CN108906865A - A kind of method of soil remediation - Google Patents

A kind of method of soil remediation Download PDF

Info

Publication number
CN108906865A
CN108906865A CN201810628048.5A CN201810628048A CN108906865A CN 108906865 A CN108906865 A CN 108906865A CN 201810628048 A CN201810628048 A CN 201810628048A CN 108906865 A CN108906865 A CN 108906865A
Authority
CN
China
Prior art keywords
well
soil remediation
water
deep
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810628048.5A
Other languages
Chinese (zh)
Inventor
阮金木
王华东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Shangyu Xieying Environmental Engineering Co Ltd
Shaoxing City Shangyu Zhonglian Environmental Protection Co Ltd
Original Assignee
Shaoxing Shangyu Xieying Environmental Engineering Co Ltd
Shaoxing City Shangyu Zhonglian Environmental Protection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Shangyu Xieying Environmental Engineering Co Ltd, Shaoxing City Shangyu Zhonglian Environmental Protection Co Ltd filed Critical Shaoxing Shangyu Xieying Environmental Engineering Co Ltd
Priority to CN201810628048.5A priority Critical patent/CN108906865A/en
Publication of CN108906865A publication Critical patent/CN108906865A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09CRECLAMATION OF CONTAMINATED SOIL
    • B09C1/00Reclamation of contaminated soil
    • B09C1/002Reclamation of contaminated soil involving in-situ ground water treatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09CRECLAMATION OF CONTAMINATED SOIL
    • B09C2101/00In situ

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Water Supply & Treatment (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Processing Of Solid Wastes (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention relates to a kind of methods of soil remediation, include the following steps:Preparation of construction, installation positioning, deep-well pipe laying, back-up sand gravel, well-flushing, lower pump examination take out, are laid with discharge pipe line and power supply circuit, following formula draw water and record.The method of soil remediation of the present invention can effectively achieve the purpose that repair underground water, applicability is extensive, repairing effect is good, repair time is fast, and its technology, environment and safety index are all satisfied requirement, is worthy of popularization using deep-well displacement landfill point underground water.

Description

A kind of method of soil remediation
Technical field
The present invention relates to a kind of methods of soil remediation, are primarily adapted for use in shadow of the Groundwater Environmental Quality by landfill sludge It rings, pollutant concentration is higher, heavy contamination place.
Background technique
In the prior art, it is frequently present of influence of a part of Groundwater Environmental Quality by landfill sludge, pollutant is dense Higher, heavy contamination place is spent, pollutant mainly includes heavy metal, volatile organic matter and semi-volatile organic matter etc.. When the higher pollutant of more and concentration there are type in underground water, in situ chemical oxidation, sky are generally used in the prior art Air-blowing is de- or pumps out the processing methods such as processing.Although it is preferable that in situ chemical oxidation handles repairing effect, chemical reaction may Generate new polluter;Air stripping repair time is slow and effect is poor;Although pumping out processing can subtract rapidly in the short time Low land is lauched middle pollutant level, but after pump-out operation stops, due to adsorbing the release of organic pollutant in soil, often There is the hangover of underground water pollutant and pollutant concentration rebound phenomena, is difficult to reach repairing effect in a short time.
Therefore, this field is badly in need of seeking a kind of method that can effectively repair underground water, thus the present invention generates.
Summary of the invention
For the above-mentioned technical problem of the prior art, the object of the present invention is to provide a kind of methods of soil remediation, adopt Landfill point underground water is replaced with deep-well, can effectively achieve the purpose that repair underground water.
In order to achieve the above objectives, the present invention is achieved by the following technical solutions:
A kind of method of soil remediation, includes the following steps:
Preparation of construction, installation positioning, deep-well pipe laying, back-up sand gravel, well-flushing, lower pump examination are taken out, and discharge pipe line and power supply circuit are laid with, under Formula is drawn water and is recorded.
The preparation of construction includes foundation pit leveling piecemeal, and earthwork leveling is reached every piece of place water storage height 25cm- 35cm, and plastic covering film.
The installation is positioned as:Well point position is determined according to drawing surveying setting-out.
The deep-well pipe laying is embedded using water jetting, including punching and pipe laying, first by high-pressure hydraulic pump using high when punching Moulding pipe is connect with punching pipe, and the water spray aperture through main punching tube head washes soil with jet erosion rapidly, while making punching Pipe rotates up and down, and it is heavy to wash down, to gradually form hole in soil, natural mud guard aperture after wellhole is formed, is extracted Punching pipe, is immediately inserted into well casing.
The joint of the well casing is wrapped up using double-layer leaching net, and is sealed using elastic tape.
The depth of the deep-well is 9-12m, and well casing 98-100cm above ground level, the distance between each deep-well is 14- 15m。
The back-up sand gravel is that mineral granule is filled between well casing and hole wall, forms sandstone filtering layer.
The sandstone filtering layer with a thickness of 60-100mm, and the packed height of sandstone filtering layer is hyperfiltration tube top 1000- 1800mm。
The following formula draws water to draw water using 0.75kw immersible pump.
Beneficial effects of the present invention are as follows:
The method of soil remediation of the present invention uses deep-well displacement landfill point underground water, can effectively reach and repair underground water Purpose, applicability is extensive, repairing effect is good, repair time is fast, and its technology, environment and safety index are all satisfied requirement, value It must promote and apply.
Detailed description of the invention
Fig. 1 is the layout diagram of the deep-well pipe laying in the present invention;
Wherein, 1 it is well casing, 2 is double-layer leaching net.
Specific embodiment
The present invention is further illustrated combined with specific embodiments below, but protection scope of the present invention is not limited to This.
Embodiment
The method of soil remediation of the present invention, includes the following steps:
(1)Preparation of construction:Foundation pit is carried out to place according to live foundation pit absolute altitude and flattens piecemeal, is optimized according to the earthwork and is deployed, entirely Foundation pit is divided into 7 pieces, by the earthwork leveling reach every piece of place water storage height 25cm-35cm, in order to accelerate underground water displacement when Between, side slope, and plastic covering film are rebuild, guarantees the stabilization of side slope.
Deep-well water outlet in foundation pit east side is connected to the double-wall corrugated sewage of PE that diameter is 300 with nylon pipeline by 0.75kw sewage pump Pipe, the double-wall corrugated sewage pipe of the PE for being 300 by three diameters imports the double-wall corrugated sewage pipe of PE that west side diameter is 400, then converges Enter southwestern side group hole catch pit, deep-well water outlet in foundation pit west side is directly connected to west side diameter with nylon tube by 0.75kw sewage pump and is The double-wall corrugated sewage pipe of 400 PE, foundation pit catch pit sewage are transported to haffir by 11kw sewage pump, pump through reservoir defeated It send to sewage network.
(2)Installation positioning:According to the measurement control point of offer, well point position is determined according to drawing surveying setting-out, is then existed Well location is first removed obstacles.
(3)Deep-well pipe laying:Embedded using water jetting, including punching and pipe laying, high-pressure hydraulic pump is first utilized high pressure by when punching Sebific duct is connect with punching pipe, and using high pressure water, the water spray aperture through main punching tube head washes soil with jet erosion rapidly, Rotate punching pipe up and down simultaneously, it is heavy to wash down, so that hole is gradually formed in soil, and natural mud guard aperture, wellhole After formation, punching pipe is extracted, well casing 1 is immediately inserted into, in order to avoid drift sand penetrates into wellhole, the joint of well casing 1 is wrapped using double-layer leaching net 2 It wraps up in, and is sealed using elastic tape, in case squeezing into silt silts well casing 1 up.Since the groundwater remediation time is longer, 1 material of well casing is soft The PE double-wall corrugated pipe that toughness and the more stable diameter of intensity are 300, guarantees that deep-well reaches the longer working time.
Further it is arranged, the depth of deep-well is 9-12m, and the distance between each deep-well is 14-15m.
To prevent rainwater silt or foreign matter from entering in well, the 98-100cm above ground level of well casing 1, well head is covered.Well casing is hung to want Vertically, and it is maintained at wellhole center.
(4)Back-up sand gravel:It fills mineral granule between well casing and hole wall, forms sandstone filtering layer, to prevent hole wall from collapsing soil.Sandstone Using coarse sand, the mesh of blocking chimney filter is prevented.Chimney filter should be placed on the centre of wellhole, sandstone filtering layer with a thickness of 60-100mm, To improve water penetration, and prevent grogs from penetrating into the mesh that chimney filter blocks chimney filter.The packed height of sandstone filtering layer is hyperfiltration tube top 1000-1800mm should be filled to former phreatic line or more, to guarantee that soil layer water flow or more is unimpeded.
(5)Well-flushing;
(6)Lower pump examination is taken out;
(7)It is laid with discharge pipe line and power supply circuit;
(8)Following formula draws water:It is drawn water using 0.75kw immersible pump.
(9)Record.
Comparative example 1
Soil remediation is carried out using in situ chemical oxidation method.It is specific to repair the known property common sense that step is this field, herein not It repeats.
Comparative example 2
Soil remediation is carried out using air stripping method.It is specific to repair the known property common sense that step is this field, it does not go to live in the household of one's in-laws on getting married herein It states.
Comparative example 3
It uses and pumps out the known property common sense that facture progress soil remediation repairs step specifically as this field, do not go to live in the household of one's in-laws on getting married herein It states.
Interpretation of result
Groundwater remediation result see the table below 1
Table 1
By upper table 1 it is found that the method for soil remediation of the present invention, replaces landfill point underground water using deep-well, can effectively reach and repair The purpose of multiple underground water, applicability is extensive, repairing effect is good, repair time is fast, and its technology, environment and safety index are full Foot requires, and is worthy of popularization.
Above-described embodiment is only used for illustrating inventive concept of the invention, rather than the restriction to rights protection of the present invention, It is all to be made a non-material change to the present invention using this design, protection scope of the present invention should all be fallen into.

Claims (9)

1. a kind of method of soil remediation, it is characterised in that include the following steps:
Preparation of construction, installation positioning, deep-well pipe laying, back-up sand gravel, well-flushing, lower pump examination are taken out, and discharge pipe line and power supply circuit are laid with, under Formula is drawn water and is recorded.
2. the method for soil remediation as described in claim 1, it is characterised in that:The preparation of construction includes foundation pit leveling point Earthwork leveling is reached every piece of place water storage height 25cm-35cm, and plastic covering film by block.
3. the method for soil remediation as described in claim 1, it is characterised in that the installation is positioned as:It is put according to drawing measurement Line determines well point position.
4. the method for soil remediation as described in claim 1, it is characterised in that:The deep-well pipe laying is embedded using water jetting, Including punching and pipe laying, first high-pressure hydraulic pump is connect using high-pressure rubber pipe with punching pipe when punching, the spray through main punching tube head Water aperture washes soil with jet erosion rapidly, while rotates punching pipe up and down, and it is heavy to wash down, to gradually exist Hole is formed in soil, natural mud guard aperture after wellhole is formed, extracts punching pipe, is immediately inserted into well casing.
5. the method for soil remediation as claimed in claim 4, it is characterised in that:The joint of the well casing uses double-layer leaching net packet It wraps up in, and is sealed using elastic tape.
6. the method for soil remediation as claimed in claim 4, it is characterised in that:The depth of the deep-well is 9-12m, and well casing is higher by Ground 98-100cm, the distance between each deep-well are 14-15m.
7. the method for soil remediation as described in claim 1, it is characterised in that:The back-up sand gravel is between well casing and hole wall Mineral granule is filled, sandstone filtering layer is formed.
8. the method for soil remediation as claimed in claim 2, it is characterised in that:The sandstone filtering layer with a thickness of 60-100mm, And the packed height of sandstone filtering layer is hyperfiltration tube top 1000-1800mm.
9. the method for soil remediation as described in claim 1, it is characterised in that:The following formula draws water to dive under water using 0.75kw Pumping water.
CN201810628048.5A 2018-06-19 2018-06-19 A kind of method of soil remediation Pending CN108906865A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810628048.5A CN108906865A (en) 2018-06-19 2018-06-19 A kind of method of soil remediation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810628048.5A CN108906865A (en) 2018-06-19 2018-06-19 A kind of method of soil remediation

Publications (1)

Publication Number Publication Date
CN108906865A true CN108906865A (en) 2018-11-30

Family

ID=64421813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810628048.5A Pending CN108906865A (en) 2018-06-19 2018-06-19 A kind of method of soil remediation

Country Status (1)

Country Link
CN (1) CN108906865A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202466645U (en) * 2012-01-17 2012-10-03 常州市环境科学研究院 Extraction-recharge well applied to restoration work of polluted underground water on site
CN104692531A (en) * 2013-12-04 2015-06-10 北京德瑞科森环保科技有限公司 Underground water heavy metal pollution remediation device
CN104975611A (en) * 2015-07-17 2015-10-14 河北二十冶建设有限公司 Sinking device and method for well point drawdown pipe of liquid soil layer
CN105399245A (en) * 2015-12-18 2016-03-16 江苏维尔利环保科技股份有限公司 Remediation device of hexavalent chromium-polluted underground water, and remediation method thereof
CN105568956A (en) * 2016-02-25 2016-05-11 山东大学 Well-point dewatering combined surcharge preloading consolidation device for subgrade and application method of such device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202466645U (en) * 2012-01-17 2012-10-03 常州市环境科学研究院 Extraction-recharge well applied to restoration work of polluted underground water on site
CN104692531A (en) * 2013-12-04 2015-06-10 北京德瑞科森环保科技有限公司 Underground water heavy metal pollution remediation device
CN104975611A (en) * 2015-07-17 2015-10-14 河北二十冶建设有限公司 Sinking device and method for well point drawdown pipe of liquid soil layer
CN105399245A (en) * 2015-12-18 2016-03-16 江苏维尔利环保科技股份有限公司 Remediation device of hexavalent chromium-polluted underground water, and remediation method thereof
CN105568956A (en) * 2016-02-25 2016-05-11 山东大学 Well-point dewatering combined surcharge preloading consolidation device for subgrade and application method of such device

Similar Documents

Publication Publication Date Title
CN105964678B (en) Soil and underground water injection in situ --- high-pressure rotary-spray injection in-situ remediation system and method
CN108314106B (en) DNAPL (deoxyribonucleic acid-styrene-acrylonitrile copolymer) polluted underground water in-situ remediation method
CN107720853A (en) DNAPL pollution amelioration system and method in underground water based on pollution resistance control
CN110090856A (en) Soil underground water linkage processing unit and its processing method
CN103967028A (en) Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure
CN103883796B (en) Silt particle mud district hand pick formula jacking construction device and method
CN106734178A (en) Comprehensive restoration system and method for polluted site
CN106975653A (en) It is a kind of to prevent the permeable reactive barrier in-situ remediation method of pollution of underground aquifers
CN209998095U (en) In-situ multiphase extraction well device for polluted sites
CN104190700A (en) Soil body repairing method based on soil gas-phase extraction and underground water gas injection
CN110104755A (en) A kind of hydrodynamic force regulator control system for the diffusion of accelerating ground water in-situ immobilization medicament
CN107159698A (en) A kind of method that three-dimensional well elution joint stabilizes in-situ remediation soil polluted by heavy metals
JP5213216B2 (en) Ground improvement method
CN205421487U (en) Infiltration type urban rainwater discharges facility
CN108679359A (en) A kind of restorative procedure of underground piping inner wall corrosion
CN105113530A (en) Caisson aid-sinking process adopting high-pressure injection
JP4114944B2 (en) Ground improvement method
CN108906865A (en) A kind of method of soil remediation
CN104912126B (en) Polluted-soil restoration system applicable to soft-soil foundation and restoration method
CN104692530B (en) Multistage quasi in-situ groundwater repair device and repair method
CN103615014B (en) A kind of dewatering device of soft soil foundation pit and using method thereof
CN108978693B (en) Foundation pit engineering soft soil foundation dewatering construction structure
CN207017281U (en) A kind of local Precipitation Structure of heavy construction deep basal pit
JP6622502B2 (en) Subsurface groundwater suction device, method for reducing the volume of mud and sludge in the bottom, methane hydrate recovery device and method in seabed
CN205314117U (en) Foundation structure that draw water is carried out with centrifugal pump

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181130

RJ01 Rejection of invention patent application after publication