CN108915280A - Auxiliary tool is used in a kind of installation of curtain skeleton - Google Patents
Auxiliary tool is used in a kind of installation of curtain skeleton Download PDFInfo
- Publication number
- CN108915280A CN108915280A CN201811131828.5A CN201811131828A CN108915280A CN 108915280 A CN108915280 A CN 108915280A CN 201811131828 A CN201811131828 A CN 201811131828A CN 108915280 A CN108915280 A CN 108915280A
- Authority
- CN
- China
- Prior art keywords
- plate
- auxiliary tool
- curtain skeleton
- corner brace
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 24
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 14
- 230000001054 cortical effect Effects 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 210000000988 bone and bone Anatomy 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 1
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000000741 silica gel Substances 0.000 description 1
- 229910002027 silica gel Inorganic materials 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Curtains And Furnishings For Windows Or Doors (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A kind of curtain skeleton installation auxiliary tool, including the first corner brace and the second corner brace, first corner brace and the second corner brace include the first plate and the second plate of integrally connected, and the first plate and the second plate are mutually perpendicular to, two the first plates are fixedly connected through a cushion block, two the first plates are parallel to each other and there are gaps, the width in gap is equal to the thickness of third vertical panel, the first frictional layer is fixedly installed on the side of two the first plates being oppositely arranged, two the second plates are oppositely extending;It is fixedly installed at least one nut on first plate of the second corner brace, is fitted through in nut equipped with screw rod, one end of screw rod is extend into gap.The present invention provides a kind of curtain skeleton installation auxiliary tool, can be fixed on vertical keel when installing curtain skeleton, then be supported to horizontal keel, save the physical efficiency of worker, improve the speed of installation.
Description
Technical field
The present invention relates to technical field of building construction, auxiliary tool is used in specifically a kind of curtain skeleton installation.
Background technique
Existing curtain skeleton generally uses the no-welding T-steel keel curtain wall of assembled, and lateral T-steel keel pass through spring
Spring pin is connected with vertical keel, and lateral keel web and edge of a wing plate thickness are 14mm, and single lateral keel weight reaches
25kg;In the construction process, each hanging basket limits upper 2 workers, needs to operate 2 operator's lifts in lateral keel installation process
It plays lateral keel and spring pin is installed jointly, every lateral keel installation duration is 5 minutes.In existing form of construction work,
Construction worker's amount of labour is larger, and physical power loss is larger, is not easy to guarantee construction safety, and installation effectiveness is not high.
Summary of the invention
In order to solve deficiency in the prior art, the present invention provides a kind of curtain skeleton installation auxiliary tool, Neng Gou
It is fixed on vertical keel when curtain skeleton is installed, then horizontal keel is supported, the physical efficiency of worker is saved, mentions
The high speed of installation.
To achieve the goals above, the concrete scheme that the present invention uses for:A kind of curtain skeleton installation auxiliary tool, institute
Stating curtain skeleton includes horizontal keel and vertical keel, and horizontal keel includes the first vertical panel and level board being fixedly connected, water
The both ends of plate are connected with extension, at least one pin hole is offered on extension, and vertical keel include being fixedly connected
The second vertical panel and third vertical panel, and the second vertical panel and third vertical panel are mutually perpendicular to, and are opened up on third vertical panel
There is at least one through-hole corresponding with the pin hole, the auxiliary tool includes the first corner brace and the second corner brace, the first corner brace
It include the first plate and the second plate of integrally connected with the second corner brace, and the first plate and the second plate are mutually perpendicular to,
Two the first plates are fixedly connected through a cushion block, and two the first plates are parallel to each other and there are gap, and the width in gap is greater than
Or the thickness equal to the third vertical panel, first, which is fixedly installed, on the side of two the first plates being oppositely arranged rubs
Layer is wiped, two the second plates are oppositely extending;It is fixedly installed at least one nut on first plate of second corner brace,
It is fitted through in nut equipped with screw rod, one end of screw rod is extend into the gap.
A positioning component is fixedly installed at least one described first plate, positioning component includes and the first plate
The pedestal being fixedly connected, pedestal are rotatably connected to positioning plate, and positioning plate is parallel to each other with the first plate, offered on positioning plate to
A few location hole.
The pedestal is set as plate, and pedestal is parallel to each other with first plate, pedestal towards second plate
One end on offer through slot, be fixedly connected with shaft between the two side walls of through slot, one end of the positioning plate and shaft turn
Dynamic connection.
Turning set is equipped with interconnecting piece, interconnecting piece semicircular in shape, interconnecting piece and the positioning plate integrally connected in the shaft.
The other end of the screw rod is fixedly connected with grip part.
The grip part is set as square bar.
The second frictional layer is fixedly connected on the one end of the screw rod protruded into the gap.
First frictional layer and second frictional layer are disposed as cortical layer.
Beneficial effect:The present invention can be fixed on vertical keel when installing curtain skeleton, then to horizontal dragon
Bone is supported, and is lifted horizontal keel for a long time without worker, is saved the physical efficiency of worker, improve the speed of installation.It is also logical
Setting positioning component is crossed to promote the speed of alignment through-hole and pin hole, further increases installation speed.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is the fit system schematic diagram of the second corner brace and screw rod of the invention;
Fig. 3 is application method schematic diagram of the invention.
Appended drawing reference:The first corner brace of 1-, the first frictional layer of 2-, 3- positioning plate, 4- location hole, 5- shaft, 6- interconnecting piece, 7-
Through slot, 8- pedestal, 9- cushion block, the second corner brace of 10-, 11- nut, 12- screw rod, the grip part 13-, the second frictional layer of 14-, 15-
One vertical panel, 16- level board, 17- extension, 18- pin hole, the second vertical panel of 19-, 20- third vertical panel, 21- through-hole.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please referring to Fig. 1 to 3, Fig. 1 is overall structure diagram of the invention, and Fig. 2 is the second corner brace and screw rod of the invention
Fit system schematic diagram, Fig. 3 is application method schematic diagram of the invention.
Curtain skeleton includes horizontal keel and vertical keel, and horizontal keel includes the first vertical panel 15 and water being fixedly connected
Plate 16, the both ends of level board 16 are connected with extension 17, at least one pin hole 18 are offered on extension 17, vertically
Keel include the second vertical panel 19 and third vertical panel 20 being fixedly connected, and 20 phase of the second vertical panel 19 and third vertical panel
It is mutually vertical, at least one through-hole 21 corresponding with pin hole 18 is offered on third vertical panel 20.Horizontal keel and vertical keel
When being installed together, one end of the first vertical panel 15 is against on the second vertical panel 19, and with the second vertical panel 19 positioned at same
Plane, one end of level board 16 are against on third vertical panel 20, and the connection corresponding with through-hole 21 of pin hole 18, utilize spring pin
It sequentially passes through through-hole 21 and pin hole 18 links together level board 16 and third vertical panel 20, to realize horizontal keel and hang down
The connection of dc machine bone.
A kind of curtain skeleton installation auxiliary tool, including the first corner brace 1 and the second corner brace 10, the first corner brace 1 and second
Corner brace 10 includes the first plate and the second plate of integrally connected, and the first plate and the second plate are mutually perpendicular to, and two
First plate is fixedly connected by cushion block 9, and two the first plates are parallel to each other and there are gap, the width in gap be greater than or
Equal to the thickness of third vertical panel 20, the first frictional layer 2 is fixedly installed on the side of two the first plates being oppositely arranged,
Two the second plates are oppositely extending.
It is fixedly installed at least one nut 11 on first plate of the second corner brace 10, fits through in nut 11 equipped with screw rod
12, one end of screw rod 12 is extend into gap.
In the use of the present invention, being inserted into third vertical panel 20 in gap, third is clamped using two the first plates and is hung down
Then straight panel 20 makes the movement of screw rod 12 by rotating screw rod 12, and then is against screw rod 12 on third vertical panel 20, final to utilize
Screw rod 12 holds out against third vertical panel 20 on the first plate of the first corner brace 1, so that auxiliary tool is fixed to vertical keel
On.First frictional layer 2 is used to increase the frictional force between the first plate and third vertical panel 20, improves auxiliary tool and vertical dragon
The stability connected between bone.Then horizontal keel is lifted, extension 17 is placed on the first plate, by auxiliary tool to water
Flat keel are supported.Horizontal keel is then unclamped, spring pin is installed.Made by means of the support of auxiliary tool
With worker is without lifting always horizontal keel, to save a large amount of physical strength, and can be avoided worker because bearing a heavy burden for a long time
And hand is caused to shake, to avoid to accelerate to install because hand shake causes pin hole 18 that can not be aligned with through-hole 21.
Another factor for limiting installation effectiveness is that pin hole 18 is difficult to be aligned with through-hole 21, in order to solve this problem,
A positioning component is fixedly installed at least one first plate, positioning component includes the base being fixedly connected with the first plate
Seat 8, pedestal 8 is rotatably connected to positioning plate 3, and positioning plate 3 is parallel to each other with the first plate, offers at least one on positioning plate 3
Location hole 4.When auxiliary tool is fixed on vertical keel, auxiliary tool is moved up and down, location hole 4 and through-hole 21 are made
Then auxiliary tool is fixed in alignment again.Subsequent rotational positioning plate 3, keeps positioning plate 3 vertical, the space above the first plate is risen
It opens.Finally horizontal keel is placed on auxiliary tool, because positioning component has been utilized to adjust the position of auxiliary tool,
Horizontal keel pin hole 18 and through-hole 21 when being put on auxiliary tool are directly aligned, so spring can be mounted directly
Pin, to greatly improve installation speed.
The specific set-up mode of positioning plate 3 is:Pedestal 8 is set as plate, and pedestal 8 is parallel to each other with the first plate, pedestal 8
Direction the second plate one end on offer through slot 7, shaft 5, positioning plate 3 are fixedly connected between the two side walls of through slot 7
One end and shaft 5 be rotatablely connected.Turning set is equipped with interconnecting piece 6,6 semicircular in shape of interconnecting piece, interconnecting piece 6 and positioning in shaft 5
3 integrally connected of plate.
The other end of screw rod 12 is fixedly connected with grip part 13, and grip part 13 is used for convenient when adjusting screw rod 12
Hold screw rod 12.Grip part 13 is set as square bar.In other embodiments of the invention, grip part 13 may be set to be spiral shell
Mother rotates the purpose that rotation screw rod 12 is realized in grip part 13 by interior hexagonal L-type spanner.
Protruding on one end in gap for screw rod 12 is fixedly connected with the second frictional layer 14, and the second frictional layer 14 is for increasing
Frictional force between screw rod 12 and third vertical panel 20.First frictional layer 2 and the second frictional layer 14 are disposed as cortical layer, can also
To be set as rubber layer or layer of silica gel etc., it is subject to and is capable of providing biggish frictional force and wear-resisting property with higher.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention.
Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one
The widest scope of cause.
Claims (8)
1. a kind of curtain skeleton installation auxiliary tool, the curtain skeleton includes horizontal keel and vertical keel, horizontal keel
Including the first vertical panel being fixedly connected(15)And level board(16), level board(16)Both ends be connected with extension
(17), extension(17)On offer at least one pin hole(18), vertical keel include the second vertical panel being fixedly connected(19)
With third vertical panel(20), and the second vertical panel(19)With third vertical panel(20)It is mutually perpendicular to, third vertical panel(20)On
Offer at least one and the pin hole(18)Corresponding through-hole(21), it is characterised in that:
The auxiliary tool includes the first corner brace(1)With the second corner brace(10), the first corner brace(1)With the second corner brace(10)Include
The first plate and the second plate of integrally connected, and the first plate and the second plate are mutually perpendicular to, and two the first plates pass through
Cushion block(9)It is fixedly connected, two the first plates are parallel to each other and there are gap, and the width in gap is more than or equal to described the
Three vertical panels(20)Thickness, be fixedly installed the first frictional layer on the side of two the first plates being oppositely arranged(2), two
A second plate is oppositely extending;
Second corner brace(10)First plate on be fixedly installed at least one nut(11), nut(11)Interior cooperation
It is equipped with screw rod(12), screw rod(12)One end extend into the gap.
2. a kind of curtain skeleton installation auxiliary tool as described in claim 1, it is characterised in that:At least one described first
A positioning component is fixedly installed on plate, positioning component includes the pedestal being fixedly connected with the first plate(8), pedestal
(8)It is rotatably connected to positioning plate(3), positioning plate(3)It is parallel to each other with the first plate, positioning plate(3)On offer at least one
Location hole(4).
3. a kind of curtain skeleton installation auxiliary tool as claimed in claim 2, it is characterised in that:The pedestal(8)Setting
For plate, pedestal(8)It is parallel to each other with first plate, pedestal(8)Towards offering on one end of second plate
Through slot(7), through slot(7)Two side walls between be fixedly connected with shaft(5), the positioning plate(3)One end and shaft(5)Turn
Dynamic connection.
4. a kind of curtain skeleton installation auxiliary tool as claimed in claim 3, it is characterised in that:The shaft(5)It is upper to turn
It is dynamic to be arranged with interconnecting piece(6), interconnecting piece(6)Semicircular in shape, interconnecting piece(6)With the positioning plate(3)Integrally connected.
5. a kind of curtain skeleton installation auxiliary tool as described in claim 1, it is characterised in that:The screw rod(12)It is another
Outer one end is fixedly connected with grip part(13).
6. a kind of curtain skeleton installation auxiliary tool as claimed in claim 5, it is characterised in that:The grip part(13)If
It is set to square bar.
7. a kind of curtain skeleton installation auxiliary tool as described in claim 1, it is characterised in that:The screw rod(12)Stretch
Enter and is fixedly connected with the second frictional layer on one end in the gap(14).
8. a kind of curtain skeleton installation auxiliary tool as claimed in claim 7, it is characterised in that:First frictional layer
(2)With second frictional layer(14)It is disposed as cortical layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811131828.5A CN108915280B (en) | 2018-09-27 | 2018-09-27 | Auxiliary tool for curtain wall keel installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811131828.5A CN108915280B (en) | 2018-09-27 | 2018-09-27 | Auxiliary tool for curtain wall keel installation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108915280A true CN108915280A (en) | 2018-11-30 |
CN108915280B CN108915280B (en) | 2024-04-05 |
Family
ID=64409287
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811131828.5A Active CN108915280B (en) | 2018-09-27 | 2018-09-27 | Auxiliary tool for curtain wall keel installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108915280B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113417387A (en) * | 2021-06-17 | 2021-09-21 | 深圳海外装饰工程有限公司 | Assembled steel through piece metal curtain wall structure and construction method |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202689264U (en) * | 2012-06-07 | 2013-01-23 | 广州银达建材科技有限公司 | Composite insulating curtain-wall suspension member |
CN203238818U (en) * | 2013-05-13 | 2013-10-16 | 中国十七冶集团有限公司 | Vertical keel fixing device for externally decorated curtain wall |
CN203603319U (en) * | 2013-10-17 | 2014-05-21 | 芜湖吉和机电厂 | High-strength corner connector for curtain wall |
CN104234284A (en) * | 2014-09-22 | 2014-12-24 | 苏州金螳螂幕墙有限公司 | Copper plate curtain wall |
CN204456536U (en) * | 2014-12-18 | 2015-07-08 | 福建鹏坤实业有限公司 | A kind of curtain skeleton system fixing device |
CN205024893U (en) * | 2015-09-17 | 2016-02-10 | 广东华途仕建材实业有限公司 | Novel curtain board can be adjusted freely installation keel structure |
CN205617629U (en) * | 2016-03-29 | 2016-10-05 | 上海西蒙幕墙吊顶板有限公司 | Fixed angle of strenghthened type sign indicating number node structure |
CN207144264U (en) * | 2017-08-10 | 2018-03-27 | 江苏常装建设有限公司 | A kind of curtain skeleton framework |
CN209025463U (en) * | 2018-09-27 | 2019-06-25 | 河南三建建设集团有限公司 | Auxiliary tool is used in a kind of installation of curtain skeleton |
-
2018
- 2018-09-27 CN CN201811131828.5A patent/CN108915280B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202689264U (en) * | 2012-06-07 | 2013-01-23 | 广州银达建材科技有限公司 | Composite insulating curtain-wall suspension member |
CN203238818U (en) * | 2013-05-13 | 2013-10-16 | 中国十七冶集团有限公司 | Vertical keel fixing device for externally decorated curtain wall |
CN203603319U (en) * | 2013-10-17 | 2014-05-21 | 芜湖吉和机电厂 | High-strength corner connector for curtain wall |
CN104234284A (en) * | 2014-09-22 | 2014-12-24 | 苏州金螳螂幕墙有限公司 | Copper plate curtain wall |
CN204456536U (en) * | 2014-12-18 | 2015-07-08 | 福建鹏坤实业有限公司 | A kind of curtain skeleton system fixing device |
CN205024893U (en) * | 2015-09-17 | 2016-02-10 | 广东华途仕建材实业有限公司 | Novel curtain board can be adjusted freely installation keel structure |
CN205617629U (en) * | 2016-03-29 | 2016-10-05 | 上海西蒙幕墙吊顶板有限公司 | Fixed angle of strenghthened type sign indicating number node structure |
CN207144264U (en) * | 2017-08-10 | 2018-03-27 | 江苏常装建设有限公司 | A kind of curtain skeleton framework |
CN209025463U (en) * | 2018-09-27 | 2019-06-25 | 河南三建建设集团有限公司 | Auxiliary tool is used in a kind of installation of curtain skeleton |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113417387A (en) * | 2021-06-17 | 2021-09-21 | 深圳海外装饰工程有限公司 | Assembled steel through piece metal curtain wall structure and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN108915280B (en) | 2024-04-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209025463U (en) | Auxiliary tool is used in a kind of installation of curtain skeleton | |
CN108915280A (en) | Auxiliary tool is used in a kind of installation of curtain skeleton | |
CN219389930U (en) | Auxiliary structure for hanging air conditioner outdoor unit | |
CN209891688U (en) | High building quick-building safe construction foot rest | |
CN209339385U (en) | A kind of cladding glass fixture | |
CN218465332U (en) | Lifting appliance for building curtain wall construction | |
CN217811810U (en) | Fixing assembly for mounting curtain wall decorative plate | |
CN212295204U (en) | Green anti-pollution building outer glass curtain wall | |
CN218715378U (en) | Ancient building repairs and uses reinforcing fixture | |
CN214884702U (en) | Connecting piece for decorating curtain wall | |
CN211018136U (en) | Support is used in installation of cable testing bridge | |
CN209129238U (en) | The furred ceiling dried hanging hang structure of ceiling | |
CN207194155U (en) | Space structure panel three-dimensional regulation system | |
CN221481138U (en) | Curved surface curtain wall mounting and fixing structure | |
CN216587682U (en) | Elevator shaft template system | |
CN221461876U (en) | Assembled building supporting seat | |
CN218346503U (en) | Building curtain anti-drop device that can adjust | |
CN210713878U (en) | Curtain installation auxiliary device for civil engineering | |
CN220814969U (en) | Auxiliary fixing device for curtain wall installation | |
CN221093373U (en) | Curtain wall hoisting structure | |
CN213288209U (en) | Building aluminum formwork straightening equipment | |
CN219508968U (en) | Hook-up type aluminum veneer suspended ceiling | |
CN217669109U (en) | Combined door and window splicing platform | |
CN217949791U (en) | Supporting device for mounting curtain wall | |
CN209989002U (en) | Quick conveying machine for building brick mortar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |