CN108894516A - The portable paying-off implement of wall and line-putting method - Google Patents
The portable paying-off implement of wall and line-putting method Download PDFInfo
- Publication number
- CN108894516A CN108894516A CN201810797168.8A CN201810797168A CN108894516A CN 108894516 A CN108894516 A CN 108894516A CN 201810797168 A CN201810797168 A CN 201810797168A CN 108894516 A CN108894516 A CN 108894516A
- Authority
- CN
- China
- Prior art keywords
- connecting sleeve
- wall
- scale
- cross
- graduated scale
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 12
- 239000003550 marker Substances 0.000 claims description 16
- 238000004140 cleaning Methods 0.000 claims description 3
- 210000001364 upper extremity Anatomy 0.000 abstract description 6
- 238000010276 construction Methods 0.000 description 4
- 238000007796 conventional method Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Length-Measuring Instruments Using Mechanical Means (AREA)
Abstract
A kind of portable paying-off implement of wall, including supporting leg, graduated scale, slidable connection bar, cross connection sleeve and ink fountain, jacking, scale mark piece;The supporting leg has four, and the cross connection sleeve includes lateral connection sleeve and vertical connection sleeve, and the two is orthogonal;A cross connection sleeve is cased on the supporting leg respectively, two groups of the supporting leg are provided with a slidable connection bar respectively between front leg strut and rear support leg, the slidable connection bar is mounted in the lateral connection sleeve of the connection sleeve of the cross on the supporting leg;The cross connection sleeve is separately cased on two front leg struts respectively, the graduated scale is mounted in the lateral connection sleeve of the cross connection sleeve;The scale mark piece is an integral structure with the jacking, and the scale mark piece is sleeved on the graduated scale and can slide on the graduated scale, and the ink fountain is mounted on the jacking.
Description
Technical Field
The invention relates to the technical field of wall construction tools, in particular to a portable wall pay-off tool and a pay-off method.
Background
In the building engineering work progress, the construction of wall body is arranged and is always indispensable procedure, and in current wall body unwrapping wire, generally two people pull the ink marker at both ends to measure out the width of wall body with the tape measure respectively at both ends, need two people's cooperations to operate in the measurement process, pop out the wall body edge line and come, this kind of construction unwrapping wire process needs two man-operation, and extravagant manpower efficiency is low, and the unwrapping wire precision is relatively poor simultaneously.
Disclosure of Invention
The invention provides a portable wall pay-off tool and a pay-off method, which can be operated by only one person and have the advantages of high pay-off precision, simplicity in operation and convenience in construction.
In order to achieve the purpose, the invention adopts the following technical scheme:
a portable wall body line laying tool comprises supporting legs, a graduated scale, a slidable connecting rod, a cross connecting sleeve, an ink fountain, a jacking support and a graduated marking piece; wherein,
the four support legs are vertically arranged and distributed in a quadrilateral shape;
the cross connecting sleeve comprises a transverse connecting sleeve and a vertical connecting sleeve which are mutually perpendicular to form an integrated structure;
the four supporting legs are respectively sleeved with one cross-shaped connecting sleeve, a slidable connecting rod is arranged between two groups of front supporting legs and rear supporting legs of the supporting legs respectively, and the slidable connecting rods are arranged in the transverse connecting sleeves of the cross-shaped connecting sleeves on the supporting legs;
the two front supporting legs are respectively sleeved with one cross-shaped connecting sleeve, and the graduated scale is arranged in the transverse connecting sleeve of the cross-shaped connecting sleeve;
the scale marker with the support formula structure as an organic whole that holds in the palm, the suit of scale marker is in on the scale and can slide on the scale, the ink marker is installed on the support.
Further, the slidable connecting rod and the scale are horizontally slidable in a transverse connecting sleeve of the cross connecting sleeve to which they are mounted;
the cross connecting sleeve can slide vertically on the supporting leg through the vertical connecting sleeve.
Furthermore, the transverse connecting sleeve and the vertical connecting sleeve of the cross connecting sleeve are respectively provided with a clamping device, and when the clamping devices are screwed, the slidable connecting rod, the graduated scale and the cross connecting sleeve in the cross connecting sleeve are fixed and cannot move.
Further, the wire laying tool further comprises four supporting pads, the supporting pads are funnel-shaped, and the four supporting legs are mounted on the four supporting pads.
The invention also provides a paying-off method using the portable wall paying-off tool, which comprises the following specific steps:
(1) cleaning the wall surface needing paying-off, ensuring that the wall surface has no sundries, placing the four support legs in a quadrilateral way, and keeping the positions of the four support legs at a horizontal plane;
(2) according to the requirements of the drawing, a group of front and rear supporting legs are abutted against the column side and are overlapped with the wall side line;
(3) moving the front support leg, adjusting the graduated scale to enable the graduated scale to abut against the surface of the column, and screwing the fixture to enable the graduated scale to be fixed;
(4) adjusting the jacking and the ink fountain to enable the scale marking piece to be aligned with the position of the first wall sideline, recording the scale on the graduated scale at the moment, and drawing the ink fountain line to pop out the first wall sideline;
(5) moving the top support and the ink fountain, adjusting the size position of the scale marker to the second wall sideline, and fixing the top support;
(6) measuring the wall width from the wall edge line popped out from the first pillar by using a measuring tape and marking by using chalk on the corresponding second pillar;
(7) drawing the ink marker line until the ink marker line reaches the second pillar edge and is overlapped with the mark made by the chalk, and popping up a second wall sideline;
(8) returning and recovering the device;
has the advantages that:
the invention can independently operate the paying-off by a single person, saves labor, and can measure and pay off the edge line of the wall by using the graduated scale, thereby improving the paying-off precision.
Drawings
FIG. 1 is a front view of the present invention
FIG. 2 is a left side view of the present invention
FIG. 3 is a top view of the present invention
FIG. 4 is a schematic view of the cross connecting sleeve structure of the present invention
FIG. 5 is a top view of the ink fountain of the present invention
FIG. 6 is a side view of an ink fountain according to the present invention
In the figure: 1-graduated scale, 2-supporting leg, 3-transverse connecting sleeve, 4-supporting pad, 5-top support, 6-graduated mark line, 7-top support fixing piece, 8-ink fountain, 9-slidable connecting rod, 10, vertical connecting sleeve, 11-clamp, 12-rolling shaft, 13-rotating handle, 14-spring cover and 15-ink fountain line
Detailed Description
The invention is further described with reference to the following drawings and detailed description.
It is to be understood that the invention as claimed and as described in the specification is made with the orientation illustrated in the drawings, when the present invention is changed in its placement, the corresponding orientation is changed accordingly.
Meanwhile, it should be noted that the front leg of the present invention uses two legs connected to the scale as the front leg and the corresponding rear leg.
As shown in fig. 1, 2, 3 and 4, the portable wall stringing tool comprises supporting legs 2, a graduated scale 1, a slidable connecting rod 9, a cross connecting sleeve, an ink fountain 8, a top support 5 and a graduated marking piece 6.
As shown in fig. 3, four of the support legs 2 are vertically arranged and distributed in a quadrilateral shape; as shown in fig. 1 and 2, the legs 2 are preferably mounted on four support pads 4, and the support pads 4 are mounted on the ground in a funnel shape, so as to firmly support the whole invention.
As shown in fig. 4, the cross connecting sleeve comprises a transverse connecting sleeve 3 and a vertical connecting sleeve 4, the transverse connecting sleeve 3 and the vertical connecting sleeve 4 are in a vertical state, and the side walls of the transverse connecting sleeve 3 and the vertical connecting sleeve 4 are connected to form an integrated structure; preferably, screw holes are formed in the side walls of the transverse connecting sleeve 3 and the vertical connecting sleeve 4, and clamps 11 with external threads are installed in the screw holes.
Referring to fig. 3 again, the four legs 4 are respectively sleeved with one cross connecting sleeve, wherein the four legs 4 are respectively sleeved in the vertical connecting sleeves 4 of the cross connecting sleeves, and the cross connecting sleeves can vertically slide on the legs 4 and are fixed in position by the clamps 11.
As shown in fig. 1, 2 and 3, a slidable connecting rod 9 is arranged between the two sets of front legs and rear legs of the legs 4, the slidable connecting rod 9 is mounted in the transverse connecting sleeve 3 of the cross connecting sleeve on the legs 4, and the slidable connecting rod 9 can move transversely in the transverse connecting sleeve 3 and can be fixed in position by the clamp 11.
As shown in fig. 1 and 2, the two front legs are respectively sleeved with the cross connecting sleeve, and the graduated scale 1 is mounted in the transverse connecting sleeve 3 of the cross connecting sleeve, can move in the transverse connecting sleeve and can be fixed in position by the fixture 11.
As shown in fig. 1, 3, 5 and 6, the scale marking member 6 and the top support 5 are of an integral structure, and the scale marking member 6 is sleeved on the scale 1 and can slide on the scale 1. The ink fountain is characterized in that a fixing hole is formed in the jacking and jacking part 5, a fixing hole is also formed in one end of the ink fountain 8, a jacking fixing part 7 is inserted into the fixing hole of the jacking part 5, and the other end of the jacking fixing part 7 is inserted into the fixing hole of the ink fountain 8 to fix the ink fountain 8 on the clamping part 5.
A paying-off method based on a portable wall paying-off tool comprises the following steps:
(1) cleaning the wall surface needing paying-off, ensuring that the wall surface has no sundries, placing the four support legs 4 in a quadrilateral way, and keeping the positions of the four support legs at a horizontal plane;
(2) according to the requirements of the drawing, a group of front and rear supporting legs 4 are abutted against the edge of the column and are overlapped with the wall edge line;
(3) moving the front support leg 4, adjusting the graduated scale 1 to enable the graduated scale 1 to abut against the surface of the column, and screwing the fixture 11 to enable the graduated scale 4 to be fixed in position;
(4) adjusting the jacking 5 and the ink fountain 8 to enable the scale marking piece 6 to be aligned with the position of the first wall sideline, recording the scale on the graduated scale 1 at the moment, and drawing the ink fountain line to pop out the first wall sideline;
(5) moving the top support 5 and the ink fountain 8, adjusting the scale marker 6 to the size position of the second wall sideline, and fixing the top support 5;
(6) measuring the wall width from the wall edge line popped out from the first pillar by using a measuring tape and marking by using chalk on the corresponding second pillar;
(7) drawing the ink marker line until the ink marker line reaches the second pillar edge and is overlapped with the mark made by the chalk, and popping up a second wall sideline;
(8) returning and recovering the device;
the above embodiments are implemented on the premise of the technical solution of the present invention, and detailed embodiments and specific operation procedures are given, but the scope of the present invention is not limited to the above embodiments. The methods used in the above examples are conventional methods unless otherwise specified.
Claims (5)
1. The utility model provides a portable unwrapping wire instrument of wall body which characterized in that: comprises supporting legs, a graduated scale, a slidable connecting rod, a cross connecting sleeve, an ink fountain, a jacking support and a graduated marking piece; wherein,
the four support legs are vertically arranged and distributed in a quadrilateral shape;
the cross connecting sleeve comprises a transverse connecting sleeve and a vertical connecting sleeve which are mutually perpendicular to form an integrated structure;
the four supporting legs are respectively sleeved with one cross-shaped connecting sleeve, a slidable connecting rod is arranged between two groups of front supporting legs and rear supporting legs of the supporting legs respectively, and the slidable connecting rods are arranged in the transverse connecting sleeves of the cross-shaped connecting sleeves on the supporting legs;
the two front supporting legs are respectively sleeved with one cross-shaped connecting sleeve, and the graduated scale is arranged in the transverse connecting sleeve of the cross-shaped connecting sleeve;
the scale marker with the support formula structure as an organic whole that holds in the palm, the suit of scale marker is in on the scale and can slide on the scale, the ink marker is installed on the support.
2. The portable wall stringing tool as claimed in claim 1, wherein: the slidable connecting rod and the graduated scale can slide horizontally in a transverse connecting sleeve of the cross connecting sleeve on which the slidable connecting rod and the graduated scale are mounted;
the cross connecting sleeve can slide vertically on the supporting leg through the vertical connecting sleeve.
3. The portable wall stringing tool as claimed in claim 1, wherein: the transverse connecting sleeve and the vertical connecting sleeve of the cross connecting sleeve are respectively provided with a clamping device, and when the clamping devices are screwed, the slidable connecting rod, the graduated scale and the cross connecting sleeve in the cross connecting sleeve are fixed and cannot move.
4. A portable wall stringing tool as claimed in claim 1, 2 or 3, wherein: the paying-off tool further comprises four supporting pads, the supporting pads are funnel-shaped, and the four supporting legs are mounted on the four supporting pads.
5. A paying-off method using a wall portable paying-off tool comprises the following steps:
(1) cleaning the wall surface needing paying-off, ensuring that the wall surface has no sundries, placing the four support legs in a quadrilateral way, and keeping the positions of the four support legs at a horizontal plane;
(2) according to the requirements of the drawing, a group of front and rear supporting legs are abutted against the column side and are overlapped with the wall side line;
(3) moving the front support leg, adjusting the graduated scale to enable the graduated scale to abut against the surface of the column, and screwing the fixture to enable the graduated scale to be fixed;
(4) adjusting the jacking and the ink fountain to enable the scale marking piece to be aligned with the position of the first wall sideline, recording the scale on the graduated scale at the moment, and drawing the ink fountain line to pop out the first wall sideline;
(5) moving the top support and the ink fountain, adjusting the size position of the scale marker to the second wall sideline, and fixing the top support;
(6) measuring the wall width from the wall edge line popped out from the first pillar by using a measuring tape and marking by using chalk on the corresponding second pillar;
(7) drawing the ink marker line until the ink marker line reaches the second pillar edge and is overlapped with the mark made by the chalk, and popping up a second wall sideline;
(8) and (5) returning the wire and recovering the device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810797168.8A CN108894516B (en) | 2018-07-19 | 2018-07-19 | Portable wall pay-off tool and pay-off method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810797168.8A CN108894516B (en) | 2018-07-19 | 2018-07-19 | Portable wall pay-off tool and pay-off method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108894516A true CN108894516A (en) | 2018-11-27 |
CN108894516B CN108894516B (en) | 2020-10-23 |
Family
ID=64351164
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810797168.8A Active CN108894516B (en) | 2018-07-19 | 2018-07-19 | Portable wall pay-off tool and pay-off method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108894516B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110077164A (en) * | 2019-06-03 | 2019-08-02 | 华北理工大学 | A kind of mobile work platform for different indoor wall Freehandhand-drawings design |
CN113802585A (en) * | 2021-10-27 | 2021-12-17 | 广东平润建设工程有限公司 | Steel sheet pile cofferdam connection structure of hydraulic engineering construction usefulness |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2216452Y (en) * | 1994-09-28 | 1996-01-03 | 夏令学 | Portable scriber |
PL322559A1 (en) * | 1997-10-09 | 1999-04-12 | Inst Spawalnictwa | Marking off and lofting assembly for use in automatic cutting-off machines |
CN102852342A (en) * | 2012-04-25 | 2013-01-02 | 江苏建筑职业技术学院 | Drawing snapping line releaser and line drawing method in building construction |
CN204748602U (en) * | 2015-07-23 | 2015-11-11 | 武汉科技大学 | Snapping line ink marker support |
-
2018
- 2018-07-19 CN CN201810797168.8A patent/CN108894516B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2216452Y (en) * | 1994-09-28 | 1996-01-03 | 夏令学 | Portable scriber |
PL322559A1 (en) * | 1997-10-09 | 1999-04-12 | Inst Spawalnictwa | Marking off and lofting assembly for use in automatic cutting-off machines |
CN102852342A (en) * | 2012-04-25 | 2013-01-02 | 江苏建筑职业技术学院 | Drawing snapping line releaser and line drawing method in building construction |
CN204748602U (en) * | 2015-07-23 | 2015-11-11 | 武汉科技大学 | Snapping line ink marker support |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110077164A (en) * | 2019-06-03 | 2019-08-02 | 华北理工大学 | A kind of mobile work platform for different indoor wall Freehandhand-drawings design |
CN113802585A (en) * | 2021-10-27 | 2021-12-17 | 广东平润建设工程有限公司 | Steel sheet pile cofferdam connection structure of hydraulic engineering construction usefulness |
Also Published As
Publication number | Publication date |
---|---|
CN108894516B (en) | 2020-10-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108894516B (en) | Portable wall pay-off tool and pay-off method | |
CN210396185U (en) | Novel pay-off fixture | |
CN104985583A (en) | Setting-out and scribing tool and setting-out and scribing method | |
CN206038732U (en) | Insulating hand tool withstand voltage test auxiliary device | |
CN206216314U (en) | saddle-shaped lathe clamp | |
CN205786071U (en) | A kind of crab-bolt shear for building | |
CN207570574U (en) | For the dedicated unit of layouting of humiture environmental test equipment calibration | |
CN203177851U (en) | Inspection tool for inspecting slope of mold plate | |
CN211205132U (en) | Device convenient to pipe diameter measurement | |
CN209175629U (en) | One kind is adjustable to be horizontally mounted datum level tooling | |
CN107449399B (en) | Level bar supporting structure | |
CN207606993U (en) | A kind of auxiliary wall perforating device of puncher for building | |
CN210833312U (en) | Pre-measurement scale frame body for grooving of pre-buried electric wires for building decoration | |
CN205809097U (en) | A kind of wind speed tester test aid | |
CN219956540U (en) | On-site measurement marker post | |
CN211333516U (en) | Measuring instrument for processing mold textures | |
CN206582491U (en) | A kind of X-ray production apparatus film making support | |
CN215588006U (en) | Angle steel cutting equipment of iron tower angle steel work piece production usefulness | |
CN205466966U (en) | Power anchor clamps | |
CN213715107U (en) | Be used for impediometer to detect rotten auxiliary device of standing tree | |
CN220561533U (en) | Auxiliary tool for marking and positioning of bar planting | |
CN205450012U (en) | Wind speed test support | |
CN220269063U (en) | Support device for measuring shield posture | |
CN216977915U (en) | Portable measurement pay-off that interior decoration used | |
CN211317980U (en) | Tool for main body rebound test stationing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |