CN108915637A - A kind of wax-proofing agent being added when pressing crack construction and the preparation method and application thereof - Google Patents

A kind of wax-proofing agent being added when pressing crack construction and the preparation method and application thereof Download PDF

Info

Publication number
CN108915637A
CN108915637A CN201810738381.1A CN201810738381A CN108915637A CN 108915637 A CN108915637 A CN 108915637A CN 201810738381 A CN201810738381 A CN 201810738381A CN 108915637 A CN108915637 A CN 108915637A
Authority
CN
China
Prior art keywords
wax
proofing agent
added
pressing crack
crack construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810738381.1A
Other languages
Chinese (zh)
Other versions
CN108915637B (en
Inventor
张军涛
吴金桥
王卫刚
周伟勤
郭庆
高志亮
张锋三
李彦林
黄华
杨先伦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Yanchang Petroleum Group Co Ltd
Original Assignee
Shaanxi Yanchang Petroleum Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Yanchang Petroleum Group Co Ltd filed Critical Shaanxi Yanchang Petroleum Group Co Ltd
Priority to CN201810738381.1A priority Critical patent/CN108915637B/en
Publication of CN108915637A publication Critical patent/CN108915637A/en
Application granted granted Critical
Publication of CN108915637B publication Critical patent/CN108915637B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells
    • E21B37/06Methods or apparatus for cleaning boreholes or wells using chemical means for preventing, limiting or eliminating the deposition of paraffins or like substances
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/52Compositions for preventing, limiting or eliminating depositions, e.g. for cleaning
    • C09K8/524Compositions for preventing, limiting or eliminating depositions, e.g. for cleaning organic depositions, e.g. paraffins or asphaltenes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Abstract

The present invention provides the wax-proofing agent being added when a kind of pressing crack construction, is made of the raw material of following weight percent:Odium stearate 10-20%, peregal O-25 10-20%, sodium sulfate of polyethenoxy ether of fatty alcohol AES 10-15%, neopelex ABS 5-10%, sodium ethylene diamine tetracetate 0.5-1%, colophony powder 1-2%, surplus is quartz sand.Meanwhile the present invention also provides the preparation method and application of the wax-proofing agent.Wax-proofing agent provided by the invention does not need individually to construct, be added while pressing crack construction, can go deep into stratum distal end, increase wax-proofing agent in the sphere of action on stratum, effective time is long, can be slow release 2 years or so on 30 DEG C of stratum;Wax control is begun to before crude oil does not generate, has directly been cut off the source of wax generation, has fundamentally been prevented the generation of wax;It is easy for construction, save operating expenses.

Description

A kind of wax-proofing agent being added when pressing crack construction and the preparation method and application thereof
Technical field
The invention belongs to technical field of petrochemical industry, and in particular to the wax-proofing agent being added when a kind of pressing crack construction and its preparation Method and application.
Background technique
Crude oil is constantly in stratum when unquarried, and the temperature and pressure of ambient enviroment is relatively high, Yi Xiegao Carbon number alkane all with liquid phase dissolved in crude oil, such as:Wax, resin and asphalt.Crude oil in the process of development, from ground layer gap In flow to shaft bottom, then the process of well head is extracted by pumping unit from shaft bottom, the temperature and pressure of ambient enviroment can be reduced ceaselessly, with The reduction of pressure, some light components in crude oil can escape in gaseous form, wax crystalline substance molecule can be with crude oil ambient enviroment Temperature and pressure it is continuous reduction and be precipitated, cause oil well paraffinication phenomenon, cause crude oil itself system unstable, the wax in crude oil It just will appear crystalline polamer.These wax crystalline substance molecules are ceaselessly deposited on oil pipe tube wall and beam hanger, will result in oil well paraffinication.It is first First, oil well paraffinication can make the aisle spare of oil pipe and transport pipeline in oil well slowly become smaller, so that blocking oil extraction pipeline, cause Crude output decline stops production.And oil pipe blocking can promote the resistance of sucker rod, or even damage equipment.To increase pumping unit Energy consumption, increase cost for oil production.If it is oil reservoir inside wax deposition, it will cause crude oil outflow channel blockage, reduce crude output. Even more serious situation is to cause beam hanger stuck, and oil well is caused to stop production.
The paraffin content of domestic each large oilfield is very high.According to statistics, the wax content in crude oil of most oil field institutes output reaches To 20% or so, the paraffin content of some crude oils is even as high as 40%, and the content of wax of 90% or so crude oil that China produces Amount is 10% or more.During oil extraction, oil well paraffinication brings serious harm to oil extraction and transportation system.Therefore, it is Guarantee the normal exploitation of crude oil and transport, paraffin removal from oil well, wax control also just become during oil extraction one it is extremely important Measure.But wax-proofing agent used at present requires individually to construct, the period is long, and operating expenses is higher, and becoming restriction, it is answered Bottleneck.
Summary of the invention
In view of the drawbacks of the prior art, the present invention provides the wax-proofing agent being added when a kind of pressing crack construction, which is not required to It individually to construct, be added in pressing crack construction, fundamentally prevent the generation of wax.
The wax-proofing agent being added when a kind of pressing crack construction is made of according to 100% meter the raw material of following weight percent:
Odium stearate 10-20%,
Peregal O-25 10-20%,
Sodium sulfate of polyethenoxy ether of fatty alcohol AES 10-15%,
Neopelex ABS 5-10%,
Sodium ethylene diamine tetracetate 0.5-1%,
Colophony powder 1-2%,
Surplus is quartz sand.
Preferably, the quartz sand crosses 70-100 mesh.
The preparation method of above-mentioned wax-proofing agent, includes the following steps:
(1)By odium stearate, peregal O-25, sodium sulfate of polyethenoxy ether of fatty alcohol AES, neopelex ABS, second Sodium ethylene diamine tetracetate, colophony powder proportionally sequentially add in reaction unit, molten to whole in 80 DEG C of at a temperature of heating stirring It is spare after solution;
(2)Quartz sand is heated to 50 DEG C while stirring, stops heating, continues to stir, by step under stirring(1)Production Object is slowly added thereto;
(3)By step(2)Product stir to temperature lower than 30 DEG C, stop stirring;
(4)20-100 mesh is crossed in screening.
Preferably, step(2)Described in be slowly subject to product and do not agglomerate.
The application of above-mentioned wax-proofing agent, the application are:In pressing crack construction, after the completion of preposition liquid pump note, less than 15% Sand is than being added above-mentioned wax-proofing agent.
Preferably, above-mentioned wax-proofing agent application be specially:
(1)Vehicle, connecting pipeline, pressure testing are set by pressure break design requirement;
(2)Pump pad of frac;
(3)After preposition liquid pump is complete, wax-proofing agent is added in pump note load fluid;
(4)After the completion of wax-proofing agent is added, fracturing propping agents are added;
(5)By normal pressing crack construction until terminating.
Wax-proofing agent provided by the invention is solid particle, odium stearate, sodium sulfate of polyethenoxy ether of fatty alcohol AES and 12 Sodium alkyl benzene sulfonate ABS, to the inhibiting effect of the precipitation of wax crystalline substance molecule, aggregation and deposition, reaches wax control using surfactant Purpose, peregal O-25 increases the intensity of surfactant and product can be improved in control release time, sodium ethylene diamine tetracetate Storage stability, rosin can be improved the intensity after product surface solidifies, and quartz sand guarantees intensity, density and the completion of product The granulation of product, while preventing product from floating on the surface of fracturing blender truck stirring pool in construction.
Advantages of the present invention:
Wax-proofing agent provided by the invention does not need individually to construct, be added while pressing crack construction, can go deep into stratum distal end, Wax-proofing agent is increased in the sphere of action on stratum, effective time is long, can be slow release 2 years or so on 30 DEG C of stratum;In crude oil Wax control is begun to before not generating, has directly been cut off the source of wax generation, has fundamentally been prevented the generation of wax;It is easy for construction, section About operating expenses.
Specific embodiment
Embodiment 1
The wax-proofing agent being added when a kind of pressing crack construction is made of according to 100% meter the raw material of following weight percent:Odium stearate 18%, peregal O-25 15%, sodium sulfate of polyethenoxy ether of fatty alcohol AES 12%, neopelex ABS 10%, second two Amine tetraacethyl sodium 1%, colophony powder 2% cross the quartz sand 42% of 70-100 mesh;
The preparation method of above-mentioned wax-proofing agent, includes the following steps:
(1)By odium stearate, peregal O-25, sodium sulfate of polyethenoxy ether of fatty alcohol AES, neopelex ABS, second Sodium ethylene diamine tetracetate, colophony powder proportionally sequentially add in reaction kettle, 80 DEG C at a temperature of heating stirring to whole dissolutions It is spare afterwards;
(2)Quartz sand is heated to 50 DEG C while stirring in dry-powder mixer, stops heating, continues to stir, in stirring It is lower by step(1)Product be slowly added thereto, product of being subject to does not agglomerate;
(3)By step(2)Product stir to temperature lower than 30 DEG C, stop stirring;
(4)20-100 mesh is crossed in screening.
Embodiment 2
The wax-proofing agent being added when a kind of pressing crack construction is made of according to 100% meter the raw material of following weight percent:Odium stearate 10%, peregal O-25 10%, sodium sulfate of polyethenoxy ether of fatty alcohol AES 15%, neopelex ABS 10%, second two Amine tetraacethyl sodium 1%, colophony powder 1% cross the quartz sand 53% of 70-100 mesh;
The preparation method of above-mentioned wax-proofing agent, with embodiment 1.
Embodiment 3
The wax-proofing agent being added when a kind of pressing crack construction is made of according to 100% meter the raw material of following weight percent:Odium stearate 20%, peregal O-25 15%, sodium sulfate of polyethenoxy ether of fatty alcohol AES 15%, neopelex ABS 5%, second two Amine tetraacethyl sodium 1%, colophony powder 2% cross the quartz sand 42% of 70-100 mesh;
The preparation method of above-mentioned wax-proofing agent, with embodiment 1.
Embodiment 4
The wax-proofing agent being added when a kind of pressing crack construction is made of according to 100% meter the raw material of following weight percent:Odium stearate 15%, peregal O-25 15%, sodium sulfate of polyethenoxy ether of fatty alcohol AES 13%, neopelex ABS 8%, second two Amine tetraacethyl sodium 0.8%, colophony powder 1.2% cross the quartz sand 47% of 70-100 mesh;
The preparation method of above-mentioned wax-proofing agent, with embodiment 1.
Embodiment 5
The wax-proofing agent being added when a kind of pressing crack construction is made of according to 100% meter the raw material of following weight percent:Odium stearate 15%, peregal O-25 20%, sodium sulfate of polyethenoxy ether of fatty alcohol AES 10%, neopelex ABS 8%, second two Amine tetraacethyl sodium 0.5%, colophony powder 1.5% cross the quartz sand 45% of 70-100 mesh;
The preparation method of above-mentioned wax-proofing agent, with embodiment 1.
Embodiment 6
The wax-proofing agent that embodiment 5 provides is used to extend oil field oil recovery factory, carries out pressure break wax control institutional operation construction;
It is 6 layers long to extend oil field oil recovery factory G-5 well, permeability 1.3mD, oil layer section 854.2-857.5m porosity 10.5%, contains Oily saturation degree 38.6%, perforated interval 854.0-856.0m(Penetrate out 2.0m), without natural production capacity after perforation, since area's wax deposition is serious, New well occurs as soon as serious wax deposition in 60 days after generally going into operation;
It has particular application as:
(1)Vehicle, connecting pipeline, pressure testing are set by pressure break design requirement;
(2)Pump pad of frac;
(3)After preposition liquid pump is complete, wax-proofing agent is added in pump note load fluid(Wax-proofing agent sand ratio is 10%);
(4)After the completion of wax-proofing agent is added, fracturing propping agents are added;
(5)By normal pressing crack construction until terminating;
Discharge capacity 2.5m30.5 m of wax-proofing agent is added in/min3, add quartz sand 35m3, carry out pressing crack construction, pressing crack construction pump note program It is shown in Table 1.
1 G-5 well pressure break wax control institutional operation of table construction pump note program
Oil, first Liquid output 5.7m are seen after pressure after 2 days3/ d, 2.6 t/d of oil-producing have no that wax deposition, correctional effect are obvious for 300 days after pressure.
Embodiment 7
The wax-proofing agent that embodiment 1 provides is used to extend oil field oil recovery factory, carries out pressure break wax control institutional operation construction;
It is 6 layers long to extend oil field oil recovery factory T-508 well, permeability 1.2mD, oil layer section 621.5-627.3m porosity 9.8%, contains Oily saturation degree 42.3%, perforated interval 621.0-624.0m(Penetrate out 3.0m), since area's wax deposition is serious, new well generally go into operation after 30 It occurs as soon as serious wax deposition, meanwhile, the well reservoir properties are poor;
It has particular application as:
(1)Vehicle, connecting pipeline, pressure testing are set by pressure break design requirement;
(2)Pump pad of frac;
(3)After preposition liquid pump is complete, wax-proofing agent is added in pump note load fluid(Wax-proofing agent sand ratio is 10%);
(4)After the completion of wax-proofing agent is added, fracturing propping agents are added;
(5)By normal pressing crack construction until terminating;
Discharge capacity 6m30.8 m of wax-proofing agent is added in/min3, add quartz sand 50m3, pressing crack construction is carried out, pressing crack construction pump note program is shown in Table 2.
2 T-508 well volume fracturing wax control institutional operation of table construction pump note program
Oil, first Liquid output 4.9m are seen after pressure after 7 days3/ d, 3.2 t/d of oil-producing have no that wax deposition, correctional effect are obvious for 280 days after pressure.

Claims (6)

1. the wax-proofing agent being added when a kind of pressing crack construction, it is characterised in that:According to 100% meter, by the raw material of following weight percent Composition:
Odium stearate 10-20%,
Peregal O-25 10-20%,
Sodium sulfate of polyethenoxy ether of fatty alcohol AES 10-15%,
Neopelex ABS 5-10%,
Sodium ethylene diamine tetracetate 0.5-1%,
Colophony powder 1-2%,
Surplus is quartz sand.
2. wax-proofing agent according to claim 1, it is characterised in that:The quartz sand crosses 70-100 mesh.
3. the preparation method of wax-proofing agent as claimed in claim 1 or 2, it is characterised in that:Include the following steps:
(1)By odium stearate, peregal O-25, sodium sulfate of polyethenoxy ether of fatty alcohol AES, neopelex ABS, second Sodium ethylene diamine tetracetate, colophony powder proportionally sequentially add in reaction unit, molten to whole in 80 DEG C of at a temperature of heating stirring It is spare after solution;
(2)Quartz sand is heated to 50 DEG C while stirring, stops heating, continues to stir, by step under stirring(1)Production Object is slowly added thereto;
(3)By step(2)Product stir to temperature lower than 30 DEG C, stop stirring;
(4)20-100 mesh is crossed in screening.
4. preparation method according to claim 3, it is characterised in that:Step(2)Described in be slowly subject to product and do not agglomerate.
5. a kind of application of wax-proofing agent, it is characterised in that:The application is:In pressing crack construction, after the completion of preposition liquid pump note, with Sand less than 15% is than being added wax-proofing agent, wherein the wax-proofing agent is wax-proofing agent as claimed in claim 1 or 2.
6. the application of wax-proofing agent according to claim 5, it is characterised in that:The application is specially:
(1)Vehicle, connecting pipeline, pressure testing are set by pressure break design requirement;
(2)Pump pad of frac;
(3)After preposition liquid pump is complete, wax-proofing agent is added in pump note load fluid;
(4)After the completion of wax-proofing agent is added, fracturing propping agents are added;
(5)By normal pressing crack construction until terminating.
CN201810738381.1A 2018-07-06 2018-07-06 Wax inhibitor added during fracturing construction and preparation method and application thereof Active CN108915637B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810738381.1A CN108915637B (en) 2018-07-06 2018-07-06 Wax inhibitor added during fracturing construction and preparation method and application thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810738381.1A CN108915637B (en) 2018-07-06 2018-07-06 Wax inhibitor added during fracturing construction and preparation method and application thereof

Publications (2)

Publication Number Publication Date
CN108915637A true CN108915637A (en) 2018-11-30
CN108915637B CN108915637B (en) 2020-04-14

Family

ID=64424834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810738381.1A Active CN108915637B (en) 2018-07-06 2018-07-06 Wax inhibitor added during fracturing construction and preparation method and application thereof

Country Status (1)

Country Link
CN (1) CN108915637B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109762545A (en) * 2019-02-27 2019-05-17 中国石油天然气股份有限公司长庆油田分公司第十二采油厂 A kind of well wellbore deep play acting type Wax removing agent and preparation method thereof
CN110079292A (en) * 2019-03-22 2019-08-02 中国石油化工股份有限公司 High-content wax oil reservoir fracturing composition, high-content wax oil reservoir fracturing fluid and high-content wax oil reservoir composite fracturing fluid
CN110511732A (en) * 2019-09-16 2019-11-29 西南石油大学 Can in depth at layer depth wax control inhibitor and the preparation method and application thereof
CN110982510A (en) * 2019-11-22 2020-04-10 中国石油天然气股份有限公司 Hydraulic fracturing propping agent and preparation method and application thereof
CN111963130A (en) * 2020-09-01 2020-11-20 中国石油天然气股份有限公司 Fracturing method capable of maintaining flow conductivity of cracks for long time and application thereof
CN113278457A (en) * 2021-06-28 2021-08-20 湖北亮绿环保技术有限公司 Wax remover for rapid treatment of oil and gas fields and preparation method thereof
CN113550714A (en) * 2020-04-26 2021-10-26 中国石油天然气股份有限公司 Hydraulic fracturing wax-proofing method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090062153A1 (en) * 2007-08-29 2009-03-05 Gray John L Enzyme enhanced oil/gas recovery (EEOR/EEGR) using non-gel hydraulic fracturing in hydrocarbon producing wells
CN102250603A (en) * 2011-05-06 2011-11-23 河北科技大学 Separated injection oil well composite blocking remover and injection method thereof
CN105567201A (en) * 2014-10-09 2016-05-11 中国石油天然气股份有限公司 Oil well oil-based wax removing agent
CN105756649A (en) * 2016-02-29 2016-07-13 烟台智本知识产权运营管理有限公司 Yield increase method for low-permeability wax-bearing oil well
US20160362597A1 (en) * 2014-03-04 2016-12-15 Cleansorb Limited Method for Treatment of Underground Reservoirs
CN106350045A (en) * 2016-08-26 2017-01-25 潍坊天福化学科技有限公司 Novel low-temperature high-efficiency oil-base paraffin remover and preparation method thereof
CN107429561A (en) * 2015-03-30 2017-12-01 通用电气(Ge)贝克休斯有限责任公司 Handle the fracturing fluid and method of hydrocarbon containing formation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090062153A1 (en) * 2007-08-29 2009-03-05 Gray John L Enzyme enhanced oil/gas recovery (EEOR/EEGR) using non-gel hydraulic fracturing in hydrocarbon producing wells
CN102250603A (en) * 2011-05-06 2011-11-23 河北科技大学 Separated injection oil well composite blocking remover and injection method thereof
US20160362597A1 (en) * 2014-03-04 2016-12-15 Cleansorb Limited Method for Treatment of Underground Reservoirs
CN105567201A (en) * 2014-10-09 2016-05-11 中国石油天然气股份有限公司 Oil well oil-based wax removing agent
CN107429561A (en) * 2015-03-30 2017-12-01 通用电气(Ge)贝克休斯有限责任公司 Handle the fracturing fluid and method of hydrocarbon containing formation
CN105756649A (en) * 2016-02-29 2016-07-13 烟台智本知识产权运营管理有限公司 Yield increase method for low-permeability wax-bearing oil well
CN106350045A (en) * 2016-08-26 2017-01-25 潍坊天福化学科技有限公司 Novel low-temperature high-efficiency oil-base paraffin remover and preparation method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘兆跃、张文正: "苏北洲城油田化学清防蜡", 《油气田地面工程》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109762545A (en) * 2019-02-27 2019-05-17 中国石油天然气股份有限公司长庆油田分公司第十二采油厂 A kind of well wellbore deep play acting type Wax removing agent and preparation method thereof
CN109762545B (en) * 2019-02-27 2021-03-02 中国石油天然气股份有限公司长庆油田分公司第十二采油厂 Oil well shaft deep-acting wax removing and preventing agent and preparation method thereof
CN110079292A (en) * 2019-03-22 2019-08-02 中国石油化工股份有限公司 High-content wax oil reservoir fracturing composition, high-content wax oil reservoir fracturing fluid and high-content wax oil reservoir composite fracturing fluid
CN110511732A (en) * 2019-09-16 2019-11-29 西南石油大学 Can in depth at layer depth wax control inhibitor and the preparation method and application thereof
CN110511732B (en) * 2019-09-16 2022-03-01 西南石油大学 Inhibitor capable of preventing wax from penetrating deep into stratum and preparation method and application thereof
CN110982510A (en) * 2019-11-22 2020-04-10 中国石油天然气股份有限公司 Hydraulic fracturing propping agent and preparation method and application thereof
CN110982510B (en) * 2019-11-22 2022-08-05 中国石油天然气股份有限公司 Hydraulic fracturing propping agent and preparation method and application thereof
CN113550714A (en) * 2020-04-26 2021-10-26 中国石油天然气股份有限公司 Hydraulic fracturing wax-proofing method
CN111963130A (en) * 2020-09-01 2020-11-20 中国石油天然气股份有限公司 Fracturing method capable of maintaining flow conductivity of cracks for long time and application thereof
CN113278457A (en) * 2021-06-28 2021-08-20 湖北亮绿环保技术有限公司 Wax remover for rapid treatment of oil and gas fields and preparation method thereof

Also Published As

Publication number Publication date
CN108915637B (en) 2020-04-14

Similar Documents

Publication Publication Date Title
CN108915637A (en) A kind of wax-proofing agent being added when pressing crack construction and the preparation method and application thereof
CA2094088C (en) Gas well treatment compositions and methods
CN102587858B (en) Method for blocking water for fracture and hole type reservoir
WO2016040742A1 (en) Methods of increasing a thermal conductivity and transferring heat within a subterranean formation, and methods of extracting hydrocarbons from the subterranean formation
CN109294541B (en) Fire flooding well self-degradation temporary plugging agent and preparation method and application thereof
US11802235B2 (en) Self propping surfactant for well stimulation
CN106703775B (en) Coal bed gas fracturing method
CN103937475A (en) Carbon dioxide acidification blocking remover and process of not reversely discharging raffinate after acidification
US20090062153A1 (en) Enzyme enhanced oil/gas recovery (EEOR/EEGR) using non-gel hydraulic fracturing in hydrocarbon producing wells
CN114836184A (en) Degradable temporary plugging agent for well repair of offshore large-leakage oil-water well and use method thereof
CN112111265A (en) In-situ generated proppant for hydraulic fracturing
US9441447B2 (en) Method of isolating a wellbore with solid acid for fracturing
CN109826590A (en) A kind of old well water blockoff fracturing process of hypotonic oil gas field High water cut
US10767102B2 (en) Clean gravel pack fluid composition and method for sand control applications
CN104453829A (en) Paving method and application for wormhole type propping agent groups
CN108291135A (en) For well inorganic agent to be released slowly into the compression spherolite of the forming in well and its application method
CN107880867B (en) Pickering emulsion fracturing fluid and preparation method and application thereof
CN106337676A (en) Method of fracturing coal-bed gas reservoir
CN102865061B (en) Honeycomb fashion spread method and the application of proppant
US2796131A (en) Process for improving the oil-water ratio of oil and gas wells
CN104449625A (en) Fracturing type sand preventing fluid for oil and gas field and construction method thereof
CN102102012A (en) Selective plugging agent for horizontal well and preparation method thereof
CN108643876A (en) A kind of multidimensional pipe fracturing process for low-permeability oilfield stripper well
US11118107B2 (en) Method of using micro-particle amorphous silicate in well stimulation
Wu et al. A New Insight into Comprehensive Treatment of Particle Migration Damage in Offshore Loose Sandstone Oilfield

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant