CN108905449A - A kind of construction site construction atomizing cleaner - Google Patents

A kind of construction site construction atomizing cleaner Download PDF

Info

Publication number
CN108905449A
CN108905449A CN201810853283.2A CN201810853283A CN108905449A CN 108905449 A CN108905449 A CN 108905449A CN 201810853283 A CN201810853283 A CN 201810853283A CN 108905449 A CN108905449 A CN 108905449A
Authority
CN
China
Prior art keywords
fixing seat
fixture block
sink
gun barrel
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810853283.2A
Other languages
Chinese (zh)
Inventor
刘黄莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810853283.2A priority Critical patent/CN108905449A/en
Publication of CN108905449A publication Critical patent/CN108905449A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2247/00Details relating to the separation of dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D2247/08Means for controlling the separation process

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Cleaning By Liquid Or Steam (AREA)

Abstract

The invention discloses a kind of construction site construction atomizing cleaners, including fixing seat, the side of the fixing seat is connected with sink, the sink is internally provided with water tank, what the lower section of the water tank was located at sink is internally provided with support plate, the bottom of the support plate is equipped with pressure sensor, the lateral wall of the fixing seat is welded with the second fixture block close to the tip edges of sink, the tip edges of the sink are provided with the first fixture block at two side positions of the second fixture block, fixing bolt is connected in the middle part of first fixture block and the second fixture block.The present invention is convenient for the installation and removal between fixing seat and sink, convenient for users to carrying out adding water process in time to the water tank soon evacuated, and can be stable control gun barrel placed angle, it is also convenient for carrying out dust-proof processing to the bottom of gun barrel, simultaneously convenient for the splashing for preventing water mist multi-faceted in spray process, the injection direction of water mist can be accurately controlled.

Description

A kind of construction site construction atomizing cleaner
Technical field
The present invention relates to building field, specifically a kind of construction site construction atomizing cleaner.
Background technique
Spraying machine is that liquid is dispersed into a kind of misty machine, is mechanical one kind, is commonly used on construction site The spraying machine used is wind spraying aid type, can effectively remove the dust granule floated in ambient enviroment.
Through retrieving, Chinese patent discloses a kind of high efficiency air-assisted type spraying machine(Authorization Notice No. CN207325116U), Tempered glass is arranged by the front surface in water tank in the patented technology, and graduation mark is arranged on tempered glass so that can when The case where carving the water storage situation understood in water tank, avoiding the occurrence of insufficient water.
But existing atomizing cleaner is in addition to patent disclosed above, the mostly fixing seat of gun barrel and water tank point Structure from formula is not easy to facilitate the installation and removal of sink when needed, and also person inconvenient to use is in time to soon evacuating Water tank carries out plus water process, and cannot be stable control gun barrel placed angle, be also not easy to carry out the bottom of gun barrel Dust-proof processing, while there is multi-faceted splashing in water mist in spray process, and cleaner surface is easily caused easily to fall into water mist, shadow Ring the operation of user.Therefore, those skilled in the art provide a kind of construction site construction atomizing cleaner, with solution Certainly the problems mentioned above in the background art.
Summary of the invention
The purpose of the present invention is to provide a kind of construction site construction atomizing cleaners, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the present invention provides the following technical solutions:
A kind of construction site construction atomizing cleaner, including fixing seat, the side of the fixing seat are connected with sink, institute The water tank that is internally provided with of sink is stated, the lower section of the water tank is located at the support plate that is internally provided with of sink, the support The bottom of plate is equipped with pressure sensor, and the lateral wall of the fixing seat is welded with the second card close to the tip edges of sink Block, the tip edges of the sink are provided with the first fixture block, first fixture block at two side positions of the second fixture block With fixing bolt is connected in the middle part of the second fixture block, the front end of the fixing seat is connected with maintenance door, and the top side of fixing seat Console is provided at edge at the top position of maintenance door, the surface of the console is provided with display screen, the fixation Rotation axis is connected at the top center of seat, and the top of fixing seat is located at the external position of rotation axis and is equipped with axis It holds, the bottom end of the rotation axis is located at the servo motor that is internally connected with of fixing seat, and the top of the rotation axis is connected with rotation Rotary table, the top of the rotating round table are connected with support base, and gun barrel, and the top of support base are equipped with above the support base Support plate is respectively connected at two side positions of gun barrel, the top of the support plate is connected at the outer wall position of gun barrel Valve is turned, the top of the gun barrel is provided with atomizing nozzle, and the outside of gun barrel is connected with admittedly close to the lower position of atomizing nozzle Determine ring, one end of the fixed ring is connected with shield, and the bottom end of the gun barrel is connected with Air Filter, the inside of the fixing seat Water pump is installed at the top position of sink, the water inlet end of the water pump is connected with the first connectivity port, and water pump goes out Water end (W.E.) is connected with second connection end mouth.
As a further solution of the present invention:It is provided with filler neck seal lid at the top of the water tank, and water tank Bottom side surfaces are provided with discharge outlet sealing cover, pass through screw thread between discharge outlet sealing cover and filler neck seal lid and water tank Connection, the outer wall of the sink correspond to and are provided with through-hole at the outer fix of discharge outlet sealing cover.
As further scheme of the invention:The inside of the gun barrel is equipped with blower close to the side of Air Filter, institute It states and is bolted between Air Filter and gun barrel.
As further scheme of the invention:First connectivity port and the top of second connection end mouth are arranged at The outside of fixing seat, is connected with water inlet pipe between the top of the water tank and the first connectivity port, the bottom of the gun barrel with Outlet pipe is connected between second connection end mouth.
As further scheme of the invention:The bottom of the fixing seat and sink is respectively mounted there are four universal wheel, institute It states and is rotatablely connected between maintenance door and fixing seat by hinge.
As further scheme of the invention:The inside setting of first fixture block has the gap, and the width in gap is big In the thickness of the second fixture block, the inside of first fixture block and the second fixture block corresponds to be provided at the external position of fixing bolt First internal thread hole.
As further scheme of the invention:It is bolted between the fixed ring and gun barrel, the shield Connection type between fixed ring is welding, and shield is a kind of bowl structure.
As further scheme of the invention:What the inner wall of the fixing seat was located at servo motor is externally connected to fixation Frame, and the inner wall of fixing seat is located at the lower position of water pump and is connected with support frame.
As further scheme of the invention:The bottom of the rotating round table corresponds to be arranged at the top position of rotation axis There is fixing groove, and is bolted between rotating round table and support base, support base spiral shell corresponding with the inside of rotating round table The second internal thread hole is provided at the external position of bolt.
Compared with prior art, the beneficial effects of the invention are as follows:
1, the present invention is welded with the second fixture block, the top side of sink close to the tip edges of sink by the lateral wall of fixing seat The first fixture block is provided at edge at two side positions of the second fixture block, is connected in the middle part of the first fixture block and the second fixture block solid Determine bolt, the inside setting of the first fixture block has the gap, and the width in gap is greater than the thickness of the second fixture block, the first fixture block and second The inside of fixture block, which corresponds to, is provided with the first internal thread hole at the external position of fixing bolt, convenient between fixing seat and sink It is connected and fixed, the installation and removal being also convenient between fixing seat and sink.
2, the support plate that is internally provided with of the invention by being located at sink in the lower section of water tank, the bottom installation of support plate There is pressure sensor, and is provided with console, console at top position of the tip edges of fixing seat close to maintenance door Surface be provided with display screen, collected signal is transferred to display by the controller inside console by pressure sensor Screen recognizes the surplus of the internal water of water tank convenient for users to observation display screen in time, and then convenient for users to right in time The water tank soon evacuated carries out plus water process.
3, the present invention is at the top center of fixing seat by being connected with rotation axis, and the top of fixing seat is located at and turns Bearing is installed, what the bottom end of rotation axis was located at fixing seat is internally connected with servo motor, rotation axis at the external position of moving axis Top be connected with rotating round table, gun barrel is installed above rotating round table, it is electric by console to control servo convenient for user Machine rotation, the further placed angle convenient for control gun barrel.
4, the present invention is connected with Air Filter by the bottom end in gun barrel, is bolted and is convenient between Air Filter and gun barrel Dust-proof processing is carried out to the bottom of gun barrel, can prevent blower from bringing the dust in ambient enviroment into gun barrel during exhausting Inside cause it is dirty.
5, the present invention is by being connected with fixed ring close to the lower position of atomizing nozzle in the outside of gun barrel, and the one of fixed ring End is connected with shield, is bolted between fixed ring and gun barrel, and the connection type between shield and fixed ring is weldering It connects, and shield is that a kind of bowl structure is also convenient for preventing water mist more in spray process convenient for the installation and removal of shield The splashing in orientation can be accurately controlled the injection direction of water mist.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that atomizing cleaner is used in a kind of construction of construction site;
Fig. 2 is the schematic diagram of internal structure of fixing seat in a kind of construction site construction atomizing cleaner;
Fig. 3 is the schematic diagram of internal structure of sink in a kind of construction site construction atomizing cleaner;
Fig. 4 is the enlarged drawing of A in Fig. 1;
Fig. 5 is the structural schematic diagram of gun barrel in a kind of construction site construction atomizing cleaner;
Fig. 6 is the structural schematic diagram of rotating round table in a kind of construction site construction atomizing cleaner.
In figure:1, fixing seat;2, sink;3, water tank;4, filler neck seal lid;5, discharge outlet sealing cover;6, support plate; 7, pressure sensor;8, the first fixture block;9, the second fixture block;10, fixing bolt;11, maintenance door;12, console;13, servo electricity Machine;14, rotation axis;15, bearing;16, water pump;17, the first connectivity port;18, second connection end mouth;19, water inlet pipe;20, it props up Support seat;21, support plate;22, valve is turned;23, gun barrel;24, Air Filter;25, atomizing nozzle;26, fixed ring;27, shield;28, Fixing groove;29, rotating round table;30, display screen;31, outlet pipe.
Specific embodiment
Please refer to Fig. 1~5, in the embodiment of the present invention, a kind of construction site construction atomizing cleaner, including fixation Seat 1, the side of fixing seat 1 is connected with sink 2, and sink 2 is internally provided with water tank 3, and the lower section of water tank 3 is located at sink 2 Be internally provided with support plate 6, the bottom of support plate 6 is equipped with pressure sensor 7, and the lateral wall of fixing seat 1 is close to sink 2 Tip edges are welded with the second fixture block 9, and the tip edges of sink 2 are provided at two side positions of the second fixture block 9 The middle part of first fixture block 8, the first fixture block 8 and the second fixture block 9 is connected with fixing bolt 10, and the front end of fixing seat 1 is connected with maintenance Door 11, and the tip edges of fixing seat 1 are provided with console 12, the table of console 12 at the top position of maintenance door 11 Face is provided with display screen 30, is connected with rotation axis 14 at the top center of fixing seat 1, and the top of fixing seat 1 is located at and turns Bearing 15 is installed, what the bottom end of rotation axis 14 was located at fixing seat 1 is internally connected with servo motor at the external position of moving axis 14 13, the top of rotation axis 14 is connected with rotating round table 29, and the top of rotating round table 29 is connected with support base 20, support base 20 it is upper Side is equipped with gun barrel 23, and the top of support base 20 is located at two side positions of gun barrel 23 and is respectively connected with support plate 21, support plate 21 top is connected at the outer wall position of gun barrel 23 turns valve 22, and the top of gun barrel 23 is provided with atomizing nozzle 25, and big gun The outside of cylinder 23 is connected with fixed ring 26 close to the lower position of atomizing nozzle 25, and one end of fixed ring 26 is connected with shield 27, the bottom end of gun barrel 23 is connected with Air Filter 24, and the inside of fixing seat 1 is equipped with water pump 16 at the top position of sink 2, The water inlet end of water pump 16 is connected with the first connectivity port 17, and the water outlet of water pump 16 is connected with second connection end mouth 18.
In Fig. 1 and Fig. 3:The top of water tank 3 is provided with filler neck seal lid 4, and the bottom side surfaces of water tank 3 are set It is equipped with discharge outlet sealing cover 5, is connected through a screw thread between discharge outlet sealing cover 5 and filler neck seal lid 4 and water tank 3, water The outer wall of slot 2 corresponds to and is provided with through-hole at the outer fix of discharge outlet sealing cover 5, convenient for user to the inside of water tank 3 into Row plus water or drainage sunk well.
In Fig. 1 and Fig. 4:The inside of gun barrel 23 is equipped with blower, Air Filter 24 and gun barrel close to the side of Air Filter 24 It is bolted between 23, by the way that Air Filter 24 is arranged, carries out dust-proof processing convenient for the bottom to gun barrel 23, can prevent Blower causes the inside that the dust in ambient enviroment brings gun barrel 23 into during exhausting dirty.
In Fig. 1:First connectivity port 17 and the top of second connection end mouth 18 are arranged at the outside of fixing seat 1, storage Be connected with water inlet pipe 19 between the top of water tank 3 and the first connectivity port 17, the bottom of gun barrel 23 and second connection end mouth 18 it Between be connected with outlet pipe 31, form water mist spray convenient for being evacuated to the water inside water tank 3 by water pump 16 behind the inside of gun barrel 23 Out.
In Fig. 1:The bottom of fixing seat 1 and sink 2 is respectively mounted there are four universal wheel, between maintenance door 11 and fixing seat 1 It is rotatablely connected by hinge, the movement convenient for cleaner and the inside to cleaner are overhauled.
In Fig. 4:The inside setting of first fixture block 8 has the gap, and the width in gap is greater than the thickness of the second fixture block 9, the The inside of one fixture block 8 and the second fixture block 9 corresponds to and is provided with the first internal thread hole at the external position of fixing bolt 10, convenient for solid Being connected and fixed between reservation 1 and sink 2, the installation and removal being also convenient between fixing seat 1 and sink 2.
In Fig. 1:It is bolted between fixed ring 26 and gun barrel 23, the connection between shield 27 and fixed ring 26 Mode is welding, and shield 27 is that a kind of bowl structure is also convenient for convenient for the installation and removal of shield 27 in spray process In prevent water mist multi-faceted splashing, the injection direction of water mist can be accurately controlled.
In Fig. 2:The inner wall of fixing seat 1 is located at the fixed frame that is externally connected to of servo motor 13, and the inner wall of fixing seat 1 Lower position positioned at water pump 16 is connected with support frame, and the installation convenient for servo motor 13 and water pump 16 is fixed.
In Fig. 5:The bottom of rotating round table 29 corresponds to and is provided with fixing groove 28 at the top position of rotation axis 14, and rotates It is bolted between rotary table 29 and support base 20, the external position of the bolt corresponding with the inside of rotating round table 29 of support base 20 Place is provided with the second internal thread hole, the installation and removal of seat 20 easy to support, and then is convenient between gun barrel 23 and fixing seat 1 Installation and removal.
The working principle of the invention is:Firstly, being connected with sink 2 in the side of fixing seat 1, the lateral wall of fixing seat 1 is leaned on The tip edges of nearly sink 2 are welded with the second fixture block 9, and the tip edges of sink 2 are at two side positions of the second fixture block 9 It is provided with the first fixture block 8, the middle part of the first fixture block 8 and the second fixture block 9 is connected with fixing bolt 10, the inside of the first fixture block 8 Setting has the gap, and the width in gap is greater than the thickness of the second fixture block 9, the corresponding fixation in the inside of the first fixture block 8 and the second fixture block 9 The first internal thread hole is provided at the external position of bolt 10, convenient for being connected and fixed between fixing seat 1 and sink 2, also just Installation and removal between fixing seat 1 and sink 2;Secondly, water tank 3 is internally provided in sink 2, under water tank 3 Orientation is internally provided with support plate 6 in sink 2, and the bottom of support plate 6 is equipped with pressure sensor 7, and on the top of fixing seat 1 Console 12 is provided at end margin at the top position of maintenance door 11, the surface of console 12 is provided with display screen 30, Collected signal is transferred to display screen 30 by the controller inside console 12 by pressure sensor 7, convenient for users to seeing The surplus that display screen 30 recognizes the internal water of water tank 3 in time is examined, and then convenient for users to the storage in time to soon evacuating Water tank 3 carries out plus water process;Then, rotation axis 14, and the top of fixing seat 1 are connected at the top center of fixing seat 1 Portion, which is located at the external position of rotation axis 14, is equipped with bearing 15, and the bottom end of rotation axis 14 is located at being internally connected with for fixing seat 1 Servo motor 13, the top of rotation axis 14 are connected with rotating round table 29, and the top of rotating round table 29 is connected with support base 20, support The top of seat 20 is equipped with gun barrel 23, and is externally connected to fixed frame what the inner wall of fixing seat 1 was located at servo motor 13, is convenient for The installation of servo motor 13 is fixed, and then is controlled servo motor 13 by console 12 convenient for user and rotated, further just In the placed angle of control gun barrel 23;Further, Air Filter 24, Air Filter 24 and gun barrel are connected in the bottom end of gun barrel 23 It is bolted between 23 and carries out dust-proof processing convenient for the bottom to gun barrel 23, can prevent blower will during exhausting Cause dirty in the inside that dust in ambient enviroment brings gun barrel 23 into;Further, in the inside of fixing seat 1 close to sink 2 Top position at water pump 16 is installed, the water inlet end of water pump 16 is connected with the first connectivity port 17, and the water outlet of water pump 16 It is connected with second connection end mouth 18, the top of the first connectivity port 17 and second connection end mouth 18 is arranged at the outer of fixing seat 1 Portion is connected with water inlet pipe 19, the bottom of gun barrel 23 and second connection end mouth between the top of water tank 3 and the first connectivity port 17 Outlet pipe 31 is connected between 18, convenient for forming water after the water inside water tank 3 is evacuated to the inside of gun barrel 23 by water pump 16 Mist sprays;Finally, fixed ring 26 is connected with close to the lower position of atomizing nozzle 25 in the outside of gun barrel 23, the one of fixed ring 26 End is connected with shield 27, is bolted between fixed ring 26 and gun barrel 23, the company between shield 27 and fixed ring 26 Mode is connect as welding, and shield 27 is that a kind of bowl structure is also convenient for being sprayed convenient for the installation and removal of shield 27 The splashing for preventing water mist multi-faceted in journey can be accurately controlled the injection direction of water mist.
It is above-described, it is merely preferred embodiments of the present invention, but protection scope of the present invention is not limited to This, anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention And its inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (9)

1. a kind of construction site construction atomizing cleaner, including fixing seat(1), which is characterized in that the fixing seat(1) Side be connected with sink(2), the sink(2)Be internally provided with water tank(3), the water tank(3)Lower section be located at Sink(2)Be internally provided with support plate(6), the support plate(6)Bottom pressure sensor is installed(7), the fixation Seat(1)Lateral wall close to sink(2)Tip edges be welded with the second fixture block(9), the sink(2)Tip edges Close to the second fixture block(9)Two side positions at be provided with the first fixture block(8), first fixture block(8)With the second fixture block(9)'s Middle part is connected with fixing bolt(10), the fixing seat(1)Front end be connected with maintenance door(11), and fixing seat(1)Top Edge is close to maintenance door(11)Top position at be provided with console(12), the console(12)Surface be provided with it is aobvious Display screen(30), the fixing seat(1)Top center at be connected with rotation axis(14), and fixing seat(1)Top be located at Rotation axis(14)External position at bearing is installed(15), the rotation axis(14)Bottom end be located at fixing seat(1)Inside It is connected with servo motor(13), the rotation axis(14)Top be connected with rotating round table(29), the rotating round table(29)'s Top is connected with support base(20), the support base(20)Top gun barrel is installed(23), and support base(20)Top position In gun barrel(23)Two side positions at be respectively connected with support plate(21), the support plate(21)Top close to gun barrel(23)It is outer It is connected at wall position and turns valve(22), the gun barrel(23)Top be provided with atomizing nozzle(25), and gun barrel(23)Outside Close to atomizing nozzle(25)Lower position be connected with fixed ring(26), the fixed ring(26)One end be connected with shield (27), the gun barrel(23)Bottom end be connected with Air Filter(24), the fixing seat(1)Inside close to sink(2)Top Water pump is installed at position(16), the water pump(16)Water inlet end be connected with the first connectivity port(17), and water pump(16)'s Water outlet is connected with second connection end mouth(18).
2. a kind of construction site construction atomizing cleaner according to claim 1, which is characterized in that the water storage Case(3)Top be provided with filler neck seal lid(4), and water tank(3)Bottom side surfaces be provided with discharge outlet sealing cover (5), the discharge outlet sealing cover(5)With filler neck seal lid(4)With water tank(3)Between be connected through a screw thread, the water Slot(2)Outer wall correspond to discharge outlet sealing cover(5)Outer fix at be provided with through-hole.
3. a kind of construction site construction atomizing cleaner according to claim 1, which is characterized in that the gun barrel (23)Inside close to Air Filter(24)Side blower, the Air Filter are installed(24)With gun barrel(23)Between pass through bolt Connection.
4. a kind of construction site construction atomizing cleaner according to claim 1, which is characterized in that described first Connectivity port(17)With second connection end mouth(18)Top be arranged at fixing seat(1)Outside, the water tank(3)Top End and the first connectivity port(17)Between be connected with water inlet pipe(19), the gun barrel(23)Bottom and second connection end mouth(18) Between be connected with outlet pipe(31).
5. a kind of construction site construction atomizing cleaner according to claim 1, which is characterized in that the fixation Seat(1)And sink(2)Bottom be respectively mounted there are four universal wheel, the maintenance door(11)With fixing seat(1)Between pass through hinge Rotation connection.
6. a kind of construction site construction atomizing cleaner according to claim 1, which is characterized in that described first Fixture block(8)Inside setting have the gap, the width in gap is greater than the second fixture block(9)Thickness, first fixture block(8)With second Fixture block(9)Inside correspond to fixing bolt(10)External position at be provided with the first internal thread hole.
7. a kind of construction site construction atomizing cleaner according to claim 1, which is characterized in that the fixation Ring(26)With gun barrel(23)Between be bolted, the shield(27)With fixed ring(26)Between connection type be weldering It connects, and shield(27)For a kind of bowl structure.
8. a kind of construction site construction atomizing cleaner according to claim 1, which is characterized in that the fixation Seat(1)Inner wall be located at servo motor(13)Be externally connected to fixed frame, and fixing seat(1)Inner wall be located at water pump(16)'s Lower position is connected with support frame.
9. a kind of construction site construction atomizing cleaner according to claim 1, which is characterized in that the rotation Rotary table(29)Bottom correspond to rotation axis(14)Top position at be provided with fixing groove(28), and rotating round table(29)With support Seat(20)Between be bolted, the support base(20)With rotating round table(29)Inside correspond at the external position of bolt It is provided with the second internal thread hole.
CN201810853283.2A 2018-07-30 2018-07-30 A kind of construction site construction atomizing cleaner Withdrawn CN108905449A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810853283.2A CN108905449A (en) 2018-07-30 2018-07-30 A kind of construction site construction atomizing cleaner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810853283.2A CN108905449A (en) 2018-07-30 2018-07-30 A kind of construction site construction atomizing cleaner

Publications (1)

Publication Number Publication Date
CN108905449A true CN108905449A (en) 2018-11-30

Family

ID=64418986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810853283.2A Withdrawn CN108905449A (en) 2018-07-30 2018-07-30 A kind of construction site construction atomizing cleaner

Country Status (1)

Country Link
CN (1) CN108905449A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111450639A (en) * 2020-04-21 2020-07-28 中国三冶集团有限公司 Civil engineering is with construction dust device
CN113413713A (en) * 2021-06-30 2021-09-21 王湘乐 Dust collecting equipment for construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111450639A (en) * 2020-04-21 2020-07-28 中国三冶集团有限公司 Civil engineering is with construction dust device
CN113413713A (en) * 2021-06-30 2021-09-21 王湘乐 Dust collecting equipment for construction

Similar Documents

Publication Publication Date Title
CN210544043U (en) Dust fall equipment is used at construction scene
CN108905449A (en) A kind of construction site construction atomizing cleaner
CN216170938U (en) Building site dust control device based on environmental protection
CN208852598U (en) A kind of construction dust-extraction unit
CN209900932U (en) Building engineering construction dust fall equipment
CN211836943U (en) Road bridge construction is with environmental protection dust device
CN112354766A (en) Casing surface spraying device for processing direct-current brushless motor
CN214160673U (en) Surface cleaning device for precise electronic parts
CN215539470U (en) House building construction dust collector
CN213571738U (en) Curing means for town road
CN109011934A (en) A kind of dedusting environment friendly equipment
CN211069467U (en) Dust device for construction
CN211136602U (en) Edge grinding device for processing curtain wall glass
CN219252117U (en) Dustproof spraying device for building construction
CN209577693U (en) A kind of double galvanometer stations thin pipe formula dust-extraction unit
CN221964820U (en) Clean papermaking spraying dust suppression device
CN211692542U (en) A dust collector for colliery is in pit
CN215027157U (en) Dust removal gun for industrial production
CN217449314U (en) Filter screen cleaning device for food detection
CN218486393U (en) Novel processing electromechanical device sprays paint
CN215654533U (en) Automatic dust collector of electrical engineering
CN219117915U (en) Road cutting machine dust device
CN220860978U (en) Construction dust fall machine
CN218136967U (en) But edging device is used in processing of container bottom plate of dust absorption
CN212497681U (en) Storage cabinet for vacuum glass production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20181130

WW01 Invention patent application withdrawn after publication