CN108915689A - 一种富水地层井筒掘进探堵水方法 - Google Patents
一种富水地层井筒掘进探堵水方法 Download PDFInfo
- Publication number
- CN108915689A CN108915689A CN201810744237.9A CN201810744237A CN108915689A CN 108915689 A CN108915689 A CN 108915689A CN 201810744237 A CN201810744237 A CN 201810744237A CN 108915689 A CN108915689 A CN 108915689A
- Authority
- CN
- China
- Prior art keywords
- water
- grouting
- depth
- shaft excavation
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/10—Preparation of the ground
- E21D1/16—Preparation of the ground by petrification
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/002—Survey of boreholes or wells by visual inspection
Abstract
本发明提供一种富水地层井筒掘进探堵水方法,将超前探水和超前注浆堵水技术相结合,实现探堵水动态反馈,特别适用于富水地层井筒掘进突水事故难的安全预防与精准治理。该方法包括步骤:(S1)在井筒中心钻凿超前探水钻孔,孔深不低于一个井筒掘进进尺距离;(S2)监测探水钻孔涌水量,当涌水量超标时,将钻孔电视伸入探水钻孔中,确定涌水点数量及其深度;(S3)依据涌水量、涌水点数量及其深度确定注浆参数;(S4)进行一次注浆堵水;(S5)根据一次注浆前后涌水量及涌水点变化情况判断堵水效果,必要时调整注浆参数,直至注浆堵水成功;(S6)在完成探水钻孔段井筒掘进工程后,重复步骤(S1)‑(S5),直至富水地层井筒施工完毕。
Description
技术领域
本发明属于井筒掘进工程技术领域,尤其涉及一种富水地层井筒掘进探堵水方法,特别适用于含水层丰富、岩溶裂隙发育的富水地层井筒掘进施工工程。
背景技术
岩层突水是富水地层井筒掘进面临的主要危害之一。由于井筒作业面狭小,缺乏有效逃生通道,若发生重大突水事故,极易造成井毁人亡的严重后果。
目前,注浆堵水技术是国内外治理井筒突水最有效的方法之一。注浆是将可凝固的浆液注入到岩层裂隙中,使浆液与裂隙岩体凝结为一个整体,达到堵水目的。然而,现有注浆堵水技术存在较多缺陷,难以安全、精准、科学地防治突水事故。
首先,现有技术注浆时间滞后,一般是在井筒工作面出现较大涌水之后,方采取注浆堵水措施,此时若涌水量及水压极大,则可能在未完成注浆时井筒已被淹毁,即使成功堵水,也会对井壁岩体稳定性产生较大影响。其次,难以精准定位注浆位置,现有方法是在井筒周围打若干钻孔进行注浆,由于富水层深度不得而知,注浆孔数量及深度的选择存在较大盲目性,导致堵水成本较高,效果不理想。此外,注浆材料的选取完全依靠施工者的主观经验,难以精准确定注浆材料配比及其浓度,影响堵水效率。
综上,目前尚且缺乏一种有效的堵水方法,实现富水地层井筒掘进突水事故的安全预防与精准治理。
发明内容
针对现有技术的上述问题,本发明提供一种富水地层井筒掘进探堵水方法,将超前探水和超前注浆堵水技术相结合,预先获知水源相关信息,并实现探堵水动态反馈,堵水效率高、安全性好、成本低廉、实用性强。
为实现上述目的,本发明的富水地层井筒掘进探堵水方法包括步骤:
(S1)在井筒中心钻凿超前探水钻孔,孔深不低于一个井筒掘进进尺距离;
(S2)监测探水钻孔涌水量,当涌水量超标时,将钻孔电视伸入探水钻孔中,确定涌水点数量及其深度;
(S3)依据涌水量、涌水点数量及其深度确定注浆参数;
(S4)进行一次注浆堵水,优选在井筒掘进工作面与富水层相差一个进尺距离时再进行注浆堵水;
(S5)再次测定涌水量、涌水点数量及其深度,根据一次注浆前后涌水量及涌水点变化情况判断堵水效果,必要时调整注浆参数,直至注浆堵水成功;
(S6)在完成探水钻孔段井筒掘进工程后,重复步骤(S1)-(S5),直至富水地层井筒施工完毕。
步骤(S1)-(S6)的施工流程简图如图1所示。
优选的,探水钻孔孔径为60~80mm,孔深为井筒掘进进尺的8~10倍。
优选的,涌水量超标的阈值为井筒排水能力的80%~90%。
优选的,注浆参数包括注浆孔位置、注浆材料配比及其浓度。
优选的,注浆钻孔孔径为30~50mm,沿井筒壁环向每隔30~60°均匀分布,进一步,注浆钻孔与垂直方向的夹角为30~45°。
优选的,该方法还包括步骤:采用堵塞器在略大于一个进尺距离的位置封堵探水钻孔,当井筒掘进工作面与富水层相差一个进尺距离时,先将鼓形堵塞器下移至富水层以下,至堵水成功时,再上移至略大于一个进尺距离的位置。所述堵塞器优选为橡胶材质的鼓形堵塞器。
本发明的有益效果:
(1)超前堵水,安全性好。通过在井筒中心钻凿超前探水钻孔,预判前方涌水情况,根据涌水量、涌水点数量及其深度提前采取注浆措施进行超前堵水,待井筒施工至富水区域时,涌水已提前得到有效防治,与现有技术在工作面已出现大量涌水时才采取堵水措施的技术方案相比,本发明安全性明显提高,解决了富水地层井筒掘进突水事故难以实现安全预防与精准治理的技术难题。
(2)探堵结合,精准度高。注浆钻孔的位置依据涌水点数量及其深度确定,确保浆液准确注入涌水位置,与依据经验的盲目注浆相比,大大降低了注浆钻孔成本;注浆材料的配比和浓度依据涌水量确定,利于科学选择浆液类型,同时能根据注浆前后涌水量及涌水点变化情况动态调整注浆参数,注浆堵水效率明显提高。
(3)科学钻孔,成本低廉。超前探水钻孔不仅具有超前探水作用,还可作为井筒爆破的自由面,节省打掏槽眼时间,同时保证较好的爆破效果。
附图说明
图1为本发明探堵水方法流程简图;
图2为具体实施方式井筒探堵水效果图;
图3为图2的A-A剖视图;
图4为鼓形堵塞器示意图;
图中:1-注浆层;2-富水层;3-井筒;4-注浆钻孔;5-鼓形堵塞器;6-探水钻孔。
具体实施方式
下面结合附图及具体实施方式对本发明进行详细说明。
参见图2-4,本发明提供的富水地层井筒掘进探堵水方法包括步骤:
(1)在井筒3中心钻凿孔径为60~80mm、孔深为井筒3掘进进尺8~10倍的探水钻孔6;
(2)监测探水钻孔6涌水量,当涌水量超过井筒3排水能力的80%时,将钻孔电视伸入探水钻孔6中,确定涌水点具体数量及其深度;
(3)采用橡胶材质的鼓形堵塞器5在略大于一个进尺距离的位置封堵探水钻孔6,防止爆破岩体碎块堵塞探水钻孔6,同时,在监测到涌水量超标时,鼓形堵塞器5还能在注浆堵水前起到很好的临时堵水效果,避免水势通过探水钻孔6上扬至作业面;
(4)在掘进完一个进尺距离后,将鼓形堵塞器5下移一个进尺距离,如此往复,直至完成探水钻孔段井筒掘进工程,若已监测到探水钻孔6涌水量超标,则在井筒掘进工作面与富水层相差一个进尺距离时,将鼓形堵塞器5下移至富水层以下,再进行注浆堵水,避免鼓形堵塞器5影响堵水效果的认定,直至注浆堵水成功后,再将鼓形堵塞器5上移至略大于一个进尺距离的位置。
本实施例采用以下方法进行注浆堵水:沿井筒2井壁每隔30~60°均匀布置6~12个注浆钻孔4,注浆钻孔4孔径为30~50mm,与垂直方向的夹角为30~45°,注浆钻孔4具体位置依据步骤(2)获得的涌水点数量及其深度信息确定,并根据步骤(2)监测的涌水量信息有针对性地选择注浆材料配比及其浓度,进行一次注浆堵水,然后再进行涌水量、涌水点数量及其深度测定,根据一次注浆前后涌水量及涌水点变化情况判断堵水效果,必要时调整注浆参数,直至注浆堵水成功。
重复步骤(1)-(4),直至富水地层井筒施工完毕。通过钻孔探水,预先获知水源相关信息,进行超前堵水,实现探堵互为反馈的有机结合,堵水精准度高、安全性好、成本低廉,实现了突水事故难的安全预防与精准治理,有效解决了富水地层井筒掘进中存在的高突水风险难题。
以上实施例仅用以说明本发明的技术方案而并非对其进行限制,凡未脱离本发明精神和范围的任何修改或者等同替换,其均应涵盖在本发明技术方案的保护范围内。
Claims (10)
1.一种富水地层井筒掘进探堵水方法,其特征在于,包括步骤:
(S1)在井筒中心钻凿超前探水钻孔,孔深不低于一个井筒掘进进尺距离;
(S2)监测探水钻孔涌水量,当涌水量超标时,将钻孔电视伸入探水钻孔中,确定涌水点数量及其深度;
(S3)依据涌水量、涌水点数量及其深度确定注浆参数;
(S4)进行一次注浆堵水;
(S5)再次测定涌水量、涌水点数量及其深度,根据一次注浆前后涌水量及涌水点变化情况判断堵水效果,必要时调整注浆参数,直至注浆堵水成功;
(S6)在完成探水钻孔段井筒掘进工程后,重复步骤(S1)-(S5),直至富水地层井筒施工完毕。
2.根据权利要求1所述的方法,其特征在于,探水钻孔孔径为60~80mm,孔深为井筒掘进进尺的8~10倍。
3.根据权利要求1所述的方法,其特征在于,涌水量超标的阈值为井筒排水能力的80%~90%。
4.根据权利要求1所述的方法,其特征在于,在井筒掘进工作面与富水层相差一个进尺距离时进行注浆堵水。
5.根据权利要求1所述的方法,其特征在于,所述注浆参数包括注浆孔位置、注浆材料配比及其浓度。
6.根据权利要求1所述的方法,其特征在于,注浆钻孔孔径为30~50mm,沿井筒壁环向每隔30~60°均匀分布。
7.根据权利要求6所述的方法,其特征在于,注浆钻孔与垂直方向的夹角为30~45°。
8.根据权利要求1所述的方法,其特征在于,还包括步骤:采用堵塞器在略大于一个进尺距离的位置封堵探水钻孔。
9.根据权利要求8所述的方法,其特征在于,当井筒掘进工作面与富水层相差一个进尺距离时,先将鼓形堵塞器下移至富水层以下,至堵水成功时,再上移到略大于一个进尺距离的位置。
10.根据权利要求8或9所述的方法,其特征在于,所述堵塞器为橡胶材质的鼓形堵塞器。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810744237.9A CN108915689A (zh) | 2018-07-09 | 2018-07-09 | 一种富水地层井筒掘进探堵水方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810744237.9A CN108915689A (zh) | 2018-07-09 | 2018-07-09 | 一种富水地层井筒掘进探堵水方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108915689A true CN108915689A (zh) | 2018-11-30 |
Family
ID=64424758
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810744237.9A Pending CN108915689A (zh) | 2018-07-09 | 2018-07-09 | 一种富水地层井筒掘进探堵水方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108915689A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110318736A (zh) * | 2019-07-08 | 2019-10-11 | 中铁隆工程集团有限公司 | 一种岩溶隧道探水装置及基于此的堵水施工方法 |
CN110439504A (zh) * | 2019-09-13 | 2019-11-12 | 鄂托克前旗长城三号矿业有限公司 | 一种细砾岩含水层注浆堵水方法 |
CN111577382A (zh) * | 2020-04-14 | 2020-08-25 | 河北昕佳工程勘查设计有限公司 | 一种河北邯邢地区岩溶大水铁矿山水害防治及水资源综合利用方法 |
CN112946781A (zh) * | 2021-02-08 | 2021-06-11 | 中国矿业大学 | 一种含水裂隙岩层改造后的超前探水方法 |
CN113530573A (zh) * | 2021-08-20 | 2021-10-22 | 湖南楚湘建设工程集团有限公司 | 基于涌水量分类的长探-短探-注浆相结合的防治水方法 |
CN113781443A (zh) * | 2021-09-13 | 2021-12-10 | 中南大学 | 一种基于数字图像颜色梯度的岩层裂隙分布规律获取方法、系统、终端及可读存储介质 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102287137A (zh) * | 2011-09-15 | 2011-12-21 | 东北石油大学 | 自激共振钻井装置及其钻井方法 |
CN102425421A (zh) * | 2011-11-08 | 2012-04-25 | 中蓝连海设计研究院 | 适用于矿山竖井的新型防治水方法 |
CN104453913A (zh) * | 2014-12-19 | 2015-03-25 | 玉溪大红山矿业有限公司 | 一种竖井工作面超前预注浆方法 |
CN104831743A (zh) * | 2015-04-02 | 2015-08-12 | 山东大学 | 一种对富水围岩注浆控水效果的评估方法 |
KR20160137143A (ko) * | 2015-05-22 | 2016-11-30 | (주)성풍건설 | 수직갱 지반보강 방법 |
-
2018
- 2018-07-09 CN CN201810744237.9A patent/CN108915689A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102287137A (zh) * | 2011-09-15 | 2011-12-21 | 东北石油大学 | 自激共振钻井装置及其钻井方法 |
CN102425421A (zh) * | 2011-11-08 | 2012-04-25 | 中蓝连海设计研究院 | 适用于矿山竖井的新型防治水方法 |
CN104453913A (zh) * | 2014-12-19 | 2015-03-25 | 玉溪大红山矿业有限公司 | 一种竖井工作面超前预注浆方法 |
CN104831743A (zh) * | 2015-04-02 | 2015-08-12 | 山东大学 | 一种对富水围岩注浆控水效果的评估方法 |
KR20160137143A (ko) * | 2015-05-22 | 2016-11-30 | (주)성풍건설 | 수직갱 지반보강 방법 |
Non-Patent Citations (3)
Title |
---|
刘天泉: "《露天煤柱优化设计理论与技术》", 31 May 1998 * |
张从军等: "超前探水预注浆技术在司家营南区的应用", 《现代矿业》 * |
诸献斌等: "丰龙矿井北翼风井井筒注浆工艺的应用", 《江西煤炭科技》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110318736A (zh) * | 2019-07-08 | 2019-10-11 | 中铁隆工程集团有限公司 | 一种岩溶隧道探水装置及基于此的堵水施工方法 |
CN110318736B (zh) * | 2019-07-08 | 2022-10-21 | 中铁隆工程集团有限公司 | 一种岩溶隧道探水装置及基于此的堵水施工方法 |
CN110439504A (zh) * | 2019-09-13 | 2019-11-12 | 鄂托克前旗长城三号矿业有限公司 | 一种细砾岩含水层注浆堵水方法 |
CN111577382A (zh) * | 2020-04-14 | 2020-08-25 | 河北昕佳工程勘查设计有限公司 | 一种河北邯邢地区岩溶大水铁矿山水害防治及水资源综合利用方法 |
CN112946781A (zh) * | 2021-02-08 | 2021-06-11 | 中国矿业大学 | 一种含水裂隙岩层改造后的超前探水方法 |
CN112946781B (zh) * | 2021-02-08 | 2023-02-28 | 中国矿业大学 | 一种含水裂隙岩层改造后的超前探水方法 |
CN113530573A (zh) * | 2021-08-20 | 2021-10-22 | 湖南楚湘建设工程集团有限公司 | 基于涌水量分类的长探-短探-注浆相结合的防治水方法 |
CN113530573B (zh) * | 2021-08-20 | 2024-01-30 | 湖南楚湘建设工程集团有限公司 | 基于涌水量分类的长探-短探-注浆相结合的防治水方法 |
CN113781443A (zh) * | 2021-09-13 | 2021-12-10 | 中南大学 | 一种基于数字图像颜色梯度的岩层裂隙分布规律获取方法、系统、终端及可读存储介质 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108915689A (zh) | 一种富水地层井筒掘进探堵水方法 | |
CN105714764A (zh) | 一种隧道地表深孔袖阀管注浆施工方法 | |
CN107676126B (zh) | 一种利用拦截控制的顺层区域水力压裂方法 | |
CN107355226B (zh) | Tbm施工隧洞断层破碎带洞段处理结构 | |
CN207892585U (zh) | 煤矿瓦斯抽采钻孔用三堵两注封孔装置 | |
CN110359898A (zh) | 一种裂缝性储层预撑裂缝堵漏材料选择方法 | |
CN105369833A (zh) | 地下室顶板渗漏注浆维修工法 | |
CN111946367B (zh) | 一种穿越富水断层隧洞注浆加固方法 | |
CN108661650A (zh) | 一种富水岩浆岩地区深大竖井井筒施工方法 | |
CN107489432A (zh) | 隧道支护注浆设备及其注浆方法 | |
CN108130901B (zh) | 岩溶注浆的施工方法 | |
CN109162731A (zh) | 铁矿区深部开采突水注浆治理方法 | |
CN108456510A (zh) | 一种复合承压堵漏浆、制备方法及施工方法 | |
CN109900232A (zh) | 缝面含可溶盐裂缝性地层钻井液防漏方法 | |
CN108756910A (zh) | 一种智能预警式土压平衡盾构超前注浆装置和施工方法 | |
CN204551447U (zh) | 淤泥质土水泥搅拌桩钻机钻头 | |
CN106194161A (zh) | 一种基于冻结封堵岩体高压裂隙水测定煤层瓦斯压力的方法 | |
CN110671075B (zh) | 一种离层注浆的冒浆防治方法 | |
CN106013155A (zh) | 一种填造覆盖层、注浆固结处理钻孔漏浆的方法 | |
CN111946355B (zh) | 一种长距离岩石顶管穿越富水断层施工方法 | |
CN203855868U (zh) | 一种不损伤路面的平孔注浆路基加固的结构 | |
CN106089174B (zh) | 水压致裂化学膨胀剂充填快速掘进巷道的方法 | |
CN104806256B (zh) | 一种盾构突遇溶腔洞内处理方法 | |
CN206917672U (zh) | 一种大水矿山巷道施工阶段防治水结构 | |
CN108625897B (zh) | 一种隧道外侧富水区的人工引流泄压方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181130 |