CN108890167A - The manufacture craft of large-scale tower cylinder - Google Patents

The manufacture craft of large-scale tower cylinder Download PDF

Info

Publication number
CN108890167A
CN108890167A CN201811092133.0A CN201811092133A CN108890167A CN 108890167 A CN108890167 A CN 108890167A CN 201811092133 A CN201811092133 A CN 201811092133A CN 108890167 A CN108890167 A CN 108890167A
Authority
CN
China
Prior art keywords
stress
shell ring
cylinder
removal
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811092133.0A
Other languages
Chinese (zh)
Inventor
谢玉超
李云萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chang Hua Machine (suzhou) Heavy Equipment Co Ltd
Original Assignee
Chang Hua Machine (suzhou) Heavy Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chang Hua Machine (suzhou) Heavy Equipment Co Ltd filed Critical Chang Hua Machine (suzhou) Heavy Equipment Co Ltd
Priority to CN201811092133.0A priority Critical patent/CN108890167A/en
Publication of CN108890167A publication Critical patent/CN108890167A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention discloses a kind of manufacture crafts of large-scale tower cylinder, include the following links:First link makes several shell rings;Second link makes several sections, and each section, which is stacked by several shell rings according to typesetting figure, to be formed;Third link, make several closure segment cylinders, each closure segment cylinder is welded according to typesetting figure split by several cylinder sections droped to the ground and is formed, and the length of each closure segment cylinder is less than or equal to the receiving length of stress-removal furnace, and each closure segment cylinder is sent into stress-removal furnace and carries out stress-removal processing;4th link, all closure segment cylinders for completing stress-removal processing carry out closing up welding, close up the seam that closes up that welding is formed and carry out stress-removal processing using stress-removal tooling, entire cylinder completes.The advantage of the invention is that:Simple and practical in structure, cost of manufacture is cheap, and applicability is wide, solves the problems, such as the stress-removal processing of the circular weld on large-size cylinder body.

Description

The manufacture craft of large-scale tower cylinder
Technical field
The present invention relates to production of pressure container equipment technical fields, and in particular to large-scale tower cylinder processing technology.
Background technique
Tower is usually columnar process equipment.The length of tower barrel is very long, and the length of large-scale tower barrel is past Toward at 50 meters or more.Tower barrel is the key that tower equipment production.
Summary of the invention
Problem to be solved of the present invention is:A kind of manufacture craft of large-scale tower cylinder is provided, can effectively be ensured Form the quality of rear cylinder body.
To solve the above problems, the technical solution adopted by the present invention is that:The manufacture craft of large-scale tower cylinder, including it is following Link:First link, makes several shell rings, and the height of each shell ring is determined according to typesetting figure;The making step packet of each shell ring It includes:One, the length of run of a shell ring is divided into several equal part length, if being then made according to equal part length and height blanking The block number of dry block steel plate, steel plate is identical as the number that shell ring length of run is divided equally, and the length of every block of steel plate is an equal part length, The width of every block of steel plate is the height of a shell ring;The width of every block of steel plate reserves the weld shrinkage of 2mm;Two, in every block of steel The surrounding of plate processes the groove of welding;Three, veneer reeling machine rolls to obtain arc panel on every block of steel plate;Four, in horizontal datum level On draw reference line, benchmark curvature of a curve is consistent with cylinder curvature, then by each arc panel according to reference line carry out split;Five, The vertical piece formed to arc panel split is vertically welded, and such as quantity of vertical piece is odd number, then all vertical pieces It welds simultaneously;If the quantity of vertical piece is even number, then it is located at the vertical piece of a pair of same diametrically and welds in pairs, successively Welding is completed;After carrying out non-destructive testing qualification to soldered vertical weld seam, a shell ring completes;Second link, system Make several sections, each section, which is stacked by several shell rings according to typesetting figure, to be formed, and the making step of each section includes:One, exist It is placed in a nethermost shell ring and holds round tooling, an interim lifting lug is then welded on the lateral wall of the shell ring, is connect A shell ring is superimposed on the shell ring, the arrangement of vertical weld seam of shell ring when being superimposed on upper and lower adjacent shell ring is according to typesetting Figure determines that four plumb lines are arranged in the outside at the top of the shell ring being located above, and circumferentially 90 degree of intervals are arranged four plumb lines, So that it is guaranteed that the straightness of the shell ring stacked, pre-fixes between upper and lower adjacent cylindrical section securely;Shell ring is stacked gradually to complete one A section is also provided in a shell ring of the top and holds round tooling, and also welding is faced on the outer wall of the shell ring of the top When lifting lug;Two, as crane, the cylinder section by made from is droped to the ground, and crane lifting is outside two shell rings of the bottom and top of each section Interim lifting lug on, the cylinder section after droping to the ground is placed on turning rolls, using turning rolls roll cylinder section, thus to every in cylinder section The synchronous welding of annular piece, circular weld non-destructive testing qualification the latter cylinder section complete;Third link makes several close up Section cylinder, each closure segment cylinder are welded according to typesetting figure split by several cylinder sections droped to the ground and are formed, each closure segment cylinder Length is less than or equal to the receiving length of stress-removal furnace, and each closure segment cylinder is sent into stress-removal furnace and carries out stress-removal processing;The Four links, all closure segment cylinders for completing stress-removal processing carry out closing up welding, close up the seam that closes up that welding is formed and use Stress-removal tooling carries out stress-removal processing, and entire cylinder completes.
Further, the manufacture craft of large-scale tower cylinder above-mentioned, wherein in the first step of the first link, by one The length of run of a shell ring is divided into three or four equal part length.
Further, the manufacture craft of large-scale tower cylinder above-mentioned, wherein in the first step of the first link, control Length, width, the cornerwise tolerance of every block of steel plate, which are respectively less than, is equal to 1mm.
Further, the manufacture craft of large-scale tower cylinder above-mentioned, wherein in the second step of the first link, every The surrounding of block steel plate processes the groove of welding, and the straightness deviation for controlling the root face of the groove in every piece of steel plate length direction is small In equal to 1mm.
Further, the manufacture craft of large-scale tower cylinder above-mentioned, wherein in the four steps of the first link, in advance Annular reference platform is built, the top surface level of reference platform is to form horizontal datum level.
Further, the manufacture craft of large-scale tower cylinder above-mentioned, wherein phase up and down in the first step of the second link Between adjacent shell ring pre-fix including:It is fixed between upper and lower adjacent cylindrical section by backing welding, it is then equal outside annular piece The fixed attachment strap in even interval, the both ends of every block of attachment strap are separately fixed on the shell ring of annular piece or more two sides, and fixed attachment strap is circumferential Every 30 ° of intervals setting.
Further, the manufacture craft of large-scale tower cylinder above-mentioned, wherein in the 4th link, the stress-removal work The structure of dress includes:The structure of a pair of of stress-removal component, each stress-removal component includes:Braced frame, it is solid in braced frame Surely semi-circular recesses are provided with, heat tape is fixedly installed in semi-circular recesses, the heat tape is connected with temperature control box It connects;A pair of of stress-removal component can be drawn close from the two sides for closing up seam respectively, until a pair of of semi-circular recesses is made to be combined to form one Circular groove closes up outside weldering so that the heat tape in circular groove is coated on.
Further, the manufacture craft of large-scale tower cylinder above-mentioned, wherein the semicircle in each stress-removal component It is filled out in groove equipped with heat-preservation cotton, the heat tape is laid in heat-preservation cotton, the semi-circular recesses in each stress-removal component Oral area interval be fixedly installed several pressing plates, pressing plate fixes heat tape.
It is an advantage of the invention that:The production of large-scale tower cylinder is realized, the length of the large-scale tower cylinder is reachable 50 meters or more, which not only effectively ensures the processing quality of tower barrel, also effectively reduces processing cost.
Detailed description of the invention
Fig. 1 is the structural representation of stress-removal tooling used in the manufacture craft of large-scale tower cylinder of the present invention Figure.
Fig. 2 is the schematic cross-sectional view in the direction A-A in Fig. 1.
Fig. 3 is the structural schematic diagram of braced frame in Fig. 1.
Specific embodiment
The following further describes the present invention in detail with reference to the accompanying drawings and preferred embodiments.
The manufacture craft of large-scale tower cylinder, includes the following links.
First link, makes several shell rings, and the height of each shell ring is determined according to typesetting figure.The typesetting figure, namely Construction drawing when processing and fabricating, when typesetting G- Design, have comprehensively considered nozzle position and process equipment etc. in equipment barrel Factor.
The making step of each shell ring includes:One, the length of run of a shell ring is divided into several equal part length, then Several blocks of steel plates are made according to equal part length and height blanking, the block number of steel plate is identical as the number that shell ring length of run is divided equally, The length of every block of steel plate is an equal part length, and the width of every block of steel plate is the height of a shell ring.In order to reduce vertical piece Quantity, the length of run of a usual shell ring is divided into three or four equal part length.Consider that welding forming will lead to device cartridge Body is shunk, therefore the width of every block of steel plate reserves the weld shrinkage of 2mm, while controlling the length of every block of steel plate, width, diagonal The tolerance of line is less than or equal to 1mm.Two, the groove of welding is processed in the surrounding of every block of steel plate, controls every piece in the present embodiment The straightness deviation of the root face of the groove in steel plate length direction is less than or equal to 1mm.Three, veneer reeling machine on every block of steel plate is rolled into obtain arc Shape plate.In order to ensure the molding effect of arc panel, can a bit of arc panel template for meeting curvature requirement of pre-production, every piece of volume Manufactured arc panel is compared with arc panel template, it is ensured that gap of the arc panel between arc panel template is less than or equal to 3mm.Four, reference platform is built in advance, and the top surface level of reference platform is to form horizontal datum level.In horizontal datum level On draw reference line, benchmark curvature of a curve is consistent with cylinder curvature, then by each arc panel according to reference line carry out split.Five, The vertical piece formed to arc panel split is vertically welded, and such as quantity of vertical piece is odd number, then all vertical pieces It welds simultaneously;If the quantity of vertical piece is even number, then it is located at the vertical piece of a pair of same diametrically and welds in pairs, successively Welding is completed;After soldered vertical weld seam carries out non-destructive testing qualification, a shell ring completes.Above-mentioned non-destructive testing It generally includes:Ultrasound examination, ray detection, Liquid penetrant testing, Magnetic testing etc., can select according to actual needs it is one of or It is several to be detected.
Second link makes several sections, and each section, which is stacked by several shell rings according to typesetting figure, to be formed.Each section Making step includes:One, tooling is held round being located to place in a nethermost shell ring, the structure for holding round tooling has very much, logical Often all include:Circular ring shape holds round bracket, and the even circumferential for holding round bracket around circular ring shape is arranged at intervals with several support components, support Component is arranged in pairs, each pair of support component be respectively positioned on it is same diametrically the length of each support component can be adjusted radially, The outer end of each support component is support block.Tooling support will be held round on shell ring inner wall, thus effectively prevent shell ring by It is deformed after power.
Then an interim lifting lug is welded on the lateral wall of the shell ring, interim lifting lug, which is welded on, holds round tooling support position On the outer wall of the corresponding shell ring in place, a shell ring is then superimposed on the shell ring, when shell ring is superimposed on upper and lower adjacent shell ring The arrangement of vertical weld seam determine that outside at the top of the shell ring being located above is arranged four plumb lines according to typesetting figure, four Plumb line circumferentially 90 degree of intervals setting pre-fixes jail between upper and lower adjacent cylindrical section so that it is guaranteed that the straightness of the shell ring stacked Gu.In order to ensure the reliability pre-fixed, pre-fixed described in the present embodiment including:By beating between upper and lower adjacent cylindrical section Back welding is fixed, and then uniform intervals fix attachment strap outside annular piece, and the both ends of every block of attachment strap are fixed on annular piece On the outer wall of the shell ring of lower two sides, the circumferentially every 30 ° of intervals setting of attachment strap.Shell ring is stacked gradually to complete a cylinder section, is located at Setting holds round tooling in one shell ring of the top, and interim lifting lug is welded on the outer wall of the shell ring of the top.Two, by hanging Vehicle drops to the ground cylinder section obtained, and crane lifting crouches on the interim lifting lug outside two shell rings of the bottom and top of each section Cylinder section after is placed on turning rolls, rolls cylinder section using turning rolls, is applied to synchronize to every annular piece in cylinder section Weldering, carries out non-destructive testing qualified the latter cylinder section to circular weld and completes.
Third link makes several closure segment cylinders, and each closure segment cylinder is by several cylinder sections droped to the ground according to typesetting figure Split welds to be formed, and the length of each closure segment cylinder is less than or equal to the receiving length of stress-removal furnace, by each closure segment cylinder It is sent into stress-removal furnace and carries out stress-removal processing, cut off the interim lifting lug on closure segment cylinder before stress-removal processing.
4th link, all closure segment cylinders for completing stress-removal processing carry out closing up welding, close up what welding was formed Close up seam and stress-removal processing is carried out using stress-removal tooling, entire cylinder completes.In the present embodiment, the knot of stress-removal tooling Structure includes:The structure of a pair of of stress-removal component 1, each stress-removal component 1 includes:Braced frame 11, for the ease of movement, branch The bottom of support frame frame 11 is provided with idler wheel, is not drawn into figure, and semi-circular recesses 12 are fixedly installed in braced frame 11, semicircle Heat tape 2 is fixedly installed in groove 12, the heat tape 2 is connected with temperature control box.In order to realize preferable heat preservation Effect simultaneously ensures that heat tape 2 can come into full contact with the seam 51 that closes up on cylinder 5, in the present embodiment in each stress-removal component 1 Semi-circular recesses 12 in fill out equipped with heat-preservation cotton 3, heat tape 2 is laid in heat-preservation cotton 3, the electricity being laid in heat-preservation cotton 3 Heating tape 2 is located at the oral area of semi-circular recesses 12.In addition, in order to fix heat tape 2, each stress-removal component 1 well In the oral area intervals of semi-circular recesses 12 be fixedly installed several pressing plates 4, heat tape 2 is fixed on semicircle recessed by pressing plate 4 The oral area of slot 12.The stress-removal tooling it is simple and practical in structure, cost of manufacture is cheap, and applicability is wide, efficiently solves beyond disappearing Stress heat size receive length cylinder on circular weld stress-removal processing the problem of, ensure that the processing quality of equipment, simultaneously Reduce the cost of manufacture of equipment.
The advantage of the invention is that:The production of large-scale tower cylinder is realized, the length of the large-scale tower cylinder can Up to 50 meters or more, which not only effectively ensures the processing quality of tower barrel, also effectively reduces processing cost.

Claims (8)

1. the manufacture craft of large-scale tower cylinder, includes the following links:First link makes several shell rings, the height of each shell ring Degree is determined according to typesetting figure;The making step of each shell ring includes:One, the length of run of a shell ring is divided into several equal parts Then several blocks of steel plates are made according to equal part length and height blanking in length, what the block number and shell ring length of run of steel plate were divided equally Number is identical, and the length of every block of steel plate is an equal part length, and the width of every block of steel plate is the height of a shell ring;Every block of steel plate Width reserve 2mm weld shrinkage;Two, the groove of welding is processed in the surrounding of every block of steel plate;Three, on every block of steel plate Veneer reeling machine rolls to obtain arc panel;Four, reference line being drawn on horizontal datum level, benchmark curvature of a curve is consistent with cylinder curvature, Then each arc panel is subjected to split according to reference line;Five, the vertical piece formed to arc panel split is vertically welded, such as The quantity of vertical piece is odd number, then all vertical pieces weld simultaneously;If the quantity of vertical piece is even number, then it is located at same The vertical piece of a pair of item diametrically welds in pairs, and successively welding is completed;Soldered vertical weld seam is carried out non-destructive testing After qualification, a shell ring completes;Second link makes several sections, and each section is by several shell rings according to typesetting figure heap Folded to be formed, the making step of each section includes:One, be located at a nethermost shell ring in place hold round tooling, then exist An interim lifting lug is welded on the lateral wall of the shell ring, and a shell ring, shell ring upper and lower phase when being superimposed then are superimposed on the shell ring The arrangement of vertical weld seam on adjacent shell ring determines that four lead are arranged in the outside at the top of the shell ring being located above according to typesetting figure Vertical line, the circumferentially 90 degree of intervals setting of four plumb lines, so that it is guaranteed that the straightness of the shell ring stacked, upper and lower adjacent cylindrical section it Between pre-fix securely;Shell ring is stacked gradually to complete a cylinder section, is also provided in a shell ring of the top and holds round work Dress, and interim lifting lug is also welded on the outer wall of the shell ring of the top;Two, as crane, the cylinder section by made from is droped to the ground, and crane is hung On the interim lifting lug outside two shell rings of the bottom and top of each section, the cylinder section after droping to the ground is placed on turning rolls, Cylinder section is rolled using turning rolls, so that welding is synchronized to every annular piece in cylinder section, after circular weld non-destructive testing is qualified One cylinder section completes;Third link, makes several closure segment cylinders, each closure segment cylinder by several cylinder sections droped to the ground by Phototypesetting domain split welds to be formed, and the length of each closure segment cylinder is less than or equal to the receiving length of stress-removal furnace, by each conjunction Hold together section cylinder and is sent into the progress stress-removal processing of stress-removal furnace;4th link completes all closure segment cylinders of stress-removal processing It carries out closing up welding, closes up the seam that closes up that welding is formed and stress-removal processing is carried out using stress-removal tooling, entire cylinder has made At.
2. the manufacture craft of large-scale tower cylinder according to claim 1, it is characterised in that:The first step of first link In, the length of run of a shell ring is divided into three or four equal part length.
3. the manufacture craft of large-scale tower cylinder according to claim 1, it is characterised in that:The first step of first link In, length, width, the cornerwise tolerance for controlling every block of steel plate, which are respectively less than, is equal to 1mm.
4. the manufacture craft of large-scale tower cylinder according to claim 1, it is characterised in that:The second step of first link In, the groove of welding is processed in the surrounding of every block of steel plate, controls the straight line of the root face of the groove in every piece of steel plate length direction It spends deviation and is less than or equal to 1mm.
5. the manufacture craft of large-scale tower cylinder according to claim 1, it is characterised in that:The four steps of first link In, annular reference platform is built in advance, and the top surface level of reference platform is to form horizontal datum level.
6. the manufacture craft of large-scale tower cylinder according to claim 1, it is characterised in that:The first step of second link In between neighbouring shell ring pre-fix including:It is fixed between upper and lower adjacent cylindrical section by backing welding, then in annular The fixed attachment strap of the outer uniform intervals of piece, the both ends of every block of attachment strap are separately fixed on the shell ring of annular piece or more two sides, fixed The circumferentially every 30 ° of intervals setting of attachment strap.
7. the manufacture craft of large-scale tower cylinder according to claim 1 or 2 or 3 or 4 or 5 or 6, it is characterised in that:The In four links, the structure of the stress-removal tooling includes:The structure of a pair of of stress-removal component, each stress-removal component is wrapped It includes:Braced frame is fixedly installed semi-circular recesses in braced frame, heat tape, institute is fixedly installed in semi-circular recesses The heat tape stated is connected with temperature control box;A pair of of stress-removal component can be drawn close from the two sides for closing up seam respectively, until making one One circular groove is combined to form to semi-circular recesses, is closed up outside weldering so that the heat tape in circular groove is coated on.
8. the manufacture craft of large-scale tower cylinder according to claim 7, it is characterised in that:In each stress-removal component It is filled out in semi-circular recesses equipped with heat-preservation cotton, the heat tape is laid in heat-preservation cotton, the semicircle in each stress-removal component The oral area interval of connected in star is fixedly installed several pressing plates, and pressing plate fixes heat tape.
CN201811092133.0A 2018-09-19 2018-09-19 The manufacture craft of large-scale tower cylinder Pending CN108890167A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811092133.0A CN108890167A (en) 2018-09-19 2018-09-19 The manufacture craft of large-scale tower cylinder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811092133.0A CN108890167A (en) 2018-09-19 2018-09-19 The manufacture craft of large-scale tower cylinder

Publications (1)

Publication Number Publication Date
CN108890167A true CN108890167A (en) 2018-11-27

Family

ID=64360089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811092133.0A Pending CN108890167A (en) 2018-09-19 2018-09-19 The manufacture craft of large-scale tower cylinder

Country Status (1)

Country Link
CN (1) CN108890167A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111136429A (en) * 2020-01-13 2020-05-12 海洋石油工程(青岛)有限公司 Dimension control process for prefabricating single-point mooring cone structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101941139A (en) * 2010-09-02 2011-01-12 中信重工机械股份有限公司 Welding and assembling method for huge mining mill barrel
CN102990237A (en) * 2012-10-24 2013-03-27 中船华南船舶机械有限公司 Welding technology for large connecting cylinder
CN103331527A (en) * 2012-12-18 2013-10-02 南通振华重型装备制造有限公司 Erecting welding method of major-diameter finished flange
US20130340635A1 (en) * 2011-01-07 2013-12-26 Avure Technologies Ab Residual stress reduction in welding
CN204737991U (en) * 2015-04-27 2015-11-04 中国核工业二三建设有限公司 A instrument for pipeline welding thermal treatment
CN205420493U (en) * 2016-03-28 2016-08-03 新疆安泰神州封头有限公司 A non -traditional machining(NTM) device for pipeline welding heat treatment 's head
CN106695252A (en) * 2016-11-23 2017-05-24 中国三冶集团有限公司 Method for manufacturing main body structure of wind turbine tower
CN107414424A (en) * 2017-07-26 2017-12-01 东方电气集团东方锅炉股份有限公司 A kind of forming method of large diameter thin wall stainless steel cylinder
CN107931991A (en) * 2017-11-22 2018-04-20 中信重工机械股份有限公司 A kind of method for ensureing large-sized grinding mill barrel concentricity by welding

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101941139A (en) * 2010-09-02 2011-01-12 中信重工机械股份有限公司 Welding and assembling method for huge mining mill barrel
US20130340635A1 (en) * 2011-01-07 2013-12-26 Avure Technologies Ab Residual stress reduction in welding
CN102990237A (en) * 2012-10-24 2013-03-27 中船华南船舶机械有限公司 Welding technology for large connecting cylinder
CN103331527A (en) * 2012-12-18 2013-10-02 南通振华重型装备制造有限公司 Erecting welding method of major-diameter finished flange
CN204737991U (en) * 2015-04-27 2015-11-04 中国核工业二三建设有限公司 A instrument for pipeline welding thermal treatment
CN205420493U (en) * 2016-03-28 2016-08-03 新疆安泰神州封头有限公司 A non -traditional machining(NTM) device for pipeline welding heat treatment 's head
CN106695252A (en) * 2016-11-23 2017-05-24 中国三冶集团有限公司 Method for manufacturing main body structure of wind turbine tower
CN107414424A (en) * 2017-07-26 2017-12-01 东方电气集团东方锅炉股份有限公司 A kind of forming method of large diameter thin wall stainless steel cylinder
CN107931991A (en) * 2017-11-22 2018-04-20 中信重工机械股份有限公司 A kind of method for ensureing large-sized grinding mill barrel concentricity by welding

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
抚顺市锅炉检验研究所: "《焊工培训指南-锅炉压力容器的焊接》", 中国农业机械出版社, pages: 217 - 224 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111136429A (en) * 2020-01-13 2020-05-12 海洋石油工程(青岛)有限公司 Dimension control process for prefabricating single-point mooring cone structure
CN111136429B (en) * 2020-01-13 2021-12-03 海洋石油工程(青岛)有限公司 Dimension control process for prefabricating single-point mooring cone structure

Similar Documents

Publication Publication Date Title
CN105252158A (en) Welding construction method for bottom plate of large storage tank
CN103492636A (en) Method for producing a yankee cylinder
CN107717346A (en) A kind of 1600T masts hang on mast building technology
CN110869156A (en) Welding method of large-sized cylinder section
BR112014012912B1 (en) End plate for isostatic hot pressing container, isostatic hot pressing container and method for isostatic hot pressing
CN108890167A (en) The manufacture craft of large-scale tower cylinder
CN110576939A (en) Construction method for large conical cylinder segments
CN110524129A (en) A kind of large scale super thick bridge steel tower bearing plate welding deformation controlling method
CN202377731U (en) Saddle and assembly part of large recovered oil gas storage tank
CN104889581A (en) Deformation preventing process for welding dense connecting tubes on thin-wall barrel body
CN103244136B (en) Shield tunneling machine drive box and production method thereof
CN111872543B (en) Inner support device and method for stirring friction welding of tank sealing circular seam of storage tank
CN207155150U (en) Burst tower welding system
CN103193153B (en) Barrel transformation preventing vertical lifting device
CN107639359A (en) A kind of modified welding procedure for thick-walled vessel cylinder longitudinal joint groove
CN104625326A (en) Spherical box bottom circumferential seam welding method for 5M-grade thin wall storage box
CN105364389B (en) A kind of stopping means for being used to roll cage machine
CN102390047B (en) Multifunctional header assembly frame
CN104028875A (en) Aluminum electrolytic cell manufacturing method
CN105758171B (en) A kind of rotary kiln device interlude changes construction method
CN108977646B (en) Stress relieving tool for welding line of large pressure vessel cylinder
CN102699614A (en) Hydraulic assembling machine
CN103143873B (en) Full-symmetrical cylindrical membrane wall assembly tooling and assembly method
CN105382438A (en) Novel oblique-inserted-pipe double-side welding groove and welding method
CN114473134A (en) Rotor support weak constraint symmetric welding process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181127