CN206019294U - Copper rod heating furnace - Google Patents

Copper rod heating furnace Download PDF

Info

Publication number
CN206019294U
CN206019294U CN201620921108.9U CN201620921108U CN206019294U CN 206019294 U CN206019294 U CN 206019294U CN 201620921108 U CN201620921108 U CN 201620921108U CN 206019294 U CN206019294 U CN 206019294U
Authority
CN
China
Prior art keywords
copper rod
heating
raceway
heating furnace
copper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620921108.9U
Other languages
Chinese (zh)
Inventor
王伟
唐志明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI YUANCHANG MACHINERY CO Ltd
Original Assignee
WUXI YUANCHANG MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI YUANCHANG MACHINERY CO Ltd filed Critical WUXI YUANCHANG MACHINERY CO Ltd
Priority to CN201620921108.9U priority Critical patent/CN206019294U/en
Application granted granted Critical
Publication of CN206019294U publication Critical patent/CN206019294U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tunnel Furnaces (AREA)
  • Heat Treatments In General, Especially Conveying And Cooling (AREA)

Abstract

The utility model discloses a kind of copper rod heating furnace, including heating furnace body, the heating furnace body interior is provided with heating furnace, multiple electroheat pairs are installed in the bore wall of the heating furnace top, the heating furnace lower end is provided with twice copper rod heating raceway, that is the first copper rod heating raceway and the second copper rod heating raceway, heating wire is equipped with the first copper rod heating raceway and second copper rod heating raceway, the first copper rod heating raceway is provided with a heating chamber with second copper rod heating raceway cohesive end, the heating chamber upper end offers a blanking port, the blanking port side is also equipped with a copper rod and shakeouts pressing plate, the heating chamber bottom end is equipped with the heating wire.By the way, this utility model can improve setting multiple tracks hot spot in the heating furnace efficiency of heating surface, heating furnace and copper rod is heated, copper rod energy continuous heating when in heating furnace so that can be directly used in extruder extruding after copper rod heating.

Description

Copper rod heating furnace
Technical field
This utility model is related to heating furnace field, more particularly to a kind of copper rod heating furnace.
Background technology
In metallurgical industry, heating furnace is to the equipment for being rolled into forging temperature by material or workpiece heat.Heating furnace should With many throughout oil, chemical industry, metallurgy, machinery, heat treatment, surface treatment, building materials, electronics, material, light industry, daily use chemicals, pharmacy etc. Industry field.There was only preheating section and bringing-up section for heating the stove of light section material base.Continuous furnace is usually used gas combustion Material, heavy oil or fine coal, some burning block coals.In order to effectively utilize waste-gas heat, preheated air and coal gas are installed in the flue Heat exchanger, or waste heat boiler is installed.But traditional heating furnace is that the heater for installing single-station in heating furnace comes to gold Category bar heating, efficiency is very low, not only results in energy waste, also allows the metal bar material can not abundant heat treated.
Utility model content
This utility model is mainly solving the technical problems that provide a kind of copper rod heating furnace, it is possible to increase heating stove heat effect Arrange multiple tracks hot spot to heat copper rod in rate, heating furnace, copper rod can continuous heating when in heating furnace.
For solving above-mentioned technical problem, the technical scheme that this utility model is adopted is:A kind of copper rod heating furnace is provided, Including heating furnace body, the heating furnace body front end is provided with copper rod conveying mechanism, and the heating furnace body rear end is provided with closure door Discharging platform is installed by mechanism, closure door mechanism lower end, and the heating furnace body interior is provided with heating furnace, the heating furnace top Multiple electroheat pairs are installed in the bore wall of end, the heating furnace lower end is provided with twice copper rod heating raceway, i.e. the first copper rod is heated Raceway and the second copper rod heating raceway, are equipped with electricity on the first copper rod heating raceway and second copper rod heating raceway Heated filament, height setting straggly between the first copper rod heating raceway and second copper rod heating raceway, first copper rod Heating raceway heats raceway, the first copper rod heating raceway and second copper rod heating raceway rank higher than second copper rod Connect end and one heating chamber is installed, the heating chamber upper end offers a blanking port, and the blanking port side is also equipped with one Copper rod shakeouts pressing plate, and the heating chamber bottom end is equipped with the heating wire, and the heating chamber rear end is additionally provided with opening and closing lock Door, the opening and closing shutter upper end connect Pneumatic extension cylinder, and the heating chamber rear end drives the opening and closing by Pneumatic extension cylinder Gate is lifted and is opened and closed.
In one preferred embodiment of this utility model, the first copper rod heating raceway is heated located at second copper rod Raceway front end, the first copper rod heating raceway are downward towards the closure door mechanism tilts with second copper rod heating raceway Arrange, relative level between the first copper rod heating raceway and second copper rod heating raceway.
In one preferred embodiment of this utility model, the copper rod shakeouts pressing plate upper end and is provided with lift drive mechanism, Lift drive mechanism upper end is fixed on the heating chamber top inner side, and it is relative with lift drive mechanism that the copper rod shakeouts pressing plate It is vertically arranged, the copper rod shakeouts pressing plate and copper rod heating raceway relative level is arranged.
In one preferred embodiment of this utility model, the blanking port is opened in the first copper rod heating raceway rear end Lower section, the copper rod tumbled on the first copper rod heating raceway are fallen in the heating chamber by the blanking port.
In one preferred embodiment of this utility model, the heating furnace body front end offers charging aperture, charging aperture with The copper rod conveying mechanism connection, the heating furnace body rear end offer discharging opening, and the closure door mechanism is connected to discharging opening On.
The beneficial effects of the utility model are:This utility model can be improved in the heating furnace efficiency of heating surface, heating furnace and be arranged Multiple tracks hot spot is heated to copper rod, copper rod energy continuous heating when in heating furnace so that can be directly after copper rod heating Extrude for extruder.
Description of the drawings
For the technical scheme being illustrated more clearly that in this utility model embodiment, below will be to needed for embodiment description Accompanying drawing to be used is briefly described, it should be apparent that, drawings in the following description are only some realities of the present utility model Example is applied, for those of ordinary skill in the art, on the premise of not paying creative work, can be with according to these accompanying drawings Other accompanying drawings are obtained, wherein:
Fig. 1 is the structural representation of one preferred embodiment of this utility model copper rod heating furnace;
Fig. 2 is the structural representation of one preferred embodiment of shown heating chamber;
In accompanying drawing, the labelling of each part is as follows:1st, furnace body is heated;2nd, copper rod conveying mechanism;3rd, seal up a door mechanism; 4、 Discharging platform;5th, heating furnace;6th, electroheat pair;7th, copper rod heating raceway;701st, the first copper rod heating raceway;702nd, second Copper rod heats raceway;8th, heating wire;9th, heating chamber;10th, blanking port;11st, copper rod shakeouts pressing plate;12nd, opening and closing shutter.
Specific embodiment
Technical scheme in this utility model embodiment will be clearly and completely described below, it is clear that described Embodiment is only a part of embodiment of the present utility model, rather than whole embodiments.Enforcement in based on this utility model Example, all other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made are belonged to The scope of this utility model protection.
Fig. 1 and Fig. 2 is referred to, this utility model embodiment includes:
A kind of copper rod heating furnace, including heating furnace body 1,1 front end of the heating furnace body is provided with copper rod conveying mechanism 2, 1 rear end of the heating furnace body is provided with closure door mechanism 3, and discharging platform 4, the heating furnace body 1 are installed 3 lower end by the closure door mechanism Inside is provided with heating furnace 5, is provided with multiple electroheat pairs 6,5 lower end of the heating furnace in 5 top bore wall of the heating furnace It is provided with twice copper rod heating raceway 7, i.e. the first copper rod heating raceway 701 and the second copper rod heating raceway 702, first copper rod Heating raceway 701 is heated with second copper rod and is equipped with heating wire 8 on raceway 702, and first copper rod heats raceway 701 Height setting straggly between raceway 702 is heated with second copper rod, the first copper rod heating raceway 701 is higher than described second Copper rod heats raceway 702, and the first copper rod heating raceway 701 is provided with second copper rod heating 702 cohesive end of raceway One heating chamber 9,9 upper end of the heating chamber offer a blanking port 10, and 10 side of the blanking port is also equipped with a copper rod Pressing plate 11 is shakeout, 9 bottom end of the heating chamber is equipped with the heating wire 8, and 9 rear end of the heating chamber is additionally provided with opening and closing lock Door 12,12 upper end of the opening and closing shutter connect Pneumatic extension cylinder, and 9 rear end of the heating chamber is driven described by Pneumatic extension cylinder Opening and closing shutter 12 is lifted and is opened and closed.
In addition, first copper rod heating raceway 701 is located at second copper rod heating raceway, 702 front end, described first Copper rod is heated raceway 701 and is arranged towards the closure door mechanism 3 diagonally downward with second copper rod heating raceway 702, described Relative level between first copper rod heating raceway 701 and second copper rod heating raceway 702.
In addition, the copper rod shakeouts 11 upper end of pressing plate is provided with lift drive mechanism, lift drive mechanism upper end is fixed on 9 top inner side of the heating chamber, the copper rod are shakeout pressing plate 11 and are arranged with lift drive mechanism Relative vertical, the copper rod stand Flat clamp 11 and the copper rod 7 relative level of heating raceway are arranged.
In addition, the blanking port 10 is opened in below 701 rear end of the first copper rod heating raceway, first copper rod adds The copper rod tumbled on hot raceway 701 is fallen in the heating chamber 9 by the blanking port 10.
In addition, 1 front end of the heating furnace body offers charging aperture, charging aperture is connected with the copper rod conveying mechanism 2, institute State 1 rear end of heating furnace body and offer discharging opening, the closure door mechanism 3 is connected on discharging opening.
Operation principle of the present utility model is to arrange copper rod conveying mechanism 2 in 1 front end of heating furnace body, heats furnace body 1 Rear end is provided with closure door mechanism 3, and 1 front end of heating furnace body offers charging aperture, and charging aperture is connected with copper rod conveying mechanism 2, heating 1 rear end of furnace body offers discharging opening, and closure door mechanism 3 is connected on discharging opening, and discharging platform 4, heating are installed 3 lower end by closure door mechanism Heating furnace 5 being provided with inside furnace body 1, multiple electroheat pairs 6 being installed in 5 top bore wall of heating furnace, copper rod is conveyed by copper rod Mechanism 2 is delivered on heating 1 charging aperture of furnace body, and copper rod is derived from discharging opening after heating furnace body 1 and heating, and copper rod is led When going out to heat furnace body 1, the closure door mechanism 3 for heating 1 rear end of furnace body opens, and copper rod is accepted by discharging platform 4 and transported.
5 lower end of heating furnace is provided with twice copper rod heating raceway 7, i.e. the first copper rod heating raceway 701 and the second copper rod add Heating wire 8, first copper rod are equipped with hot raceway 702, the first copper rod heating raceway 701 and the second copper rod heating raceway 702 Height setting straggly between heating raceway 701 and the second copper rod heating raceway 702, the first copper rod heating raceway 701 is higher than second Copper rod heats raceway 702, and the first copper rod heating raceway 701 is located at 702 front end of the second copper rod heating raceway, the heating rolling of the first copper rod Road 701 and the second copper rod heat that raceway 702 is equal to be arranged diagonally downward towards closure door mechanism 3, the first copper rod heating raceway 701 and the Relative level between two copper rods heating raceway 702, the first copper rod heating raceway 701 and the second copper rod heating 702 cohesive end of raceway One heating chamber 9 is installed, 9 upper end of heating chamber offers a blanking port 10, and blanking port 10 is opened in the heating rolling of the first copper rod Below 701 rear end of road, the copper rod tumbled on the first copper rod heating raceway 701 is fallen in heating chamber 9 by blanking port 10, is fallen 10 side of material mouth is also equipped with a copper rod and shakeouts pressing plate 11, and copper rod shakeouts 11 upper end of pressing plate and is provided with lift drive mechanism, lifting Drive mechanism upper end is fixed on 9 top inner side of heating chamber, and copper rod is shakeout pressing plate 11 and arranged with lift drive mechanism Relative vertical, Copper rod shakeouts pressing plate 11 and copper rod 7 relative level of heating raceway is arranged, and 9 bottom end of heating chamber is equipped with heating wire 8, heating chamber 9 rear end of room is additionally provided with opening and closing shutter 12, and 12 upper end of opening and closing shutter connects Pneumatic extension cylinder, and 9 rear end of heating chamber is stretched by pneumatic Contracting cylinder driven opening/closing gate 12 is lifted and is opened and closed, first bronze medal of the copper rod after heating furnace body 1 is entered, on heating furnace 5 Rod heating raceway 701 and the second copper rod heating raceway 702 are transmitted, on the electroheat pair 6 on heating furnace 5 and copper rod heating raceway 7 Heating wire 8 equal copper rod can be heated, and copper rod through the first copper rod heat raceway 701 and the second copper rod heating raceway Can drop to when between 702 in heating chamber 9,9 bottom end of heating chamber is also equipped with heating wire 8 and copper rod is heated so that copper Rod uninterruptedly can be heated in heating furnace body 1, and 9 upper end of heating chamber is also installed copper rod and shakeouts pressing plate 11 and copper rod can be carried out Stand pressure, copper rod can be heated on the heating wire 8 of 9 bottom end of heating chamber, and in heating furnace body 1, multiple tracks hot spot is to copper Rod is heated, copper rod energy continuous heating when in heating furnace body 1 so that can be directly used in extruder after copper rod heating Extruding.
Embodiment of the present utility model is the foregoing is only, the scope of the claims of the present utility model is not thereby limited, every The equivalent structure that is made using this utility model description or equivalent flow conversion, or directly or indirectly it is used in other phases The technical field of pass, is included in scope of patent protection of the present utility model in the same manner.

Claims (5)

1. a kind of copper rod heating furnace, including heating furnace body, it is characterised in that the heating furnace body front end is provided with copper rod conveying Mechanism, the heating furnace body rear end are provided with closure door mechanism, and discharging platform, the heating furnace body are installed in closure door mechanism lower end Inside is provided with heating furnace, is provided with multiple electroheat pairs in the bore wall of the heating furnace top, and the heating furnace lower end is provided with Twice copper rod heats raceway, i.e. the first copper rod heating raceway and the second copper rod heating raceway, first copper rod heating raceway with Heating wire is equipped with the second copper rod heating raceway, and the first copper rod heating raceway and second copper rod heating are rolled Height setting straggly between road, the first copper rod heating raceway heat raceway, first copper rod higher than second copper rod Heating raceway is provided with a heating chamber with second copper rod heating raceway cohesive end, and the heating chamber upper end offers one Blanking port, the blanking port side are also equipped with a copper rod and shakeout pressing plate, and the heating chamber bottom end is equipped with the electric heating Silk, the heating chamber rear end are additionally provided with opening and closing shutter, and the opening and closing shutter upper end connects Pneumatic extension cylinder, the heating chamber Rear end drives the opening and closing shutter lifting by Pneumatic extension cylinder and is opened and closed.
2. copper rod heating furnace according to claim 1, it is characterised in that the first copper rod heating raceway is located at described the Two copper rods heating raceway front end, the first copper rod heating raceway is with second copper rod heating raceway towards the closure door machine Structure is arranged diagonally downward, relative level between the first copper rod heating raceway and second copper rod heating raceway.
3. copper rod heating furnace according to claim 1, it is characterised in that the copper rod shakeouts pressing plate upper end and is provided with lifting Drive mechanism, lift drive mechanism upper end are fixed on the heating chamber top inner side, and the copper rod is shakeout pressing plate and driven with lifting Motivation structure Relative vertical is arranged, and the copper rod shakeouts pressing plate and copper rod heating raceway relative level is arranged.
4. copper rod heating furnace according to claim 1, it is characterised in that the blanking port is opened in first copper rod and adds Below hot raceway rear end, the copper rod tumbled on the first copper rod heating raceway falls to the heating chamber by the blanking port Indoor.
5. copper rod heating furnace according to claim 1, it is characterised in that the heating furnace body front end offers charging Mouthful, charging aperture is connected with the copper rod conveying mechanism, and the heating furnace body rear end offers discharging opening, and the closure door mechanism connects It is connected on discharging opening.
CN201620921108.9U 2016-08-23 2016-08-23 Copper rod heating furnace Withdrawn - After Issue CN206019294U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620921108.9U CN206019294U (en) 2016-08-23 2016-08-23 Copper rod heating furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620921108.9U CN206019294U (en) 2016-08-23 2016-08-23 Copper rod heating furnace

Publications (1)

Publication Number Publication Date
CN206019294U true CN206019294U (en) 2017-03-15

Family

ID=58250476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620921108.9U Withdrawn - After Issue CN206019294U (en) 2016-08-23 2016-08-23 Copper rod heating furnace

Country Status (1)

Country Link
CN (1) CN206019294U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106123581A (en) * 2016-08-23 2016-11-16 无锡市源昌机械制造有限公司 Copper rod heating furnace
CN108889893A (en) * 2018-08-16 2018-11-27 江西科明铜业有限公司 A kind of charging equipment for warm and hot forging technique
CN109321732A (en) * 2018-11-06 2019-02-12 杨胜 A kind of stainless steel bars heat treatment process for discharge method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106123581A (en) * 2016-08-23 2016-11-16 无锡市源昌机械制造有限公司 Copper rod heating furnace
CN106123581B (en) * 2016-08-23 2018-05-11 无锡市源昌机械制造有限公司 Copper rod heating furnace
CN108889893A (en) * 2018-08-16 2018-11-27 江西科明铜业有限公司 A kind of charging equipment for warm and hot forging technique
CN109321732A (en) * 2018-11-06 2019-02-12 杨胜 A kind of stainless steel bars heat treatment process for discharge method
CN109321732B (en) * 2018-11-06 2020-05-01 上海加宁新材料科技有限公司 Material supplying and discharging method for stainless steel bar heat treatment process

Similar Documents

Publication Publication Date Title
CN206019294U (en) Copper rod heating furnace
CN206469667U (en) A kind of energy-conserving and environment-protective mineral hot furnace for being easy to feed
CN106123581B (en) Copper rod heating furnace
CN205803560U (en) A kind of secondary aluminium stir-melting stove
CN206875956U (en) Variable capacity bench vehicle type electrical resistance furnace
CN207210329U (en) Coal drying and preheating device and coking equipment
CN106091690B (en) The metal bar material heating furnace of efficient feeding
CN2564574Y (en) Vertical coke oven
CN2410303Y (en) Multichamber continuous annealing furnace
CN206019325U (en) The metal bar material heating furnace of efficient feeding
CN205537100U (en) Oblique end stove dynamic sending machine
CN202582151U (en) Industrial furnace for smelting nonferrous metal
CN205798326U (en) A kind of forge furnace
CN205955543U (en) Steel pipe coating hot -blast furnace electric lift door
CN206019292U (en) The copper rod heating furnace of internal pressing copper rod heating
CN105627745B (en) A kind of metal smelting furnace
CN207688636U (en) A kind of copper rod heating furnace
CN206875967U (en) A kind of hardware smelts melting furnace
CN206073685U (en) A kind of rare earth processing oxidation kiln
CN207006835U (en) A kind of sliding desk type modularization dynamic calcining furnace
CN206073712U (en) A kind of closed large-size workpiece resistance-heated furnace of auto-stitching
CN205482335U (en) Coke hydraulic pressure verts to cast and melts aluminium stove
CN205347535U (en) Heating furnace
CN104764329B (en) A kind of preheating device of smelting non-ferrous metal
CN212109524U (en) Overhead natural gas tapping expansion furnace of preheating furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170315

Effective date of abandoning: 20180511

AV01 Patent right actively abandoned