CN108889893A - A kind of charging equipment for warm and hot forging technique - Google Patents

A kind of charging equipment for warm and hot forging technique Download PDF

Info

Publication number
CN108889893A
CN108889893A CN201810935692.7A CN201810935692A CN108889893A CN 108889893 A CN108889893 A CN 108889893A CN 201810935692 A CN201810935692 A CN 201810935692A CN 108889893 A CN108889893 A CN 108889893A
Authority
CN
China
Prior art keywords
fixed
fire door
furnace body
warm
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810935692.7A
Other languages
Chinese (zh)
Inventor
邵高科
王颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Keming Copper Industry Co Ltd
Original Assignee
Jiangxi Keming Copper Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Keming Copper Industry Co Ltd filed Critical Jiangxi Keming Copper Industry Co Ltd
Priority to CN201810935692.7A priority Critical patent/CN108889893A/en
Publication of CN108889893A publication Critical patent/CN108889893A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J17/00Forge furnaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K27/00Handling devices, e.g. for feeding, aligning, discharging, Cutting-off means; Arrangement thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Heat Treatments In General, Especially Conveying And Cooling (AREA)
  • Tunnel Furnaces (AREA)

Abstract

The invention discloses a kind of charging equipments for warm and hot forging technique, belong to charging equipment field.A kind of charging equipment for warm and hot forging technique includes bottom plate, it is fixed on the heating furnace and feed mechanism of plate upper surface, heating furnace includes the furnace body being laterally arranged, it is fixed on the left fire door and right fire door at furnace body both ends, furnace body inside wall is fixed with heating ramp, the upper end of right fire door is equipped with right dodge gate, furnace body inside wall is equipped with discharging mechanism, discharging mechanism includes the longitudinally disposed shaft for being articulated in sidewall of the furnace body, the transmission gear being fixed in shaft, discharge baffle on the left of transmission gear, in discharge baffle, right dodge gate side close to each other, the upper end of discharge baffle, the side wall of right dodge gate is respectively and fixedly provided with rack segments, two rack segments are connected by meshing transmission with transmission gear, right fire door lateral wall is fixed with adapting table.A kind of charging equipment for warm and hot forging technique disclosed by the invention can be realized the automatic charging of single cylindrical workpiece, improve production efficiency.

Description

A kind of charging equipment for warm and hot forging technique
Technical field
The present invention relates to charging equipment fields, and in particular to a kind of charging equipment for warm and hot forging technique.
Background technique
Warm and hot forging technique is the forging technology carried out more than metal recrystallization temperature, it is therefore an objective to improve plastic deformation, drop Low resistance of deformation makes it easy to flowing forming and organizes after obtaining good forging.Cylindrical workpiece is heated before forging, so The cylindrical workpiece of heating is forged on forging equipment afterwards, the forging equipment of most forging producers uses on artificial at present Material, production efficiency is low, large labor intensity, and increased production cost for enterprise, and feeding quantity is difficult to control, be easy to cause wave Take.
Summary of the invention
In order to overcome the drawbacks of the prior art, a kind of for warm and hot forging technical problem to be solved by the present invention lies in proposing The charging equipment of technique can be realized the automatic charging of single cylindrical workpiece, improve production efficiency.
For this purpose, the present invention uses following technical scheme:
The present invention provides a kind of charging equipment for warm and hot forging technique, including bottom plate, it is fixed on table on the bottom plate The heating furnace in face, the heating furnace include the furnace body being laterally arranged, the left fire door and right fire door for being fixed on the furnace body both ends, institute It states furnace body inside wall and is fixed with heating ramp, the heating ramp is arranged diagonally downward to the direction close to the right fire door, institute The upper end for stating right fire door is equipped with the right dodge gate of the first opening and salable first opening, the bottom wall of the right dodge gate It is concordant with the heating upper surface in ramp and fit closely;Close to described right fire door one end, the furnace body inside wall is equipped with Discharging mechanism, the discharging mechanism include the longitudinally disposed shaft for being articulated in the sidewall of the furnace body, are arranged and be fixed on described Transmission gear in shaft, the vertical discharge baffle positioned at the transmission gear far from the right dodge gate side, described turn The output axis connection of axis and the motor for being fixed on the furnace body lateral wall, is mutually leaned in the discharge baffle, the right dodge gate Close side, the upper end of the discharge baffle, the right dodge gate side wall be respectively and fixedly provided with vertical rack segments, two teeth Transmission gear described in Duan Junyu is connected by meshing transmission, and the right fire door lateral wall is fixed with adapting table, and the adapting table is located at The lower section in the heating ramp;In side of the adapting table far from the right fire door, the upper surface of the bottom plate is fixed with Expect mechanism, the feed mechanism includes the vertical oscillating cylinder being fixed on the bottom plate, the output with the oscillating cylinder The frame plate of the output axis connection of first lifting cylinder of axis connection and first lifting cylinder is fixed on the frame plate end The horizontal bi-directional expansion cylinder of downside, the piston rod end at bi-directional expansion cylinder both ends are vertical with a clamping jaw solid respectively Fixed, the frame plate is parallel with the bi-directional expansion cylinder, and the frame plate is vertical with the output shaft of first lifting cylinder.At this Invent in preferable embodiment, it is described heating ramp top, the left fire door be equipped with second opening and it is salable The left dodge gate of second opening, is fixed with the second lifting cylinder, the output of second lifting cylinder on the right fire door Axis is fixedly connected with the upper end of the left dodge gate.
In preferably embodiment of the invention, in the top in the heating ramp, the left fire door is equipped with second and opens Mouthful and salable second opening left dodge gate, be fixed with the second lifting cylinder on the left fire door, described second liter The output shaft of sending down abnormally ascending cylinder is fixedly connected with the upper end of the left dodge gate.
In preferably embodiment of the invention, the bottom wall of second opening is obliquely installed, and inclined direction with it is described The inclined direction for heating ramp is identical.
In preferably embodiment of the invention, the side wall of the left fire door is fixed with lateral guide platform, the guide The upper surface of platform is arranged diagonally downward to the side close to the left fire door, and the lower end of the guide platform is leaned on second opening The end wall of nearly guide platform one end is concordant, and the bottom wall of the left dodge gate is concordant with the upper surface of the guide platform and closely pastes It closes;Above the guide platform, the side wall of the left fire door is fixed with stock stop, and the stock stop is described including being fixed on The lateral fixed plate of the side wall of left fire door, by bracket in the fixed plate moving guide rail, be set in the shifting The slide unit that is slidably matched on dynamic guide rail and with the moving guide rail, the first telescopic cylinder being fixed on the slide unit, with it is described First telescopic cylinder export axis connection charging baffle, the moving guide rail is parallel with the upper surface of the guide platform, it is described into Expect that baffle is vertical with the moving guide rail.
In preferably embodiment of the invention, in the two sides of the charging baffle, the slide unit lower surface is fixed with the One guide plate, two first guide plates are parallel with the charging baffle and are close to the side wall of the charging baffle.
In preferably embodiment of the invention, the two sides of the guide platform are fixed with guardrail.
In preferably embodiment of the invention, the upper end of the discharge baffle is fixed by spring and the furnace body roof Connection.
In preferably embodiment of the invention, it is fixed on the inside of the two sides of the discharge baffle, the furnace body roof The side wall of the second vertical guide plate, two second guide plates is close to the side wall of the discharge baffle.
In preferably embodiment of the invention, in the top in the heating ramp, the furnace body inside wall is fixed with top Plate, the top plate is adapted with the shape in the corresponding heating ramp, under the upper surface of each top plate, the heating ramp Surface is equipped with heater strip.
Beneficial effects of the present invention are:
A kind of charging equipment for warm and hot forging technique provided by the invention, the furnace body inside wall are fixed with heating slope Road, for being heated and being transported to cylindrical workpiece;Discharging mechanism is being equipped in described right fire door one end, the furnace body, When starting the motor, the transmission gear is driven to rotate counterclockwise, the right dodge gate constantly rises, while the discharging Baffle constantly declines, and the lower end of the discharge baffle is contacted with the cylindrical workpiece side wall on the left of it, stops its whereabouts;When the right side When dodge gate rises to setting height, the lower end of the discharge baffle supports the upper surface in the heating ramp, while resistance completely Cylindrical workpiece of the gear on the left of the discharge baffle falls, the cylindrical workpiece on the right side of the discharge baffle smoothly slide to On the adapting table of the furnace body lateral wall, is then realized by feed mechanism and transport single cylindrical workpiece to the work of forging equipment Make the upper surface of platform, improves production efficiency.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the charging equipment for warm and hot forging technique provided in the embodiment of the present invention;
Fig. 2 is the side view of right fire door;
Fig. 3 is the side view of left fire door;
Fig. 4 is the structural schematic diagram of the cooperation of left dodge gate, guide platform, left fire door.
In figure:100, bottom plate;200, heating furnace;210, furnace body;220, left fire door;221, the second opening;222, left activity Door;223, the second lifting cylinder;224, guide platform;225, guardrail;230, right fire door;231, the first opening;232, right dodge gate; 240, ramp is heated;241, top plate;242, heater strip;250, discharging mechanism;251, shaft;252, transmission gear;253, it discharges Baffle;253, rack segments;254, adapting table;255, spring;256, the second guide plate;300, feed mechanism;310, oscillating cylinder; 320, the first lifting cylinder;330, frame plate;340, bi-directional expansion cylinder;341, piston rod;350, clamping jaw;400, stock stop; 410, fixed plate;420, moving guide rail;430, slide unit;431, the first guide plate;440, the first telescopic cylinder;450, charging gear Plate.
Specific embodiment
To further illustrate the technical scheme of the present invention below with reference to the accompanying drawings and specific embodiments.
As shown in Figure 1, a kind of charging equipment for warm and hot forging technique includes bottom plate 100, is fixed on the bottom plate 100 The heating furnace 200 on surface, the heating furnace 200 include the furnace body 210 being laterally arranged, the left side for being fixed on 210 both ends of furnace body Fire door 220 and right fire door 230,210 inner sidewall of furnace body are fixed with heating ramp 240, and the heating ramp 240 is to close to institute The direction for stating right fire door 230 is arranged diagonally downward, as shown in Fig. 2, the upper end of the right fire door 230 be equipped with first opening 231 with And the right dodge gate 232 of salable first opening 231, the bottom wall of the right dodge gate 232 and the heating ramp 240 Upper surface is concordant and fits closely.
Discharging mechanism 250, the discharging mechanism 250 are being equipped in described right 230 one end of fire door, the furnace body 210 Including being articulated in the longitudinally disposed shaft 251 of 210 side wall of furnace body, the transmission for being arranged and being fixed in the shaft 251 Gear 252, the vertical discharge baffle 253 positioned at the transmission gear 252 far from right 232 side of dodge gate, described turn The output axis connection of axis 251 and the motor for being fixed on 210 lateral wall of furnace body, in the discharge baffle 253, the right activity Door 232 sides close to each other, the upper end of the discharge baffle 253, the right dodge gate 232 side wall be respectively and fixedly provided with it is vertical Rack segments 253a, two rack segments 253a are connected by meshing transmission with the transmission gear 252, outside the right fire door 230 Side wall is fixed with adapting table 254, and the adapting table 254 is located at the lower section in the heating ramp 240.Cylindrical workpiece is in the heating Be in line on ramp 240, and place vertically, the discharge baffle 253 close to right 232 one side of dodge gate with it is described Lateral distance between the sidewall bottom of right dodge gate 232 is equal to the diameter of a cylindrical workpiece, in the initial state, it is described go out Expect that the lower end of baffle 253 is equal to the height of a cylindrical workpiece to the vertical distance between the upper surface in the heating ramp 240.
In side of the adapting table 254 far from the right fire door 230, the upper surface of the bottom plate 100 is fixed with feeding Mechanism 300, the feed mechanism 300 include the vertical oscillating cylinder 310 being fixed on the bottom plate 100 and the swing First lifting cylinder 320 of the output axis connection of cylinder 310, the frame plate with the output axis connection of first lifting cylinder 320 330, the horizontal bi-directional expansion cylinder 340 being fixed on the downside of 330 end of frame plate, 340 both ends of bi-directional expansion cylinder 341 end of piston rod it is vertical with a clamping jaw 350 fixed respectively, the frame plate 330 and the bi-directional expansion cylinder 340 are flat Row, the frame plate 330 are vertical with the output shaft of first lifting cylinder 320.The port of the bi-directional expansion cylinder 340 passes through Tracheae is connect with air pump, and when air pump output high-pressure gas, the piston rod 341 at 340 both ends of bi-directional expansion cylinder is stretched simultaneously Exhibition, when air pump gas recovery, the piston rod 341 at 340 both ends of bi-directional expansion cylinder bounces back simultaneously.
A kind of above-mentioned charging equipment for warm and hot forging technique, 210 inner sidewall of furnace body are fixed with heating ramp 240, cylindrical workpiece is heated and is transported;Discharging machine is being equipped in described right 230 one end of fire door, the furnace body 210 Structure 250 realizes that single cylindrical workpiece slides to the adapting table 254 of right 230 lateral wall of fire door, then passes through feed mechanism 300, realization transports cylindrical workpiece to the upper surface of the workbench of forging equipment, thus realize the automatic charging of single workpiece, Improve production efficiency.
Specifically, multiple cylindrical workpieces are in line on the heating ramp 240, and place vertically, cylindrical workpiece It is heated in the heating ramp 240, the discharge baffle 253 is close to right 232 one side of dodge gate and the right work A cylindrical workpiece is accommodated between the sidewall bottom of dynamic door 232, when needing past forging equipment feeding, when the starting motor When, drive the transmission gear 252 to rotate counterclockwise, the right dodge gate 232 constantly rises, while the discharge baffle 253 Constantly decline, the lower end of the discharge baffle 253 are contacted with the cylindrical workpiece side wall in left side, stop its whereabouts;When the right work The distance that dynamic door 232 rises and the height of cylindrical workpiece to it is identical when, the lower end of the discharge baffle 253 supports the heating slope The upper surface in road 240 stops the cylindrical workpiece for being located at 253 left side of discharge baffle to fall completely, is located at simultaneously The cylindrical workpiece on 253 right side of discharge baffle smoothly slides to the adapting table 254 of 210 lateral wall of furnace body, then opens The oscillating cylinder 310 is moved, so that the clamping jaw 350 is located at the top of the adapting table 254, restarts first lifting cylinder 320, the 350 whereabouts certain altitude of clamping jaw is driven, so that the clamping jaw 350 is in same level with cylindrical workpiece, then opens The bi-directional expansion cylinder 340 is moved, two clamping jaw 350 movements close to each other, clamp cylinders workpiece, starting described first are made Lifting cylinder 320 makes the clamping jaw 350 rise certain altitude, starts the oscillating cylinder 310, and the clamping jaw 350 is driven to rotate Set angle makes cylindrical workpiece be located at the upper surface of the workbench of forging equipment, starts the bi-directional expansion cylinder 340, makes two A clamping jaw 350 is located remotely from each other, and unclamps cylindrical workpiece, and then oscillating cylinder 310 resets, and completes once upper material process.
As shown in Fig. 1, Fig. 3 and Fig. 4, further, in the top in the heating ramp 240, set on the left fire door 220 There is the left dodge gate 222 of the second opening 221 and salable second opening 221, is fixed with second on the left fire door 220 Lifting cylinder 223, the output shaft of second lifting cylinder 223 are fixedly connected with the upper end of the left dodge gate 222;Work as needs In the furnace body 210 when charging, start second lifting cylinder 223, the left dodge gate 222 is driven to transport straight up Dynamic, cylindrical workpiece enters in the furnace body 210 from second opening 221 to be heated.
Further, the bottom wall of second opening 221 is obliquely installed, and inclined direction and the heating ramp 240 Inclined direction is identical;Cylindrical workpiece slides along the inclined bottom wall of second opening 221 to the heating ramp 240, subtracts The resistance that few cylindrical workpiece falls.
As shown in Fig. 1 and Fig. 4, further, the side wall of the left fire door 220 is fixed with lateral guide platform 224, described The upper surface of guide platform 224 is arranged diagonally downward to close to the side of the left fire door 220, the lower end of the guide platform 224 with End wall of second opening 221 close to described 224 one end of guide platform is concordant, and the bottom wall of the left dodge gate 222 is led with described Expect that the upper surface of platform 224 is concordant and fits closely;Above the guide platform 224, the side wall of the left fire door 220 is fixed with gear Expect mechanism 400, the stock stop 400 includes the lateral fixed plate 410 for being fixed on the side wall of the left fire door 220, passes through Bracket in the fixed plate 410 moving guide rail 420, be set on the moving guide rail 420 and led with the movement Slide unit 430 that rail 420 is slidably matched, the first telescopic cylinder 440 being fixed on the slide unit 430, with the described first flexible gas Cylinder 440 exports the charging baffle 450 of axis connection, and the moving guide rail 420 is parallel with the upper surface of the guide platform 224, described It is vertical with the moving guide rail 420 to feed baffle 450;By the stock stop 400 realize the cylindrical workpiece of specified number into Material avoids extra cylindrical workpiece from entering in the furnace body 210.
Specifically, multiple cylindrical workpieces the guide platform 224 upper surface proper alignment, previously according to needing toward described The quantity that cylindrical workpiece is added in furnace body 210 determines the mobile distance of the slide unit 430, starts for driving the moving guide rail The motor of 420 movements, it is mobile to the side far from the left fire door 220 to drive the slide unit 430, until being moved to the last one It needs then to start first telescopic cylinder 440 into the lower section of the cylindrical workpiece of the furnace body 210, drive the charging Baffle 450 stretches out, and the charging baffle 450 is located at the last one and needs the cylindrical workpiece into the furnace body 210 far from described The side of left fire door 220, the whereabouts for stopping not needing the cylindrical workpiece entered in the furnace body 210, then described in starting Second lifting cylinder 223 drives the left dodge gate 222 to move straight up, and cylindrical workpiece enters from second opening 221 Heating in the furnace body 210 starts second lifting cylinder 223 after the completion of charging, drives the left dodge gate 222 perpendicular It directly moves downward, to seal second opening 221.
Further, in the two sides of the charging baffle 450,430 lower surface of slide unit is fixed with the first guide plate 431, two first guide plates 431 are parallel with the charging baffle 450 and are close to the side wall of the charging baffle 450;If First guide plate 431 is set to be oriented to the movement of the charging baffle 450, avoid the charging baffle 450 inclination and It causes smoothly cylindrical workpiece to be stopped to fall.
Further, the two sides of the guide platform 224 are fixed with guardrail 225;The guardrail 225 is set and avoids cylindrical workpiece Stress skids off the guide platform 224 when sliding along the upper surface of the guide platform 224.
Further, the upper end of the discharge baffle 253 is fixedly connected by spring 255 with 210 roof of furnace body;It is logical Crossing the spring 255 will be fixed between 210 roof of the discharge baffle 253 and the furnace body, avoids the discharge baffle 253 de- From.
Further, vertical second is fixed on the inside of the two sides of the discharge baffle 253,210 roof of furnace body Guide plate 256, the side wall of two second guide plates 256 are close to the side wall of the discharge baffle 253;Second guiding Plate 256 play the guiding role, and avoids the movement of discharge baffle 253 inclination, guarantees the stability that the discharge baffle 253 moves.
Further, in the top in the heating ramp 240,210 inner sidewall of furnace body is fixed with top plate 241, described Top plate 241 is adapted with the shape in the corresponding heating ramp 240, upper surface, the heating ramp of each top plate 241 240 lower surface is equipped with heater strip 242;Heater strip 112 on the top plate 115 to being heated at the top of cylindrical workpiece, Heater strip 112 heats the bottom of cylindrical workpiece on the heating ramp 240, is conducive to improve heating efficiency.
The present invention is described with reference to the preferred embodiments, and those skilled in the art know, of the invention not departing from In the case where spirit and scope, various changes or equivalence replacement can be carried out to these features and embodiment.The present invention is not by this The limitation of specific embodiment disclosed in place, other embodiments fallen into claims hereof belong to protection of the present invention Range.

Claims (9)

1. a kind of charging equipment for warm and hot forging technique, it is characterised in that:Including bottom plate (100), it is fixed on the bottom plate (100) heating furnace (200) of upper surface, the heating furnace (200) include the furnace body (210) being laterally arranged, are fixed on the furnace The left fire door (220) and right fire door (230) at body (210) both ends, furnace body (210) inner sidewall are fixed with heating ramp (240), Heating ramp (240) is arranged diagonally downward to close to the direction of the right fire door (230), the right fire door (230) it is upper End is equipped with the right dodge gate (232) of the first opening (231) and salable first opening (231), the right dodge gate (232) bottom wall is concordant with the heating upper surface of ramp (240) and fits closely;
Close to described right fire door (230) one end, furnace body (210) inner sidewall is equipped with discharging mechanism (250), the discharging machine Structure (250) includes the longitudinally disposed shaft (251) for being articulated in the furnace body (210) side wall, is arranged and is fixed on the shaft (251) transmission gear (252) on is located at the transmission gear (252) far from the vertical of described right dodge gate (232) side Discharge baffle (253), the output axis connection of the shaft (251) and the motor for being fixed on the furnace body (210) lateral wall, in institute State discharge baffle (253), the right dodge gate (232) side close to each other, it is the upper end of the discharge baffle (253), described The side wall of right dodge gate (232) is respectively and fixedly provided with vertical rack segments (253a), two rack segments (253a) with the biography Moving gear (252) is connected by meshing transmission, and right fire door (230) lateral wall is fixed with adapting table (254), the adapting table (254) it is located at the lower section of heating ramp (240);
In the side of the adapting table (254) far from the right fire door (230), the upper surface of the bottom plate (100) is fixed with Expect mechanism (300), the feed mechanism (300) include be fixed on the bottom plate (100) vertical oscillating cylinder (310), With the first lifting cylinder (320) of the output axis connection of the oscillating cylinder (310), with first lifting cylinder (320) The horizontal bi-directional expansion cylinder (340) for exporting the frame plate (330) of axis connection, being fixed on the downside of the frame plate (330) end, institute Piston rod (341) end for stating bi-directional expansion cylinder (340) both ends is vertical with one clamping jaw (350) fixed respectively, the frame plate (330) parallel with bi-directional expansion cylinder (340), the output shaft of the frame plate (330) and first lifting cylinder (320) Vertically.
2. a kind of charging equipment for warm and hot forging technique according to claim 1, it is characterised in that:On the heating slope The top in road (240), the left fire door (220) are open (221) equipped with the second opening (221) and salable described second Left dodge gate (222) is fixed with the second lifting cylinder (223) on the left fire door (220), second lifting cylinder (223) Output shaft be fixedly connected with the upper end of the left dodge gate (222).
3. a kind of charging equipment for warm and hot forging technique according to claim 2, it is characterised in that:Second opening (221) bottom wall is obliquely installed, and inclined direction is identical as the heating inclined direction of ramp (240).
4. a kind of charging equipment for warm and hot forging technique according to claim 2, it is characterised in that:The left fire door (220) side wall is fixed with lateral guide platform (224), and the upper surface of the guide platform (224) is to close to the left fire door (220) side is arranged diagonally downward, and the lower end of the guide platform (224) and second opening (221) are close to the guide The end wall of platform (224) one end is concordant, the bottom wall of the left dodge gate (222) it is concordant with the upper surface of the guide platform (224) and It fits closely;Above the guide platform (224), the side wall of the left fire door (220) is fixed with stock stop (400), described Stock stop (400) includes the lateral fixed plate (410) for being fixed on the side wall of the left fire door (220), passes through bracket In on the fixed plate (410) moving guide rail (420), be set on the moving guide rail (420) and with the moving guide rail (420) slide unit (430) being slidably matched, the first telescopic cylinder (440) and described first being fixed on the slide unit (430) Telescopic cylinder (440) exports the charging baffle (450) of axis connection, and the moving guide rail (420) is upper with the guide platform (224) Surface is parallel, and the charging baffle (450) is vertical with the moving guide rail (420).
5. a kind of charging equipment for warm and hot forging technique according to claim 4, it is characterised in that:It is kept off in the charging The two sides of plate (450), slide unit (430) lower surface are fixed with the first guide plate (431), two first guide plates (431) side wall that is parallel with charging baffle (450) and being close to charging baffle (450).
6. a kind of charging equipment for warm and hot forging technique according to claim 4, it is characterised in that:The guide platform (224) two sides are fixed with guardrail (225).
7. a kind of charging equipment for warm and hot forging technique according to claim 1, it is characterised in that:The discharge baffle (253) upper end is fixedly connected by spring (255) with the furnace body (210) roof.
8. a kind of charging equipment for warm and hot forging technique according to claim 1, it is characterised in that:It is kept off in the discharging The two sides of plate (253), furnace body (210) the roof inside are fixed with vertical the second guide plate (256), and two described second are led It is close to the side wall of the discharge baffle (253) to the side wall of plate (256).
9. a kind of charging equipment for warm and hot forging technique according to claim 1, it is characterised in that:On the heating slope The top in road (240), furnace body (210) inner sidewall are fixed with top plate (241), the top plate (241) and the corresponding heating The shape in ramp (240) is adapted, and the upper surface of each top plate (241), the lower surface for heating ramp (240) are equipped with Heater strip (242).
CN201810935692.7A 2018-08-16 2018-08-16 A kind of charging equipment for warm and hot forging technique Pending CN108889893A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810935692.7A CN108889893A (en) 2018-08-16 2018-08-16 A kind of charging equipment for warm and hot forging technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810935692.7A CN108889893A (en) 2018-08-16 2018-08-16 A kind of charging equipment for warm and hot forging technique

Publications (1)

Publication Number Publication Date
CN108889893A true CN108889893A (en) 2018-11-27

Family

ID=64354543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810935692.7A Pending CN108889893A (en) 2018-08-16 2018-08-16 A kind of charging equipment for warm and hot forging technique

Country Status (1)

Country Link
CN (1) CN108889893A (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070063923A (en) * 2005-12-16 2007-06-20 주식회사 포스코 Apparatus for supplying strips into a heating furnace automatically
CN201628480U (en) * 2010-01-29 2010-11-10 俞小元 Metal ingot feeding mechanism
CN101879574A (en) * 2010-07-06 2010-11-10 杨少华 Heating furnace before forging
CN102876873A (en) * 2012-09-17 2013-01-16 太原通泽重工有限公司 Feeding device of inclined-bottom heating furnace
CN203177641U (en) * 2013-04-26 2013-09-04 宁波盛发铜业有限公司 Automatic copper bar heating furnace
CN103350884A (en) * 2013-07-17 2013-10-16 江苏宏宝五金股份有限公司 Metal rod automatic feeding device for heating furnace
CN103769525A (en) * 2012-10-23 2014-05-07 丹阳市利普机械配件有限公司 Inclined forging medium-frequency furnace heating device
CN203629286U (en) * 2013-11-19 2014-06-04 重庆傲典工业炉有限公司 Improved automatic discharging type furnace with oblique bottom
CN105033160A (en) * 2015-08-19 2015-11-11 浙江博雷重型机床制造有限公司 Forging feeding method
CN205393441U (en) * 2016-02-15 2016-07-27 刘兴军 Magnesium alloy automobile wheel hub forging apparatus
CN205537100U (en) * 2016-01-22 2016-08-31 南京宝泰特种材料股份有限公司 Oblique end stove dynamic sending machine
CN206019294U (en) * 2016-08-23 2017-03-15 无锡市源昌机械制造有限公司 Copper rod heating furnace
CN207090468U (en) * 2017-08-12 2018-03-13 山东高强紧固件有限公司 Tappet automatic charging device

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070063923A (en) * 2005-12-16 2007-06-20 주식회사 포스코 Apparatus for supplying strips into a heating furnace automatically
CN201628480U (en) * 2010-01-29 2010-11-10 俞小元 Metal ingot feeding mechanism
CN101879574A (en) * 2010-07-06 2010-11-10 杨少华 Heating furnace before forging
CN102876873A (en) * 2012-09-17 2013-01-16 太原通泽重工有限公司 Feeding device of inclined-bottom heating furnace
CN103769525A (en) * 2012-10-23 2014-05-07 丹阳市利普机械配件有限公司 Inclined forging medium-frequency furnace heating device
CN203177641U (en) * 2013-04-26 2013-09-04 宁波盛发铜业有限公司 Automatic copper bar heating furnace
CN103350884A (en) * 2013-07-17 2013-10-16 江苏宏宝五金股份有限公司 Metal rod automatic feeding device for heating furnace
CN203629286U (en) * 2013-11-19 2014-06-04 重庆傲典工业炉有限公司 Improved automatic discharging type furnace with oblique bottom
CN105033160A (en) * 2015-08-19 2015-11-11 浙江博雷重型机床制造有限公司 Forging feeding method
CN205537100U (en) * 2016-01-22 2016-08-31 南京宝泰特种材料股份有限公司 Oblique end stove dynamic sending machine
CN205393441U (en) * 2016-02-15 2016-07-27 刘兴军 Magnesium alloy automobile wheel hub forging apparatus
CN206019294U (en) * 2016-08-23 2017-03-15 无锡市源昌机械制造有限公司 Copper rod heating furnace
CN207090468U (en) * 2017-08-12 2018-03-13 山东高强紧固件有限公司 Tappet automatic charging device

Similar Documents

Publication Publication Date Title
CN103862672B (en) A kind of plastic grain extrudes welding machine
CN107931863B (en) Full-automatic feeding machine
CN203540811U (en) Automatic gluing machine
CN208342207U (en) The automatic mounting production line of fire extinguisher handle
CN107098142A (en) A kind of nail polish packaging production line hollow bottle apparatus for placing
CN2782704Y (en) Fully automatic rotary conveying type annealing furnace
CN109079518B (en) Screen plate bending welding machine
CN108889893A (en) A kind of charging equipment for warm and hot forging technique
CN207255616U (en) A kind of slide bullet pitches assembly equipment
CN109455512A (en) Steelframe tubing feeding device
CN219234211U (en) Automatic circulating flame brazing assembly line
CN212418496U (en) Full-lamination display screen gluing device
CN108581442A (en) Barrel of Hydraulic Cylinders bottom valve press-loading apparatus and its processing technology
CN207077184U (en) A kind of automatic assembly line of LED planar lamp
CN215217153U (en) Metal melting furnace with vertical filling device
CN106623750B (en) A kind of turbine blade formation system
CN106541071B (en) A kind of turbine blade molding machine
CN212041310U (en) Heating equipment suitable for powder spraying of oversized metal workpiece
CN211387599U (en) Full-automatic clamping machine for air conditioner copper pipe elbow welding spring
CN209601536U (en) Go up and down transfer mechanism
CN203908288U (en) Automatic feeding device for reverberating furnace
CN209242105U (en) A kind of conveying device of automobile roof liner automatic assembly line
CN208290016U (en) Automatic loading and unloading device based on plate cutting
CN107364150B (en) Rubber handle material arranging, conveying and heating equipment
CN205917304U (en) Automatic quenching device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181127

RJ01 Rejection of invention patent application after publication