axial direction (i.e. along public piece in the step of cutting With the segmentation direction of master slice), and its be cut after have even curface so that shell public affairs piece and shell master slice are welding When have enough contact surfaces.
It preferably, further include the step disassembled the water meter case blank as facing in the step of component is disassembled Suddenly, facing is configured to include import facing, outlet facing and shell mouth facing;Import facing and outlet facing are configured as point It is not matched with the end of intake tunnel and exhalant canal.And in shell public affairs piece and shell master slice inner wall be configured as being correspondingly provided with Detent slot is enclosed, inner ring detent slot is to be projected by shell public affairs piece and the outside punching press of shell master slice and formed, and inner ring is configured as can It is set in cavity and is arranged in inner ring detent slot.
The import facing, outlet facing and shell mouth facing are both configured in hollow cylindrical structure, outside End is equipped with boss, the internal diameter of inner end and the outer diameter of intake tunnel, exhalant canal and shell mouth end match (it is of substantially equal or It is bigger), and internal diameter of the internal diameter at the boss of outer end then with intake tunnel, exhalant canal and shell mouth end matches, thus Import facing, outlet facing and shell mouth facing are respectively cooperating in intake tunnel, exhalant canal and shell mouth End is to play fixed function to shell and the thickness of three ends is made to increase to design requirement;Obviously, three final ends Pipe thickness be the sum of shell wall thickness and facing inner end wall thickness.
At the same time, the component processing the step of in equally include the steps that processing facing, can equally adopt It is processed and is obtained with the mode of cold working (punching press or stretching) or numerical control cutting.
Preferably, the inner ring is configured as being additionally provided with the fixation hole of water meter machine core setting thereon, naturally it is also possible to be There is no the complete sheet material of fixation hole.The processing capacity that fixation hole is set in advance when can mitigate subsequent numerical control cutting, and it is complete Sheet material also can be achieved on function of the invention.
Further, at least one of the inner ring and the thickness of facing are configured as being greater than its setting thickness (i.e. most Respective thickness requirement in whole water meter case finished product), so that having centainly at the age of a draught animal of finally obtained shell blank Thickness is more than needed, so as to repair during subsequent numerical control cutting for the slight deviations of the processing of shell and assembling Just.This is because the specification and fixation hole of rules and regulations water outlet mouthpiece and water outlet mouthpiece and the depth of parallelism of shell mouth, are desirable It meets certain requirements, if being not provided with surplus, that may cause final products that can go out because of material error or mismachining tolerance Not the case where not conforming to regulation now, and the setting of above-mentioned surplus then can be to avoid this problem.
Preferably, straight in the middle part of the inner ring, fixation hole is set among middle part, and the first end of inner ring, which is equipped with, to be upwardly extended First end, second end is equipped with the second end that extends downwardly;At the same time, shell public affairs piece and shell master slice inner wall are set to Inner ring detent slot there is the structure that extends upward or downward accordingly so that inner ring can be firmly fixed in shell public affairs In piece and shell master slice.The inner ring can be used for horizontal water meter.
Preferably, the inner ring is integrally in straight sheet, and fixation hole is set to one end, and the other end is equipped with straight end Head;At the same time, the inner ring detent slot for being set to shell public affairs piece and shell master slice inner wall is also set on same plane, So that inner ring can be firmly fixed in shell public affairs piece and shell master slice.The inner ring can be used for vertical water meter.
It further, further include disassembling the water meter case blank for connecting rod valve support and modeling the step of component is disassembled The step of part bracket, the connecting rod valve support are configured as being set on exhalant canal, and at the same time, the male piece of shell and shell are female The valve opening for the setting of connecting rod valve support is reserved on piece corresponding position in punch forming so that connecting rod valve support is arranged in out On aquaporin;Also, it is additionally provided with valve detent slot in exhalant canal inner wall corresponding position, so that connecting rod valve can be by well It is fixed in exhalant canal.It is equipped on corresponding position in punch forming on shell public affairs piece and shell master slice and is arranged for plastic bracket The age of a draught animal (step) so that plastic bracket can be fixed in housing body securely;Plastic bracket equally uses metal (preferably stainless steel material) is made, and plastic bracket equally welds together (point postwelding in assembling and welding with housing body Boxing respectively, and final furnace weldering).More preferably, it projects and is formed outward when the valve with detent slot is also punch forming.In this way The shell processed can be made to have for the setting of the components such as connecting rod valve and IC shell, to form the intelligent water of IC card type Table.
A kind of stainless steel water watch shell blank is by prepared by the processing method by any of the above-described content.
A kind of stainless steel water watch shell is by above-mentioned stainless steel water watch shell blank through numerical control cutting and surface treatment Obtained from.The numerical control cutting and surface treatment are identical as the processing mode of blank that casting in the prior art obtains, only Design parameter correspondingly adjusts.
A kind of stainless steel water meter is mainly made of shell, machine core and lid, and the shell is above-mentioned stainless steel water meter Shell places lower gasket between the fixation hole on machine core and inner ring, after placing upper gasket between machine core and lid, puts tight lid Body obtains the i.e. described stainless steel water meter.
Processing method of the invention, using runner vertical plane as the plane of symmetry, is divided into left and right creatively by water meter case Symmetrical shell public affairs piece and shell master slice, and using stainless steel plate as raw material, punching press/drawing and forming by the way of hydraulic cold punching and Obtain its main component;Inner ring fixed for machine core necessary to water meter case separately punching press or adds as independent part Work obtains, and the corresponding inner ring detent slot of corresponding position punching press on shell public affairs piece and shell master slice, so that in blank group When dress can by easily, be accurately installed to design position;Increase the blank wall of each interface with the facing for closing auxiliary again Molding method is welded in thickness and spot welding, boxing and furnace, so that blank obtained by processing method of the invention is each The parameters such as interface specification, machine core chamber size meet laws and regulations requirement, can be logical with other existing Water gauge components or waterpipe jointing With;Certainly, the model of interface can be (referring to internal diameter of the pipeline size) such as DN15, DN20, DN25, the DN40 specified by regulation.More For importantly, the processing method mainly use hydraulic Cold Press Working, be aided with numerical control cutting and welding fabrication, relative to For traditional casting method, raw material is more environmentally-friendly, energy consumption is lower, and can also recycle;Relative to novel laser For welding, structure is more reasonable, compressive resistance is higher and used equipment and production cost are lower, is conducive to big rule Mould is promoted.
Detailed description of the invention
The process flow chart of processing method Fig. 1 of the invention;
Fig. 2 is the structural schematic diagram of the stainless steel water watch shell blank of embodiment one;
Fig. 3 is the decomposition diagram of Fig. 1 embodiment blank;
Fig. 4 is the structural schematic diagram of Fig. 1 embodiment shell public affairs piece;
Fig. 5 is the cross-sectional view of Fig. 1 embodiment shell public affairs piece;
Fig. 6 is the medial elevational view of Fig. 1 embodiment shell public affairs piece;
Fig. 7 is the structural schematic diagram of Fig. 1 embodiment inner ring;
Fig. 8 is the structural schematic diagram of Fig. 1 embodiment import facing;
Fig. 9 is the structural schematic diagram of Fig. 1 embodiment mouth shell mouth facing
Figure 10 is the shell public affairs piece of Fig. 1 embodiment and the cooperation schematic diagram of inner ring;
Figure 11 is the structural schematic diagram of the stainless steel water watch shell blank of embodiment two;
Figure 12 is the decomposition diagram of Figure 11 embodiment blank;
Figure 13 is the cooperation cross-sectional view of Figure 11 embodiment shell public affairs piece Yu connecting rod valve support;
Figure 14 is the medial elevational view of Figure 11 embodiment shell public affairs piece;
Figure 15 is the shell public affairs piece of Figure 11 embodiment and the cooperation schematic diagram of inner ring;
Figure 16 is the structural schematic diagram of the stainless steel water watch shell blank of embodiment three;
Figure 17 is the decomposition diagram of Figure 16 embodiment blank;
Figure 18 is the structural schematic diagram of Figure 16 embodiment shell public affairs piece;
Figure 19 is the medial elevational view of Figure 16 embodiment shell public affairs piece;
Figure 20 is the structural schematic diagram of Figure 16 embodiment inner ring;
Figure 21 is the shell public affairs piece of Figure 16 embodiment and the cooperation schematic diagram of inner ring;
Specific embodiment
In order to make those skilled in the art more fully understand the present invention, to be made more to the scope of protection of present invention It clearly limits, with regard to some embodiments of the invention, the present invention will be described in detail below.It should be noted that following The certain specific embodiments for being only present inventive concept are only a part of the embodiments of the present invention, wherein for the tool of dependency structure The direct description of body is only for convenience of the present invention is understood, each specific features are not certain, directly limit implementation of the invention Range.Those skilled in the art made conventional selection and replacement under the guidance of present inventive concept, are regarded as in the present invention In claimed range.
A kind of processing method of stainless steel water watch shell blank comprising following steps:
The step of component is disassembled:Stainless steel water watch shell blank is decomposed into shell public affairs piece, shell master slice and inner ring, it is described Shell public affairs piece and shell master slice are configured as foring the inner cavity knot of water meter case after the two cooperation in the symmetrical mirror-image structure in face Structure, inner cavity include cavity, intake tunnel and exhalant canal, and intake tunnel and exhalant canal are connected respectively to form water with cavity Channel;Inner ring separates the cavity into bottom and top, and bottom is connected with intake tunnel and top is connected with exhalant canal, water Stream can enter cavity bottom through intake tunnel, then again by after entering at the top of cavity after inner ring to exhalant canal.In cavity Equipped with the accommodating space being arranged for water meter machine core, top is equipped with shell mouth.The inner ring and the male piece of shell and shell are female Plane where matching relationship between piece is configured such that the fixation hole of inner ring and plane where shell mouth are parallel or substantially parallel. More preferably, the inner ring is configured as being additionally provided with the fixation hole of water meter machine core setting thereon, naturally it is also possible to be unfixed The complete sheet material in hole.
The step of punch forming:Shell stainless steel materials are taken, are placed on mold, the hydraulic cold by the way of primary or gradation Punching or drawing and forming, so that the molding structure of shell public affairs piece and shell master slice meets setting structure requirement.
The step of cutting:Stamping forming shell public affairs piece and shell master slice are placed on cutter, along plane of symmetry direction into Row cutting, will form generate extra rim charge excision, and make cut after section be it is smooth so that male piece and mother Piece has biggish contact area in favor of subsequent welding processing.
The step of component processing:Inner ring stainless steel materials are taken, are placed on interior ring mould, the liquid by the way of primary or gradation Cold-punching molding is pressed, so that the molding structure of inner ring meets design requirement;Certainly, for inner ring, it is also possible to using numerical control cutting Mode be process.More preferably, the inner ring stainless steel materials thickness is configured as being greater than its setting thickness (i.e. final water Inner ring thickness in watch shell finished product), so that finally obtained shell blank is more than needed with certain thickness, so as to The slight deviations of the subsequent numerical control cutting of fixation position during to(for) inner ring are modified.
The step of assembling:The inner ring obtained after processing is matched with setting position in shell public affairs piece and shell master slice, i.e., will Inner ring is matched in the inner ring fixing groove in public piece and master slice, after fixed to joint progress spot welding, by the whole work after assembling Part is placed in girth welding machine, is carried out boxing to joint and is fixed.
The step of furnace welds:Stainless steel metal glue is coated in the joint for the workpiece that boxing fixes, is subsequently placed in furnace welding machine Interior progress furnace weldering, so that blank is obtained, it is consistent with the water meter case blank structure that casting obtains.
It is subsequent through numerical control cutting and surface treatment (identical as existing mode) by the blank, water meter case can be obtained.
In certain embodiments, the shell stainless steel materials carry out thickness processing in advance, so that interface and shell There is corresponding thickness at body mouth.
It further include by the shell of water flowmeter body embryo in the step of component is disassembled in some other preferred embodiment The step of part dismantling is facing, facing are configured to include import facing, outlet facing and shell mouth facing;Import facing and go out Mouth facing is configured to be matched with the end of intake tunnel and exhalant canal.And shell public affairs piece and shell master slice inner wall are matched It is set to and is correspondingly provided with inner ring detent slot, inner ring detent slot is to be projected by shell public affairs piece and the outside punching press of shell master slice and formed , inner ring 2 is configured as may be disposed in cavity and be arranged in inner ring detent slot.
The import facing, outlet facing and shell mouth facing are both configured in hollow cylindrical structure, outside End is equipped with boss, the internal diameter of inner end and the outer diameter of intake tunnel, exhalant canal and shell mouth end match (it is of substantially equal or It is bigger), and internal diameter of the internal diameter at the boss of outer end then with intake tunnel, exhalant canal and shell mouth end matches, thus Import facing, outlet facing and shell mouth facing are respectively cooperating in intake tunnel, exhalant canal and shell mouth End is to play fixed function to shell and the thickness of three ends is made to increase to design requirement;Obviously, three final ends Pipe thickness be the sum of shell wall thickness and facing inner end wall thickness.
More preferably, the thickness of the facing is configured as being greater than its setting thickness (phase in i.e. final water meter case finished product Answer thickness requirement), so that having certain thickness more than needed at the age of a draught animal of finally obtained shell blank, so as to rear The slight deviations of the processing of shell and assembling are modified during continuous numerical control cutting.
At the same time, the component processing the step of in equally include the steps that processing facing, can equally adopt It is processed and is obtained with the mode of cold working (punching press or stretching) or numerical control cutting.More preferably, facing equally can be set to have Thicker thickness is so that final products can carry out deviation modification and improve yields.
In certain preferred embodiments, the cutting of the shell public affairs piece and shell master slice is axial along it, and it is cut There is even curface, so that shell public affairs piece and shell master slice have enough contact surfaces in welding after cutting.
In certain embodiments, straight in the middle part of the inner ring, fixation hole is set among middle part, and the first end of inner ring is equipped with The first end upwardly extended, second end are equipped with the second end extended downwardly;At the same time, shell public affairs piece and shell are set to The inner ring detent slot of master slice inner wall has the structure extended upward or downward accordingly, so that inner ring can be firmly fixed In in shell public affairs piece and shell master slice.And in further embodiments, the inner ring is integrally in straight sheet, fixation hole setting In one end, the other end is equipped with straight end;At the same time, it is set to the inner ring detent slot of shell public affairs piece and shell master slice inner wall Also it is set on same plane, so that inner ring can be firmly fixed in shell public affairs piece and shell master slice.With Upper two kinds of structures correspond respectively to the inner ring structure of horizontal water meter case and vertical water meter shell.
It further include disassembling the water meter case blank for connecting rod in the step of component dismantling in certain more preferably embodiments The step of valve support and plastic bracket, the connecting rod valve support are configured as being set on exhalant canal, and at the same time, shell is public The valve opening for the setting of connecting rod valve support is reserved on piece and shell master slice on corresponding position in punch forming for connecting rod valve branch Frame is arranged on exhalant canal;Also, it is additionally provided with valve detent slot in exhalant canal inner wall corresponding position, so that connecting rod valve can To be well secured in exhalant canal.It is equipped in punch forming for modeling on corresponding position on shell public affairs piece and shell master slice The age of a draught animal of part bracket setting, so that plastic bracket can be fixed in housing body securely;Plastic bracket equally uses Metal (preferably stainless steel material) is made, and plastic bracket equally welds together (point with housing body in assembling and welding Postwelding distinguishes boxing, and final furnace weldering).More preferably, it projects and is formed outward when the valve with detent slot is also punch forming. The shell processed can be made to have in this way for the setting of the components such as connecting rod valve and IC shell, to form intelligent IC cassette Water meter.
A kind of stainless steel water watch shell blank is by prepared by the processing method by any of the above-described content.
A kind of stainless steel water watch shell is by above-mentioned stainless steel water watch shell blank through numerical control cutting and surface treatment Obtained from.The numerical control cutting and surface treatment are identical as the processing mode of blank that casting in the prior art obtains, only Design parameter correspondingly adjusts.
A kind of stainless steel water meter is mainly made of shell, machine core and lid, and the shell is above-mentioned stainless steel water meter Shell places lower gasket between the fixation hole on machine core and inner ring, after placing upper gasket between machine core and lid, puts tight lid Body obtains the i.e. described stainless steel water meter.
Embodiment one
A kind of stainless steel water watch shell blank structure, mainly by shell public affairs piece 11, shell master slice 12, inner ring 2 and tooth 3 composition of set, facing 3 include import facing 31, outlet facing 32 and shell mouth facing 33;The shell public affairs piece 11 and shell master slice 12 be the symmetrical mirror-image structure in face, the inner-cavity structure of water meter case is formd after the two cooperation, and the two joint is plane Structure;Inner cavity includes cavity 13, intake tunnel 14 and exhalant canal 15, intake tunnel 14 and exhalant canal 15 respectively with cavity 13 It is connected to form water stream channel, intake tunnel 14 and exhalant canal 15 are linearly arranged, import facing 31 and outlet facing 32 are respectively cooperating in the end of intake tunnel 14 and exhalant canal 15;The accommodating for the setting of water meter machine core is equipped in cavity 13 Space, top are equipped with shell mouth 16.Shell public affairs piece 11 and 12 inner wall of shell master slice are correspondingly provided with inner ring detent slot 21, inner ring Detent slot 21 is to be projected by shell public affairs piece 11 and the outside punching press of shell master slice 12 and formed, and inner ring 2 is configured as may be disposed at It in cavity 13 and is arranged in inner ring detent slot 21, inner ring 2 is equipped with the fixation hole 22 of water meter machine core setting;Inner ring 2 and shell Matching relationship between body public affairs piece 11 and shell master slice 12 is configured such that the 22 place plane of fixation hole and shell mouth 16 of inner ring 2 Place plane is parallel or substantially parallel.Water flow enters behind 13 lower part of cavity after by machine core to 13 top of cavity from intake tunnel 14 It is flowed out by exhalant canal 15.
The import facing 31, outlet facing 32 and shell mouth facing 33, are hollow cylindrical structure, outer end is set There is boss 34, the internal diameter of their inner end and the outer diameter of 16 end of intake tunnel 14, exhalant canal 15 and shell mouth match (of substantially equal or bigger), and the internal diameter at outer end boss 34 then with 16 end of intake tunnel 14, exhalant canal 15 and shell mouth The internal diameter in portion matches, so that import facing 31, outlet facing 32 and shell mouth facing 33 can be respectively cooperating in water inlet The end in channel 14, exhalant canal 15 and shell mouth 16 is to play fixed function to shell and increase the thickness of three ends To design requirement;Obviously, the pipe thickness of three final ends is the sum of shell wall thickness and facing inner end wall thickness.
2 middle part of the inner ring is straight, fixation hole 22 is set to that middle part is intermediate, and the first end of inner ring 2, which is equipped with, to be upwardly extended First end 23, second end are equipped with the second end 24 extended downwardly;At the same time, shell public affairs piece 1 and shell master slice 2 are set to The inner ring detent slot 21 of inner wall has the structure extended upward or downward accordingly, so that inner ring 2 can be firmly fixed In in shell public affairs piece 1 and shell master slice 2.
Intake tunnel 14 and the corresponding interface screw thread of exhalant canal 15 can be configured as DN15, DN20, DN25, DN40 Etc. models.
Embodiment two
A kind of IC stainless steel water watch shell blank structure, primary structure is identical as the shell blank of embodiment one, difference It is, which further includes connecting rod valve support 4 and plastic bracket 5.
The connecting rod valve support 4 is set on exhalant canal 15, at the same time, right on shell public affairs piece 11 and shell master slice 12 It answers and is reserved with the valve opening 18 for the setting of connecting rod valve support 4 on position in punch forming so that connecting rod valve support 4 is arranged in water outlet On channel 15.Also, it is additionally provided with valve detent slot 17 in 15 inner wall corresponding position of exhalant canal, so that connecting rod valve can be by very It is fixed on well in exhalant canal 15;More preferably, it projects and is formed outward when the valve with detent slot 17 is also punch forming.
To install for IC component, which further includes plastic bracket 5, while 11 He of shell public affairs piece The age of a draught animal on shell master slice 12 on corresponding position in punch forming equipped with its setting of confession, so that plastic bracket 5 can be firm Admittedly be fixed in housing body;Plastic bracket 5 is equally made of metal (preferably stainless steel material), and plastic bracket 5 is same Sample welds together in assembling and welding with housing body.
Intake tunnel 14 and the corresponding interface screw thread of exhalant canal 15 can be configured as DN15, DN20, DN25, DN40 Etc. models.
Embodiment three
A kind of vertical stainless steel water watch shell blank structure, primary structure is identical as the shell blank of embodiment one, area It is not, it is vertical that the water-in and water-out channel of the shell blank is changed by horizontal;Inner ring 2 is on the whole in planar knot simultaneously Structure.The specific structure of the vertical stainless steel water watch shell blank is:
The vertical stainless steel water watch shell blank is made of shell public affairs piece 11, shell master slice 12, inner ring 2 and facing 3, tooth Set 3 includes import facing 31, outlet facing 32 and shell mouth facing 33;The shell public affairs piece 11 and shell master slice 12 are that face is symmetrical Mirror-image structure, the inner-cavity structure of water meter case is formd after the two cooperation, and the two joint is planar structure;Inner cavity packet Cavity 13, intake tunnel 14 and exhalant canal 15 are included, intake tunnel 14 and exhalant canal 15 are connected respectively with cavity 13 with shape At aquaporin, intake tunnel 14 and exhalant canal 15 are concentrically vertically arranged;Water flow turns water after vertically entering into intake tunnel 14 Square to 13 bottom of cavity is entered, inversely enter in exhalant canal 15 to flow vertically after machine core to the top of cavity 13 is horizontal again Out.The accommodating space for the setting of water meter machine core is equipped in cavity 13, top is equipped with shell mouth 16.Shell public affairs piece 11 and shell 12 inner wall of body master slice is correspondingly provided with inner ring detent slot 21, and inner ring detent slot 21 is outside by shell public affairs piece 11 and shell master slice 12 Punching press is projected and is formed, and inner ring 2 is configured as may be disposed in cavity 13 and being arranged in inner ring detent slot 21, on inner ring 2 Fixation hole 22 equipped with the setting of water meter machine core;Matching relationship between inner ring 2 and shell public affairs piece 11 and shell master slice 12 is configured To make 22 place plane of fixation hole and the 16 place plane of shell mouth of inner ring 2 parallel or substantially parallel.
The import facing 31, outlet facing 32 and shell mouth facing 33, are hollow cylindrical structure, outer end Equipped with boss 34, import facing 31 and outlet facing 32 are respectively cooperating in the end of intake tunnel 14 and exhalant canal 15, they The internal diameter of inner end and the outer diameter of 16 end of intake tunnel 14, exhalant canal 15 and shell mouth match (it is of substantially equal or slightly Greatly), and the then internal diameter phase with 16 end of intake tunnel 14, exhalant canal 15 and shell mouth of the internal diameter at outer end boss 34 Match, leads to so that import facing 31, outlet facing 32 and shell mouth facing 33 can be respectively cooperating in intake tunnel 14, water outlet The end of road 15 and shell mouth 16 is to play fixed function to shell and the thickness of three ends is made to increase to design requirement;It is aobvious So, the pipe thickness of three final ends is the sum of shell wall thickness and facing inner end wall thickness.
The whole inner ring 2 is in straight sheet, and fixation hole 22 is set to one end, and the other end is equipped with straight end 25; At the same time, the inner ring detent slot 21 for being set to 12 inner wall of shell public affairs piece 11 and shell master slice is also set at same plane On, so that inner ring 2 can be firmly fixed in shell public affairs piece 11 and shell master slice 12.
Intake tunnel 14 and the corresponding interface screw thread of exhalant canal 15 can be configured as DN15, DN20, DN25, DN40 Etc. models.
By above structure description it is found that embodiment one and embodiment are third is that two kinds of more traditional water meter structures, difference Only it is that one is horizontal the other is vertical, has corresponding variation so as to cause its structure;Embodiment is second is that in embodiment The intelligent IC formula water meter case being derived on the basis of one, which increase the connecting rod valve support and valve that are arranged for connecting rod valve use Detent slot, and the plastic bracket fixed for IC shell, so that the water meter being made from it is more intelligent compared with conventional water meter, it can To reduce the workload of manual metering.But for from the angle of processing, the water meter case blank of embodiment two is the most complicated , the water meter case blank of embodiment one, three is mutually omitted on its basis accordingly increases structure, therefore, with embodiment two IC formula blank processing for, specific processing method of the invention is described in detail.
Step 1 blanking:Stainless steel materials are sent into press machine, stainless steel materials can be sheet and be also possible to roll up Shape, it is specifically dependent upon the thickness and flexibility of plate, and completion blanking sheet is rushed by blanking die.The requirement of its technique It is:The shape and size of one of pre-stretching mold requirement must be pressed by rushing the sheet fallen, i.e. shape with the size needs of blanking meet Design requirement.
Step 2 is preforming:Sheet material after blanking is sent into drawing machine tool, it is hydraulic at pre-shaped, technique to be carried out to it It is required that being:Pre-shaped at product must walk to expect position, must not unfilled corner, lack side.
Step 3 stretches:Workpiece after will be preforming is sent into drawing machine tool, to carry out hydro-forming to it, to complete Public piece or master slice it is integrally formed, technique require be:Molding public affairs piece or master slice must be examined by drawing, can after qualified Into subsequent handling.
Step 4 trimming:The workpiece (public piece or master slice) of drawing and forming is sent into trimming lathe, by its four Monday circle Side crops are squeezed to be cut off;Dedicated cutting apparatus is used when trimming, the plane of symmetry direction along public piece or master slice is cut, So that having biggish contact area in favor of welding when the two cooperates.Its technique requires:Material thickness section after excision It must be flat and smooth.
Step 5 coining:Workpiece (public piece or master slice) after trimming is sent into copy press bed, extrudes corresponding number, text And the markings such as mark, such as:The specification of 15mm, 20mm, 25mm identify, the mark etc. of arrow direction.
Step 6 component processing:Other component press its Structural Design Requirement, can be used above-mentioned steps 1-4 processing method or It is the methods of numerical control cutting, other component is processed into design shape and structure.
The assembling of step 7 inner ring:In the inner ring detent slot of workpiece (public piece and master slice) after inner ring to be placed in pressure word, then by valve It is placed in valve detent slot with inner ring, conjunction welding machine bed progress multiple spot welding is sent into and fixes.Its technique requires:Public piece must be right with master slice Together, dislocation is not allowed.
Step 8 boxing:Workpiece of the spot welding after fixed is sent into boxing lathe and carries out boxing.The requirement of its technique:Boxing starting point It must once complete to terminal, must not cease fire halfway, molten depth >=surface 1.5mm is smooth, must nitrogen in no overlap welding slag housing chamber Gas shielded guarantees intracavitary Non-carbonized.
The assembling of step 9 facing:After facing (water inlet facing, water outlet facing and table mouth facing) is inserted in boxing respectively The corresponding site of workpiece is sent into dedicated boxing lathe and carries out a boxing then.Its technique requires:It is held by the 8th technique requirement Row.
Step 10 valve opening punching press:The workpiece of step 8 is sent into press machine, completes the punching press of valve portion tie rod holes.Its technique It is required that:Aperture must not deform, must not jagged cutting edge of a knife or a sword skin.
Step 11 bracket assembled:Valve is placed in the valve orifice of upper one of shell product with connecting rod rack, and is put into dedicated Boxing lathe carries out boxing.Technique requires:It is executed by the 8th technique requirement.
Step 12 plastic bracket assembled:By the corresponding site outside the upper shell together of plastic bracket merging, aligning direction with Highly (support of tooling mould) is sent into dedicated boxing lathe and carries out local welding.Its technique requires:Stent cover must be flat with table mouth face Row, welding are executed by the 8th technique requirement.
The weldering of step 13 furnace:Intracavitary be painted into stainless steel metal glue feeding furnace of workpiece that step 12 completes welding is subjected to furnace Weldering, technique requirement:Weldering must not be lacked at intracavitary furnace weldering, built-up welding is flat and smooth, after coming out of the stove up to it is solid molten require it is unstressed.
The cutting of step 14 data:The workpiece of step 13 is sent into numerically-controlled machine tool and carries out hardware cutting, technique requirement:Cutting face Must flat and smooth, impulse- free robustness, tooth away from inspection is executed by only/logical ring gauge, press product figure and execute inspection by height and length unit etc..
Step 15 leak test:The workpiece that step 14 completes cutting is carried out pressure testing to leak hunting water, technique requirement:By the pressure of product It is required that >=3 seconds inaccurate water clocks are surveyed in examination.
Step 16 surface treatment:Intact product after step 15 pressure testing is leaked hunting is sent into electrolysis and is surface-treated, technique It is required that:Single product no color differnece, must not shock by electricity perforation, verify through salt spray test chamber.
Step 17 final inspection packaging:The workpiece that step 16 is obtained packs cartonning after final quality inspection is qualified.
By shell finished product obtained from above-mentioned processing technology and product structure production, it is made relative to most traditional casting method For, material is more environmentally friendly, wall thickness is thinner, but Specifeca tion speeification is able to satisfy regulation and requirement;On the other hand, originally The processing method of invention do not cast melting when high energy consumption and high pollution, thus cost is lower to more environment-friendly.And it is opposite For method of laser welding, it is more reasonable that shell structure of the invention is decomposed, and used equipment cost is lower, more conducively It promotes, and the joint of each component of shell of the invention, successively welds and weld through spot welding, boxing and furnace, engage stronger And it is unstressed.

Claims (10)

1. a kind of processing method of stainless steel water watch shell blank comprising following steps:
The step of component is disassembled:Stainless steel water watch shell blank is decomposed into shell public affairs piece, shell master slice and inner ring, the shell The inner cavity of water meter case is formd after public piece and the cooperation of shell master slice, inner cavity includes cavity, intake tunnel and exhalant canal, water inlet Channel and exhalant canal are connected respectively to form aquaporin with cavity;The accommodating for the setting of water meter machine core is equipped in cavity Space, top are equipped with shell mouth;In matching relationship between the inner ring and shell public affairs piece and shell master slice is configured such that Plane where the fixation hole of circle and plane where shell mouth are parallel or substantially parallel;
The step of punch forming:Take shell stainless steel materials, be placed on mold, by the way of primary or gradation hydraulic cold punching or Drawing and forming, so that the molding structure of shell public affairs piece and shell master slice meets setting structure requirement;
The step of cutting:Stamping forming shell public affairs piece and shell master slice are placed on cutter, the extra of generation will be formed Rim charge excision;
The step of component processing:Inner ring stainless steel materials are taken, are placed on interior ring mould, the hydraulic cold by the way of primary or gradation It is washed into type, or is processed by the way of numerical control cutting, so that the molding structure of inner ring meets design requirement;
The step of assembling:Inner ring is matched in the inner ring fixing groove in public piece and master slice, after fixed to joint progress spot welding, The one-piece machine member after assembling is placed in girth welding machine again, boxing is carried out to joint and is fixed;
The step of furnace welds:Coat stainless steel metal glue in the joint for the workpiece that boxing fixes, be subsequently placed in furnace welding machine into Row furnace weldering, to obtain blank.
2. processing method according to claim 1, which is characterized in that the male piece of shell and shell are female in the step of the cutting The cutting of piece be along its axial direction, and its be cut after have even curface so that shell public affairs piece and shell master slice exist There is enough contact surfaces when welding.
3. processing method according to claim 1, which is characterized in that the component dismantling the step of in, further include by The step of water meter case blank dismantling is facing, facing is configured to include import facing, outlet facing and shell mouth tooth Set;Import facing and outlet facing are configured to be matched with the end of intake tunnel and exhalant canal.
4. processing method according to claim 3, which is characterized in that the inner ring is configured as being additionally provided with water meter thereon The fixation hole of machine core setting.
5. processing method according to claim 4, which is characterized in that the thickness of the facing and/or inner ring is configured as Thickness is set greater than it, so that having centainly at the age of a draught animal of finally obtained shell blank and/or at machine core fixation hole Thickness is more than needed, so as to repair during subsequent numerical control cutting for the slight deviations of the processing of shell and assembling Just.
6. processing method according to claim 3, which is characterized in that it is straight in the middle part of the inner ring, during fixation hole is set to Among portion, the first end of inner ring is equipped with the first end upwardly extended, and second end is equipped with the second end extended downwardly;It is same with this When, the inner ring detent slot for being set to shell public affairs piece and shell master slice inner wall has the structure extended upward or downward accordingly, with Inner ring is firmly fixed in shell public affairs piece and shell master slice;Or,
The inner ring is integrally in straight sheet, and fixation hole is set to one end, and the other end is equipped with straight end;At the same time, The inner ring detent slot for being set to shell public affairs piece and shell master slice inner wall is also set on same plane, so that inner ring can To be firmly fixed in shell public affairs piece and shell master slice.
7. processing method according to claim 1, which is characterized in that in the step of component is disassembled, further including will be described The step of dismantling of water meter case blank is connecting rod valve support and plastic bracket, the connecting rod valve support is configured as being set to water outlet On channel, at the same time, it is reserved in punch forming on corresponding position for connecting rod valve support on shell public affairs piece and shell master slice The valve opening of setting is arranged on exhalant canal for connecting rod valve support;Also, valve is additionally provided in exhalant canal inner wall corresponding position With detent slot, so that connecting rod valve can be well secured in exhalant canal;It is nearby equipped with for plastic bracket at shell mouth The step of setting.
8. a kind of stainless steel water watch shell blank, which is characterized in that the blank is according to claim 1-7 Prepared by processing method.
9. a kind of stainless steel water watch shell, which is characterized in that the shell is by stainless steel water watch shell embryo according to any one of claims 8 Part is through obtained from numerical control cutting and surface treatment.
10. a kind of stainless steel water meter, the water meter includes shell, machine core and lid, which is characterized in that the shell is that right is wanted Stainless steel water watch shell described in asking 9 is respectively arranged with down between machine core and the fixation hole of inner ring and between machine core and lid Washer and upper gasket are threadably secured between lid and shell mouth and connect.
CN201810812381.1A 2018-07-23 2018-07-23 Stainless steel water watch shell blank and processing method, stainless steel water watch shell and water meter Active CN108917872B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201810812381.1A CN108917872B (en) 2018-07-23 2018-07-23 Stainless steel water watch shell blank and processing method, stainless steel water watch shell and water meter
KR1020190017025A KR102268254B1 (en) 2018-07-23 2019-02-14 Stainless steel water meter housing blank and processing method, stainless steel water meter housing and water meter
JP2019132405A JP6736732B2 (en) 2018-07-23 2019-07-18 Blank material and processing method for stainless steel water meter housing, stainless water meter housing and water meter
PCT/CN2019/097166 WO2020020112A1 (en) 2018-07-23 2019-07-22 Water meter case and processing method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810812381.1A CN108917872B (en) 2018-07-23 2018-07-23 Stainless steel water watch shell blank and processing method, stainless steel water watch shell and water meter

Publications (2)

Publication Number Publication Date
CN108917872A true CN108917872A (en) 2018-11-30
CN108917872B CN108917872B (en) 2019-07-09

Family

ID=64417024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810812381.1A Active CN108917872B (en) 2018-07-23 2018-07-23 Stainless steel water watch shell blank and processing method, stainless steel water watch shell and water meter

Country Status (3)

Country Link
JP (1) JP6736732B2 (en)
KR (1) KR102268254B1 (en)
CN (1) CN108917872B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110686733A (en) * 2019-10-15 2020-01-14 杭州乾博科技有限公司 Stainless steel water meter shell and water meter
WO2020020112A1 (en) * 2018-07-23 2020-01-30 浙江优立普计量科技有限公司 Water meter case and processing method therefor
CN113523711A (en) * 2020-04-20 2021-10-22 三川智慧科技股份有限公司 Stainless steel water meter shell blank, preparation method and stainless steel water meter shell

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118143135A (en) * 2024-05-09 2024-06-07 兴化市铁信电子工程有限公司 Dial plate die casting equipment

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101314177A (en) * 2007-05-31 2008-12-03 牛宝国 Stainless steel water meter casing structural design and casing split model, unit cast process
KR20100096293A (en) * 2009-02-24 2010-09-02 방병민 Double Sided Adhesive Water Meter
CN101995280A (en) * 2009-08-15 2011-03-30 江西三川水表股份有限公司 Water meter shell
CN202209970U (en) * 2011-07-28 2012-05-02 东莞市德山水表有限公司 Stainless steel watermeter housing
CN102636232A (en) * 2012-03-09 2012-08-15 何国忠 Stainless steel water meter shell
CN202442741U (en) * 2012-03-01 2012-09-19 蔡海龙 Stainless steel water meter shell
CN103542906A (en) * 2013-06-28 2014-01-29 刘祥胜 Manufacturing technique for thin-wall stainless steel water meter casing
CN105181060A (en) * 2015-05-29 2015-12-23 杭州雷神激光技术有限公司 High-strength and long-service-life stainless steel water meter and preparation method thereof
CN205002827U (en) * 2015-08-19 2016-01-27 天津鸥翼科技发展有限公司 Protective housing of IC -card water gauge
CN205981343U (en) * 2016-07-12 2017-02-22 张伟 Water meter shell is pressed in forge hot
US20170176232A1 (en) * 2014-08-14 2017-06-22 RG5 Meter Company, (dba RG-3) Perpetual Meter with Noise Damping
CN207379570U (en) * 2017-09-29 2018-05-18 福州金泽科技有限公司 A kind of laser welding intelligent telemetering stainless steel water watchcase

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63104780A (en) * 1986-10-21 1988-05-10 Showa Alum Corp Simultaneous brazing method for iron and steel additive parts to iron and steel pipes
JP2579326Y2 (en) * 1992-12-24 1998-08-27 株式会社金門製作所 Impeller water meter
KR100817755B1 (en) * 2007-12-24 2008-03-31 (주)대한계기정밀 Water meter flag including check valve
JP5330799B2 (en) * 2008-10-31 2013-10-30 愛知時計電機株式会社 Method of manufacturing meter case, flow meter, and method of manufacturing the same
US8959996B2 (en) * 2009-08-15 2015-02-24 Jiangxi Sanchuan Water Meter Co., Ltd Water meter casing having a middle casing and inlet and outlet ports formed as separate components
KR101159760B1 (en) * 2012-04-05 2012-06-25 (주)대한계기정밀 A electronic type water gauge for steal water and anti-freezing prevention
CN202710128U (en) * 2012-06-20 2013-01-30 杨学刚 Water meter casing
KR101961552B1 (en) * 2017-06-13 2019-03-26 주식회사 아이엠아이시스템 The method for producing hot-water distributer

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101314177A (en) * 2007-05-31 2008-12-03 牛宝国 Stainless steel water meter casing structural design and casing split model, unit cast process
KR20100096293A (en) * 2009-02-24 2010-09-02 방병민 Double Sided Adhesive Water Meter
CN101995280A (en) * 2009-08-15 2011-03-30 江西三川水表股份有限公司 Water meter shell
CN202209970U (en) * 2011-07-28 2012-05-02 东莞市德山水表有限公司 Stainless steel watermeter housing
CN202442741U (en) * 2012-03-01 2012-09-19 蔡海龙 Stainless steel water meter shell
CN102636232A (en) * 2012-03-09 2012-08-15 何国忠 Stainless steel water meter shell
CN103542906A (en) * 2013-06-28 2014-01-29 刘祥胜 Manufacturing technique for thin-wall stainless steel water meter casing
US20170176232A1 (en) * 2014-08-14 2017-06-22 RG5 Meter Company, (dba RG-3) Perpetual Meter with Noise Damping
CN105181060A (en) * 2015-05-29 2015-12-23 杭州雷神激光技术有限公司 High-strength and long-service-life stainless steel water meter and preparation method thereof
CN205002827U (en) * 2015-08-19 2016-01-27 天津鸥翼科技发展有限公司 Protective housing of IC -card water gauge
CN205981343U (en) * 2016-07-12 2017-02-22 张伟 Water meter shell is pressed in forge hot
CN207379570U (en) * 2017-09-29 2018-05-18 福州金泽科技有限公司 A kind of laser welding intelligent telemetering stainless steel water watchcase

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020020112A1 (en) * 2018-07-23 2020-01-30 浙江优立普计量科技有限公司 Water meter case and processing method therefor
CN110686733A (en) * 2019-10-15 2020-01-14 杭州乾博科技有限公司 Stainless steel water meter shell and water meter
CN113523711A (en) * 2020-04-20 2021-10-22 三川智慧科技股份有限公司 Stainless steel water meter shell blank, preparation method and stainless steel water meter shell

Also Published As

Publication number Publication date
JP2020016653A (en) 2020-01-30
KR102268254B1 (en) 2021-06-24
JP6736732B2 (en) 2020-08-05
CN108917872B (en) 2019-07-09
KR20200010987A (en) 2020-01-31

Similar Documents

Publication Publication Date Title
CN108917872B (en) Stainless steel water watch shell blank and processing method, stainless steel water watch shell and water meter
US8959996B2 (en) Water meter casing having a middle casing and inlet and outlet ports formed as separate components
CN104874767A (en) Multi-pipeline low-pressure and counter-pressure casting process and device
CN208505403U (en) The horizontal water meter Stainless Steel Shell of half cutting type and its stainless steel water meter
CN107774796A (en) The stretch forming process of copper alloy shock-absorbing sleeve
CN209656121U (en) Water meter case
CN202210010U (en) Diaphragm type compression gauge having nonmetal and metal combined type watchcase
CN207636132U (en) A kind of integral type sonac
CN208505401U (en) A kind of stainless steel water watchcase
CN208527821U (en) High-precision hardware stamping precision die
CN209589168U (en) A kind of water meter housing
CN109916464B (en) Water meter shell
CN209432213U (en) Internet of Things stainless steel water watch shell
CN209979000U (en) Water meter shell
CN208568008U (en) Vertical truncation water meter case and its water meter
CN209446121U (en) The Internal Gauge room cassette mechanism structure of diaphragm gas meter
WO2020020112A1 (en) Water meter case and processing method therefor
CN208536958U (en) A kind of stainless steel water watchcase
CN211098931U (en) Chemical production is with reation kettle who conveniently puts in
CN209334701U (en) A kind of fixed device of stalk
CN208921212U (en) A kind of two halves formula assembly water meter case
CN216483305U (en) Stainless steel water meter case
CN209354725U (en) A kind of novel welding tap
CN206793648U (en) A kind of PH adjusting meanss
CN105312499A (en) Ceramic core sizing agent mold-filling capacity testing device and use method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant